Bldg 9 Vol. 18-23.pdf
PDF 2 MB Posted
- Attached to
- Y1DA--Replace Building 7 and Building 9 Roofs Federal contract opportunity
- Solicitation number
- 36C24620R0093
About this file
This solicitation requests proposals to replace roofs on two buildings at a Department of Veterans Affairs medical center. The solicitation seeks contractors to replace the roofs on Building 7 and Building 9 at the Veterans Integrated Service Network 6 facility. Contractors should provide all necessary labor, materials, equipment and supervision to remove existing roofing systems and install new roofing that meets specifications. Proposals are due by the date listed in the solicitation. The awarded firm will be expected to complete roof replacements while minimizing disruption to medical center operations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bldg 9 Vol. 1-8.pdf | ||
| Bldg 9 Vol. 9-17.pdf | ||
| 36C24620R0093_1.docx | DOCX document | |
| Building 9_FINAL SPECIFICATIONS.pdf | ||
| Building 7_FINAL SPECIFICATIONS.pdf | ||
| P07 Wage Determintions VA20200172 Roanoke.pdf | ||
| Bldg 7 Vol. 1-8.pdf | ||
| Bldg 7 Vol. 18-23.pdf | ||
| Bldg 7 Vol. 9-17.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXISTING FRAMING
EXISTING EXTERIOR BRICK VENEER
INSTALL NEW SLATE IN ACCORDANCE WITH THE
PROJECT DOCUMENTS AND SPECIFICATIONS.
SECURE W/ (2) COPPER NAILS THROUGH
EXISTING HOLES IN SLATE.
NEW 20 OZ. COPPER GUTTER LINER. SET IN
APPROVED ADHESIVE (APPLIED IN SPOTS AT 16"
O.C. TO SECURE IN-PLACE DURING INSTALLATION).
FABRICATE TO PROFILE SHOWN. SECURE TO W/
DRIP EDGE AND EXTERIOR CLIPS. CONTINUOUS
SOLDER ALL JOINTS.
NEW CONT. 1/4"x1 1/2" PRESSURE
TREATED CANT STRIP. SECURE THRU
COPPER FLASHING AND SELF-ADHERING
UNDERLAYMENT INTO DECK W/ #10 CTD.
FLATHEAD SCREWS AT 12"O.C.
STAGGERED.
NEW 20 OZ. COPPER PRIMARY
DOWNSPOUT BOOT W/ 4" FLANGES.
FABRICATE TO FIT EXISTING OPENING.
SECURE WITH APPROVED FASTENERS.
NEW COPPER DOWNSPOUT. (SIZE TO MATCH
EXISTING) SEE TYPICAL DOWNSPOUT
DETAILS ON SHEET AE305
NEW COPPER STRAINER AT EACH
DOWN SPOUT LOCATION. SUBMIT
SAMPLE FOR APPROVAL.
NEW 20 OZ. COPPER DRIP EDGE. FABRICATE
TO PROFILE SHOWN. SECURE TO DECK
COPPER NAILS AT 6"O.C.
NEW 20 OZ. COPPER
FLASHING. FABRICATE TO
PROFILE SHOWN. JOIN
TO CLEAT, CLIP AND
GUTTER LINER W/
CONTINUOUS SOLDERED
FLAT SEAM.
SELF-ADHERED UNDERLAYMENT
DOWNSPOUT BOOT FLASHING.
ADHERE TO EXISTING WOOD
BLOCKING.
NEW 20 OZ. COPPER SECONDARY
DOWN SPOUT BOOT FLASHING.
EXTEND INTO DOWN SPOUT 2"
MIN. SOLDER CONT. TO LINER.
NEW CONTINUOUS 20
OZ. COPPER CLEAT.
SECURE TO CORNICE
WITH APPROVED
FASTENERS.
SELF-ADHERING UNDERLAYMENT GUTTER
FLASHING. ADHERE TO DECK, EXTEND INTO
GUTTER AND TERMINATE.
EXISTING 1"X6" T&G WOOD PLANK DECK. REPLACE
DAMAGED AND DETERIORATED WOOD PLANK DECK
PER TYPICAL DETAIL D1/AE305. ORIENTATION OF T&G
DECK MAY DIFFER FROM THAT SHOWN.
COPPER CLIPS AT 12"
O/C. SEE
EXISTING WOOD
SILL PLATES. REPLACE
ALL DAMAGED AND
DETERIORATED
SECTIONS WITH P.T. 2 X.
SEE SPECIFICATIONS
FOR ALLOWANCES.
AE305
D5
NEW WOOD TRIM TO MATCH EXISTING
SIZE AND PROFILE. SECURE INTO
EXISTING RAFTERS W/ (2) S.S. TRIM
SCREWS AT EACH RAFTER.
EXISTING WOOD FRAMING.
REPLACE ALL DAMAGED AND
DETERIORATED FRAMING.
SEE SPECIFICATION FOR
ALLOWANCES. PRIME AND
PAINT AS SPECIFIED. ALL
WOOD TRIM TO BE SECURED
TO SOLID/SOUND
UNDAMAGED STRUCTURE.
/B5 AE305
N E
W W
O R
K
REPLACE UP TO 250LF (LINEAR FEET) OF WOOD
CORNICE BELOW THE BUILT-IN COPPER GUTTER TO
MATCH THE EXISTING CORNICE IN PROFILE AND
FINISH, THE REMAINING CORNICE IS TO SCRAPED,
PRIMED, AND PAINTED.
NEW COPPER APRON FLASHING. INSTALL AND
SECURE W/ COPPER CLEAT. EXTEND UP
MASONRY WALL AND SECURE W/ S.S.
CONCRETE SCREWS AT 12" O/C.
INSTALL NEW SLATE TO MATCH EXISTING
SLATE IN ACCORDANCE WITH THE PROJECT
DOCUMENTS AND SPECIFICATIONS. SECURE W/
(2) COPPER NAILS THROUGH EXISTING HOLES.
EXISTING T&G WOOD PLANK
DECK. SEE D1/AE305 FOR
REPLACEMENT OF DAMAGED
SECTIONS OF DECK.
NEW COPPER FLASHING CLEAT. INSTALL
AND SECURE BETWEEN SLATE WITH
COPPER NAILS.
SELF-ADHERING UNDERLAYMENT
ADHERE TO NEW PLYWOOD LEVELING
LAYER AND EXTEND UP MASONRY
WALL. TERMINATE WITH COPPER
APRON FLASHING AS SHOWN.
NEW CONT. 1/2" PLYWOOD SHEATHING
LEVELING LAYER. SECURE W/ 8d NAILS
AT 8" O/C AT EACH ROOF JOIST.
NEW CONT. 20 OZ. COPPER COUNTERFLASHING.
FABRICATE TO PROFILE SHOWN, SAWCUT A
REGLET INTO MASONRY JOINT TO A MIN. DEPTH
OF 1-1/2" COUNTERFLASHING SHALL BE HELD IN
PLACE BY SPRING ACTION OR WEDGES. INSTALL
PER 'SMACNA' FIG. 4-4.
EXISTING
MASONRY
CHIMNEY
CONT. BEAD OF SILICONE SEALANT.
EXISTING WOOD RAFTER
20 OZ. COPPER CLEAT SECURE W/
S.S. CONCRETE SCREWS AT 12" O/C.
1 1/2"
AE305
D5
S E
C T
IO
N
A
-A
SECTION "A-A"
NEW SELF-ADHERED
UNDERLAYMENT
OVER NEW PLYWOOD.
NEW SELF-ADHERING
UNDERLAYMENT FLASHING.
EXTEND ONTO SELF-
ADHERED UNDERLAYMENT
(MIN. 4") AND UP PIPE
PENETRATION AS SHOWN.
PRIME PIPE AS REQUIRED.
FIELD SLATE. FIELD
CUT AS REQUIRED.
SECURE TO DECK W/
COPPER NAILS.
NEW 6 LB. LEAD BOOT.
EXTEND FLANGE
UNDER FIELD SLATE
ON UPSLOPE SIDE MIN.
8". WRAP PIPE VENT
AND TURN DOWN INTO
PIPE MIN. 1".
FIELD SLATE. CUT
1/8"-1/4" LARGER
THAN PIPE VENT.
FIELD SLATE
6 LB. LEAD BOOT
EXISTING 1"X6" T&G WOOD PLANK DECK.
REPLACE DAMAGED AND DETERIORATED
WOOD PLANK DECK PER TYPICAL DETAIL
D1/AE305. ORIENTATION OF T&G DECK
MAY DIFFER FROM THAT SHOWN.
4" MIN. 4" MIN.
M
IN
M
IN
M
IN
EXISTING 1"x6" T&G WOOD PLANK DECK. REPLACE
DAMAGED AND DETERIORATED WOOD PLANK DECK
PER TYPICAL DETAIL D1/AE305. ORIENTATION OF T&G
DECK MAY DIFFER FROM THAT SHOWN.
INSTALL NEW SLATE TO MATCH EXISTING
SLATE IN ACCORDANCE WITH THE PROJECT
DOCUMENTS AND SPECIFICATIONS.
SECURE W/ (2) COPPER NAILS THROUGH
EXISTING HOLES IN ACCORDANCE W/
TYPICAL FLASHING METHODS FOR SLATE.
SELF-ADHERING FLASHING MEMBRANE. ADHERE TO
UNDERLAYMENT AND COPPER FLASHING (MIN. 4").
CONT. SELF-ADHERING UNDERLAYMENT.
ADHERE TO NEW PLYWOOD.
NEW 20 OZ. COPPER
FLASHING. FABRICATE
TO PROFILE SHOWN.
SECURE THROUGH NEW
PLYWOOD INTO
EXISTING DECKING W/
COPPER NAILS AT 6" O/C.
SLATE SHALL EXTEND
1-1/2" BEYOND
EXTERIOR FACE OF
WOOD TRIM.
1 1/2" 3" 4"
AE305
D5
EXISTING EXTERIOR BRICK VENEER
INSTALL NEW SLATE IN ACCORDANCE WITH THE PROJECT
DOCUMENTS AND SPECIFICATIONS. SECURE W/ (2) COPPER
NAILS THROUGH EXISTING HOLES IN ACCORDANCE W/
TYPICAL FLASHING METHOD FOR SLATE.
NEW CONT. 1/4"x1 1/2" PRESSURE TREATED
CANT STRIP. SECURE THRU COPPER FLASHING
AND SELF-ADHERING UNDERLAYMENT INTO
DECK W/ #14 CTD. FLATHEAD SCREWS AT
12"O.C. STAGGERED.
NEW 20 OZ. COPPER DRIP EDGE. FABRICATE
TO PROFILE SHOWN. SECURE TO DECK W/
#14 CTD. FLATHEAD SCREWS AT 8"O.C.
NEW 20 OZ. COPPER
FLASHING. SET IN
APPROVED ADHESIVE.
(APPLIED IN SPOTS AT 16"
O.C. TO SECURE IN-PLACE
DURING INSTALLATION).
FABRICATE TO PROFILE
SHOWN. JOIN TO CLEAT
AND GUTTER LINER W/
CONTINUOUS SOLDERED
FLAT SEAM.
NEW CONT. 20 OZ.
COPPER CLEAT.
SECURE TO CORNICE
WITH APPROVED
FASTENERS.
SELF-ADHERING UNDERLAYMENT GUTTER
FLASHING. ADHERE TO DECK, EXTEND INTO
GUTTER AND TERMINATE.
EXISTING 1"X6" T&G WOOD PLANK DECK. REPLACE
DAMAGED AND DETERIORATED WOOD PLANK DECK
PER TYPICAL DETAIL D1/AE305. ORIENTATION OF T&G
DECK MAY DIFFER FROM THAT SHOWN.
SEE D1/AE304 FOR ALL
INFORMATION RELATED TO
GUTTER AND FLASHING OF
DOWNSPOUT.
COPPER CLIPS AT 12" O/C. SEE
FOR ADDITIONAL
INFORMATION.
AE305
D5
NEW WOOD TRIM TO MATCH
EXISTING SIZE AND PROFILE.
SECURE INTO EXISTING
RAFTERS W/ (2) S.S. TRIM
SCREWS AT EACH RAFTER.
EXISTING WOOD FRAMING.
REPLACE ALL DAMAGED
AND DETERIORATED
FRAMING. SEE
SPECIFICATION FOR
ALLOWANCES.
PRIME AND PAINT AS
SPECIFIED. ALL WOOD
TRIM TO BE SECURED TO
SOLID/SOUND UNDAMAGED
STRUCTURE.
/B5 AE305
N E
W W
O R
K
REPLACE UP TO 250LF (LINEAR FEET) OF WOOD
CORNICE BELOW THE BUILT-IN COPPER GUTTER TO
MATCH THE EXISTING CORNICE IN PROFILE AND
FINISH, THE REMAINING CORNICE IS TO SCRAPED,
PRIMED, AND PAINTED.
EXISTING EXTERIOR BRICK VENEER
CONT. 20 OZ. COPPER CLEAT. SECURE
INTO WOOD SUBSTRATE W/ COPPER
NAILS AT 6" O/C.
SELF-ADHERED HIGH TEMPERATURE
BITUTHENE MEMBRANE. EXTEND OVER
CONT. CLEAT, ACROSS TAPERED EDGE
INSULATION, AND UP MASONRY WALL.
20 OZ. COPPER CORNICE CAP. SECURE W/ CONT.
CLEAT AND S.S. MASONRY SCREWS THROUGH
SLOTTED HOLES INTO THE MORTAR JOINTS AT 8"
O/C. PROVIDE CLIPS (MIN. 3 PER SEAM) AND FULLY
SOLDER FLAT SEAMS PER
NEW CONT. 20 OZ. COPPER COUNTERFLASHING.
FABRICATE TO PROFILE SHOWN, SAWCUT A
REGLET INTO MASONRY JOINT TO A MIN. DEPTH
OF 1-1/2". COUNTERFLASHING SHALL BE HELD IN
PLACE BY SPRING ACTION OR WEDGES. INSTALL
PER 'SMACNA' FIG. 4.4.
20 OZ. COPPER CLEAT SECURE W/
S.S. CONCRETE SCREWS AT 12" O/C.
1 1/2"
CONT. BEAD OF SILICONE SEALANT.
/B5 AE305
REPLACE UP TO 100LF (LINEAR FEET) OF WOOD
CORNICE AT THE GABLE ENDS TO MATCH THE
EXISTING CORNICE IN PROFILE AND FINISH,
THE REMAINING CORNICE AT THE GABLE ENDS
IS TO BE SCRAPED, PRIMED, AND PAINTED.
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:0 P
M
ROOFING DETAILS
7 JANUARY, 2019
7 JANUARY, 2019
AE304
MJC SEC
AE304
3" = 1'-0" D1
GUTTER SECTION W/ DOWNSPOUT
3" = 1'-0" F4
FLASHING @ CHIMNEY
3" = 1'-0"
F1
PIPE VENT
3" = 1'-0" F6
SECTION AT RAKE
3" = 1'-0" D4
GUTTER SECTION
3" = 1'-0" C6
GABLE END WOOD CORNICE REPAIR
FIELD CONDITION #1 - DAMAGE OVER
MULTIPLE SPANS OF ROOF DECK
CENTERLINE OF WOOD RAFTER
EVERY OTHER WOOD
PLANK IN (2) SPAN
CONDITION WITHIN THE
DAMAGED AREA SHALL BE
REPLACED TO MAINTAIN
ITS (2) SPAN CONDITION.
EVERY OTHER WOOD
PLANK WITH THE END OF
THE PLANK WITHIN THE
DAMAGED AREA MAY BE
CUT AND REPLACED WITH
WOOD PLANK IN A (2)
SPAN CONDITION
FRAMING A (2) SPAN
CONTINUOUS LAYOUT.
AREA OF DAMAGE
FIELD CONDITION #2 - DAMAGE OVER
SINGLE SPAN OF ROOF DECK
CENTERLINE OF WOOD RAFTER
CUT EXISTING
DAMAGED WOOD DECK
AT EACH ADJACENT
JOIST. REPLACE WITH
NEW IN SINGLE SPAN
CONDITION.
AREA OF DAMAGE
NEW 2"x4" STIFF BACK.
EXTEND 12" PAST AREA
OF NEW DECK. SECURE
WITH (2) #12 SCREWS AT
EACH SECTION OF DECK.
EDGE CONDITION
CENTERLINE OF WOOD RAFTER
AREA OF DAMAGE
NEW 2"x4" STIFF BACK.
EXTEND 12" PAST AREA OF
NEW DECK. SECURE WITH
(2) #12 CTD. SCREWS AT
EACH SECTION OF DECK.
TYPICAL SECTION THROUGH ROOF DECK
CUT EXISTING DAMAGED
WOOD DECK AT EACH
ADJACENT JOIST.
REPLACE WITH NEW IN
SINGLE SPAN CONDITION.
EXISTING WOOD RAFTER
CUT THE LAST LOWER EDGE OF
GROOVE TO ALLOW FOR THE
INSTALLATION OF THE LAST
SECTION OF NEW WOOD PLANK
DECK.
EXISTING 1"x6" T&G
WOOD PLANK DECK
TO REMAIN.
NEW 1"x6" T&G WOOD PLANK
DECK. SECURE NEW WOOD PLANK
DECK WITH (2) #12 CTD. SCREWS
INTO EACH RAFTER.
EXISTING 1"x6" T&G WOOD
PLANK DECK TO REMAIN.
EXISTING 1"x6" T&G WOOD
PLANK DECK TO REMAIN.
EXISTING 1"x6" T&G WOOD
PLANK DECK TO REMAIN.
EXISTING 1"x6" T&G
WOOD PLANK DECK
TO REMAIN.
FIELD VERIFY
SPAN
EQUAL EQUAL
FIELD VERIFY
SPAN
VARIES - FIELD VERIFY
FIELD VERIFY
SPAN
PERIMETER/EDGE
RAFTER
EQUAL EQUAL
NEW SLATE SHINGLES.
SECURE W/ COPPER NAILS.
PENETRATE EXISTING T&G
WOOD PLANK DECK BY 1/4"
NEW CONT. 1/2" PLYWOOD
SHEATHING LEVELING LAYER
SECURE W/ 8d NAILS AT 8"
O/C AT EACH ROOF JOIST.
EXISTING WOOD FRAMING
SELF-ADHERING UNDERLAYMENT.
ADHERE TO NEW PLYWOOD.
EXISTING T&G WOOD PLANK
DECK. SEE D1/AE305 FOR
REPLACEMENT OF DAMAGED
SECTIONS OF DECK.
CONTRACTOR IS TO INCLUDE
IN HIS BID THE REPLACEMENT
OF 1500 SQUARE FEET OF T&G
WOOD PLANK ROOF DECK.
FACE OF EXISTING
MASS MASONRY
WALL WALL OR
STONE VENEER
NEW 2" WIDE x(LENGTH TO SUIT) 20 oz. COPPER DOWNSPOUT
STRAP. FABRICATE IN
ACCORDANCE WITH "SMACNA"
FIGURE 1-35G. POP RIVET STRAPS
TO DOWNSPOUT (MIN. 2 PER
SIDE). STRAPS SHALL BE
LOCATED AT TOP AND BOTTOM,
AND SHALL NOT EXCEED 5'-0" O/C
TYPICAL U.N.O.
NEW 20 oz. COPPER DOWNSPOUT.
FABRICATE IN ACCORDANCE WITH
"SMACNA" FIGURE 1-32B. SEE OTHER
SECTIONS AND DETAILS FOR SIZE.
ANCHOR STRAPS TO BRICK VENEER
WALL USING S.S. CONCRETE SCREWS
W/ EPDM SEALING WASHERS (1 EA.
SIDE). NOTE: AT STONE VENEER
LOCATIONS, FASTEN INTO MORTAR
JOINTS BETWEEN STONES.
N O
T E
T
O T
A L
D O
W N
S P
O U
T H
E
IG
H T
M A
Y V
A R
Y
C O
N T
R A
C T
O R
S H
A L L F
IE
L D
V E
R
IF
Y E
A C
H
C O
N D
IT
IO
N P
R
IO
R T
O O
R D
E R
IN
G
O R
F
A B
R
IC
A T
IO
N
O F
A N
Y M
A T
E R
IA
L
EXISTING DOWNSPOUT
BOOT TO REMAIN.
NEW 20 oz. x 3" x 4"
COPPER DOWNSPOUT.
NEW 20 oz. x 3" x 4"
COPPER DOWNSPOUT.
D.S. STRAP SEE PLAN
DETAIL
NEW WOOD FASCIA /
SOFFIT. SEE APPLICABLE
SECTIONS AND DETAILS.
NEW SLATE SHINGLES.
SEE APPLICABLE
SECTIONS AND DETAILS.
/F3 AE305
S Y
M M
E T
R
IC
A
L PROVIDE BEAD OF
POLYURETHANE SEALANT
BETWEEN COPPER AND
CONCRETE AROUND EACH
CHIMNEY OPENING.
NEW COPPER CAP WITH
HEMMED DRIP EDGE. INSTALL
BETWEEN NEW ANGLE AND
BRASS MESH FRAME, SECURE
LEG INTO FIRST MORTAR JOINT
(AS SHOWN) WITH S.S.
MASONRY SCREWS AT 12" O/C.
CONTRACTOR TO VERIFY
CONSTRUCTION PRIOR TO
FABRICATING CAP.
EXISTING BRICK
MASONRY, TUCKPOINT
AS REQUIRED.
EXISTING BRASS MESH FRAME.
EMOVE AND REINSTALL ON TOP OF
THE NEW COPPER CAP.
3'-1" 5"
1'-0 1/2" 5"
/4
1'-3 1/2"6"2'-3 1/2"
F6
AE305
NOTE: COPPER CAPS TO BE INSTALLED AFTER
ALL TUCKPOINTING ON THE CHIMNEY IS
COMPLETED.
PROVIDE BEAD OF POLYURETHANE
SEALANT BETWEEN COPPER AND
CONCRETE AROUND EACH CHIMNEY
OPENING.
EXISTING BRICK MASONRY, TUCKPOINT AS
REQUIRED.
INSTALL NEW ANGLE AROUND
PERIMETER OF CHIMNEY OPENING.
SECURE TO NEW/EXISTING CONCRETE
CAP W/ APPROVED FASTENERS. ALLOW
SUFFICIENT SPACE TO INSTALL NEW
COPPER FLASHING BETWEEN ANGLE
AND CONCRETE SURFACE.
EXISTING BRASS MESH FRAME.
REMOVE AND REINSTALL AS
REQUIRED TO INSTALL NEW COPPER
FLASHING.
NEW COPPER CAP WITH HEMMED DRIP
EDGE. INSTALL BETWEEN NEW ANGLE
AND BRASS MESH FRAME, SECURE LEG
INTO FIRST MORTAR JOINT(AS SHOWN)
WITH APPROVED FASTENERS.
CONTRACTOR TO VERIFY CONSTRUCTION
PRIOR TO FABRICATING CAP.
1'-0 1/2" 5"
8" 5"
F4
AE305
3/4"
NEW 20 OZ. COPPER FLAT SEAM
ROOM PANEL. INSTALL IN
ACCORDANCE WITH THE PROJECT
DOCUMENTS.
NEW 2" WIDE, 20 OZ.
COPPER CLEAT.
NEW 12" S.S. SCREWS FOR
CLEAT SECUREMENT. SEE
SECTIONS AND DETAILS
NOTE: ALL FLAT SEAMS AT PANEL
INTERRUPTIONS SUCH AS AT EAVES,
HIPS, RIDGES, PENETRATIONS, ETC.,
SHALL BE CONTINUOUS.
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:0 P
M
ROOFING DETAILS
7 JANUARY, 2019
7 JANUARY, 2019
AE305
MJC SEC
AE305
1" = 1'-0" D1
WOOD PLANK ROOF DECK REPLACEMENT
3" = 1'-0"
D5
TYPICAL ROOF SECTION
3" = 1'-0" F3
TYPICAL DOWNSPOUT STRAP DETAIL
3" = 1'-0"
F1
TYPICAL DOWNSPOUT ELEVATIONS
1 1/2" = 1'-0" F4
CHIMNEY ELEVATION
1 1/2" = 1'-0"
F6
CHIMNEY SECTION
6" = 1'-0" B5
DETAIL - TYPICAL FLAT SEAM CLEAT PROFILE
EXISTING CONCRETE ROOF DECK
NEW THERMAL ROOF INSULATION. TAPER
INSULATION TO PROVIDE SUMP AROUND
EXISTING ROOF DRAIN. SEE TYPICAL
ROOF DRAIN SUMP DETAIL
EXISTING ROOF DRAIN. REMOVE ALL EXISTING
CONTAMINANTS FROM DRAIN BOWL, CLAMPING
RING AND OTHER ACCESSORIES THAT WILL BE IN
CONTACT W/ NEW FLASHING MATERIALS.
REPLACE MISSING OR DAMAGED COMPONENTS
W/ CAST-IRON REPLACEMENT PARTS FROM THE
ORIGINAL DRAIN MANUFACTURER. REPLACE
EXISTING PLASTIC DRAIN DOMES WITH NEW CAST
IRON DRAIN DOMES. SUBMIT PROPOSED
REPLACEMENT COMPONENTS IF ORIGINAL DRAIN
MANUFACTURER COMPONENTS ARE
UNAVAILABLE. NOTE: IF EXISTING DRAIN BOWL IS
CRACKED OR DAMAGED, CONTRACTOR SHALL
INSTALL A NEW RETROFIT ROOF DRAIN. SEE
RETROFIT ROOF DRAIN DETAIL AT RIGHT.
NEW CONT. EPDM ROOF MEMBRANE. SEE
SPECIFICATIONS AND DETAIL BLOW UP FOR
INSTALLATION INTO DRAIN BOWL. INSTALL PER
MEMBRANE MANUFACTURER'S WRITTEN
INSTRUCTIONS. NOTE: IF SEAM EDGE IS
WITHIN 9" OF DRAIN COMPRESSION RING,
EPDM TARGET PATCH REQUIRED.
NEW 1/4" INSULATION
PROTECTION LAYER. INSTALL IN
ACCORDANCE WITH THE
PROJECT DOCUMENTS AND
SPECIFICATIONS.
CLAMP RING
SPECIFIED SEALANT
TARGET SHEET
NEW CAST ALUMINUM RETROFIT
REPLACEMENT ROOF DRAIN (SUBMIT
SAMPLE FOR APPROVAL). INSTALL PER
MANUFACTURER'S SPECIFICATIONS.
MAXIMIZE REPLACEMENT DRAIN SIZE TO
FIT EXISTING DRAIN LEADER. PROVIDE
STEM OF SUFFICIENT LENGTH SO SEAL
IS BELOW DRAIN PIPE TO DRAIN
CONNECTION. NOTE: REMOVE AND
DISPOSE OF EXISTING RETROFIT ROOF
DRAINS WHERE PRESENT (ROOF AREAS
'F' & 'K'), INSTALL NEW RETROFIT ROOF
DRAINS. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
EXISTING CONCRETE ROOF DECK
NEW THERMAL ROOF INSULATION.
TAPER INSULATION TO PROVIDE SUMP
AROUNDEXISTING ROOF DRAIN. SEE
TYPICAL ROOF DRAIN SUMP
DETAIL
NEW 1/4" INSULATION PROTECTION LAYER.
INSTALL IN ACCORDANCE WITH THE PROJECT
DOCUMENTS AND SPECIFICATIONS.
NEW CONT. EPDM ROOF
MEMBRANE. INSTALL PER
MEMBRANE MANUFACTURER'S
WRITTEN INSTRUCTIONS.
NOTE: IF SEAM EDGE IS WITHIN
9" OF DRAIN COMPRESSION
RING, EPDM TARGET PATCH
REQUIRED.
EXISTING LEAN CONCRETE FILL
EXISTING DRAIN BOWL. NOTE: IF
EXISTING DRAIN BOWL IS
CRACKED OR DAMAGED,
CONTRACTOR SHALL INSTALL A
NEW RETROFIT ROOF DRAIN. SEE
RETROFIT ROOF DRAIN DETAIL AT
RIGHT.
EXISTING CRACKED OR DAMAGED DRAIN BOWL
1" M
IN
EXISTING ROOF DRAIN NEW RETROFIT ROOF DRAIN
(USE ONLY IF EXISTING DRAIN BOWL IS CRACKED OR DAMAGED)
/B8 AE306
/B8 AE306
(4) SIDES
2'-0" TYP
EDGE OF DRAIN
OF DRAIN
DRAIN SUMP
INSULATION SLOPES
FROM EDGE OF DRAIN
SUMP TO 0" AT DRAIN
BOWL. TYPICAL ALL
FOUR (4) SIDES.
ROOF DRAIN. SEE
APPLICABLE SECTIONS
AND DETAILS.
EDGE OF
DRAIN SUMP
B1
AE306
NEW TAPERED POLYISOCYANURATE THERMAL ROOF
INSULATION (SEE THERMAL ROOF INSULATION
THICKNESS SCHEDULE ON THIS SHEET FOR INSULATION
TAPER RATE AND MINIMUM START THICKNESS AT
VALLEYS, DRAINS SCUPPERS, ETC. FOR EACH ROOF
AREA). MECHANICALLY ATTACH BASE LAYER THROUGH
EXISTING LEAN CONCRETE FILL INTO PRE-DRILLED
HOLES IN CONCRETE ROOF DECK IN ACCORDANCE WITH
THE PROJECT DOCUMENTS AND SPECIFICATIONS.
ADHERE ADDITIONAL LAYERS TO BASE LAYER WITH LOW
RISE FOAM ADHESIVE IN ACCORDANCE WITH THE
PROJECT DOCUMENTS AND SPECIFICATIONS.
EXISTING LEAN CONCRETE FILL (THICKNESS
VARIES) - NOT PRESENT AT ROOF AREA 'C'.
CONTRACTOR TO VERIFY THICKNESS AND
ADJUST LENGTH OF SCREW TO ACHIEVE
MINIMUM EMBEDMENT INTO STRUCTURAL
CONCRETE. FASTENERS SHOULD NOT BE
SECURED INTO LEAN CONCRETE.
EXISTING CONCRETE ROOF DECK
/2
1 1/2" MINIMUM EMBEDMENT INTO
STRUCTURE OR AS SPECIFIED BY THE
MEMBRANE MANUFACTURER
M
IN
NEW CONT. 90 MIL EPDM (ETHYLENE
PROPYLENE DIENE MONOMER) ROOF
MEMBRANE . FULLY ADHERE TO NEW
INSULATION PROTECTION LAYER IN
ACCORDANCE WITH THE PROJECT
DOCUMENTS AND SPECIFICATIONS.
NEW 1/4" INSULATION PROTECTION
LAYER. ADHERE TO NEW THERMAL
ROOF INSULATION WITH LOW RISE
FOAM ADHESIVE IN ACCORDANCE
WITH THE PROJECT DOCUMENTS AND
SPECIFICATIONS.
NEW CONT. .125" ALUMINUM TERMINATION BAR W/
INTEGRAL CAULK TRAY. SECURE THRU WALL FLASHING
MEMBRANE INTO EXISTING MASONRY WALL W/ S.S.
CONCRETE SCREWS W/ EPDM SEALING WASHERS AT 8"
O/C. PROVIDE A CONT. BEAD OF SEALANT IN CAULK TRAY
AS SHOWN.
EXISTING LEAN CONCRETE FILL
EXISTING CONCRETE ROOF DECK
NEW CONT. EPDM ROOF MEMBRANE.
FULLY ADHERE TO INSULATION
PROTECTION LAYER IN ACCORDANCE
WITH THE PROJECT DOCUMENTS AND
SPECIFICATIONS. TERMINATE AT BASE OF
WALL WITH PRESSURE BAR.
EXISTING CANT
MIN
4"
MIN
1 1/2"
M
IN2
M
IN8
NEW CONT. EPDM WALL FLASHING
MEMBRANE. EXTEND ONTO ROOF
MEMBRANE (MIN. 4") AND ADHERE W/
CONT. SPLICE TAPE. FULLY ADHERE TO
EXISTING MASONRY WALL. TERMINATE
WITH TERMINATION BAR AS SHOWN.
ENSURE REGLET LOCATION IS EITHER AT
OR ABOVE EXISTING REGLET ELEVATION.
NEW CONT. 20 oz. COPPER
COUNTERFLASHING. FABRICATE TO
PROFILE SHOWN. SAWCUT A REGLET
INTO MASONRY JOINT TO A MIN. DEPTH
OF 1-1/2". COUNTERFLASHING SHALL BE
HELD IN PLACE BY SPRING ACTION OR
WEDGES. INSTALL PER "SMACNA" FIGURE
4-4
FILL REGLET WITH CONT. SILICONE SEALANT
NOTE: INSTALL NEW 1/4" TREATED GYPSUM
SEPARATION LAYER (NOT SHOWN) ONTO
FACE OF EXISTING MASONRY WALL IF
CONTAMINATED WITH ASPHALTIC
MATERIAL. SECURE INTO MASONRY WALL
W/ S.S. CONCRETE SCREWS W/ 3"
GALVANIZED PLATES AT 12" O/C, (2) ROWS
TOP AND BOTTOM.
EXISTING MASS BRICK MASONRY WALL
NEW CONT. .100" ALUMINUM PRESSURE BAR.
SECURE THRU ROOF MEMBRANE INTO EXISTING
MASONRY WALL W/ S.S. CONCRETE SCREWS AT
8" O/C.
B5
AE306
NEW CONT. P.T. "2x" WOOD NAILER AS REQUIRED TO
OBTAIN 8" MIN. FLASHING HEIGHT. ADD ADDITIONAL
NAILERS AS REQUIRED TO OBTAIN 8" MIN. FLASHING
HEIGHT. SEE FOR ATTACHMENT.
EXISTING LEAN CONCRETE FILL
EXISTING CONCRETE ROOF DECK
NEW CONT. EPDM ROOF MEMBRANE.
FULLY ADHERE TO INSULATION
PROTECTION LAYER IN ACCORDANCE
WITH THE PROJECT DOCUMENTS AND
SPECIFICATIONS. TERMINATE AT BASE OF
WALL WITH PRESSURE BAR.
EXISTING MECH. CURB. CURB MAY BE PREFAB,
WOOD OR CONCRETE (FIELD VERIFY). CURB
SIZE, PROFILE, ETC. MAY VARY FROM THAT
SHOWN.
MIN
4"
M
IN8
NEW CONT. EPDM WALL FLASHING
MEMBRANE. EXTEND ONTO ROOF
MEMBRANE (MIN. 4") AND ADHERE W/ CONT.
SPLICE TAPE. FULLY ADHERE TO EXISTING
MASONRY WALL. TERMINATE WITH
TERMINATION BAR AS SHOWN.
NOTE: INSTALL NEW 1/4" TREATED GYPSUM
SEPARATION LAYER (NOT SHOWN) ONTO
FACE OF EXISTING MASONRY WALL IF
CONTAMINATED WITH ASPHALTIC
MATERIAL. SECURE INTO MASONRY WALL
W/ S.S. CONCRETE SCREWS W/ 3"
GALVANIZED PLATES AT 12" O/C, (2) ROWS
TOP AND BOTTOM.
NOTE: CONTRACTOR SHALL COORDINATE
SHUT DOWN OF ANY MECHANICAL VENTS
WITH OWNER PRIOR TO DISCONNECTING.
TEMPORARY MECHANICAL SYSTEMS MAY
BE REQUIRED WHEN EXISTING UNITS ARE
TO BE DISCONNECTED FOR THE ROOF
REPLACEMENT. VERIFY WHICH UNITS WILL
REQUIRE TEMPORARY SYSTEMS WITH THE
VA PRIOR TO SUBMITTING BID.
EXISTING ROOF MOUNTED EQUIPMENT TO REMAIN
NEW CONT. .100" ALUMINUM PRESSURE BAR.
SECURE THRU ROOF MEMBRANE INTO EXISTING
MASONRY WALL W/ S.S. CONCRETE SCREWS AT
8" O/C.
B5
AE306
EXISTING WOOD NAILER
/C7 AE306
1"
/2
1 1/2" MIN
EMBEDMENT UNO
1" MIN FROM EDGE UNO
MIN. 2x4 P.T. WOOD. SECURE W/
(2) ROWS OF #12 S.S. SCREWS AT
12" O/C (EACH ROW STAGGERED).
WOOD SUBSTRATE
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% DESIGN DESIGN
CONSTRUCTION DOCUMENTS
SUBMISSION
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:1 P
M
ROOFING DETAILS - FLAT ROOF
7 JANUARY, 2019
7 JANUARY, 2019
AE306
MJC SEC
3" = 1'-0" B1
SECTION - ROOF DRAIN
1/2" = 1'-0"
B8
TYPICAL ROOF DRAIN SUMP
3" = 1'-0" B5
TYPICAL ROOF CROSS SECTION
3" = 1'-0" D1
SECTION @ BASE OF WALL TERMINATION
3" = 1'-0"
D4
SECTION @ ROOF CURB / MECH VENT
NTS
C7
TYPICAL WOOD NAILER SECUREMENT
FIELD VERIFY LOCATIONS FOR DRIVEN
GROUND RODS. COORDINATE DOWN
CONDUCTOR ROUTING ON SITE FROM
NEAREST AIR TERMINAL SHOWN ON
DRAWING E-401, NO MORE 150' APART
AND AVERAGING NOT MORE THAN 100'
APART. PROVIDE FLUSH ACCESSIBLE
TEST WELL PER DETAIL "H" WHERE
GROUND ROD IS LOCATED IN
SIDEWALK/PARKING LOT TYPE
SURFACE (TYPICAL).
CLASS I COPPER DOWN CONDUCTOR
SEE DOWN CONDUCTOR DETAIL AND
COORDINATE WITH VA COR. (TYPICAL)
21 23
TLRDAJ
E-101
ELECTRICAL - SITE PLAN - LPS
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e inc he s = o ne fo ot on e an d on e-ha lf i nc he s = o ne fo ot on e inc h on e fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf i nc h on e fo ot th re e-eig ht s i nc h on e fo ot on e-qu ar te r i nc h on e fo ot on e-eig ht in ch o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
658-16-101
7 January 2019
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
E101 102 3rd Ave., NE
Hickory, NC 28601 828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #450 Charlotte, NC 28217
704.535.6374 www.wmba.net
Quality Consulting Engineers, LLC
6277-600 Carolina Commons Drive, #350 Indian Land SC 29707
803.207.5450 djones@qualityconsultingengineers.com
FINAL CONSTRUCTION DOCUMENTS
04 JAN 2019QCE Project # 19001
22 23
TLRDAJ
E-401
ELECTRICAL - ROOF PLAN - LPS
1.
2. ALUMINUM LIGHTNING PROTECTION SYSTEM COMPONENTS SHALL NOT BE
MOUNTED TO COPPER SURFACES. COPPER COMPONENTS SHALL BE USED
TO AVOID ELECTROLYTIC CORROSION. COPPER LIGHTNING PROTECTION
MATERIALS SHALL NOT BE PLACED ON ALUMINUM, GALVANIZED STEEL,
GALVALUME SURFACES OR ANY OTHER DISSIMILAR METAL SURFACES,
PAINTED OR NOT.
3. GROUNDED METAL BODIES WITHIN THE BONDING DISTANCE DETERMINED
BY NFPA 780 - 2017 EDITION SHALL BE BONDED TO THE SYSTEM IN
ACCORDANCE WITH THOSE REQUIREMENTS.
4. UNDERGROUND METALLIC PIPING FOR EVERY UTILITY ENTERING THE
BUILDING SHALL BE BONDED TO THE NEAREST DOWN CONDUCTOR OR
GROUND ELECTRODE. FIELD VERIFY EXACT LOCATIONS.
5. ADHESIVE USED WITH ADHESIVE AIR TERMINAL BASES AND CONDUCTOR
FASTENERS SHALL BE COMPATIBLE WITH ROOFING MEMBRANE - VERIFY
WITH ROOFING CONTRACTOR.
6. AIR TERMINALS HAVE BEEN LOCATED ON THE ROOF TOP EQUIPMENT AS
BEST DETERMINED BY THE ENGINEER. IF THE METAL THICKNESS OF AN
OBJECT IS 3/16" OR GREATER, AIR TERMINALS MAY BE ELIMINATED IF THE
OBJECT IS PROPERLY CONNECTED TO THE SYSTEM.
7. ROOF TOP METALLIC EQUIPMENT OR OBJECTS NOT SHOWN ON THIS
DRAWING SHALL BE PROTECTED AS REQUIRED TO MEET THE
REQUIREMENTS LISTED ABOVE INCLUDING THE INSTALLATION OF AIR
TERMINALS AND OR BONDING. IF THE METAL THICKNESS OF AN OBJECT IS
3/16" OR GREATER, AIR TERMINALS MAY BE ELIMINATED IF THE OBJECT IS
PROPERLY CONNECTED TO THE SYSTEM.
8. ALL ELEVATIONS ARE APPROXIMATE AND ARE TAKEN FROM AVERAGE
GRADE.
9. AIR TERMINALS SHALL BE PLACED WITHIN 24” OF THE OUTSIDE CORNER OR
EDGE OF THE OBJECT THEY ARE PROTECTING AND SHALL PROJECT A
MINIMUM OF 10" ABOVE THE PROTECTED EDGE OR OBJECT. THE SPACING
BETWEEN AIR TERMINALS ARE NOT TO EXCEED 20 FEET. AIR TERMINALS
THAT EXTEND 24" ABOVE THE PROTECTED EDGE ARE NOT TO EXCEED A
SPACING GREATER THAN 25', EXCEPT FOR MID-ROOF AIR TERMINALS (50'
MAX SPACING).
10. ALL LIGHTNING CONDUCTORS ARE TO MAINTAIN A HORIZONTAL OR
DOWNWARD PATH. ALL BENDS IN THE CONDUCTOR SHALL HAVE A RADIUS
BEND OF 8 INCHES OR GREATER, AND SHALL HAVE AN ANGLE BEND OF 90
DEGREES OR GREATER.
11. EACH INDIVIDUAL ITEM OF THE LIGHTNING PROTECTION SYSTEM IS NOT
LABELED FOR THE SAKE OF CLARITY. ITEMS ARE INDICATED AT RANDOM
LOCATIONS ONLY, BUT A COMPLETE SYSTEM SHALL BE PROVIDED TO MEET
THE REQUIREMENTS LISTED ABOVE.
LPS NOTES
1 CLASS I COPPER HORIZONTAL LIGHTNING CONDUCTOR RUN EXPOSED ON
SLATE ROOF. FASTEN EVERY 3 FEET MAXIMUM WITH COPPER CABLE
HOLDER SET IN ADHESIVE.
2 CLASS I COPPER DOWN CONDUCTOR CONNECTED TO GROUND ROD AND
INSTALLED EITHER: A) CONCEALED IN 1" PVC SCHEDULE 40 CONDUIT PER
THE DOWN CONDUCTOR DETAIL, B) EXPOSED ON EXTERIOR OF BUILDING
IF PERMITTED BY THE VA OR C) BONDED TO INTEGRAL BUILDING STEEL
AT TOP AND BOTTOM OF DOWN CONDUCTOR PENETRATION ONLY IF
STEEL IS 3/16" THICK, AN 8" SQUARE AREA OF WELDING TO STEEL IS
POSSIBLE & THE STEEL IS CONTINUOUS. COORDINATE WITH VA RESIDENT
ENGINEER AND UL INSPECTOR.
4 BOND TO COPPER GUTTER WITH COPPER BONDING LUG AND SECURE
WITH APPROPRIATE SCREW FASTENER.
5 THE EXISTING ATTACHED BUILDING CONNECTOR IS NOT IN SCOPE.
3 ROUTE CONDUCTORS ALONG AND DOWN CHIMNEY TO MATCH SURFACE
CONTOURS AND ARCHITECTURAL FEATURES WHERE POSSIBLE.
PLAN NOTES
12. ROOF PADS, PAVERS, FLASHINGS OR ANY OTHER SPECIAL ROOFING
MATERIALS REQUIRED FOR THE INSTALLATION OF THE LIGHTNING
PROTECTION SYSTEM SHALL BE FURNISHED AND INSTALLED BY THE
ROOFING CONTRACTOR.
13. ACTUAL JOB SITE CONDITIONS MAY REQUIRE ITEMS SHOWN ON THE
DRAWING TO BE EITHER LOCATED IN DIFFERENT LOCATIONS OR MADE OF
DIFFERENT MATERIALS. ALL CHANGES MADE TO THE LIGHTNING
PROTECTION SYSTEM AND THE COMPLETED INSTALLATION SHALL MEET
OR EXCEED THE REQUIREMENTS LISTED ABOVE.
14. MAXIMUM HEIGHT OF BUILDING ~ 60' ABOVE FINISHED GRADE.
15. IN ORDER FOR THESE SYSTEMS TO BE COMPLETE LIGHTNING PROTECTION
SYSTEMS, THE ELECTRICAL SERVICE, WATER SERVICE AND GAS SERVICE
MUST BE BONDED TO THE NEAREST DOWN CONDUCTOR OR GROUND
ELECTRODE AS WELL AS ANY AND ALL UNDERGROUND METALLIC PIPING
ENTERING THE STRUCTURE. BOND SERVICES WITH TINNED PIPE CLAMP.
16. PROVIDE UL LETTER OF FINDINGS UPON INSPECTION TO ALLOW FOR
FUTURE UL MASTER LABEL AFTER ALL CONNECTED STRUCTURES HAVE
LIGHTNING PROTECTION SYSTEM INSTALLED.
17. BOND ALL METALLIC OBJECTS ON ROOF INCLUDING GUTTER SYSTEM AND
MECHANICAL UNITS/DUCTS/FLUES, LADDERS, HATCHES, ETC.
1/2" X 24" GENTLY TAPERED SOLID
COPPER AIR TERMINAL WITH
UNIVERSAL SWIVEL BASE SET IN
ADHESIVE. PLUMB AIR TERMINAL
AFTER ADHESIVE HAS SET.
SEE DETAIL "A". NOT USED THIS
PROJECT.
1/2" X 12" GENTLY TAPERED SOLID
COPPER AIR TERMINAL WITH
UNIVERSAL SWIVEL BASE SET IN
ADHESIVE. PLUMB AIR TERMINAL
AFTER ADHESIVE HAS SET.
SEE DETAIL "B". NOT USED THIS
PROJECT.
CLASS I ALUMINUM LIGHTNING
CONDUCTOR (24 STRANDS OF 14 AWG
WIRE - 95 LBS. PER 1000 FEET). SEE
AIR TERMINAL DETAILS FOR METHOD
OF FASTENING. SECURE TO BUILDING
EVERY THREE FEET MAXIMUM. (NOT
USED UNLESS REQUIRED FOR
BONDING TO SIMILAR METALS.)
CLASS I COPPER LIGHTNING
CONDUCTOR (29 STRANDS OF 16 AWG
WIRE - 203 LBS. PER 1000 FEET).
COPPER PARALLEL CABLE
CONNECTOR.
3/4" X 10'-0" COPPER CLAD GROUND
ROD WITH ULTRAWELD CONNECTIONS.
SEE DETAIL "G" AND "H"
ULTRAWELD CONNECTION WITH WELD
METAL. NOT USED THIS PROJECT.
LPS LEGEND
1/2" X 12" GENTLY TAPERED SOLID
COPPER AIR TERMINAL WITH
UNIVERSAL BASE MOUNTED
HORIZONTALLY.
SEE DETAIL "C"
1/2" X 12" GENTLY TAPERED SOLID
COPPER AIR TERMINAL WITH RIDGE
SADDLE BASE.
SEE DETAIL "D"
18. ISOLATED METAL BODIES THAT SHOW NO CONDUCTANCE TO GROUND
SHALL NOT REQUIRE BONDING. A GROUNDED METAL BODY WITHIN THE
SIX-FOOT RULE SHALL BE BONDED TO THE SYSTEM.
19. CONNECTIONS TO GROUND COUNTERPOISE SHALL BE MADE AT A POINT
NOT LESS THAN 1'-0” BELOW GRADE, AND 2'-0” AWAY FROM FOUNDATION
WALL
20. CONNECTIONS TO GROUND SHALL BE MADE AT A POINT NOT LESS THAN
1'-0” BELOW GRADE, AND 2'-0” AWAY FROM FOUNDATION WALL
21.
22. A LIGHTNING ARRESTOR, PROTECTOR, OR ANTENNA-DISCHARGE UNIT
MUST BE INSTALLED ON EACH ELECTRIC, TELEPHONE, AND TELEVISION
SERVICE ENTRANCE.
CONDUCTORS SHALL MAINTAIN A HORIZONTAL OR DOWNWARD PATH FREE
FROM “U” AND “V” POCKETS. ANY RISE IN HORIZONTAL CONDUCTOR SHALL
NOT EXCEED 8 INCHES. CONDUCTOR MAY RISE UPWARDS AT A RATE OF NO
MORE THAN 3” OF RISE PER 1'-0” RUN.
23. ALL ADHESIVE FIXTURES SHALL BE SET WITH AN ADHESIVE COMPOUND
COMPATIBLE WITH THE ROOFING MATERIAL. ADHESIVES SHALL BE
APPROVED IN ADVANCE BY THE ROOFING CONTRACTOR.
24. CONDUCTOR SHALL BE FASTENED EVERY 3'-0” ON CENTER MAXIMUM.
25. WHEN ANCHORING IN MASONRY, HOLES MADE TO RECEIVE THE BODY OF
THE ANCHOR SHALL BE MADE IN THE BRICK, STONE, OR OTHER MASONRY
UNIT RATHER THAN IN MORTAR JOINTS.
26. BOND TO METALLIC PLUMBING WASTE VENTS ON ROOF AND TO
STRUCTURAL STEEL WITHIN BUILDING.
LIGHTNING PROTECTION SYSTEM SHALL BE INSTALLED BY QUALIFIED
PERSON(S) PER THE LIGHTNING PROTECTION STANDARDS: LPI-175, NFPA
780, UL96A, VA OFFICE OF OCCUPATIONAL SAFETY AND HEALTH, AND VA
DESIGN GUIDE STANDARDS. THESE STANDARDS MUST BE FOLLOWED
DURING THE DESIGN, INSTALLATION, AND INSPECTION OF A LIGHTNING
PROTECTION SYSTEM.
27. THE ROOF LINES OF THIS BUILDING ARE NON-STANDARD AND NEED TO BE
THOROUGHLY SURVEYED. THE ROOF IS ARCHITECTURAL IN NATURE AS
WELL AND EXTRA CARE IS REQUIRED WITH REGARDS TO LPS CONDUCTOR
ROUTING .
28. JOB CONDITIONS MAY DICTATE VARIATIONS IN AIR
TERMINAL, CONDUCTORS, AND GROUND ROD LOCATIONS AND A
THOROUGH SITE SURVEY MUST BE COMPLETED PRIOR TO SHOP DRAWING
FABRICATION.
LIGHTNING PROTECTION SYSTEMS SHALL BE INSTALLED IN A NEAT,
PROFESSIONAL MANNER.
29.
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e inc he s = o ne fo ot on e an d on e-ha lf i nc he s = o ne fo ot on e inc h on e fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf i nc h on e fo ot th re e-eig ht s i nc h on e fo ot on e-qu ar te r i nc h on e fo ot on e-eig ht in ch o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
658-16-101
7 January 2019
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
E401 102 3rd Ave., NE
Hickory, NC 28601 828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #450 Charlotte, NC 28217
704.535.6374 www.wmba.net
FINAL CONSTRUCTION DOCUMENTS
04 JAN 2019
Quality Consulting Engineers, LLC
6277-600 Carolina Commons Drive, #350 Indian Land SC 29707
803.207.5450 djones@qualityconsultingengineers.com
QCE Project # 19001
GROUND ROD DETAIL "G"
CLASS I COPPER
LIGHTNING
CONDUCTOR
ULTRAWELD MOLD WITH
WELD METAL
3/4" X 10' COPPER
CLAD GROUND ROD
AIR TERMINAL DETAIL "A"
SWIVEL BASE SET IN
ADHESIVE. PLUMB AIR
TERMINAL AFTER
ADHESIVE HAS SET.
1/2" X 24" GENTLY
TAPERED SOLID COPPER
AIR TERMINAL
COPPER CABLE
HOLDER. SECURE
CONDUCTOR EVERY 3'
MAXIMUM.
CLASS I COPPER
LIGHTNING
CONDUCTOR
1" PVC SCH. 40
CONDUIT
TYPICAL BOND TO
BASE OF STEEL COLUMN
ULTRAWELD MOLD WITH
WELD METAL
SEE GROUND ROD
DETAIL "G" FOR
CONTINUATION
STUB OUT PVC
BELOW
FOOTING
CLASS I COPPER
LIGHTNING CONDUCTOR
HLPUL
50H2
1 BOLT PARALLEL CLAMP BONDING LUG BONDING LUG COPPER FLANGE
BONDING PLATE
TINNED
U-BOLT PIPE CLAMP
THRU ROOF DETAIL "T"
CLASS I COPPER LIGHTNING
CONDUCTOR
BIMETAL THRU-ROOF
ASSEMBLY
1" PVC SCHEDULE 40
CONDUIT
CLASS I COPPER LIGHTNING
CONDUCTOR
DOWN CONDUCTOR DETAIL
CLASS I COPPER
LIGHTNING
CONDUCTOR SECURED
EVERY 3' WITH COPPER
CABLE HOLDER SET IN
ADHESIVE
1" PVC SCH. 40
CONDUIT
BRONZE FLANGE
BONDING PLATE (TYP.
OF 2)
AIR TERMINAL DETAIL "B" AIR TERMINAL DETAIL "C" AIR TERMINAL DETAIL "D"
HL P
0 H2
5UL
GENTLY TAPERED AIR
TERMINAL
UNIVERSAL CONCEALED
AIR TERMINAL BASE
MOUNTED HORIZONTALLY
CABLE FASTENER
COPPER, CLASS I
LIGHTNING PROTECTION
CONDUCTOR
AIR TERMINAL ADAPTER
HORIZONTAL BASE
GENTLY TAPERED AIR
TERMINAL
ADHESIVE CABLE
FASTENER
COPPER, CLASS I
LIGHTNING PROTECTION
CONDUCTOR
UNIVERSAL SWIVEL AIR
TERMINAL BASE
NOT USED THIS PROJECT
GENTLY TAPERED AIR
TERMINAL
RIDGE SADDLE AIR
TERMINAL BASE
CABLE FASTENER
COPPER, CLASS I
LIGHTNING PROTECTION
CONDUCTOR
RIDGE SADDLE BASE
ALL CONDUCTOR BENDS
SHALL HAVE A RADIUS
OF 8" OR GREATER AND
SHALL HAVE AN ANGLE
BEND OF 90° OR
GREATER.
CONNECT TO
GROUND ROD BELOW
GRADE. -SEE DETAIL
"G"
CLASS I COPPER
LIGHTNING
CONDUCTOR
SEE THRU
ROOF DETAIL
"T"
GROUND ROD TEST WELL DETAIL "H"
23 23
DAJDAJ
E-801
ELECTRICAL LPS - DETAILS
NOT USED THIS PROJECT
GROUND PLATE DETAIL "G"
ALTERNATE METHOD
24"
24"
1/4"
COPPER GROUND PLATE, TO BE USED AS AN
ALTERNATIVE INSTALLATION METHOD, WHERE ROCK
IS ENCOUNTERED LIMITING THE BURAL DEPTH;
BURY AT A MINIMUM OF 24" BFG
BASE METHOD
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e inc he s = o ne fo ot on e an d on e-ha lf i nc he s = o ne fo ot on e inc h on e fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf i nc h on e fo ot th re e-eig ht s i nc h on e fo ot on e-qu ar te r i nc h on e fo ot on e-eig ht in ch o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
658-16-101
7 January 2019
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
E801 102 3rd Ave., NE
Hickory, NC 28601 828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #450 Charlotte, NC 28217
704.535.6374 www.wmba.net
FINAL CONSTRUCTION DOCUMENTS
04 JAN 2019
Quality Consulting Engineers, LLC
6277-600 Carolina Commons Drive, #350 Indian Land SC 29707
803.207.5450 djones@qualityconsultingengineers.com
QCE Project # 19001
| Building 9_FINAL CD DRAWINGS 18 |
| Building 9_FINAL CD DRAWINGS 19 |
| Building 9_FINAL CD DRAWINGS 20 |
| Building 9_FINAL CD DRAWINGS 21 |
| Building 9_FINAL CD DRAWINGS 22 |
| Building 9_FINAL CD DRAWINGS 23 |
File details come from the government source that posted it. Updated .