Bldg 9 Vol. 9-17.pdf
PDF 4 MB Posted
- Attached to
- Y1DA--Replace Building 7 and Building 9 Roofs Federal contract opportunity
- Solicitation number
- 36C24620R0093
About this file
This package includes construction drawings and specifications for replacing roofs on Buildings 7 and 9 at the Department of Veterans Affairs Medical Center in Salem, Virginia. The drawings depict new slate roofing, flashing, underlayment, gutters, downspouts and related repairs. Replacement is needed for approximately 250 linear feet of wood cornice and 100 linear feet at gable ends. Additional work includes tuckpointing and repairs to chimneys and dormers. The solicitation seeks bids for a firm fixed-price contract to complete the roof replacements per the final construction documents. The period of performance and response date are not specified. The contracting agency is the Veterans Health Administration within the Department of Veterans Affairs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bldg 9 Vol. 18-23.pdf | ||
| Building 7_FINAL SPECIFICATIONS.pdf | ||
| P07 Wage Determintions VA20200172 Roanoke.pdf | ||
| Bldg 9 Vol. 1-8.pdf | ||
| 36C24620R0093_1.docx | DOCX document | |
| Building 9_FINAL SPECIFICATIONS.pdf | ||
| Bldg 7 Vol. 1-8.pdf | ||
| Bldg 7 Vol. 18-23.pdf | ||
| Bldg 7 Vol. 9-17.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THE GENERAL CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES
PRIOR TO NEW STUD INSTALLATION.
2. ALL WALL HUNG ITEMS OR EQUIPMENT PROVIDED BY THE
OWNER OR GENERAL CONTRACTOR SHALL HAVE FIRE TREATED
WOOD BLOCKING WHERE REQUIRED.
3. THE GENERAL CONTRACTOR IS TO FIELD VERIFY THE INTEGRITY
AND PENETRATIONS OF ALL EXISTING RATED PARTITIONS TO
REMAIN COMPLIANT WITH THE LIFE SAFETY PLANS.
4. WHERE NEW WORK IS LIMITED TO A PORTION OF A WALL,
REFINISH ENTIRE WALL TO MATCH EXISTING TO NEAREST
CORNER OR MATERIAL TRANSITION.
1. INSTALL NEW LOUVER AND NEW FLASHING. PAINT EXPOSED
TRIM.
2. INSTALL NEW WOOD SUBSTRATE WHERE IT WAS
DEMOLISHED AND INSTALL NEW SLATE ROOF & FLASHINGS.
3. RECAP EXISTING CHIMNEY. TUCKPOINT & REPAIR ANY
DAMAGED BRICK.
4. INSTALL NEW WOOD TRIM AND COPPER INTEGRAL GUTTER.
5. INSTALL NEW FLAT ROOF WITH GRAVEL STOP & COPING TO
MATCH EXISTING.
6. INSTALL NEW DRIP EDGE ONLY.
7. INSTALL NEW SLATE TILE ON VERTICAL SURFACES OF
DORMERS.
8. INSTALL NEW DOWNSPOUTS.
9. REINSTALL BUILDING SIGNAGE.
10. NEW 42" HIGH SYNTHETIC GUARDRAIL TO MATCH EXISTING
11. EXISTING DOWNSPOUT RECEIVERS TO REMAIN. CLEAN
OUT AS RQD.
12. REPLACE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE
BELOW THE BUILT-IN COPPER GUTTER TO MATCH THE
EXISTING CORNICE IN PROFILE AND FINISH, THE REMAINING
CORNICE IS TO SCRAPED, PRIMED, AND PAINTED.
13. REPLACE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE
AT THE GABLE ENDS TO MATCH THE EXISTING CORNICE IN
PROFILE AND FINISH, THE REMAINING CORNICE AT THE GABLE
ENDS IS TO BE SCRAPED, PRIMED, AND PAINTED.
14. SCRAPE, PRIME, AND REPAINT WOOD GABLE END
MEDALLION.
C1
AE201
C
A E
F
A E
F1
AE201
1 1
C
A E
C
A E
E
A E
C
A E
E
A E
E
A E
LIMITED ACCESS
ABOVE PORTICO
LIMITED ACCESS
ABOVE PORTICO
EXISTING
STAIRWELL
MECHANICAL
ROOM ELEVATOR
OVERUN
AHU
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:4 P
M
FLOOR PLAN - ATTIC SLAB
7 JANUARY, 2019
7 JANUARY, 2019
AE101
MJC SEC
AE101
FLOOR PLAN GENERAL NOTES
FLOOR PLAN KEYED NOTES
1/8" = 1'-0" F1
FLR - ATTIC SLAB - NEW
C
A E
F
A E
C
A E
C
A E
E
A E
C
A E
E
A E
E
A E
AE101A
E7
1"
4 1/8"
/4
1. SNOW GUARD LAYOUT MAY VARY
DEPENDING ON MANUFACTURER. SUBMIT
SNOW GUARD LAYOUT W/ SUBMITTALS.
2. SNOW GUARD MANUFACTURER SHALL USE
GROUND SNOW LOAD OF 30PSF WHEN
DESIGNING SNOW GUARD LAYOUTS.
No.100 SNOWGUARD ASSEMBLY
BY "BERGER BROS. CO."
60˚
1"
2"
1'-5 1/2"
V
IF
E Q
V
IF
E Q
RIDGE (TOP OF ROOF)
EAVE (BOTT. OF ROOF)
X X X X X X X
X X X X X X X
X X X X X X X
2'-0" TYP
LOCATE SECOND GROUP OF SNOW
GUARDS MIDWAY UP ROOF SLOPE.
REVERSE SPACING FROM FIRST
GROUP PATTERN, AS SHOWN.
START THIRD ROW OR SNOW
GUARD ASSEMBLY UP TWO (2)
ROWS OF SLATE FROM THE
SECOND ROW. CENTER
BETWEEN GUARDS ON SECOND
ROW.
START SECOND ROW OF SNOW
GUARD ASSEMBLY TWO (2) ROWS
OF SLATE ABOVE THE FIRST ROW
OF SNOW GUARDS. CENTER
BETWEEN GUARDS ON FIRST ROW.
SNOW GUARD ASSEMBLY.
BEGIN FIRST ROW AT BOTTOM
OF SECOND SLATE COURSE
AND INSTALL AT 2'-0" O/C
HORIZONTALLY.
NOTE: CONTRACTOR SHALL VERIFY
QUANTITY OF SNOW GUARDS
REQUIRED PER ROOF AREA PRIOR
TO BID AND ORDERING OF
MATERIALS.
XXXXXXX
XXXXXXX
XXXXXXX
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:4 P
M
SNOW GUARD LOCATIONS ROOF PLAN
7 JANUARY, 2019
7 JANUARY, 2019
AE101A
MJC SEC
AE101A
1/8" = 1'-0" F1
FLR - ROOF - NEW SNOW GUARD LOCATIONS ROOF PLAN
3" = 1'-0" F7
TYPICAL SNOWGUARD BRACKET
3" = 1'-0" E7
TYPICAL SNOWGUARD LAYOUT
C1
AE201
C
A E
F
A E
F1
AE201
2 2
2 2
2 2
222222
2 2 2 2
2 22 23
4 4 4444
4 4
4 4
44 44
7 77777
777 7
7 7 7 7
7 77 77
7 7 7 777
7 7 7 7
7 7 7 7 7 7
C
A E
C
A E
E
A E
C
A E
E
A E
E
A E
190'-10 3/4"
F6
AE304
TYP
F6
AE304
TYP
F6
AE304
TYP
F6
AE304
TYP
F6
AE304
TYP
F6
AE304
TYP
B1
AE303
TYP
B4
AE303
TYP
B4
AE303
TYP
B1
AE303
TYP
D4
AE304
TYP
B4
AE303
TYP
B4
AE303
TYP
B4
AE303
TYP
B4
AE303
TYP
B4
AE303
TYP
B1
AE303
TYP
B4
AE303
TYP
B4
AE303
TYP
B4
AE303
TYP
B4
AE303
TYP
B4
AE303
TYP
B4
AE303
TYP
B4
AE303
TYP
B4
AE303
TYP
B1
AE303
TYP
B1
AE303
TYP
B1
AE303
TYP
B4
AE303
TYP
B4
AE303
TYP
B1
AE303
TYP
B1
AE303
TYP
B1
AE303
TYP
D1
AE304
TYP
D4
AE304
TYP
F4
AE303
TYP
F4
AE304
TYP
F4
AE303
TYP
F4
AE304
TYP
D1
AE304
TYP
AE102
F7
TYP.
AE102
E7
TYP.
7'-8 5/8" 34'-5 1/8" 27'-1 3/8" 7'-5 1/2" 37'-5 3/8" 7'-5 1/4" 27'-1 5/8" 34'-4 3/4" 7'-9"
13 13
1. THE GENERAL CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES
PRIOR TO NEW STUD INSTALLATION.
2. ALL WALL HUNG ITEMS OR EQUIPMENT PROVIDED BY THE
OWNER OR GENERAL CONTRACTOR SHALL HAVE FIRE TREATED
WOOD BLOCKING WHERE REQUIRED.
3. THE GENERAL CONTRACTOR IS TO FIELD VERIFY THE INTEGRITY
AND PENETRATIONS OF ALL EXISTING RATED PARTITIONS TO
REMAIN COMPLIANT WITH THE LIFE SAFETY PLANS.
4. WHERE NEW WORK IS LIMITED TO A PORTION OF A WALL,
REFINISH ENTIRE WALL TO MATCH EXISTING TO NEAREST
CORNER OR MATERIAL TRANSITION.
1. INSTALL NEW LOUVER AND NEW FLASHING. PAINT EXPOSED
TRIM.
2. INSTALL NEW WOOD SUBSTRATE WHERE IT WAS
DEMOLISHED AND INSTALL NEW SLATE ROOF & FLASHINGS.
3. RECAP EXISTING CHIMNEY. TUCKPOINT & REPAIR ANY
DAMAGED BRICK.
4. INSTALL NEW WOOD TRIM AND COPPER INTEGRAL GUTTER.
5. INSTALL NEW FLAT ROOF WITH GRAVEL STOP & COPING TO
MATCH EXISTING.
6. INSTALL NEW DRIP EDGE ONLY.
7. INSTALL NEW SLATE TILE ON VERTICAL SURFACES OF
DORMERS.
8. INSTALL NEW DOWNSPOUTS.
9. REINSTALL BUILDING SIGNAGE.
10. NEW 42" HIGH SYNTHETIC GUARDRAIL TO MATCH EXISTING
11. EXISTING DOWNSPOUT RECEIVERS TO REMAIN. CLEAN
OUT AS RQD.
12. REPLACE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE
BELOW THE BUILT-IN COPPER GUTTER TO MATCH THE
EXISTING CORNICE IN PROFILE AND FINISH, THE REMAINING
CORNICE IS TO SCRAPED, PRIMED, AND PAINTED.
13. REPLACE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE
AT THE GABLE ENDS TO MATCH THE EXISTING CORNICE IN
PROFILE AND FINISH, THE REMAINING CORNICE AT THE GABLE
ENDS IS TO BE SCRAPED, PRIMED, AND PAINTED.
14. SCRAPE, PRIME, AND REPAINT WOOD GABLE END
MEDALLION.
D4
AE306
D1
AE306
/8
B1
AE303
TYP
F1
AE303
TYP
D4
AE303
TYP
D7
AE303
TYP
C
A E
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:5 P
M
FLOOR PLAN - ROOF
7 JANUARY, 2019
7 JANUARY, 2019
AE102
MJC SEC
AE102
1/8" = 1'-0" F1
FLR - ROOF - NEW
FLOOR PLAN GENERAL NOTES
FLOOR PLAN KEYED NOTES
1/4" = 1'-0" E7
FLR - ROOF - ENLARGED FLAT ROOF PLAN
1/4" = 1'-0" F7
FLR - ROOF - NEW - TYP ENLARGED DORMER
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
2 222
22 2 22 22
33 3 3
4 4
7 77 7
8 888 8 8
11 111111 11 11
4 44
ETR BRICK
NEW SLATE ROOF
NEW WOOD
CORNICE
ETR STONE
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
222 2
3 333
2 2 2 2
2 2222
4 4
8 8 8888
7 7 7 7 7 7
11 11 11111111
4 4
ETR BRICK
NEW SLATE ROOF
NEW WOOD
CORNICE
ETR STONE
12 12
1. THE GENERAL CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES
PRIOR TO NEW STUD INSTALLATION.
2. ALL WALL HUNG ITEMS OR EQUIPMENT PROVIDED BY THE
OWNER OR GENERAL CONTRACTOR SHALL HAVE FIRE TREATED
WOOD BLOCKING WHERE REQUIRED.
3. THE GENERAL CONTRACTOR IS TO FIELD VERIFY THE INTEGRITY
AND PENETRATIONS OF ALL EXISTING RATED PARTITIONS TO
REMAIN COMPLIANT WITH THE LIFE SAFETY PLANS.
4. WHERE NEW WORK IS LIMITED TO A PORTION OF A WALL,
REFINISH ENTIRE WALL TO MATCH EXISTING TO NEAREST
CORNER OR MATERIAL TRANSITION.
1. INSTALL NEW LOUVER AND NEW FLASHING. PAINT EXPOSED
TRIM.
2. INSTALL NEW WOOD SUBSTRATE WHERE IT WAS
DEMOLISHED AND INSTALL NEW SLATE ROOF & FLASHINGS.
3. RECAP EXISTING CHIMNEY. TUCKPOINT & REPAIR ANY
DAMAGED BRICK.
4. INSTALL NEW WOOD TRIM AND COPPER INTEGRAL GUTTER.
5. INSTALL NEW FLAT ROOF WITH GRAVEL STOP & COPING TO
MATCH EXISTING.
6. INSTALL NEW DRIP EDGE ONLY.
7. INSTALL NEW SLATE TILE ON VERTICAL SURFACES OF
DORMERS.
8. INSTALL NEW DOWNSPOUTS.
9. REINSTALL BUILDING SIGNAGE.
10. NEW 42" HIGH SYNTHETIC GUARDRAIL TO MATCH EXISTING
11. EXISTING DOWNSPOUT RECEIVERS TO REMAIN. CLEAN
OUT AS RQD.
12. REPLACE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE
BELOW THE BUILT-IN COPPER GUTTER TO MATCH THE
EXISTING CORNICE IN PROFILE AND FINISH, THE REMAINING
CORNICE IS TO SCRAPED, PRIMED, AND PAINTED.
13. REPLACE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE
AT THE GABLE ENDS TO MATCH THE EXISTING CORNICE IN
PROFILE AND FINISH, THE REMAINING CORNICE AT THE GABLE
ENDS IS TO BE SCRAPED, PRIMED, AND PAINTED.
14. SCRAPE, PRIME, AND REPAINT WOOD GABLE END
MEDALLION.
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:5 P
M
EXTERIOR ELEVATIONS
7 JANUARY, 2019
7 JANUARY, 2019
AE201
MJC SEC
AE201
1/8" = 1'-0" C1
NORTHEAST ELEVATION - NEW
1/8" = 1'-0" F1
SOUTHWEST ELEVATION - NEW
FLOOR PLAN GENERAL NOTES
FLOOR PLAN KEYED NOTES
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
2 2
888 8
11 11 11 11
ETR BRICK
NEW SLATE ROOF
NEW WOOD
CORNICE
ETR STONE
12 12
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
2 2
2 2 2
888 8
1 1
111111 11
44 4
ETR BRICK
NEW SLATE ROOF
NEW WOOD
CORNICE
ETR STONE
12 1212
1. THE GENERAL CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES
PRIOR TO NEW STUD INSTALLATION.
2. ALL WALL HUNG ITEMS OR EQUIPMENT PROVIDED BY THE
OWNER OR GENERAL CONTRACTOR SHALL HAVE FIRE TREATED
WOOD BLOCKING WHERE REQUIRED.
3. THE GENERAL CONTRACTOR IS TO FIELD VERIFY THE INTEGRITY
AND PENETRATIONS OF ALL EXISTING RATED PARTITIONS TO
REMAIN COMPLIANT WITH THE LIFE SAFETY PLANS.
4. WHERE NEW WORK IS LIMITED TO A PORTION OF A WALL,
REFINISH ENTIRE WALL TO MATCH EXISTING TO NEAREST
CORNER OR MATERIAL TRANSITION.
1. INSTALL NEW LOUVER AND NEW FLASHING. PAINT EXPOSED
TRIM.
2. INSTALL NEW WOOD SUBSTRATE WHERE IT WAS
DEMOLISHED AND INSTALL NEW SLATE ROOF & FLASHINGS.
3. RECAP EXISTING CHIMNEY. TUCKPOINT & REPAIR ANY
DAMAGED BRICK.
4. INSTALL NEW WOOD TRIM AND COPPER INTEGRAL GUTTER.
5. INSTALL NEW FLAT ROOF WITH GRAVEL STOP & COPING TO
MATCH EXISTING.
6. INSTALL NEW DRIP EDGE ONLY.
7. INSTALL NEW SLATE TILE ON VERTICAL SURFACES OF
DORMERS.
8. INSTALL NEW DOWNSPOUTS.
9. REINSTALL BUILDING SIGNAGE.
10. NEW 42" HIGH SYNTHETIC GUARDRAIL TO MATCH EXISTING
11. EXISTING DOWNSPOUT RECEIVERS TO REMAIN. CLEAN
OUT AS RQD.
12. REPLACE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE
BELOW THE BUILT-IN COPPER GUTTER TO MATCH THE
EXISTING CORNICE IN PROFILE AND FINISH, THE REMAINING
CORNICE IS TO SCRAPED, PRIMED, AND PAINTED.
13. REPLACE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE
AT THE GABLE ENDS TO MATCH THE EXISTING CORNICE IN
PROFILE AND FINISH, THE REMAINING CORNICE AT THE GABLE
ENDS IS TO BE SCRAPED, PRIMED, AND PAINTED.
14. SCRAPE, PRIME, AND REPAINT WOOD GABLE END
MEDALLION.
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:5 P
M
EXTERIOR ELEVATIONS
7 JANUARY, 2019
7 JANUARY, 2019
AE202
MJC SEC
AE202
1/8" = 1'-0" C1
NORTHWEST ELEVATION - NEW
1/8" = 1'-0" F1
SOUTHEAST ELEVATION - NEW
FLOOR PLAN GENERAL NOTES
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
8 8
11 11
ETR BRICK
NEW SLATE ROOF
NEW WOOD
CORNICE
ETR STONE
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
ETR BRICK
NEW SLATE ROOF
NEW WOOD
CORNICE
ETR STONE
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
8 8
11 11
ETR BRICK
NEW SLATE ROOF
NEW WOOD
CORNICE
ETR STONE
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
4 4
ETR BRICK
NEW SLATE ROOF
NEW WOOD
CORNICE
ETR STONE
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
8 8
11 11
ETR BRICK
NEW SLATE ROOF
NEW WOOD
CORNICE
ETR STONE
12 12
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
22 2
10 10 10
13 13 13
ETR BRICK
NEW SLATE ROOF
NEW WOOD
CORNICE
ETR STONE
12 12
1. THE GENERAL CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES
PRIOR TO NEW STUD INSTALLATION.
2. ALL WALL HUNG ITEMS OR EQUIPMENT PROVIDED BY THE
OWNER OR GENERAL CONTRACTOR SHALL HAVE FIRE TREATED
WOOD BLOCKING WHERE REQUIRED.
3. THE GENERAL CONTRACTOR IS TO FIELD VERIFY THE INTEGRITY
AND PENETRATIONS OF ALL EXISTING RATED PARTITIONS TO
REMAIN COMPLIANT WITH THE LIFE SAFETY PLANS.
4. WHERE NEW WORK IS LIMITED TO A PORTION OF A WALL,
REFINISH ENTIRE WALL TO MATCH EXISTING TO NEAREST
CORNER OR MATERIAL TRANSITION.
1. INSTALL NEW LOUVER AND NEW FLASHING. PAINT EXPOSED
TRIM.
2. INSTALL NEW WOOD SUBSTRATE WHERE IT WAS
DEMOLISHED AND INSTALL NEW SLATE ROOF & FLASHINGS.
3. RECAP EXISTING CHIMNEY. TUCKPOINT & REPAIR ANY
DAMAGED BRICK.
4. INSTALL NEW WOOD TRIM AND COPPER INTEGRAL GUTTER.
5. INSTALL NEW FLAT ROOF WITH GRAVEL STOP & COPING TO
MATCH EXISTING.
6. INSTALL NEW DRIP EDGE ONLY.
7. INSTALL NEW SLATE TILE ON VERTICAL SURFACES OF
DORMERS.
8. INSTALL NEW DOWNSPOUTS.
9. REINSTALL BUILDING SIGNAGE.
10. NEW 42" HIGH SYNTHETIC GUARDRAIL TO MATCH EXISTING
11. EXISTING DOWNSPOUT RECEIVERS TO REMAIN. CLEAN
OUT AS RQD.
12. REPLACE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE
BELOW THE BUILT-IN COPPER GUTTER TO MATCH THE
EXISTING CORNICE IN PROFILE AND FINISH, THE REMAINING
CORNICE IS TO SCRAPED, PRIMED, AND PAINTED.
13. REPLACE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE
AT THE GABLE ENDS TO MATCH THE EXISTING CORNICE IN
PROFILE AND FINISH, THE REMAINING CORNICE AT THE GABLE
ENDS IS TO BE SCRAPED, PRIMED, AND PAINTED.
14. SCRAPE, PRIME, AND REPAINT WOOD GABLE END
MEDALLION.
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:0 P
M
EXTERIOR ELEVATIONS
7 JANUARY, 2019
7 JANUARY, 2019
AE203
MJC SEC
AE203
1/8" = 1'-0" C1
WEST ELEVATION A - NEW
1/8" = 1'-0"
C3
EAST ELEVATION A - NEW
1/8" = 1'-0" C5
EAST ELEVATION B - NEW
1/8" = 1'-0" E1
EAST ELEVATION C - NEW
1/8" = 1'-0"
E4
WEST ELEVATION B - NEW
1/8" = 1'-0" E6
WEST ELEVATION C - NEW
FLOOR PLAN GENERAL NOTES
EXISTING T&G SHEATHING
WALL UNDERLAYMENT
EXISTING T&G DECKING
ICE/WATER SHIELD
UNDERLAYMENT
BASE FLASHING (TYP)
4"
T O
G A
P
3"
ICE/WATER SHIELD UNDERLAYMENT, TYP
SLATE SHINGLES
COPPER DRIP EDGE WITH
INTEGRAL CANT. MECH
ATTACHED @ 6" O.C AND
SET IN WATER CUT-OFF
MASTIC
WOOD FASCIA
METAL LOUVERS
/8
/8
COPPER FLASHING.
MECH. ATTACHED @
6" O.C AND SET IN
WATER CUT-OFF MASTIC
SLATE SHINGLES
ICE/WATER SHIELD
UNDERLAYMENT, TYP
EXISTING T&G
DECKING
EXISTING FRAMING
VIF
A2
AE301
B2
AE301
C2
AE301
FIELD SLATE SHINGLES
RAKE FLASHING (TYP.)
ICE/WATER SHIELD
UNDERLAYMENT
EXISTING T&G DECKING
TYP
6" MIN
1"±
ICE/WATER SHIELD
UNDERLAYMENT
FIELD SLATE
SHINGLES
EXISTING T&G
DECKING
NAIL @ 16" O.CEXISTING RAKE
BOARD
RAKE FLASHING
TYP
/2
3"
RAGGLE (SAW CUT)
1 1/2" MIN
HOOK DAM
LEAD WEDGE
BACKER ROD
AND SEALANT
COUNTERFLASHING (TYP.)
BASE FLASHING (TYP.)
1/2" HEM
ICE/WATER SHIELD
UNDERLAYMENT
EXISTING T&G DECKING
EXISTING
MASONRY
WALL
LE
N G
TH
E
XP
O
SU
R E
H E A D
LA
P
1"
T O
(N A
IL
IN
G
FLA
N G
E
4"
MIN.
1/ 4"
T O
/2
NAIL BASE FLASHING
ABOVE TOP EDGE OF
SLATE.
EXISTING T&G DECKING
BASE FLASHING (TYP.)
ALTERNATIVE NAIL LOCATION
FIELD SLATE SHINGLES
ICE/WATER
SHIELD UNDERLAYMENT
M
IN
M
IN
4"
MIN
. L
AP
4"
MIN
8" M
IN
1/2" TO
1" GAP
1/2"
HEM
IF THE COUNTERFLASHING HEIGHT IS GREATER
THAN 8", A HEAVY GAUGE COPPER CLIP
SHALL
BE SOLDERED TO THE UNDERLYING
COUNTERFLASHING AND FOLDED OVER THE
OVERLYING COUNTERFLASHING AS SHOWN
CENTERED VERTICALLY.
C U T
AW
AY
V
IE
W
COUNTERFLASHING (TYP.)
UNDERLYING
BASE FLASHING (TYP)
FIELD STALE SHINGLES
EXISTING T&G DECKING
ICE/WATER SHIELD
UNDERLAYMENT
BASE FLASHING
(TYP.)
EXSTING MASONRY
2"
JOINT SEALANT
ICE/WATER SHIELD WALL
UNDERLAYMENT
COPPER DORMER WALL
FLASHING, CONTINUOUS
FULL HEIGHT OF WINDOW.
EXTEND TOP END BEHIND
CROWN MOLDING 1" MIN.
1/2" HOOK DAM,
FLATTEN TO ALLOW
SLATE TO LIE FLAT
HEM TO PROVIDE
CLEAN EDGE
BEND FOR SNUG FIT
TO OUTSIDE CASING.
EXISTING WALL SHEATHING
EXISTING FRAMING
+/- 1/2"
3 3/4" 6 1/4" 6"
/2
/2
SLATE
LOOKOUTS
LEAD PIPE SLEEVE
METAL LINED GUTTER
SCREEN
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:0 P
M
ROOFING DETAILS
7 JANUARY, 2019
7 JANUARY, 2019
AE301
MJC SEC
AE301
1 1/2" = 1'-0" D2
BASE FLASHING SECTION
3/4" = 1'-0" A2
DORMER SECTION
3/4" = 1'-0" B2
DORMER WINDOW SILL
3/4" = 1'-0"
B4
EXISTING DORMER ELEVATION
1 1/2" = 1'-0" F2
RAKE FLASHING DETAIL
1 1/2" = 1'-0" A1
RAKE FLASHING SECTION
3/4" = 1'-0" D3
REGLET SECTION
1 1/2" = 1'-0" F6
TYP. BASE FLASHING DETAIL
1 1/2" = 1'-0" D4
TYP. COUNTERFLASHING DETAIL
3" = 1'-0" C2
DORMER SIDE WALL
3/4" = 1'-0" F4
EXISTING TYPICAL SECTION THROUGH CORNICE
FIELD SLATE 20" OR 24"
LENGTH BY 12" WIDTH
DORMER SLATE 16"
LENGTH BY 8" WIDTH
+/- 3'-6 1/2"
C3
AE302
C3
AE302
F1
AE302
F4
AE302
ALL WOOD TRIM AROUND
LOUVERS IS TO BE REPLACED
WITH NEW TRIM TO MATCH
THE EXISTING.
ALL LOUVERS ON SLATE ROOFS
TO BE REPLACED W/ NEW
PREFINISHED ALUMINUM
LOUVERS. EXHAUST/INTAKE
DUCT WORK HAS BEEN
ATTACHED TO THE BACK OF THE
LOUVERS AT SOME LOCATIONS.
CONTRACTOR TO VERIFY
LOCATIONS PRIOR TO PROVIDING
BID.
FIELD SLATE 20" OR 24"
LENGTH BY 12" WIDTH
DORMER SLATE 16"
LENGTH BY 8" WIDTH
AE303
F4
TYP
B1
AE303
TYP
D4
AE303
TYP
D7
AE303
TYP
F1
AE303
TYP
C3
AE302
AE302
F1
AE302
F4
AE302
F6
ATTIC SLAB
112'-7"
1/2" COPPER HOOK DAM, FLATTEN
TO ALLOW SLATE TO LIE FLAT.
COPPER DORMER WALL FLASHING,
CONT. FULL HEIGHT OF LOUVER.
EXTEND TOP END BEHIND CROWN
MOLDING 1" MIN. INSTALL OVER
SELF-ADHERING UNDERLAYMENT.
SECURE INTO WOOD FRAMING W/
COPPER NAILS AT 4" O/C.
NEW CONT. #30 FELT UNDERLAYMENT.
INSTALL OVER SELF-ADHERING
UNDERLAYMENT IN ACCORDANCE
WITH THE PROJECT DOCUMENTS AND
SPECIFICATIONS. LAP ONTO STEP
FLASHING. SEE FOR
ADDITIONAL INFORMATION.
NEW CONT. SELF-ADHERING
UNDERLAYMENT. INSTALL ON VERTICAL
DORMER WALLS. LAP ONTO SELF-
ADHERING ROOF UNDERLAYMENT. SEE
FOR ADDITIONAL INFORMATION.
INSTALL NEW SLATE TO MATCH
EXISTING SLATE LAYOUT IN
ACCORDANCE WITH THE PROJECT
DOCUMENTS AND SPECIFICATIONS.
AT SOME LOUVER LOCATIONS MECHANCIAL
DUCT EXISTS IN THE ATTIC. AT THESE
LOCATIONS THE DUCT IS SECURED INTO THE
WOOD BLOCKING FROM THE INSIDE OF THE
DUCT. HOLES IN THE LOUVERS MUST BE
MADE TO ACCESS THE DUCT FASTENERS
AND A SECTION OF THE DUCT REMOVED IN
ORDER TO REMOVE THE LOUVER. PROVIDE
SUPPLEMENTAL WOOD BLOCKING IN THE
ATTIC SO DUCT CAN BE SECURED FROM THE
EXTERIOR WITH REINSTALLED.
INTERIOR
OF DUCT
NEW WOOD TRIM TO MATCH EXISTING
SIZE AND PROFILE. SECURE INTO
EXISTING RAFTERS W/ (2) S.S. TRIM
SCREWS AT EACH RAFTER.
/F1 AE303
/F1 AE303
SELF-ADHERING UNDERLAYMENT
ADHERE TO NEW PLYWOOD
LEVELING LAYER.
INSTALL SLATE STARTER
COURSE AT PERIMETER.
SLATE SHALL EXTEND
1-1/2" BEYOND
EXTERIOR FACE OF
WOOD TRIM/FASCIA AT
EAVE.
INSTALL NEW SLATE IN ACCORDANCE WITH
THE PROJECT DOCUMENTS AND
SPECIFICATIONS. SECURE W/ (2) COPPER
NAILS THROUGH EXISTING HOLES IN SLATE.
EXISTING WOOD FRAMING
EXISTING LOUVER. ALL LOUVERS ARE TO BE
REPLACED WITH NEW PREFINISHED ALUMINUM
TO MATCH EXISTING. AT SOME LOCATIONS
WINDOW IS PRESENT IN LIEU OF LOUVER.
CONT. SELF-ADHERING
UNDERLAYMENT FLASHING STRIP.
EXTEND ONTO SELF-ADHERING
UNDERLAYMENT AND COPPER
DRIP EDGE.
EXISTING T&G WOOD PLANK DECK.
SEE D1/AE305 FOR REPLACEMENT
OF DAMAGED SECTIONS OF DECK.
NEW CONT 1/2" PLYWOOD SHEATHING
LEVELING LAYER. SECURE W/ 8d NAILS
AT 8" O/C AT EACH ROOF JOIST.
NEW CONT. 1/4"x1 1/2" PRESSURE
TREATED CANT STRIP. SECURE THRU
COPPER FLASHING AND SELF-ADHERED
UNDERLAYMENT INTO DECK W/ #10
CTD. FLATHEAD SCREWS AT 12"O.C.
STAGGERED.
NEW 20 OZ. COPPER DRIP
EDGE. FABRICATE TO PROFILE
SHOWN. SECURE TO DECK W/
COPPER NAILS AT 6"O.C.
1/2
AE305
D5
NEW WOOD TRIM/FASCIA TO
MATCH EXISTING SIZE AND
PROFILE. SECURE INTO EXISTING
WOOD RAFTERS W/ TWO (2) S.S.
TRIM SCREWS AT EACH RAFTER.
INSTALL NEW SLATE TO MATCH EXISTING
SLATE IN ACCORDANCE WITH THE PROJECT
DOCUMENTS AND SPECIFICATIONS. SECURE
W/ (2) COPPER NAILS THROUGH EXISTING
HOLES IN ACCORDANCE W/ TYPICAL
FLASHING METHODS FOR SLATE.
EXISTING WOOD
FRAMING
EXISTING LOUVER TO BE REMOVED. ALL LOUVERS ARE TO
BE REPLACED WITH NEW PREFINISHED ALUMINUM LOUVERS
TO MATCH EXISTING. SEE ELEVATIONS FOR LOUVER
LOCATIONS.
EXISTING T&G WOOD PLANK
DECK. SEE D1/AE305 FOR
REPLACEMENT OF DAMAGED
SECTIONS OF DECK.
SELF-ADHERING UNDERLAYMENT ADHERE
TO NEW PLYWOOD LEVELING LAYER. TURN
UP WOOD FRAMING AND TERMINATE WITH
P.T. WOOD BLOCKING.
NEW CONT. 1/2" PLYWOOD SHEATHING
LEVELING LAYER. SECURE W/ 8d NAILS
AT 8" O/C AT EACH ROOF JOIST.
AT LOUVER
LOCATIONS INSTALL 20
OZ COPPER PAN W/
1/2" BACK DAM UNDER
WOOD NEW WOOD
SILL.
AE305
D5
AE302
F6
NEW PEEL AND STICK
TRACTION MEMBRANE
FOR INFORMATION NOT SHOWN SEE F4/AE302
EXISTING DRAIN PIPING EXISTS AT
SOME LOCATIONS.
PROVIDE FILLET BEADS OF SPECIFIED
SEALANT AROUND PIPE BEFORE AND
AFTER INSTALLATION OF COPPER
APRON FLASHING.
PROVIDE FILLET BEADS OF URETHANE
SEALANT AROUND PIPE AFTER
INSTALLATION OF SELF-ADHERING
UNDERLAYMENT.
NEW COPPER APRON FLASHING.
INSTALL AND SECURE INTO WOOD
BLOCKING W/ #12 S.S. SCREWS
THROUGH EPDM SEALING WASHERS.
NEW WOOD SILL TO MATCH EXISTING SIZE AND
PROFILE WHERE LOUVERS ARE TO BE REPLACED.
SECURE INTO WOOD FRAMING W/ (2) S.S. TRIM
SCREWS AT 12" O/C. CLEAN, PRIME AND PAINT.
SILL AT WINDOW LOCATIONS TO REMAIN.
NEW P.T. WOOD BLOCKING. SECURE THORUGH
SELF-ADHERING UNDERLAYMENT INTO WOOD
FRAMING W/ (2) ROUND #10 S.S. WOOD
SCREWS AT 12" O/C. LEAVE ROOM ABOVE
BLOCKING TO ALLOW FOR THE INSTALLATION
OF NEW COPPER APRON FLASHING.
NEW COPPER FLASHING CLEAT.
INSTALL AND SECURE BETWEEN
SLATE WITH COPPER NAILS.
INSTALL A CONT. BEAD OF APPROVED
SEALANT BETWEEN WOOD SILL AND
FLASHING.
AE305
D5
NEW METAL SILL PAN & END DAM PER LOUVER
MFGR RECOMMENDATIONS
NEW PEEL AND STICK TRACTION
MEMBRANE
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:0 P
M
ROOFING DETAILS
7 JANUARY, 2019
7 JANUARY, 2019
AE302
MJC SEC
AE302
3/4" = 1'-0" C1
TYPICAL DORMER LOUVER ELEVATION
NTS
C5
TYPICAL DORMER SIDE ELEVATION
3" = 1'-0" C3
PLAN - DORMER SIDE WALL
3" = 1'-0" F1
DORMER SECTION
3" = 1'-0"
F4
DORMER LOUVER/WINDOW SILL
6" = 1'-0" F6
ENLARGED DORMER LOUVER/WINDOW SILL
EXISTING WOOD RAFTERS
2" LG. COPPER CLEAT SPACED AT 12"
O/C. ON BOTH SIDES OF VALLEY.
SECURE EACH CLEAT W/ (2) COPPER
NAILS. BEND BACK OF CLEAT TO
CONCEAL NAILS.
30" WIDE, 20 OZ. COPPER VALLEY
FLASHING. FABRICATE TO PROFILE
SHOWN. SECURE TO DECK W/
COPPER CLEATS EACH SIDE.
FIELD SLATE. FIELD CUT AS
REQUIRED. SECURE INTO DECK
W/ COPPER NAILS.
NOTE: DO NOT PENETRATE COPPER VALLEY
FLASHING W/ FASTENERS. ADD ADDITIONAL
HOLES IN SLATE OR USE COPPER TIE WIRE
TO FASTENED SLATE TO DECK.
EXISTING T&G WOOD PLANK DECK.
SEE D1/AE305 FOR REPLACEMENT OF
DAMAGED SECTIONS OF DECK.
NEW CONT. 1/2" PLYWOOD
SHEATHING LEVELING LAYER.
SEE OTHER SECTIONS FOR
ADDITIONAL INFORMATION.
20 OZ COPPER CANT STRIP ON
EACH SIDE OF VALLEY. SOLDER TO
COPPER VALLEY FLASHING.
36" SELF-ADHERING UNDERLAYMENT
FLASHING STRIP. ADHERE TO PLYWOOD
EXTENDING 18" UP EACH SIDE OF VALLEY
SELF-ADHERING FLASHING. ADHERE TO
UNDERLAYMENT AND EXTEND ONTO
COPPER VALLEY FLASHING DOWN TO
THE EDGE OF THE SLATE.
1'-3"
1'-3"
1'-6" (E
ACH SIDE)
AE305
D5
EXISTING WOOD RAFTERS
SELF ADHERING MEMBRANE FLASHING. ADHERE TO
UNDERLAYMENT (MIN. 3"). EXTEND UP AND OVER
RIDGE/HIP NAILERS CONTINUE DOWN OTHER SIDE AND
TERMINATE (3" MIN) BEYOND NAILER.
1"x4" RIDGE/HIP NAILERS AT EACH SIDE OF PEAK. INSTALL AS CLOSE
TO THE RIDGE LINE AS POSSIBLE. SECURE INTO DECK W/ #12 CTD.
SCREWS AT 12" O/C STAGGERED.
EXISTING T&G WOOD PLANK
DECK. SEE D1/AE305 FOR
REPLACEMENT OF DAMAGED
SECTIONS OF DECK.
NEW CONT. 1/2" PLYWOOD SHEATHING
LEVELING LAYER. SECURE W/ 8d NAILS AT
8" O/C AT EACH ROOF JOIST
(2) PIECE HIP CAPS. SECURE EACH
SEGMENT INTO HIP NAILERS W/
COPPER NAILS.
INDIVIDUAL 20 OZ COPPER CAP FLASHING
SEGMENTS. BED TO PROFILE SHOWN. SECURE
BETWEEN HIP CAPS.
SELF-ADHERING UNDERLAYMENT.
ADHERE TO PLYWOOD
SHEATHING. EXTEND AND
CONTINUE ACROSS RIDGE.
INSTALL A CON'T. BEAD OF SEALANT
AT PEAK BETWEEN SLATE.
(MIN. LAP)
3"
(MIN. LAP)
3"
AE305
D5
EXISTING WOOD RAFTER
EXISTING WOOD FRAMING
NEW WOOD TRIM TO MATCH EXISTING SIZE AND
PROFILE. SECURE INTO EXISTING RAFTERS W/
(2) S.S. TRIM SCREWS AT EACH RAFTER.
INSTALL SLATE STARTER COURSE AT PERIMETER.
SLATE SHALL EXTEND 1-1/2" BEYOND EXTERIOR
FACE OF WOOD TRIM/FASCIA AT EAVE.
NEW CONT. SELF-ADHERING UNDERLAYMENT. EXTEND UP VERTICAL
WALL SURFACE AT DORMER. TURN OUT ONTO ROOF LAPPING ONTO
SELF-ADHERING UNDERLAYMENT AS SHOWN.
NEW CONT. SELF-ADHERING UNDERLAYMENT ON VERTICAL
WALL SURFACE OF DORMER. LAP OVER COPPER STEP
FLASHING AS SHOWN.
INSTALL NEW/ SLATE TO MATCH EXISTING SLATE LAYOUT IN
ACCORDANCE WITH THE PROJECT DOCUMENTS AND
SPECIFICATIONS. SECURE W/ (2) COPPER NAILS THROUGH
EXISTING HOLES IN ACCORDANCE W/ TYPICAL FLASHING
METHOD FOR SLATE.
EXISTING WOOD FRAMING
EXTEND NEW SELF-ADHERING UNDERLAYMENT AS
FAR AS POSSIBLE BEHIND WOOD TRIM/FASCIA.
INSTALL NEW SLATE TO MATCH EXISTING SLATE IN
ACCORDANCE WITH THE PROJECT DOCUMENTS AND
SPECIFICATIONS.
EXISTING 1"x6" T&G WOOD PLANK DECK.
REPLACE DAMAGED AND DETERIORATED
WOOD PLANK DECK PER TYPICAL DETAIL
D1/AE305 ORIENTATION OF T&G DECK MAY
DIFFER FROM THAT SHOWN.
FIELD SLATE. SECURE TO DECK W/ COPPER NAILS.
CONT. 20 0Z. COPPER STEP FLASHING INSTALL BETWEEN
FIELD SLATE COURSES. FABRICATE TO PROFILE SHOWN.
SECURE THRU SLATE INTO DECK W/ (2) COPPER NAILS.
EXISTING T&G WOOD PLANK DECK. SEE
D1/AE305 FOR REPLACEMENT OF DAMAGED
SECTIONS OF DECK.
CONT. SELF-ADHERING UNDERLAYMENT. ADHERE TO NEW PLYWOOD.
SELF-ADHERING MEMBRANE FLASHING. ADHERE TO
PLYWOOD AND EXTEND OVER COPPER DRIP EDGE AS
SHOWN.
NEW CONT. 1/4" x 1 1/2" PRESSURE TREATED CANT
STRIP. SECURE THRU COPPER FLASHING AND
SELF-ADHERING UNDERLAYMENT INTO DECK W/ #10
CTD. FLATHEAD SCREWS AT 12" O.C. STAGGERED.
NEW 20 OZ. COPPER DRIP EDGE. FABRICATE TO
PROFILE SHOWN. SECURE TO DECK COPPER NAILS
AT 6" O.C.
V A
R
IE
S
R O
O F
S L O
P E
S
4"
"6
M
IN
1'-4"
1 1/2"
AE305
D5
AE305
D5
EXISTING WOOD RAFTERS
FIELD SLATE. CUT AS REQUIRED TO
MATCH ANGLE OF HIP. SECURE TO DECK
W/ COPPER NAILS.
SELF ADHERING MEMBRANE FLASHING. ADHERE TO
UNDERLAYMENT (MIN. 3"). EXTEND UP AND OVER
RIDGE/HIP NAILERS CONTINUE DOWN OTHER SIDE AND
TERMINATE (3" MIN) BEYOND NAILER.
1"x4" RIDGE/HIP NAILERS AT EACH SIDE OF PEAK. INSTALL AS CLOSE
TO THE RIDGE LINE AS POSSIBLE. SECURE INTO DECK W/ #12 CTD.
SCREWS AT 12" O/C STAGGERED. INSTALL A CON'T. BEAD OF SEALANT
AT PEAK BETWEEN SLATE.
EXISTING T&G WOOD PLANK
DECK. SEE D1/AE305 FOR
REPLACEMENT OF DAMAGED
SECTIONS OF DECK.
NEW CONT. 1/2" PLYWOOD SHEATHING
LEVELING LAYER. SECURE W/ 8d NAILS AT
8" O/C AT EACH ROOF JOIST
SELF-ADHERING UNDERLAYMENT. ADHERE
TO PLYWOOD SHEATHING. EXTEND AND
CONTINUE ACROSS RIDGE.
(MIN. LAP)
3"
(MIN. LAP)
3"
AE305
D5
NEW CONT. SELF-ADHERING
UNDERLAYMENT. INSTALL OVER
NEW PLYWOOD IN ACCORDANCE
WITH THE PROJECT DOCUMENTS
AND SPECIFICATIONS.
INSTALL NEW SLATE TO MATCH EXISTING SLATE
LAYOUT IN ACCORDANCE WITH THE PROJECT
DOCUMENTS AND SPECIFICATIONS. SECURE W/
(2) COPPER NAILS THROUGH EXISTING HOLES IN
ACCORDANCE W/ TYPICAL FLASHING METHOD
FOR SLATE.
EXISTING T&G WOOD PLANK DECK.
SEE D1/AE305 FOR REPLACEMENT
OF DAMAGED SECTIONS OF DECK.
(ORIENTATION MAY DIFFER FROM
THAT SHOWN).
NEW COPPER HIP FLASHING.
NEW CONT. 1/2" PLYWOOD
SHEATHING LEVELING LAYER
SECURE W/ 8d NAILS AT 8" O/C
AT EACH ROOF JOIST.
SEE OTHER SECTIONS
AND DETAILS FOR NEW
ROOFING
EXISTING BRICK VENEER
ROOF SLOPE VARIES
STEP #1
NEW 20 OZ COPPER STEP
FLASHING. LACE STEP
FLASHING BETWEEN SLATE.
SEE OTHER SECTIONS
AND DETAILS FOR NEW
ROOFING
STEP #2
ROOF SLOPE VARIES
THIS ELEVATION SHOWN SCHEMATICALLY.
LENGTH AND HEIGHT OF NEW STEPPED
COUNTERFLASHING MAY VARY FROM THAT
SHOWN DEPENDING ON ROOF SLOPE.
LAP STEPPED SECTIONS
OF COUNTERFLASHING A
MIN. OF 2-1/2" AS SHOWN.
NEW STEPPED SECTIONS 20 OZ
COPPER COUNTERFLASHING WITH
AND VERTICAL CAULK TRAYS. SET IN
CUT REGLET. SEE SECTION
FOR ADDITIONAL INFORMATION
PROVIDE VERTICAL CAULK
TRAYS ON STEPPED SECTIONS
OF COUNTERFLASHING. CUT
AND FLATTEN HORIZONTAL
CAULK TRAY THAT EXTENDS
BENEATH UPPER SECTION OF
COUNTERFLASHING.
SECURE UPPER AND
LOWER SECTIONS OF
COUNTERFLASHING
WITH (1) COPPER POP
RIVET (TYPICAL). DO
NOT PENETRATE STEP
FLASHING.
EXISTING BRICK VENEER
MIN.
2 1/2"
/B7 AE303
FIELD SLATE. SECURE TO DECK W/ COPPER NAILS.
CONT. 20 0Z. COPPER STEP FLASHING PLACE
BETWEEN FIELD SLATE. FABRICATE TO
PROFILE SHOWN. SECURE INTO DECK W/
COPPER NAILS.
CONT. SELF-ADHERING FLASHING. ADHERE TO
PLYWOOD SHEATHING, LAP ONTO SELF-
ADHERING UNDERLAYMENT. EXTEND UP WALL
BEYOND TOP OF STEP FLASHING AND
TERMINATE W/ TERMINATION BAR AS SHOWN.
EXISTING MASS MASONRY WALL
CONT. BEAD OF SILICONE SEALANT.
CONT. 0.125" ALUMINUM
TERMINATION BAR W/
INTEGRAL CAULK TRAY.
SECURE THRU
BITUTHENE FLASHING
INTO EXISTING MASONRY
WALL W/ S.S. CONCRETE
SCREWS W/ EPDM
SEALING WASHERS AT 8"
O/C. PROVIDE A CONT.
BEAD OF SEALANT IN
CAULK TRAY AS SHOWN.
EXISTING WOOD RAFTER
EXISTING T&G WOOD PLANK
DECK. SEE D1/AE305 FOR
REPLACEMENT OF DAMAGED
SECTIONS OF DECK.
CONT. SELF-ADHERING UNDERLAYMENT.
ADHERE TO NEW PLYWOOD.
NEW CONT. 20 OZ. COPPER SPRING
ACTION COUNTERFLASHING. SEE
FOR ADDITIONAL INFORMATION.
FABRICATE TO PROFILE AS SHOWN. SET IN
CUT REGLET.
MIN.
4"
MIN.
4"
M
IN
1 1/2"
4"
AE305
D5
/D1 AE306
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:0 P
M
ROOFING DETAILS
7 JANUARY, 2019
7 JANUARY, 2019
AE303
MJC SEC
AE303
3" = 1'-0" B1
SLOPING VALLEY
3" = 1'-0"
B4
MAIN RIDGE
3" = 1'-0" F1
DORMER WALL
3" = 1'-0" D4
DORMER RIDGE
1" = 1'-0"
D7
DORMER MITERED HIP
1 1/2" = 1'-0" F4
FLASHING ELEVATION
3" = 1'-0" B7
SECTION - RAKE WALL
| Building 9_FINAL CD DRAWINGS 9 |
| Building 9_FINAL CD DRAWINGS 10 |
| Building 9_FINAL CD DRAWINGS 11 |
| Building 9_FINAL CD DRAWINGS 12 |
| Building 9_FINAL CD DRAWINGS 13 |
| Building 9_FINAL CD DRAWINGS 14 |
| Building 9_FINAL CD DRAWINGS 15 |
| Building 9_FINAL CD DRAWINGS 16 |
| Building 9_FINAL CD DRAWINGS 17 |