BPM006394_Ninyo_and_Moore_.pdf
PDF 26 MB Posted
- Attached to
- Master Agreement AZ|CTR074821
- Contract number
- CTR074821
- Issued by
- Arizona
About this file
This document is a Request for Proposal (RFP) Solicitation No. BPM006394 for Brownfields Environmental Site Assessment Services issued by the Arizona Department of Environmental Quality, located in Phoenix, Arizona. The solicitation was awarded to Ninyo & Moore Geotechnical & Environmental Sciences Consultants, a consulting firm based in Phoenix, Arizona. The document includes multiple attachments covering offer and acceptance, boycott of Israel disclosure, forced labor ban certification, confidential information designation, and key personnel information.
The contract appears to be for providing environmental site assessment services, specifically focused on Brownfields assessments across Arizona. The contract involves comprehensive environmental investigations including Phase I and Phase II Environmental Site Assessments, site characterization, remediation planning, hazardous materials assessment, and regulatory compliance services. The key personnel, Mark J. Guatney, will serve as Contract Manager/Principal Engineer and is proposed to dedicate 60% of his time to the project. The contract term is set for 180 days from the solicitation due date, with potential for extensions, and covers services for various governmental and public entities including state agencies, local governments, and potential utility clients.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BPM006394_Solicitation_-BAFO_Attachment_13_-_Ninyo_and_Moore_.xlsx | XLSX spreadsheet | |
| CTR074821-Amendment_1-_Extension.pdf | ||
| CTR074821-COI_Exp_2025-5-1.pdf | ||
| BPM006394-BAFO_-Request_Letter__2_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
Solicitation No. BPM006394 Brownfields Environmental Site
Assessment Services
Arizona Department of
Environmental Quality
1110 W. Washington St.
Phoenix, AZ 85007
Solicitation Attachment – Offer and Acceptance | Revision No. 6 | Revised 03-24
Attachment 1 – Offer and Acceptance Form
SUBMISSION OF OFFER: The undersigned hereby offers and agrees to provide Brownfields Environmental Site Assessments in compliance with all terms, conditions, specifications, and amendments in the Solicitation and any written exceptions in the Offer indicated by the latest dated version below
CERTIFICATION: By signature in the above, Offeror certifies that it:
1. Will not discriminate against any employee or applicant for employment in violation of Federal Executive Order 11246, [Arizona] State Executive
Orders 2023-09, 2023-01, 2009-09 or A.R.S. §§ 41-1461 through 41-1465;
2. Has not given, offered to give, nor intends to give at any time hereafter any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, or Service to a public servant in connection with the submitted offer. Failure to provide a valid signature affirming the stipulations required by this clause will result in rejection of the Offer. Signing the Offer with a false statement will void the Offer, any resulting contract, and may be subject to legal penalties under law;
3. Complies with A.R.S. § 18-132 when offering electronics or information technology products, Services, or maintenance;
4. Has submitted this Offer as a firm offer for 180 days following the Solicitation due date and time per the Instructions to Offers. Any extensions to the Offer Acceptance Period shall be made in accordance with the A.A.C. R2-7-C310;
5. Did not and will not involve collusion or other anti-competitive practices; and
6. Is not debarred from, or otherwise prohibited from, participating in any contract awarded by federal, state, or local government.
7. Acknowledges and agrees to the terms provided in the DBRA Requirements for Contractors and Subcontractors Under EPA Grants.
ACCEPTANCE OF OFFER
The offer is hereby accepted.
The Contractor is now bound to sell the Materials or Services listed by the attached Contract and based upon the Solicitation, including all terms, conditions, specifications, amendments, etc., and the Contractor’s Offer as accepted by the State.
The Contract shall henceforth be referred to as Contract No.
The effective date of the Contract is
The Contractor is cautioned not to commence any billable work or to provide any Material or Service under this Contract until Contractor receives purchase order or written notice to proceed.
State of Arizona Awarded this day of 20
Louis Anaya Chief Procurement Officer (CPO), MPA, C.P.M., CPPB
Procurement officer signature
Ninyo & Moore Geotechnical & Environmental Sciences Consultants 10/03/2024
Offeror company name Signature of person authorized to sign Offer Date
3202 E. Harbour Drive Mark Guatney, PE, Contract Manager/Principal Engineer
Address Printed name and Title
Phoenix, AZ 85034 Mark Guatney, PE, Contract Manager/Principal Engineer
City, State, ZIP Contact name and Title mguatney@ninyoandmoore.com 602-243-1600 x16219
Contact email address Contact phone number
Revised Offers:
Date Signature Date Signature
Best and Final Offer:
Date Signature
Assessment Services
Arizona Department of
Environmental Quality
Solicitation Attachment – Boycott of Israel Disclosure | Revision No. 2 | Revised 11-22
Attachment 2 – Boycott of Israel Disclosure
Please note that if any of the following apply to this Solicitation, Contract, or Contractor, then the Offeror shall select the “Exempt Solicitation, Contract, or Contractor” option below:
● The Solicitation or Contract has an estimated value of less than $100,000;
● Contractor is a sole proprietorship;
● Contractor has fewer than ten (10) employees; or
● Contractor is a non-profit organization.
Pursuant to A.R.S. § 35-393.01, public entities are prohibited from entering into contracts “unless the contract includes a written certification that the company is not currently engaged in, and agrees for the duration of the contract to not engage in, a boycott of Materials or Services from Israel.”
Under A.R.S. § 35-393:
1. "Boycott" means engaging in a refusal to deal, terminating business activities or performing other actions that are intended to limit commercial relations with entities doing business in Israel or in territories controlled by Israel, if those actions are taken either:
(a) Based in part on the fact that the entity does business in Israel or in territories controlled by Israel.
(b) In a manner that discriminates on the basis of nationality, national origin or religion and that is not based on a valid business reason.
2. "Company" means an organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, limited liability company or other entity or business association, including a wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate, that engages in for-profit activity and that has ten or more full-time employees.
5. "Public entity": (a) Means this State, a political subdivision of this State or an agency, board, commission or department of this State or a political subdivision of this State. (b) Includes the universities under the jurisdiction of the Arizona board of regents and community college districts as defined in section 15-1401.
The certification below does not include boycotts prohibited by 50 United States Code Section 4842 or a regulation issued pursuant to that section. See A.R.S. § 35-393.03.
In compliance with A.R.S. § 35-393 et seq., all Offerors must select one of the following:
The Company submitting this Offer does not participate in, and agrees not to participate in during the term of the contract, a boycott of Israel in accordance with A.R.S. § 35-393 et seq. I understand that my entire response will become a public record in accordance with A.A.C. R2-7-C317;
☐ The Company submitting this Offer does participate in a boycott of Israel as described in A.R.S. § 35-393 et seq.; or
☐ Exempt Solicitation, Contract, or Contractor. Indicate which of the following statements applies to this Contract (may be more than one):
☐ Solicitation or Contract has an estimated value of less than $100,000;
☐ Contractor is a sole proprietorship;
☐ Contractor has fewer than ten (10) employees; or ☐ Contractor is a non-profit organization.
Ninyo & Moore Geotechnical & Environmental Sciences Consultants
Company name Signature of person authorized to sign
3202 E. Harbour Drive Mark Guatney, PE, Contract Manager/Principal Engineer
Address Printed name and Title
Phoenix, AZ 85034 mguatney@ninyoandmoore.com 602-243-1600 x16219
City, State, ZIP Contact email address Contact phone number
Assessment Services
Arizona Department of Environmental Quality
Solicitation Attachment – Forced Labor of Ethnic Uyghurs Ban | Revision No. 3 | Revised 12-22
Attachment 3 – Forced Labor of Ethnic Uyghurs Ban
Please note that if any of the following apply to the Contractor, then the Contractor shall select the “Exempt Contractor” option below:
● Contractor is a sole proprietorship;�
● Contractor has fewer than ten (10) employees; OR�
● Contractor is a non-profit organization.�
Pursuant to A.R.S. § 35-394, written certification is required to show that the company entering into a contract with a public entity does not use the forced labor, or use any contractors, subcontractors or suppliers that use the forced labor or any goods or services produced by the forced labor or any goods or services produced by the forced labor, of ethnic Uyghurs in the People's Republic of China.
Under A.R.S. § 35-394:
1. "Company" means an organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, limited liability company or other entity or business association, including a wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate, that engages in for-profit activity and that has ten or more full-time employees.
2. "Public entity" means this State, a political subdivision of this State or an agency, board, commission or department of this State or a political subdivision of this State.
In compliance with A.R.S. § 35-394, all Contractors must select one of the following:
Company does not use, and agrees not to use during the term of the contract, any of the following:
● Forced labor of ethnic Uyghurs in the People’s Republic of China;
● Any goods or services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China; or
● Any Contractors, Subcontractors, or suppliers that use the forced labor or any goods or services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China.
☐ The Company does participate in the use of Forced Uyghurs Labor as described in A.R.S. § 35-394.
☐ Exempt Contractor: Select all statements that apply to the Contractor:
☐ Contractor is a sole proprietorship;
☐ Contractor has fewer than ten (10) employees; and/or ☐ Contractor is a non-profit organization.
Ninyo & Moore Geotechnical & Environmental
Sciences Consultants
Company name Signature of person authorized to sign
3202 E. Harbour Drive Mark Guatney, PE, Contract Manager/Principal Engineer
Address Printed name and Title
Phoenix, AZ 85034 mguatney@ninyoandmoore.com 602-243-1600 x16219
City, State, ZIP Contact email address Contact phone number
Assessment Services
Arizona Department of Environmental Quality
Solicitation Attachment – Confidential Information Designation | Revision No. 3 | Revised 03-24
Attachment 4 – Confidential Information Designation
All materials submitted as part of a response to a solicitation are subject to Arizona public records law and will be disclosed if there is an appropriate public records request at the time of or after the award of the contract. Recognizing there may be materials included in a solicitation response that are proprietary or a trade secret, a process is set out in A.A.C. R2-7-103 (copy attached) that will allow qualifying materials to be designated as confidential and excluded from disclosure. For purposes of this process the definition of “trade secret” will be the same as that set out in A.A.C. R2-7-101(51).
Complete this form and return it with your Offer along with the appropriate supporting information to assist the State in making its determination as to whether any materials submitted as part of your Offer should be designated confidential because the material is proprietary or a trade secret and therefore not subject to disclosure. Offerors shall create a redacted version of documents containing confidential information upon request from the Procurement Officer.
STATE WILL NOT CONSIDER ANY MATERIAL IN YOUR OFFER “CONFIDENTIAL” UNLESS DESIGNATED ON THIS FORM.
Check one of the following – if neither is checked, State will assume that it is equivalent to “DOES NOT”:
This response DOES NOT contain proprietary or trade secret information. I understand that my entire response will become public record in accordance with A.A.C. R2-7-C317; or
☐ This response DOES contain trade secret information because it contains information that:
1. Is a formula, pattern, compilation, program, device, method, technique or process;
2. Derives independent economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by, other persons who can obtain economic value from its disclosure or use; and
3. Is the subject of efforts by myself or my organization that are reasonable under the circumstances to maintain its secrecy.
NOTE: Failure to attach an explanation may result in a determination that the information does not meet the statutory trade secret definition. All information that does not meet the definition of trade secret as defined by A.A.C. R2-7-101(51) will become public in accordance with A.A.C. R2-7-C317. State may make its own determination on materials in accordance with A.A.C. R2-7-103.
If State agrees with Offeror’s designation of trade secret or confidentiality and the determination is challenged, the Offeror hereby agrees to cooperate and support the defense of the determination with all interested parties, including legal counsel or other necessary assistance.
By submitting this response, Offeror agrees that the entire Offer, including confidential, trade secret, and proprietary information may be shared with an evaluation committee and technical advisors during the evaluation process. Offeror agrees to indemnify and hold State, its agents and employees, harmless from any claims or causes of action relating to State’s withholding of information based upon reliance on the above representations, including the payment of all costs and attorney fees incurred by State in defending such an action.
Assessment Services
Arizona Department of Environmental Quality
Solicitation Attachment – Confidential Information Designation | Revision No. 3 | Revised 03-24
Attachment – Confidential Information Designation (for reference only)
A.A.C. R2-7-103 [Confidential Information] as was current at time of Solicitation issuance
A. If a person wants to assert that a person's offer, specification, or protest contains a trade secret or other proprietary information, a person shall include with the submission a statement supporting this assertion. A person shall clearly designate any trade secret and other proprietary information, using the term "confidential".
Contract terms and conditions, pricing, and information generally available to the public are not considered confidential information under this Section.
B. Until a final determination is made under subsection (C), an agency chief procurement officer shall not disclose information designated as confidential under subsection (A) except to those individuals deemed by an agency chief procurement officer to have a legitimate state interest.
C. Upon receipt of a submission, an agency chief procurement officer shall make one of the following written determinations:
1. The designated information is confidential and the agency chief procurement officer shall not disclose the information except to those individuals deemed by the agency chief procurement officer to have a legitimate state interest;
2. The designated information is not confidential; or
3. Additional information is required before a final confidentiality determination can be made.
D. If an agency chief procurement officer determines that information submitted is not confidential, a person who made the submission shall be notified in writing. The notice shall include a time period for requesting a review of the determination by the state procurement administrator.
E. An agency chief procurement officer may release information designated as confidential under subsection (A) if:
1. A request for review is not received by the state procurement administrator within the time period specified in the notice; or
2. The state procurement administrator, after review, makes a written determination that the designated information is not confidential.
X
Exceptions to Instructions to Offerors (RFP) Article /
Paragraph or Exhibit
Reference
RFP language (Copy and paste from Solicitation) Proposed Changes / Alternate Language Rationale for Proposed Change State Response
X
Exceptions to Scope of Work and Specifications Article /
Paragraph or Exhibit
Reference
RFP language (Copy and paste from Solicitation) Proposed Changes / Alternate Language Rationale for Proposed Change State Response
Request for Proposal
Solicitation No. BPM006394
Brownfields Environmental Site Assessment Services
Arizona Department of Environmental Quality
1110. W Washington St.
Phoenix, AZ 85007
Attachment 5 - BPM006394 Conformance Statements and Exceptions Requests
Offeror Name: Ninyo & Moore Geotechnical & Environmental Sciences Consultants
If taking exceptions, the relevant subsequent sections must be completed. Add additional rows as needed.
This document must be returned in an Excel (.xls or .xlsx) format.
STATE WILL NOT CONSIDER ANY EXCEPTIONS UNLESS DESIGNATED ON THIS FORM.
READ ALL INSTRUCTIONS TO OFFERORS BEFORE TAKING ANY EXCEPTIONS. OFFERS WITH EXCEPTIONS MAY BE FOUND NOT SUSCEPTIBLE FOR AWARD UNDER
IF NEITHER BOX IS MARKED WITH AN "X" UNDER ANY SECTION BELOW, THE OFFEROR’S RESPONSE TO THAT SECTION WILL BE CONSIDERED “YES” AND
STATE WILL INTERPRET THE OFFER AS IF THERE WERE NO EXCEPTIONS TAKEN.
CONFORMANCE TO THE INSTRUCTIONS TO OFFERORS
Place an "X" in one of the following boxes to indicate the Offeror's conformance:
YES – Offeror acknowledges that it has read and understands the Instructions to Offerors (RFP) of the Solicitation Documents and attests that its Offer complies with all aspects.
NO – Offeror acknowledges that it has read and understands the Instructions to Offerors (RFP) in the Solicitation Documents, and attests that its Offer complies with all aspects
Special Instructions to Offerors
Standard Instructions to Offerors (RFP)
CONFORMANCE TO THE SCOPE OF WORK AND SPECIFICATIONS
Place an "X" in one of the following boxes to indicate the Offeror's conformance:
YES – Offeror acknowledges that it has read and understands the Scope of Work and Specifications, along with any respective Exhibits, Addendums, and Appendices of the NO – Offeror acknowledges that it has read and understands the Scope of Work and Specifications, along with any respective Exhibits, Addendums, and Appendices of the
Solicitation Attachment – Conformance Statements and Exceptions Requests | Revision No. 2 | Revised 03-24
X
Exceptions to Contract Terms & Conditions
Article / Paragraph or
Exhibit Reference
RFP language (Copy and paste from Solicitation) Proposed Changes / Alternate Language Rationale for Proposed Change State Response
Addendum A to Special Terms & Conditions
Addendum B to Special Terms & Conditions
Uniform Terms & Conditions
Scope of Work and Specifications
CONFORMANCE TO THE CONTRACT TERMS AND CONDITIONS
Place an "X" in one of the following boxes to indicate the Offeror's conformance: g p g y p
Addendums, and Appendices of the Solicitation Requirements and attests that its Offer complies with all aspects. g p , g y p , Addendums, and Appendices of the Solicitation Requirements and attests that its Offer complies with all aspects EXCEPT FOR the exceptions listed below.
Special Terms & Conditions
Solicitation Attachment – Conformance Statements and Exceptions Requests | Revision No. 2 | Revised 03-24
Assessment Services
Arizona Department of
Environmental Quality
Solicitation Attachment – Key Personnel | Revision No. 1 | Revised 11-22
Attachment 6 – Key Personnel
Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel proposed to be involved in performing the Services. Insert or attach a separate resume as applicable, but any attached resumes are supplemental to this form and do not substitute for this form. If there are more than three (3) Key Personnel, please utilize the same form for each additional Personnel by making copies of this page as needed.
1 Name: Mark J. Guatney, PE, CHMM Job title: Contract Manager/Principal Engineer
Length of employment with the company:
8 years Length of time in current role: 8 years
Proposed percentage of overall time to be dedicated to the Services:
60 % If applicable, length of time in related experience with large local, state or federal government agencies:
37 years
Proposed position with regard to the Services:
Contract Manager/Principal Engineer
Proposed primary responsibilities with regard to the Services:
As Principal Engineer and Environmental Operations Manager for Ninyo & Moore’s Arizona operations, Mr. Guatney oversees environmental investigations and subcontracted analyses; reviews and prepares environmental assessment, investigation and remediation reports; prepares remediation workplans and abatement specifications; reviews and provides technical support to engineers, geologists, and environmental scientists;
coordinates environmental research and development activities; manages remediation and abatement projects; and assists in business development.
Describe experience in performing Services similar to those that are to be assigned:
Mr. Guatney is experienced in all phases of environmental site assessments (Phase I and II ESAs), comprehensive site characterization, and remediation planning and design.
Additionally, he has experience performing and/or managing hazardous materials/industrial hygiene services (asbestos, lead-containing paint, indoor air quality, mold), and regulatory compliance (spill plans, stormwater, air permitting, environmental auditing). He has project experience providing these services on a wide variety of sites for clients including federal and state agencies, local governments, utilities, and private industry.
List job-related certifications, training, and education:
CERTIFICATIONS:
AZ PE (Environmental) 53561 CHMM No. 15023 AHERA Asbestos Building Inspector AHERA Asbestos Contractor/Supervisor AHERA Asbestos Management/Planner AHERA Asbestos Project Designer OSHA HAZWOPER 40-Hour Certification OSHA HAZWOPER 8-Hour Refresher XRF Analyzer Training
EDUCATION
M.B.A., Business Administration, 2008, University of Phoenix B.S., Mechanical Engineering, 1985, Georgia Institute of Technology
Resume: Ninyo & Moore Resume – Mark Guatney
Mark J. Guatney, PE, CHMM, Principal Engineer, Environmental | Ninyo & Moore
EXPERIENCE
8 Years with Firm
37 Years Total
EDUCATION
M.B.A., Business Administration, 2008, University of Phoenix
B.S., Mechanical Engineering, 1985, Georgia Institute of Technology
REGISTRATIONS
AZ PE (Environmental) 53561
AZ PE (Mechanical) 28202
UT PE 13293717-2202
IL PE 062-060122
CHMM No. 15023
AHERA Asbestos Building Inspector
AHERA Asbestos Contractor/Supervisor
AHERA Asbestos Management/Planner
AHERA Asbestos Project Designer
OSHA HAZWOPER 40-Hour Certification
OSHA HAZWOPER 8-Hour Refresher
XRF Analyzer Training
PROFESSIONAL AFFILIATIONS
American Public Works Association
Arizona Rock Products Association
Environmental Professionals of Arizona
Institute of Hazardous Materials Management
EXPERIENCE
Mark J. Guatney, PE, CHMM
Principal Engineer, Environmental Mr. Guatney is experienced in all phases of environmental site assessments (Phase I and II ESAs), comprehensive site characterization, and remediation planning and design. Additionally, he has experience performing and/or managing hazardous materials/industrial hygiene services (asbestos, lead-containing paint, indoor air quality, mold), and regulatory compliance (spill plans, stormwater, air permitting, environmental auditing). He has project experience providing these services on a wide variety of sites for clients including federal and state agencies, local governments, utilities, and private industry. As Principal Engineer and Environmental Operations Manager for Ninyo & Moore’s Arizona operations, Mr. Guatney oversees environmental investigations and subcontracted analyses; reviews and prepares environmental assessment, investigation and remediation reports; prepares remediation workplans and abatement specifications; reviews and provides technical support to engineers, geologists, and environmental scientists;
coordinates environmental research and development activities;
manages remediation and abatement projects; and assists in business development.
PROJECT EXPERIENCE
Northern Arizona Council of Governments, Arizona Route 66 Coalition, Brownfields Environmental Services, Coconino and Yavapai County:
Principal Engineer for the Northern Arizona Council of Governments, Arizona Route 66 Coalition, Brownfields Environmental Services contract in Yavapai and Coconino Counties, Arizona. The project included performing environmental assessments (approximately 25 sites), cleanup, redevelopment planning, addressing real or perceived contamination from hazardous substances and/or petroleum products along the Historic Route 66 corridor. This contract was used to communicate Brownfields issues and opportunities to governmental agencies, private investors, and the community.
City of Glendale, City Hall, AZ: Principal Engineer during a pre-renovation asbestos-containing material (ACM) and lead-based paint (LBP) survey, and Abatement Oversight and Sampling of City Hall and the Council Chambers buildings. The purpose of the survey and sampling was to evaluate all building materials inside and along the exterior of the structures for the presence of ACM and LBP, to determine if regulated building materials were present that would require special handling or removal in advance of selective demolition and renovation.
Tucson Unified School District, University of Arizona Administration Property, AZ: Principal Engineer during a Phase I and Phase II Environmental Assessment (ESA), geophysical services, and American Land Title Association Survey (ATLAS) for property acquisition on 6 acres at Main Avenue and 6th Street in Tucson, Arizona.
Northern Arizona Council of Governments, Prescott City Hall, AZ: Principal Engineer during a Phase I Environmental Site Assessment, and asbestos and lead-based paint surveys at Prescott City Hall in Prescott, Arizona. The building is 20,500 square feet and the purpose of our services was to assess the site for sale.
City of Mesa, Arizona Museum of Natural History, AZ: Principal Engineer during abatement contractor surveillance, perimeter air monitoring, and final visual inspection at the Arizona Museum of Natural History in Mesa, Arizona.
Valleywise Health, Medical Office Building, Phoenix, AZ: Principal Engineer during Phase I ESA, Phase II ESA, agricultural chemical soil sampling, hazardous building materials survey, and asbestos abatement services at a Medical Office
Building in Phoenix, Arizona. The site was developed with a 46,913 square foot medical office building and associated asphalt parking lot.
Valleywise Health, Vacant Restaurant and Reception Hall, Mesa, AZ: Principal Engineer during a Phase II ESA, asbestos survey, hazardous building materials survey (HBMS), and asbestos abatement oversight of approximately 2.75 acres of land, which was a developed as a restaurant and reception hall, approximately 9,000 square feet each located in Mesa, Arizona.
City of Mesa, Eastmark Fire Station, AZ: Principal Engineer during a Phase I and Phase II ESA of the vacant land proposed as the future location of the Eastmark Fire Station located in Mesa, Arizona. The parcel encompasses approximately 2.27 acres and was previously part of General Motors’ Desert Proving Grounds.
ADOT, Vacant Building at 59th Avenue and Van Buren Street, Phoenix, AZ: Principal Engineer during ACM and LBP Surveys, and asbestos abatement oversight of the vacant meat packing facility, located in Phoenix, Arizona.
ADOT, Industrial Properties, Phoenix, AZ: Principal Engineer during an asbestos survey and asbestos abatement that included perimeter air monitoring, contractor surveillance, and final visual inspection for selective asbestos roofing removal at two industrial properties located in Phoenix, Arizona. The ACM removed from the property involved approximately 23,000 square feet of roofing.
City of Glendale, Glendale Fire Department Fire Prevention Office Building Remodel, AZ: Principal Engineer during an ACM and LBP Surveys of the Glendale Fire Department Fire Prevention Office Building located in Glendale, Arizona. The project included remodeling the interior of a 2-story, 108-year-old building.
City of Glendale, Fire Station 152, AZ: Principal Engineer during a Pre-Renovation ACM Survey, owner assistance and addendum preparation during the competitive abatement contractor bidding phase, and Asbestos Abatement Oversight during abatement of asbestos vinyl sheet flooring in Fire Station 152 located in Glendale, Arizona. The purpose of our survey was to assess whether ACMs were present in areas scheduled for renovation on the building interior and rooftop.
Northern Arizona Council of Governments, Former Gas Station, Flagstaff, AZ: Principal Engineer during a Phase II ESA at a former gas station on a 0.69-acre lot in Flagstaff, Coconino County, Arizona. The site included an unoccupied, 2,500 square foot gas station, fuel island, and former underground storage tank.
Bureau of Land Management, Cross Y Ranch, Black Canyon City, AZ: Principal Engineer during a Phase I ESA on the Cross Y Ranch located in Black Canyon City, Arizona. The site is approximately 702 acres and consisted of vacant and unoccupied desert land.
Lennar Arizona, Cat Mountain Vista Residential Development, Tucson, AZ: Principal Engineer during a Phase I ESA, Phase II ESA, and Asbestos and Lead-Based Paint Survey for the Cat Mountain Vista, which totals approximately 82.7 acres, and is located in Tucson, Arizona. The purpose of our services was for purchase of the land to develop single-family residential homes.
Mark J. Guatney, Principal Engineer, Environmental
Mark J. Guatney, PE, CHMM, Principal Engineer, Environmental | Ninyo & Moore
HAZMAT
| �� | �#�,%���! |
| ��",�. | ! |
| �!"#�&���' �- | ���/��#������� | |
| �$�����������-,����������������������� | ����/��������������������������������������������������/�,�����0���������/�����/�����������������������������������������������������������������1�������/�,�����0���������/�����/��������������������������������������������������������������������������������������������������������������1�������/�,���������������0���������������������������1�������/� |
&��������2�3455&�������������"�����2�6789:&�������������& ���2�87;89;989<�=�87;86;989>!������,���#���#���2�8<;:8;9897
?@ABCD@E�5FGH�IJ�KLFMN@O
&���������#2�68<786#����,�����&��������2�8<;6P;988> ����������/��������25FGH�IJ�KLFMN@OQGRNBRSFA�TNURN@@GE�TNVRGCND@NMFA�WS@GFMRCNX�5FNU@GYRNOC�Z�5CCG@�K@CM@B[NRBFA�FN\�]BR@NB@X�3CNXLAMFNMX:989�T�4FĜCLG�_GQ[C@NR̀E�ab�c78:<=d99P����� �������������������2DeULFMN@OfUDFRAJBCD����� ����2QGRNBRSFA�TNURN@@G;TNVRGCND@NMFA�WS@GFMRCNX�5FNFU@GE�YRNOC�FN\�5CCG@�K@CM@B[NRBFAZ�TNVRGCND@NMFA�]BR@NB@X�3CNXLAMFNMX!���������������$������'�����3CDSA@M@ .�������������������$������&������������ &�������'����� &������#���3455 3CDSA@M@ 89;8c;989<
����� +������ #���#��� !������P7cPP: 69;96;989: 3455�gCG�5FGH�IJ�KLFMN@O�=�3455�h87;86;989<=8<;:8;9897i j6d8J88 j=6d8J88 j8J8887;86;989<QGRNMP<P>d9 69;6>;9899 3455�gCG�5FGH�IJ�KLFMN@O�=�3455�h87;86;989:=8<;:8;989<i j6d8J88 j=6d8J88 j8J8887;86;989:QGRNMP:d:d9 89;6<;9899 3455�gCG�5FGH�IJ�KLFMN@O�=�3455�h87;86;9899=8<;:8;989:i j6P8J88 j=6P8J88 j8J8887;86;9899QGRNMP9d9d> 89;8<;9896 3455�gCG�5FGH�IJ�KLFMN@O�=�3455�h87;86;9896=8<;:8;9899i j6P8J88 j=6P8J88 j8J8887;86;9896QGRNMP6Pcd: 89;8P;9898 3455�gCG�5FGH�IJ�KLFMN@O�=�3455�h87;86;9898=8<;:8;9896i j6P8J88 j=6P8J88 j8J8887;86;9898QGRNMP8c666 89;8<;986> 3455�gCG�5FGH�IJ�KLFMN@O�=�3455�h87;86;986>=8<;:8;9898i j6P8J88 j=6P8J88 j8J8887;86;986>QGRNMP88:>6 89;87;986c 3455�gCG�5FGH�IJ�KLFMN@O�=�3455�h87;86;986c=8<;:8;986>i j6P8J88 j=6P8J88 j8J8887;86;986cQGRNM7c>7<> 89;9d;986d 3455�gCG�5FGH�IJ�KLFMN@O�=�3455�=�k@FG<�Cg�3@GMRgRBFMRCN�Q@GRC\�h87;86;986d=8<;:8;986ci j6P8J88 j=6P8J88 j8J8887;86;986dQGRNM7c8<9P 89;8<;986P 3455�gCG�5FGH�IJ�KLFMN@O�=�3455�=�k@FG�:�Cg�3@GMRgRBFMRCN�Q@GRC\�h87;86;986P=8<;:8;986di j6<8J88 j=6<8J88 j8J8887;86;986PQGRNM ]@@�aAA�lNVCRB@X m ��� >;6:;9<E�<n8<�Q5 _FX[̂CFG\
[MMSXn;;CNARN@JR[DDJCGU;R[DDXXF;goSp]q_]]an6888n6P78P66>c7:69dnnnnKr3s]qrl_n68<786n 6;9
%�������������������&#'()�((*�������+,�+���-,���.����/012()03�����,��� ���
Mark Guatney
March 31, 2024
ON-188748-136-033124
31-Mar-2024
31-Mar-2025
Powered by TCPDF (www.tcpdf.org) http://www.tcpdf.org
July 07, 2024
ON-190978-136-070724
7-Jul-2024
07-Jul-2025
March 31, 2024
ON-4651-136-033124
31-Mar-2024
31-Mar-2025
July 06, 2024
ON-184435-136-070624
6-Jul-2024
06-Jul-2025
Customer
Training
Certifi cate
C U
S T
O M
E R
T R
A
IN
IN
G Customer
Training
Certifi cate
C U
S T
O M
E R
T R
A
IN
IN
G
Thermo Scientific Niton XRF Analyzer Operator’s Training Certificate
This is to certify that has successfully completed the Thermo Fisher Scientific Niton XRF Analyzer Operational Training Course. The topics of this course include device configuration, sample preparation, safe operation and analysis, interpretation of results, and routine maintenance of the Thermo Scientific Niton XRF Analyzer.
Course date: September 19, 2018 Location: Phoenix, Arizona Certificate Number: TP3693aq 09191802
Assessment Services
Arizona Department of
Environmental Quality
Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel proposed to be involved in performing the Services. Insert or attach a separate resume as applicable, but any attached resumes are supplemental to this form and do not substitute for this form. If there are more than three (3) Key Personnel, 2 Name: Fred F. Narcaroti Job title: Principal/Tucson Office Manager company:
15 years Length of time in current role: 29 years
Proposed percentage of overall time to be dedicated to the Services:
20% If applicable, length of time in related experience with large local, state or federal government agencies:
29 years
Proposed position with regard to the Services:
Technical Advisor
Proposed primary responsibilities with regard to the Services:
His responsibilities include coordinating projects, mentoring junior staff, maintaining client relationships, lead and guide marketing efforts, provide ongoing training to staff, provide direction and review of work products, and review and sign reports. He has vast knowledge associated with the planning and implementation of residential subdivisions and has lived in the Tucson community for over 40 years.
Describe experience in performing Services similar to those that are to be assigned:
Fred is specialized in conducting Phase I Environmental Site Assessments for various local municipalities, developers, and lending institutions. He has experience with all phases of environmental site assessments (Phase I and II ESAs), comprehensive site characterization, remediation planning and managing industrial hygiene services (asbestos, lead-containing paint, indoor air quality, mold).
List job-related certifications, training, and education:
CERTIFICATIONS:
MSHA 8-Hour Refresher Certification MSHA CFR Part 46 Training OSHA HAZWOPER 40- Hour and 24-Hour
EDUCATION
M.B.A., 2005, University of Phoenix B.S., Environmental Science, 2001, University of Arizona
Resume: Ninyo & Moore Resume – Fred Narcaroti
Fred F. Narcaroti, Principal/Tucson Office Manager | Ninyo & Moore
15 Years with Firm
29 Years Total
EDUCATION
M.B.A., 2005, University of Phoenix
B.S., Environmental Science, 2001, University of Arizona
CERTIFICATIONS
MSHA 8-Hour Refresher Certification
MSHA CFR Part 46 Training
OSHA HAZWOPER 40- Hour and 24-Hour
PROFESSIONAL AFFILIATIONS
American Public Works Association, Southern AZ Golf Tournament Committee (2015-present)
American Society of Civil Engineers
Arizona Association for Economic Development, Southern AZ Committee (2015-present)
Arizona Rock Products Association, Southern AZ Committee Chair (2020-2023)
Arizona Transportation Builders Association, Past President (2012-present)
Metropolitan Pima Alliance, Common Ground Committee (2018-present)
Society for Mining Metallurgy & Exploration
Town of Oro Valley, Regional Transportation Authority, Committee (2018-2025)
AWARDS/RECOGNITION
2016 Presidents Award, Arizona Transportation Builders 2015 & 2017 Associate of the Year, Arizona Transportation Builders Association
EXPERIENCE
AWARD AWARD
WINNINGWINNING
20232023
Fred F. Narcaroti, Principal/Tucson Office Manager
Mr. Narcaroti specializes in building relationships with clients and municipalities throughout the state of Arizona. He is an experienced team builder who promotes our services to secure new and returning clients. He is active in civic duty groups including the Oro Valley Sports Alliance, American Public Works Association, Arizona Transportation Builders, and Arizona Association of Economic Development. This wide ranging professional and personal network is one of the keys to our track record of satisfied customers. His responsibilities include coordinating projects, mentoring junior staff, maintaining client relationships, lead and guide marketing efforts, provide ongoing training to staff, provide direction and review of work products, and review and sign reports. He has vast knowledge associated with the planning and implementation of residential subdivisions and has lived in the Tucson community for over 40 years. Mr. Narcaroti is specialized in conducting Phase I Environmental Site Assessments for various local municipalities, developers, and lending institutions. He has experience with all phases of environmental site assessments (Phase I and II ESAs), comprehensive site characterization, remediation planning and managing industrial hygiene services (asbestos, lead-containing paint, indoor air quality, mold).
PROJECT EXPERIENCE
Tucson Unified School District, University of Arizona Administration Property, AZ: Technical Advisor during a Phase I and Phase II Environmental Assessment (ESA), geophysical services, and American Land Title Association Survey (ATLAS) for property acquisition on 6 acres at Main Avenue and 6th Street in Tucson, Arizona.
Town of Sahuarita, Eagle Picher Mill Parcel 30, AZ: Technical Advisor during environmental services for the acquisition of a 238-acre former mill site to create hiking trails and pollinator gardens.
Lukeville Housing Complex, Pima County, AZ: Technical Advisor during a Phase I Environmental Site Assessment, Asbesto-Containing Material and Lead-Based Paint Surveys at the Lukeville Housing Complex in Pima County, Arizona. The property is comprised of 13 total units and includes three land parcels under Customs and Border Protection housing, ten Government Services Administration housing units/garages/sheds and associated land parcels totaling five acres.
Tucson Airport Authority, Aragon Road Sites, AZ: Technical Advisor during Phase I Environmental Site Assessments, Asbestos and Lead- Based Paint Surveys, and Septic Tank Decommissioning at multiple sites on Aragon Road totaling 4 acres for future acquisition by Tucson International Airport.
Santa Cruz County, Cross Creek Donation, Patagonia, AZ: Technical Advisor during Pre-Demolition Asbestos and Lead-Based Paint Survey on 133 acres that consisted of six homes with various storage building.
Lennar Homes, Edgestone At Gladden Farms, Marana, AZ: Technical Advisor during Phase I ESA, Phase II ESA, and Soil Remediation on the Gladden Farms Block 30 (67 Lots) located in Marana, Arizona. The site is approximately 14.5 acres in size and will be used for future residential development.
Davis-Monthan Air Force Base, Permanent Party Dorm Renovations, Tucson, AZ: Technical Advisor during Asbestos- Containing Material (ACM) and Lead-Based Paint (LBP) Survey services for the renovation of interior walls, plumbing, mechanical, electrical and fire protection systems to meet current Airforce standards and included the design and construction of a new elevator, new exterior walkways and stairwells to increase usable floor area.
Tucson Unified School District, 10th Street Building, Tucson, AZ: Technical Advisor during a Phase I and Phase II Environmental Site Assessment (ESA) and American Land Title Association Survey (ATLAS) in support of property transfer of 5 acres of the 10th Street Building in Tucson, Arizona.
Catalina Foothills School District, Ventana Vista Elementary School, Tucson, AZ: Technical Advisor during an asbestos-containing material (ACM) and lead-based paint (LBP) survey of the roofing and exterior of Ventana Vista Elementary School, in Tucson, Arizona. Included in the survey were painted components and suspected asbestos materials of the school building roofing and exterior and are scheduled for repair and weatherization.
City of Tucson, 22nd Street Widening: Kino Parkway to Tucson Boulevard, AZ: Technical Advisor during a Phase I Environmental Site Assessment (ESA), and Asbestos Containing Material (ACM) and Lead-Based Paint (LBP) Surveys for the planned widening of 22nd Street between Kino Parkway and Tucson Boulevard located in Tucson, Arizona. The project included the replacement of the existing bridge over a rail yard and Aviation Parkway (SR210), with a slight shift to the north of the existing bridge alignment; and the design and construction of 22nd Street between Kino Parkway and Tucson Boulevard.
Town of Sahuarita, 150 Acres at Twin Buttes Road and La Villita Road, AZ: Technical Advisor during a Phase I and Phase II Environmental Site Assessment on 150-acres of land at West Twin Buttes Road and La Villita Road, in Sahuarita, Arizona.
Pima County, Canoa Ranch Sewer Extension Realignment, Green Valley, AZ: Technical Advisor during an Asbestos- Containing Material (ACM) survey, and Lead-Based Paint (LBP) survey services for the design and construction of 7,200 feet of sewer line.
USDA Forest Services, Hannagan Meadow Lodge, Greenlee County, AZ: Technical Advisor during a Phase I and Phase II Environmental Site Assessment on 12.2 acres and consisted of one main lodge and restaurant, a recreation cabin, thirteen guest cabins, a maintenance building, and an employee cabin.
Tucson Metro CAP, Pima County and Arizona State Land Department Properties, AZ: Technical Advisor during Phase I Environmental Site Assessments (ESA) in Tucson, Arizona for 6 ASLD parcels and 13 Pima County parcels.
Arizona State Parks, Oracle State Park Facilities, Oracle, AZ: Technical Advisor during asbestos and lead-based paint (LBP) surveys at the Oracle State Park Facilities located in Oracle, Arizona. The objective of the survey was to assess and quantify accessible asbestos-containing material (ACM) within the interiors and exteriors of the Sisters Cottages (300 square feet) and the Adobe House and adjoining cottage (1700 square feet), in preparation for planned renovation or demolition.
Fred F. Narcaroti, Principal/Tucson Office Manager
Fred F. Narcaroti, Principal/Tucson Office Manager | Ninyo & Moore
Assessment Services
Arizona Department of
Environmental Quality
Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel proposed to be involved in performing the Services. Insert or attach a separate resume as applicable, but any attached resumes are supplemental to this form and do not substitute for this form. If there are more than three (3) Key Personnel, 3 Name: Christian D. Lewallen, RG Job title: Senior Geologist company:
5 years Length of time in current role: 5 years
Proposed percentage of overall time to be dedicated to the Services:
40% If applicable, length of time in related experience with large local, state or federal government agencies:
14 years
Proposed position with regard to the Services:
Senior Geologist
Proposed primary responsibilities with regard to the Services:
Responsibilities include managing projects and project budgets, managing client and client relationships, overseeing project staff, mentor junior staff, lead and guide proposal efforts, and assist with or lead report preparation and other project documents. Responsibilities also include various office tasks comprised of data compilation, review and assimilation of historic information and environmental databases, and phone/email contact/coordination with subcontractors/vendors.
Describe experience in performing Services similar to those that are to be assigned:
Chris is experienced in all phases of environmental site assessments (Phase I and II ESAs), comprehensive site characterization, and remediation planning and design. Additionally, experience performing or managing industrial hygiene services (asbestos, lead-containing paint, indoor air quality, mold), and regulatory compliance (storm water, permitting, environmental auditing)
List job-related certifications, training, and education:
CERTIFICATIONS:
RG 67107 (Arizona) PG 3328 (Washington) PG 4094 (Wyoming) AHERA Asbestos Building Inspector AHERA Asbestos Contractor/Supervisor EPA Lead-Based Paint Inspector EPA Lead-Based Paint Risk Assessor First Aid CPR Certification OSHA HAZWOPER 8-Hour Refresher XRF Analyzer Training
EDUCATION
B.S., Geology, 2008, Oregon State University
Resume: Ninyo & Moore Resume – Chris Lewallen
Christian D. Lewallen, RG, Senior Geologist | Ninyo & Moore
5 Years with Firm
14 Years Total
EDUCATION
B.S., Geology, 2008, Oregon State University
REGISTRATIONS/
CERTIFICATIONS
RG 67107 (Arizona)
PG 3328 (Washington)
PG 4094 (Wyoming)
AHERA Asbestos Building Inspector
AHERA Asbestos Contractor/Supervisor
EPA Lead-Based Paint Inspector
EPA Lead-Based Paint Risk Assessor
First Aid CPR Certification
OSHA HAZWOPER 8-Hour Refresher
XRF Analyzer Training
EXPERIENCE
Christian D. Lewallen, RG
Senior Geologist Mr. Lewallen is experienced in a project-coordinating role for numerous projects from proposal preparation, project inception, sub-contractor coordination and supervision, client deliverables, to final project completion. Chris has conducted field support operations, documentation, and analytical results table preparation. He has involvement in remediation investigations/feasibility studies and groundwater monitoring plans for CERCLA/RCRA programs and experience with projects supporting both federal and state superfund registry and CERCLA/WQARF sites. Projects have also included UST removal and characterization of LUST/UST sites including groundwater monitoring and reporting. He has conducted numerous Phase I and II Environmental Site Assessments throughout the United States and in Mexico.
PROJECT EXPERIENCE
Northern Arizona Council of Governments, Arizona Route 66 Coalition, Brownfields Environmental Services, Coconino and Yavapai County:
Project Manager for the Northern Arizona Council of Governments, Arizona Route 66 Coalition, Brownfields Environmental Services contract in Yavapai and Coconino Counties, Arizona. The project included performing environmental assessments (approximately 25 sites), cleanup, redevelopment planning, addressing real or perceived contamination from hazardous substances and/or petroleum products along the Historic Route 66 corridor. This contract was used to communicate Brownfields issues and opportunities to governmental agencies, private investors, and the community.
City of Glendale, Glendale West Area Water Reclamation Facility, AZ:
Project Manager during asbestos-containing material (ACM) and lead-based paint (LBP) survey of the West Area Water Reclamation Facility to evaluate several wastewater treatment plant structures scheduled for rehabilitation, removal and replacement, or demolition for the presence of ACM and LBP.
Arizona State Land Department, H2K Development, Tucson, AZ: Project Manager during a Phase I Environmental Site Assessment (ESA) on 2,616 acres of land in Tucson, Arizona. The project consisted of a new development referred to as H2K that includes buildings, driveways, parking areas and other improvements.
Tucson Airport Authority, Aragon Road Sites, Tucson, AZ: Project Manager during Phase I ESAs, Asbestos and Lead-Based Paint Surveys, and Septic Tank Decommissioning at multiple sites on Aragon Road totaling 4 acres for future acquisition by Tucson International Airport.
Maricopa County, Office Building, Gilbert, AZ: Project Manager during limited ACM and LBP Surveys of the 40,000 square foot Fiesta Tech Office Building, in Gilbert, Arizona.
City of Mesa, Charles Luster Building, AZ: Project Manager during an asbestos inspection at the 75,000 square foot Charles Luster Building in Mesa, Arizona.
Town of Gilbert, Ocotillo Road Improvements: 148th Street to Greenfield Road, AZ: Project Manager during a Phase I ESA for the design and construction of 1.5 miles of pavement widening (four lanes and striped center left turn lane), bike lanes, sidewalks, street lights, and sewer lines, and relocation of 69KV power lines.
City of Glendale, City Hall, AZ: Project Manager during a pre-renovation ACM and LBP survey, and Abatement Oversight and Sampling of City Hall and the Council Chambers buildings. The purpose of the ACM sampling was to evaluate the topping slab on Level 1 of the City Hall building scheduled for demolition for the presence of ACM, to determine if regulated building materials were present that would require special handling or removal in advance of demolition.
Town of Gilbert, Greenhouse Property, AZ: Project Manager during a Phase I, Phase II ESA, Regulatory Compliance, and Remediation services for 36 acres of future commercial/industrial development in Gilbert, Arizona.
Tucson Unified School District, University of Arizona Administration Property, AZ: Principal Engineer during a Phase I and Phase II ESA, geophysical services, and American Land Title Association Survey (ATLAS) for property acquisition on 6 acres at Main Avenue and 6th Street in Tucson, Arizona.
City of Mesa, Transportation Building, AZ: Project Manager during a limited ACM Survey of the Transportation Building in Mesa, Arizona. The purpose of the limited ACM survey was to evaluate flooring materials for the presence of ACM, in areas scheduled for future flooring renovation.
Northern Arizona Council of Governments, Grand Canyon Oasis Store, Flagstaff, AZ: Project Manager during a Phase II ESA on a 9-acre parcel that is developed with a store, residences, and a recreational vehicle park.
Northern Arizona Council of Governments, Commercial Buildings, Prescott, AZ: Project Manager during a Phase I ESA, and Regulated Building Material Survey (Asbestos and Lead-Based Paint) at an office building and retail store in Prescott, Arizona. The site is owned by the City of Prescott, and the purpose of this Phase l ESA and Regulated Building Materials Survey was to assess the site for sale and possible redevelopment.
Lennar Homes, Edgestone At Gladden Farms, Marana, AZ: Project Manager during a Phase I ESA, Phase II ESA, and Soil Remediation on the Gladden Farms Block 30 (67 Lots) located in Marana, Arizona. The site is approximately 14.5 acres in size and will be used for future residential development.
Lukeville Housing Complex, Pima County, AZ: Project…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .