About this file

This document is a Project Specification and Price Sheet (PSPS) issued by the Arizona Department of Economic Security's Division of Developmental Disabilities (DDD), located in Phoenix, Arizona. The document is specifically a home modification service contract template designed for approved contractors to submit pricing and project details for accessibility modifications for individuals with developmental disabilities.

The contract covers comprehensive home modification services, focusing on bathroom accessibility improvements, including removing existing shower/tub units, installing curbless shower pans, ceramic tile work, plumbing modifications, grab bar installations, and flooring replacements. The specification provides detailed line-item requirements for each modification component, with contractors required to submit both material and labor costs for each specified item. Key specifications include ADA-compliant design elements, waterproofing requirements, and specific installation guidelines. Contractors are expected to complete projects within 90 days, provide completion documentation including photographs, offer a two-year warranty on materials and workmanship, and adhere to strict installation and professional conduct standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DDD Instructions (INTERAL ONLY)

Instructions on how to use the Project Specification and Pricing Sheet - DDD
1. Save a copy of the file to your desktop, do NOT save over the template.

2. Notice there are three (3) tabs in blue. These are the tabs that will be used by the contractor.

3. Ensure the holiday dates are updated for the current year in the Holidays tab (see instructions below).

4. Go to the Cover Page tab
A. Fill in the yellow areas:
A1. Date of Request
A2. DDD Project Number
A3. Home Modification Project General Information
5. Go to the PP2 tab
A. Fill in the yellow areas: Home Visit Date
B. Check NO or YES on the Special Insurance Claimer area
C. Adjust rows 21 to 46 accordingly
6. Review your document. Ready to save?
A. Save file to your desktop, not the template.
B. Hide the holidays and DDD Instructions tabs (if visible)
C. To go the Cover Page tab, Review, and Protect Sheet to lock the cells, select a password

D. To go the PP2 tab, Review and Protect Sheet to lock the cells, select a password.

7. Save the file as XXXX. The file is now locked and ready for the contractor to fill out.

How to maintain the Holiday dates – DDD Administration POC
1. Go to the Holidays tab.

2. Ensure the Holidays (YEAR) column has the updated holiday dates for the year. Enter in the yellow highlighted cells.

Holidays

Date of RequestDays (Working)Submittal Due Date
12/31/9951/6/00
Holidays FY 2023/2024
11/1/25
21/15/24
32/19/24
45/27/24
57/4/24
69/2/24
710/14/24
811/11/24
911/28/24
1012/25/24

Cover Page

Katie Hobbs
GovernorAngie Rodgers

Director

PSPS Prepared by:First and Last Name, CEAC, Home Modification Specialist
Cell: Email:
Date of Request:DDD PROJECT NUMBER:
Home Visit date:SUBMITTAL DUE DATE:

As an approved Contractor with the Arizona Department of Economic Security, Division of Developmental Disabilities (Division), your organization is invited to submit a price for the home modification project detailed on the following page(s). Price submittals must be completed as instructed below using the enclosed form(s), and submitted to the Division by the SUBMITTAL DUE DATE listed above. Price submittals for this home modification project received after the above date will not be considered.

Instructions
Review all enclosed documents and provide a Material Cost and a Labor Cost for each Item Number. The Division reserves the right to reject price submittals due to incomplete or missing information, or prices submitted on forms other than the enclosed form(s). The above DDD PROJECT NUMBER must appear on all price submittals, referenced in correspondence, and in the subject line on all related emails.
PROJECT COMPLETION DUE DATE:
If your organization is selected by the Division to provide services for this home modification project, this home modification project must be finished by the above COMPLETION DATE. By submitting a price for this home modification project, the Contractor confirms that they have the resources available and the ability to complete the home modification project as specified, by the Completion Date.
Home Modification Project General Information

*If a name or address is not identified below, contact the C.E.A.C. regarding ACP (Address Confidentiality Program) participants.

*Address:
*Phone:
*Family Contact:
Support Coordinator:
SC Supervisor:
Additional Information:
In accordance to the Scope of Work for Home Modification Service, Contractor assumes all responsibility for obtaining all applicable permits or licenses and providing all licensed Subcontractors, materials, tools and supplies for the Home Modification project.
Contractor’s total price is all inclusive, which means the submitted price shall include all costs associated with the provision of the service including but not limited to: salaries, operating costs, insurance, travel to and from the work site, Subcontractor expenses, licenses and permits, rentals, equipment, materials, tools, supplies and preparation of billing and reports. The Department will not pay these or any other costs separately.
Changes to any of the specifications listed in this Project Specification and Pricing Sheet are not permitted unless authorized by the Division in writing.

Contractor Name: contractor name here

Comments:

Version 01/29/2024

HOME MODIFICATION SERVICE

PROJECT SPECIFICATION AND PRICE SHEET (PSPS)

Arizona Department of Economic Security Division of Developmental Disabilities 4000 N. Central Ave. Suite 400 Phoenix, AZ 85012 DHomeModifications@azdes.gov

Send all price submittals to Fax to 602-666-8807 or email to DHomeModifications@azdes.gov prior to the above SUBMITTAL DUE DATE.

If the Contractor does not wish to submit a price for this project, please email a reply designating “No Price”, or complete the below and check the NO PRICE box at right, and send this page only to the Division at Fax: 602-666-8807 or Email: DHomeModifications@azdes.gov

PSPS

Remove this text before pasting your Company's Letterhead Logo within this cell.

: Click within the cell of Row 1 and Column F to paste your Company's Letterhead Logo within this cell.

PROJECT SPECIFICATION AND PRICE SHEET (PSPS)

PSPS Prepared by:First and Last Name, CEAC, Home Modification Specialist
Cell: Email:
[Company Name]Invoice Date:
[Provider ID:]
[Principle Name]DDD Project Number:
[Street Address]
[City, ST ZIP Code]Home Visit Date:
[Phone]
Project Completion Due Date:

Actual Completion Date:

Check box below to indicated which document you are submitting:
FALSEFALSEFALSEFALSE
NOTE:Pricing must be provided for MATERIAL COST and LABOR COST for each ITEM NUMBER below.

Selected Contractor shall be responsible for adhering to all Special Instructions listed below each ITEM NUMBER.

ITEM
NUMBERSPECIFICATION DESCRIPTIONMATERIAL
COSTLABOR
COSTLINE

TOTAL

EXISTING CONDITIONS Structure type: Stucco frame construction home; 2-Story house Foundation: concrete slab Location of bathroom modification: Upstairs master bathroom Existing bathroom tub/shower enclosure material: synthetic cultured marble panels Location of accessible entry: front entry Home is owned by the member-member’s family Note: Always Observe Universal Building Codes, electrical changes comply with the NEC requirements, and the Tile Counsel of North America guidelines for barrier free pan and shower construction.when applicable.

See Picture Tab for photos of existing and proposed sketches they apply

1Accessible-Bathing Area; Two-Wall Curb-Less Shower: Provide a barrier-free bathing area for a Wheeled Shower Chair: Remove & dispose of existing gardentub/shower stall combo, glass walls/doors and surround.
ITEM 1 Special Instructions:Provide completion pictures within three (3) business days of completion of the Home Modification Project.
1AAccessible-Bathing Area; Curb-Less Shower: Prep floor area to accept Wheelchair accessible prefab shower pan with two-wall surround; protect shower area walls with durable waterproof wallboard backer material.
ITEM 1A Special Instructions:Provide completion pictures within three (3) business days of completion of the Home Modification Project.
1BAccessible-Bathing Area; Two-Wall Curb-Less Shower: Provide and install a Curbless Fiberglass Shower Pan. Shower Pan shall be accessible for a wheeled shower chair; has an ADA certified nonslip textured surface; is sloped for appropriate drainage; and is not less than 42” deep. Estimated/recommended shower pan size is 60” X 42”. The shower pan shall have a Center Drain pan. Ensure shower pan entry is level with (To be installed) ceramic tile bathroom floor.
ITEM 1B Special Instructions:Provide W all rough-in and waterproofing pictures within three (3) business days of completion of the Home Modification Project.
1CAccessible-Bathing Area; Two-Wall Curb-Less Shower: Protect shower area walls with durable waterproof wallboard backer material and waterproof membrane at shower pan joint (Red Guard or similar product acceptable, apply product 12” up walls or to TCNA recommended height with fiberglass reinforcement for wall corners and at joint to the pan); Upon tear out reinforce walls for grab bar placement and construct waterproof area for shelf / niche.
ITEM 1C Special Instructions:Provide completion pictures within three (3) business days of completion of the Home Modification Project.
1DAccessible-Bathing Area; Two-Wall Curb-less Shower: Provide a barrier-free bathing area for a Wheeled Shower Chair: Provide and install ceramic tile surround for two-wall shower. Provide and install accessible soap/shampoo Shelve/Niche. Contractor to provide color/pattern choices to homeowner ensuring choice is within contractor's budgeted tile cost.
ITEM 1D Special Instructions:Provide completion pictures within three (3) business days of completion of the Home Modification Project.
1EAccessible-Bathing Area; Two-Wall Curb-Less Shower: Match existing finishes. Repair, patch drywall to edge of new curbless shower unit. Finish drywall surfaces to ceiling and adjoining corners, texture, prime and topcoat/paint (2coats) area of modification to nearest corners (ceiling and adjoining walls). Match paint color and sheen. DO NOT USE Wood Trim molding. If a factory supplied tile trim metal /plastic to be used verify that dimensions do not interfere with installation of other items specified for the modifications prior to installation.
ITEM 1E Special Instructions:Provide completion pictures within three (3) business days of completion of the Home Modification Project.
1FAccessible-Bathing Area; Double Shower Curtain System: Provide and install three heavy duty vinyl-weighted shower curtains/liners to be placed side by side on one-piece 90 degree curtain rod with screws to hold for secure attachment. Use curtain hangers with rollers. The curtain/liner requirements; 52W X 78L” Stall Size, should be clear deluxe weight vinyl, have oversized rust proof grommets and Suction Anchors. Ensure system is mounted inside of shower pan against the collapsible water dam and the ends of the curtains are within a ¼” of shower pan.
ITEM 1F Special Instructions:Provide completion pictures within three (3) business days of completion of the Home Modification Project.
1GAccessible -Bathing Area; Two-Wall Curb-Less Shower; Provide a barrier-free bathing area for a Wheeled Shower Chair: Provide and install an approved collapsible water stopper kit/water dam on the shower pan. Ensure unit is sealed with manufactured end caps. Apply the water stopper and end caps with marine grade epoxy to prevent water intrusions and enhance 'waterproofness'.
ITEM 1G Special Instructions:Provide completion pictures within three (3) business days of completion of the Home Modification Project.
2Accessible-Bathing Area; Plumbing: Resize and replace Shower waste line to 2” with ‘P-Trap’ from shower drain to include, when necessary, 'Sani-T' connection at main line, Center Drain.
ITEM 2 Special Instructions:Provide completion and plumbing rough-in pictures within three (3) business days of completion of the Home Modification Project.
2AAccessible-Bathing Area; Plumbing: Provide and install a Single lever Pressure-Balanced Anti-scald control valve, Re-centering supply lines at location of new shower valve and handheld shower wand connection.
ITEM 2A Special Instructions:Provide picture of valve and plumbing rough-in pictures and completion pictures within three (3) business days of completion of the Home Modification Project.
2BAccessible-Bathing Area; Plumbing: Provide and install a Handheld Shower Wand complete w/safety strap, a 7’ extra-long soft flex hose, easy turn spray control and flow reducing pause control.
ITEM 2B Special Instructions:Provide completion pictures within three (3) business days of completion of the Home Modification Project.
2CAccessible-Bathing Area; Plumbing: Provide two points of attachment for handheld shower wand; one at main showerhead spout and the second on wall or on grab bar. Provide the slide bar type as second point of attachment when requested by member. Consult with member on the placement of the second attachment point.
ITEM 2C Special Instructions:Provide completion pictures within three (3) business days of completion of the Home Modification Project.
2DAccessible-Bathing Area; Plumbing: Cap-off supply lines (behind walls) and drain lines (below floor) to shower stall upon removal of the shower stall. Refer to CADD drawing.
ITEM 2D Special Instructions:Provide completion pictures within three (3) business days of completion of the Home Modification Project.
ITEM 3 General calloutAccessible-Bathing Area; Grab Bars, P.T. Rail Hinged, Assist Poles, Hand Rails:

Always ask and allow member / guardian to participate in placement of Bars, P.T. Rails, Assist Poles, and Hand Rails; and utilize Occupational Therapist (O.T.) or Physical Therapist (P.T.) Report if available. Work with member and caregiver on appropriate position, placement and location of all grab bars. When Installing Grab Bars, PT Rails, assist poles and handrails all mounting areas shall have appropriate wall substrate supports at all attachment points. Always install 2x6 minimum backer boards behind wall. Finish grab bar /handrail area: patch drywall, texture, prime and topcoat (2coats) area of modification to nearest corner of the ceiling and adjoining walls. 'Wing-It' mounting anchors may only be used when wall backing installation is not possible for all Grab Bar, PT Rail, Assist Pole and Handrail installations.

Handrails: The diameter or width of the gripping surfaces of a handrail shall be 1-¼” to 1-½” (32 mm to 38 mm) or an equivalent profile gripping surface. Rails shall have minimum 1/4” (6.4 mm) radius on gripping surface edges with non-grip edges on handrails shall have a minimum radius of 1/8 in (3.2 mm).

When handrails mounted on or beside wall, the space between the wall and the handrails shall be 1-1/2 in (38 mm). Handrails, walls or surfaces adjacent to it shall be free of any sharp or abrasive elements. Some field measurements required in home at the time of installation to ensure the proper placement of the handrails to meet the individual’s specific need.

To provide support and stability while accessing the member’s bathing and sleeping areas:

3AProvide and install a wall mounted pivoting and 5-locking positions dual rail (with minimum 17” long pivoting ‘looped’ arm and ‘L’ shaped anchoring arms) in shower area on lateral wall. (Similar or comparable to Dependa-bar). Consult with member/caregiver on location/placement of grab bar.
ITEM 3A Special Instructions:Provide completion pictures within three (3) business days of completion of the Home Modification Project.
3BProvide and install Handrails in Staircase.
ITEM 3B Special Instructions:Provide completion pictures within three (3) business days of completion of the Home Modification Project.
4Accessible-Bathing Area; Bathroom Flooring: Remove existing flooring (~90 SQ FT). Replace (~60 SQ FT) bathroom flooring with ceramic tile due to bathroom modifications. Replace baseboard to match as close as possible the existing baseboards.Provide color/pattern choice to homeowner ensuring choice is within contractor's budgeted tile cost.
ITEM 4 Special Instructions:Provide completion pictures within three (3) business days of completion of the Home Modification Project.
MATERIAL SUBTOTAL
TAX %0.00%
TAX AMOUNT$ - 0
MATERIAL TOTAL WITH TAX
LABOR SUBTOTAL
OVERHEAD / OPERATIONAL
Pricing prepared by:Date:NamePERMITS
GRAND TOTAL
Changes in the above specifications can only be made by the Division in writing.

Version 01/29/2024

PRICING

CHANGE ORDER

UNFORESEEN CIRCUMSTANCE

INVOICE

Pictures

Mod Service Acknowledgments

Home Modification Service Acknowledgements and understanding for the Member, Legal Responsible Person and Property Owner:
I understand and acknowledge that the Building Contractor is under contract with the Division to provide the home modification service according to the Home Modification Scope of Work (SOW) and the Project Specification and Price Sheet. I understand and acknowledge that the items outline below are not all inclusive and are just some requirements from the SOW.
Upgraded and Unauthorized Modifications:
I understand and acknowledge that the Building Contractor is under contract with the Division to provide the home modification service according to the Division's Home Modification Service Scope of Work (SOW) and Special Terms and Conditions. I understand and acknowledge that the items outline below are not all inclusive and are just some requirements from the SOW.

I acknowledge that I am not to make any request from the Contractor that will place the Contractor in a position that may violate any condition of the SOW and the Project Specification and Price Sheet, which include, but not limited to:

Entering into any agreement with the Contractors assigned to a Home Modification Project to perform any additional services; including upgrades to materials and/or equipment, which are not addressed on the Project Specification and Price Sheet.

Additional upgrades to materials and/or equipment used to complete specified modifications to increase the project’s cost will be considered unauthorized and will not be reimbursed by the Division.

Work done contrary to or in disregard of the service provisions listed in the Project Specification and Price Sheet, or any extra work done without prior written authorization, shall be considered to be unauthorized and at the expense of the Contractor and shall not be paid for by the Division. The Contractor may be ordered to remove and/or replace the unauthorized work at the Contractor's expense.

The Division will not be responsible for damages or cost of repairs to the residence due to any unauthorized work performed by the Contractor.

Service Requirements:
I will work collaboratively with the Contractor so the modifications can be, which include, but not limited to:

Schedule and provide all services between the hours of 8:00 a.m. and 5:00 p.m. Monday through Friday, excluding State Holidays, unless otherwise arranged with the homeowner/DDD Member or Legally Responsible Person.

The work is scheduled only when the DDD Member can be accompanied by a Legally Responsible Person or designated Responsible Adult (age 18 years of age or older).

I will contact my Support Coordinator/Home Modification Unit and /or Contractor, if the Contractor does not contact me within (7) calendar days of receiving the Notice of Selection, to schedule a start date for the modifications. I will work with the Contractor to schedule a start and completion date to finish project within the 90-day Completion Due Date from the date of the assessment..

Code of Conduct
I acknowledge that the Building Contractor, sub-contractor, which include, but not limited to:

Require all its Personnel to wear an identification badge, uniform or clothing with the Contractor’s or the Subcontractor’s name to identify themselves to individuals at the DDD Member’s residence. Only persons employed by the Contractor or Subcontractor personnel shall be allowed on the jobsite.

Perform work in a manner that minimizes disruption to the normal day-to-day routines of the DDD Member.

Take reasonable measures to minimize noise and ensure construction area is sealed to prevent dust migration through the DDD Member’s residence.

Keep all materials, equipment, and devices safe by the Contractor. Should the materials, equipment, or devices be lost, stolen, or damaged during the course of the project, the replacement of the items is the responsibly of the Contractor and shall not be the billed to the Division, Member, Legal Responsible Person or Property Owner.

Remove Contractor’s and Subcontractor(s) property and remaining materials, as applicable, from the DDD Member’s residence upon completion of the Home Modification Project.

Clean up and remove all trash and debris generated by the Home Modification Project from the DDD Member’s residence on a daily basis.

Will not dispose of trash and debris in the DDD Member’s, Legal Responsible Person’s or Property Owner’s trash.

When using property owners’ premises / landscaped area for preparation of building materials and demolition rubble, ensure to obtain permissions from property owner and protect surrounding area from overspray and debris by using tarps or similar means to maintain landscape integrity.

Restore the premises / landscaped area to its pre-construction state.

Provide instruction to the DDD Member and/or the Legally Responsible Person any information regarding the safe operation and maintenance of all equipment or building features installed.

Provide the DDD Member and/or the Legally Responsible Person with all operating instructions, manuals, and warranty information literature from the manufacturer.

Warranty
I acknowledge that the Building Contractor, sub-contractor, will provide warranty services including all materials and labor which include, but not limited to, as follows:

Warranty all equipment for two (2) year from the Home Modification Project completion date, or as provided by the manufacturer, whichever is greater.

Warranty all materials and workmanship for two (2) years from the Home Modification Project completion date, including all work performed by the Contractor Personnel or as deemed by AZ Registrar of Contractors (AROC).

I acknowledge that the workmanship of the modification is warrantied for two (2) years from the date the project is complete.

I am to contact the SC of any concerns/issues with a home modification provided by the Division within the 2-years after the project completion date, the SC must notify the Home Modification Unit of the concerns/issues. The Home Modification Unit will work with the family and the contractor who completed the work on the modifications to address/correct the issues.

If any modification issues are brought to the attention of the Home Modification Unit after the two (2) years from the project completion date, the Division will not pay to correct modification issues when the two-year warranty period has expired. These become the responsibility of the homeowner.

I acknowledge that the contractor is not responsible for corrections/repairs when the two-year warranty period has expired. These become the resonsibility of the homeowner.

I acknowledge that any workmanship correction and payment of modification issues becomes the homeowner’s responsibility after the two-year warranty expires.