Bldg 9 Vol. 1-8.pdf

PDF 5 MB Posted

Attached to
Y1DA--Replace Building 7 and Building 9 Roofs Federal contract opportunity
Solicitation number
36C24620R0093
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This set of construction documents details requirements for replacing the roofs on Buildings 7 and 9 at the Salem VA Medical Center in Salem, Virginia. The project involves demolishing existing slate roof tiles and flashing, removing dormer louvers and wood trim, and installing new roofing. The drawings show demolition plans, keyed notes, elevations, and exit protection requirements. Bidders are advised to follow provided phasing and scheduling. The contract will require maintaining egress and life safety systems during construction, while keeping adjacent areas occupied. Overhead protection must be installed within 10 feet of building exits.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--Replace Building 7 and Building 9 Roofs, newest first.
File Type Posted
Bldg 9 Vol. 9-17.pdf PDF
36C24620R0093_1.docx DOCX document
Building 9_FINAL SPECIFICATIONS.pdf PDF
Building 7_FINAL SPECIFICATIONS.pdf PDF
P07 Wage Determintions VA20200172 Roanoke.pdf PDF
Bldg 9 Vol. 18-23.pdf PDF
Bldg 7 Vol. 1-8.pdf PDF
Bldg 7 Vol. 18-23.pdf PDF
Bldg 7 Vol. 9-17.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT

LOCATION

SALEM VA MEDICAL CENTER, SALEM, VA.

NTS

1 23

TLRWCB

GI001

COVER SHEET: DRAWING INDEX, MAPS,

GENERAL NOTES

SALEM VETERANS AFFAIRS MEDICAL CENTER

FOR

1970 ROANOKE BOULEVARD SALEM, VA 24153PROJECT # 658-16-101

REPLACE ROOF AND TUCKPOINT

(BUILDING 9)

INDEX OF DRAWINGS

DRAWING TITLESHEET # DWG.#

GENERAL NOTES

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c h e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t s i n c e f o o t o n e q u a r t e r i n c e f o o t o n e e i g h t i n c e f o o t

DRAWING NO.

Dwg. Of

Project No.

Date

DrawnChecked

Location

Building Number

Project Title

Approved: Medical Center Director

Approved: Chief of Facility Management Svc.

Drawing Title

Date Revisions

Approved: Infection Control Officer

Approved: Safety Manager

Approved: GEMS Coordinator

Approved: Energy Engineer

658-16-101

7 January 2019

BUILDING 9

VA MEDICAL CENTER, SALEM, VA 24153

REPLACE ROOF AND TUCKPOINT (BUILDING 9)

102 3rd Ave., NE

Hickory, NC 28601

828.315.9962 www.atriaxgroup.com

2105 Water Ridge Pkwy #450

Charlotte, NC 28217

704.535.6374 www.wmba.net

Quality Consulting

Engineers, PLLC

6277-600 Carolina Commons Drive, #350

Indian Land SC 29707

803.207.5450 djones@qualityconsultingengineers.com

FINAL CONSTRUCTION DOCUMENTS

7 JAN 2019

4191RE

G

IS

TERED ARCHITECT

NORT H CA ROL I N

AC

H

A R L OT T E , N

. C

C

HA

RL

ES W I LL IAM BEV

IN

S

2 23

TLRWCB

GI002

ARCHITECTURAL ABBREVIATIONS

AND SYMBOLS

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t s i n c e f o o t o n e q u a r t e r i n c e f o o t o n e e i g h t i n c e f o o t

DRAWING NO.

Dwg. Of

Project No.

Date

DrawnChecked

Location

Building Number

Project Title

Approved: Medical Center Director

Approved: Chief of Facility Management Svc.

Drawing Title

Date Revisions

Approved: Infection Control Officer

Approved: Safety Manager

Approved: GEMS Coordinator

Approved: Energy Engineer

658-16-101

7 January 2019

BUILDING 9

VA MEDICAL CENTER, SALEM, VA 24153

REPLACE ROOF AND TUCKPOINT (BUILDING 9)

102 3rd Ave., NE

Hickory, NC 28601

828.315.9962 www.atriaxgroup.com

2105 Water Ridge Pkwy #450

Charlotte, NC 28217

704.535.6374 www.wmba.net

Quality Consulting

Engineers, PLLC

6277-600 Carolina Commons Drive, #350

Indian Land SC 29707

803.207.5450 djones@qualityconsultingengineers.com

FINAL CONSTRUCTION DOCUMENTS

7 JAN 2019

4191RE

G

IS

TERED ARCHITECT

NORT H CA ROL I N

AC

H

A R L OT T E , N

. C

C

HA

RL

ES W I LL IAM BEV

IN

S

F1

AD201

C

A D

C1

AD201

F

A D

D-5

D-5 D-5

D-5

LIMITED ACCESS

ABOVE PORTICO

WALKABLE ATTIC

LIMITED ACCESS

ABOVE PORTICO

C

A D

C

A D

E

A D

E

A D

E

A D

C

A D

MECHANICAL

ROOM

ELEVATOR

OVERUN

EXISTING

STAIRWELL

D-5

D-5

AHU

1. EXISTING ADJACENT ROOMS, ABOVE AND BELOW WILL REMAIN

OCCUPIED DURING CONSTRUCTION. NO DISRUPTION OF BUILDING

SYSTEMS OR OPERATIONS ARE PERMITTED WITHOUT PRIOR

APPROVAL BY THE BUILDING OWNER.

2. REFER TO NEW CONSTRUCTION PLANS TO COORDINATE THE

EXTENT OF DEMOLITION WITH NEW CONSTRUCTION.

3. DEMOLITION OF BUILDING SYSTEMS INCLUDING CONDUIT AND

WIRING MAY EXTEND BEYOND THE LIMITS SHOWN ON THE

DEMOLITION PLANS. THIS WORK SHALL BE INCLUDED IN THE

CONTRACTORS SCOPE OF WORK.

4. THE GENERAL CONTRACTOR SHALL SEAL OR PROVIDE FILTERS ON

ALL REMAINING DUCTWORK TO PREVENT INFILTRATION OF DUST.

MAINTAIN FILTERS AS REQUIRED.

5. GENERAL CONTRACTOR SHALL MAINTAIN EGRESS AND INTEGRITY

OF LIFE SAFETY SYSTEMS DURING ALL DEMOLITION AND NEW

CONSTRUCTION.

6. PROTECT EXISTING MTL CANOPIES TO REMAIN DURING

CONSTRUCTION.

7. BUILDING 9 WILL REMAIN FULLY OPERATIONAL DURING THE

CONSTRUCTION PERIOD. OVERHEAD PROTECTION AT ALL EXTERIOR

EXIT-WAYS (EXIT-WAYS AT THE GROUND LEVEL AND UPPER LEVELS)

IS A REQUIREMENT OF THIS CONTRACT FOR THE PROTECTION OF

THE SALEM VA MEDICAL CENTER STAFF AND THE GENERAL PUBLIC.

1. DEMOLISH EXISTING SLATE ROOF TILES AND ALL DAMAGED

WOOD SUBSTRATE.

2. DEMOLISH ALL EXISTING FLASHING IN ROOF VALLEYS AND

HIPS.

3. REMOVE EXISTING BALUSTRADE HARDWARE.

4. REMOVE EXISTING LOUVER, TRIM, & FLASHING.

5. DEMOLISH EXISTING DORMER LOUVERS & WOOD TRIM.

6. DEMOLISH INTEGRAL GUTTER & COPPER COVER.

7. DEMOLISH EXISTING COPPER CHIMNEY CAP.

8. DEMOLISH EXISTING DOWNSPOUTS. BASE RECEPTOR TO

REMAIN

9. DEMOLISH EXISTING SLATE TILE FROM VERTICAL SURFACE OF

DORMER.

10. DEMOLISH EXISTING ASPHALT ROOF & COPING.

11. REMOVE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE

BELOW THE BUILT-IN COPPER GUTTER THAT IS DETERIORATED

BEYOND THE ABILITY TO SCRAPE/PRIME/REPAINT.

12. REMOVE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE AT

THE GABLE ENDS THAT IS DETERIORATED BEYOND THE ABILITY

TO SCRAPE/PRIME/REPAINT.

D-#

33 5 5

N

FINAL CONSTRUCTION DOCUMENTS

A f f a ir s

V e te ra n s

Approved: Infection Control Officer

Approved: Safety Manager

Approved: GEMS Coordinator

Approved: Energy Engineer

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot

DRAWING NO.

Dwg. Of

Project No.

Date

DrawnChecked

Location

Building Number

Project Title

Approved: Medical Center Director

Approved: Chief of Facility Management Svc.

Drawing Title

DateRevisions

BUILDING 9

VA MEDICAL CENTER, SALEM, VA 24153

REPLACE ROOF AND TUCKPOINT (BUILDING 9)

102 3rd Ave., NE Hickory, NC 28601

828.315.9962 www.atriaxgroup.com

2105 Water Ridge Pkwy #

Charlotte, NC 28217 704.535.6374 www.wmba.net

Quality Consulting Engineers, PLLC

6277-600 Carolina Commons Drive, #

Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com

100% FINAL CONSTRUCTION

DOCUMENTS

1 2 3 4 5 6 7 8

A

B

C

D

E

F

658-16-101

C U s e r s

\m c h ri s te n s e n \D o c u m e n ts

\3

V

A S

A L E

M B

L D

G

R O

O F

R E

P L A

C E

M E

N T

A

R C

H m c h ri s te n s e n w m b a .n e t.

rv t

/3 /2

:3

:3 P

M

DEMOLITION PLAN - ATTIC SLAB

7 JANUARY, 2019

7 JANUARY, 2019

AD101

MJC SEC

AD101

1/8" = 1'-0" F1

FLR - ATTIC SLAB - DEMO

DEMOLITION GENERAL NOTES

DEMOLITION PLAN KEYED NOTES

1/16" = 1'-0" F7

FLR - ROOF - NEW PHASING

GC TO FOLLOW PHASING & PROPOSE

SCHEDULES WITH THEIR BID

F1

AD201

C

A D

C1

AD201

F

A D

D-1

D-1 D-1

D-1

D-1

D-1D-1

D-1

D-1

D-1D-1

D-1 D-1

D-1

D-1 D-1

D-1

D-1

D-1 D-1

D-1

D-1 D-1 D-1 D-1

D-1 D-1

D-1

D-1

D-1 D-1

D-1

D-1

D-2

D-2

D-2

D-2

D-2

D-2

D-2 D-2

D-2 D-2

D-2 D-2 D-2 D-2D-2D-2D-2

D-2 D-2

D-2D-2

D-2

D-2

D-2

D-2

D-2

D-2

D-2

D-2 D-2

D-2

D-2

D-2

D-2

D-2

D-2

D-2

D-2

D-2 D-2

D-5

D-7

D-7

D-7

D-7

D-7 D-7

D-9 D-9D-9

D-9D-9 D-9 D-9D-9D-9 D-9

D-9

D-9 D-9D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-9

D-1D-1

D-1D-1D-1D-1D-1D-1

D-1D-1

D-1 D-1D-1

D-1

D-1 D-1

HEALING GARDEN LABYRINTH BELOW, NIC

ROOF OF CONNECTOR. NIC

METAL CANOPY

BELOW, NIC

C

A D

C

A D

D-4

D-4

E

A D

E

A D

E

A D

C

A D

D-3

D-3

D-4

D-3

D-4

D-3

D-3

D-3

D-4

D-3

D-4

D-3

D-4

D-5

D-5

D-5

D-5

D-2

D-2

D-2

D-2

D-2

D-2 D-2 D-2

D-2

D-2

D-2

D-2

D-2

D-10

D-6

D-6 D-6

D-6

D-6D-6

D-6

D-6

D-6

D-6

D-6

D-6

D-6

D-6D-6

D-8

D-8

D-8

D-8

D-8

D-8

D-8D-8 D-8

D-8

D-8

D-8

D-8

D-8

D-8

D-8

D-8

D-8 D-8 D-8

D-4

D-4

D-4 D-4

D-4

D-2

D-12

D-11

D-11

D-11

D-11

D-11

D-11

D-11

D-11

D-11

D-11

D-11

D-11

D-11

D-11

D-11

D-11D-11

D-11

D-11

D-11

D-11

D-12

D-12

D-12

D-12D-12

D-11

D-11

1. EXISTING ADJACENT ROOMS, ABOVE AND BELOW WILL REMAIN

OCCUPIED DURING CONSTRUCTION. NO DISRUPTION OF BUILDING

SYSTEMS OR OPERATIONS ARE PERMITTED WITHOUT PRIOR

APPROVAL BY THE BUILDING OWNER.

2. REFER TO NEW CONSTRUCTION PLANS TO COORDINATE THE

EXTENT OF DEMOLITION WITH NEW CONSTRUCTION.

3. DEMOLITION OF BUILDING SYSTEMS INCLUDING CONDUIT AND

WIRING MAY EXTEND BEYOND THE LIMITS SHOWN ON THE

DEMOLITION PLANS. THIS WORK SHALL BE INCLUDED IN THE

CONTRACTORS SCOPE OF WORK.

4. THE GENERAL CONTRACTOR SHALL SEAL OR PROVIDE FILTERS ON

ALL REMAINING DUCTWORK TO PREVENT INFILTRATION OF DUST.

MAINTAIN FILTERS AS REQUIRED.

5. GENERAL CONTRACTOR SHALL MAINTAIN EGRESS AND INTEGRITY

OF LIFE SAFETY SYSTEMS DURING ALL DEMOLITION AND NEW

CONSTRUCTION.

6. PROTECT EXISTING MTL CANOPIES TO REMAIN DURING

CONSTRUCTION.

7. BUILDING 9 WILL REMAIN FULLY OPERATIONAL DURING THE

CONSTRUCTION PERIOD. OVERHEAD PROTECTION AT ALL EXTERIOR

EXIT-WAYS (EXIT-WAYS AT THE GROUND LEVEL AND UPPER LEVELS)

IS A REQUIREMENT OF THIS CONTRACT FOR THE PROTECTION OF

THE SALEM VA MEDICAL CENTER STAFF AND THE GENERAL PUBLIC.

1. DEMOLISH EXISTING SLATE ROOF TILES AND ALL DAMAGED

WOOD SUBSTRATE.

2. DEMOLISH ALL EXISTING FLASHING IN ROOF VALLEYS AND

HIPS.

3. REMOVE EXISTING BALUSTRADE HARDWARE.

4. REMOVE EXISTING LOUVER, TRIM, & FLASHING.

5. DEMOLISH EXISTING DORMER LOUVERS & WOOD TRIM.

6. DEMOLISH INTEGRAL GUTTER & COPPER COVER.

7. DEMOLISH EXISTING COPPER CHIMNEY CAP.

8. DEMOLISH EXISTING DOWNSPOUTS. BASE RECEPTOR TO

REMAIN

9. DEMOLISH EXISTING SLATE TILE FROM VERTICAL SURFACE OF

DORMER.

10. DEMOLISH EXISTING ASPHALT ROOF & COPING.

11. REMOVE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE

BELOW THE BUILT-IN COPPER GUTTER THAT IS DETERIORATED

BEYOND THE ABILITY TO SCRAPE/PRIME/REPAINT.

12. REMOVE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE AT

THE GABLE ENDS THAT IS DETERIORATED BEYOND THE ABILITY

TO SCRAPE/PRIME/REPAINT.

D-#

N

FINAL CONSTRUCTION DOCUMENTS

A f f a ir s

V e te ra n s

Approved: Infection Control Officer

Approved: Safety Manager

Approved: GEMS Coordinator

Approved: Energy Engineer

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot

DRAWING NO.

Dwg. Of

Project No.

Date

DrawnChecked

Location

Building Number

Project Title

Approved: Medical Center Director

Approved: Chief of Facility Management Svc.

Drawing Title

DateRevisions

BUILDING 9

VA MEDICAL CENTER, SALEM, VA 24153

REPLACE ROOF AND TUCKPOINT (BUILDING 9)

102 3rd Ave., NE Hickory, NC 28601

828.315.9962 www.atriaxgroup.com

2105 Water Ridge Pkwy #

Charlotte, NC 28217 704.535.6374 www.wmba.net

Quality Consulting Engineers, PLLC

6277-600 Carolina Commons Drive, #

Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com

100% FINAL CONSTRUCTION

DOCUMENTS

1 2 3 4 5 6 7 8

A

B

C

D

E

F

658-16-101

C U s e r s

\m c h ri s te n s e n \D o c u m e n ts

\3

V

A S

A L E

M B

L D

G

R O

O F

R E

P L A

C E

M E

N T

A

R C

H m c h ri s te n s e n w m b a .n e t.

rv t

/3 /2

:3

:3 P

M

DEMOLITION PLAN - ROOF

7 JANUARY, 2019

7 JANUARY, 2019

AD102

MJC SEC

AD102

1/8" = 1'-0" F1

FLR - ROOF - DEMO

DEMOLITION GENERAL NOTES

DEMOLITION PLAN KEYED NOTES

1. EXISTING ADJACENT ROOMS, ABOVE AND BELOW WILL REMAIN

OCCUPIED DURING CONSTRUCTION. NO DISRUPTION OF BUILDING

SYSTEMS OR OPERATIONS ARE PERMITTED WITHOUT PRIOR

APPROVAL BY THE BUILDING OWNER.

2. REFER TO NEW CONSTRUCTION PLANS TO COORDINATE THE

EXTENT OF DEMOLITION WITH NEW CONSTRUCTION.

3. DEMOLITION OF BUILDING SYSTEMS INCLUDING CONDUIT AND

WIRING MAY EXTEND BEYOND THE LIMITS SHOWN ON THE

DEMOLITION PLANS. THIS WORK SHALL BE INCLUDED IN THE

CONTRACTORS SCOPE OF WORK.

4. THE GENERAL CONTRACTOR SHALL SEAL OR PROVIDE FILTERS ON

ALL REMAINING DUCTWORK TO PREVENT INFILTRATION OF DUST.

MAINTAIN FILTERS AS REQUIRED.

5. GENERAL CONTRACTOR SHALL MAINTAIN EGRESS AND INTEGRITY

OF LIFE SAFETY SYSTEMS DURING ALL DEMOLITION AND NEW

CONSTRUCTION.

6. PROTECT EXISTING MTL CANOPIES TO REMAIN DURING

CONSTRUCTION.

7. BUILDING 9 WILL REMAIN FULLY OPERATIONAL DURING THE

CONSTRUCTION PERIOD. OVERHEAD PROTECTION AT ALL EXTERIOR

EXIT-WAYS (EXIT-WAYS AT THE GROUND LEVEL AND UPPER LEVELS)

IS A REQUIREMENT OF THIS CONTRACT FOR THE PROTECTION OF

THE SALEM VA MEDICAL CENTER STAFF AND THE GENERAL PUBLIC.

LEVEL 01

1,091'-0"

LEVEL 02

1,102'-11"

BASEMENT -

LEVEL 00

1,079'-0"

PIPE BASEMENT -

LEVEL 0A

1,073'-0"

ATTIC SLAB

1,115'-9"

D-1D-1

D-1 D-1D-1D-1

D-1

D-1

D-7 D-7D-7D-7

D-8 D-8 D-8D-8 D-8 D-8

D-1 D-1 D-1D-1 D-1D-1

D-5 D-9D-9 D-9 D-9

D-2D-2 D-2D-2

CURVED WALL BEYOND, NIC

D-6 D-6 D-6

D-6D-6D-6D-6

D-5

D-11 D-11 D-11

D-11

D-11 D-11

D-11

D-12

LEVEL 01

1,091'-0"

LEVEL 02

1,102'-11"

BASEMENT -

LEVEL 00

1,079'-0"

PIPE BASEMENT -

LEVEL 0A

1,073'-0"

ATTIC SLAB

1,115'-9"

D-1 D-1

D-1 D-1

D-1D-1

D-1D-1 D-1D-1 D-1D-1

D-7 D-7D-7D-7

D-1 D-1 D-1 D-1

D-8D-8D-8 D-8D-8 D-8

CURVED WALL BEYOND, NIC

D-6 D-6

D-6 D-6

D-6

D-9 D-9 D-9 D-9 D-9 D-9

D-11

D-12

D-11

D-11

D-12

D-11

D-12

1. DEMOLISH EXISTING SLATE ROOF TILES AND ALL DAMAGED

WOOD SUBSTRATE.

2. DEMOLISH ALL EXISTING FLASHING IN ROOF VALLEYS AND

HIPS.

3. REMOVE EXISTING BALUSTRADE HARDWARE.

4. REMOVE EXISTING LOUVER, TRIM, & FLASHING.

5. DEMOLISH EXISTING DORMER LOUVERS & WOOD TRIM.

6. DEMOLISH INTEGRAL GUTTER & COPPER COVER.

7. DEMOLISH EXISTING COPPER CHIMNEY CAP.

8. DEMOLISH EXISTING DOWNSPOUTS. BASE RECEPTOR TO

REMAIN

9. DEMOLISH EXISTING SLATE TILE FROM VERTICAL SURFACE OF

DORMER.

10. DEMOLISH EXISTING ASPHALT ROOF & COPING.

11. REMOVE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE

BELOW THE BUILT-IN COPPER GUTTER THAT IS DETERIORATED

BEYOND THE ABILITY TO SCRAPE/PRIME/REPAINT.

12. REMOVE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE AT

THE GABLE ENDS THAT IS DETERIORATED BEYOND THE ABILITY

TO SCRAPE/PRIME/REPAINT.

D-#

N

FINAL CONSTRUCTION DOCUMENTS

A f f a ir s

V e te ra n s

Approved: Infection Control Officer

Approved: Safety Manager

Approved: GEMS Coordinator

Approved: Energy Engineer

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot

DRAWING NO.

Dwg. Of

Project No.

Date

DrawnChecked

Location

Building Number

Project Title

Approved: Medical Center Director

Approved: Chief of Facility Management Svc.

Drawing Title

DateRevisions

BUILDING 9

VA MEDICAL CENTER, SALEM, VA 24153

REPLACE ROOF AND TUCKPOINT (BUILDING 9)

102 3rd Ave., NE Hickory, NC 28601

828.315.9962 www.atriaxgroup.com

2105 Water Ridge Pkwy #

Charlotte, NC 28217 704.535.6374 www.wmba.net

Quality Consulting Engineers, PLLC

6277-600 Carolina Commons Drive, #

Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com

100% FINAL CONSTRUCTION

DOCUMENTS

1 2 3 4 5 6 7 8

A

B

C

D

E

F

658-16-101

C U s e r s

\m c h ri s te n s e n \D o c u m e n ts

\3

V

A S

A L E

M B

L D

G

R O

O F

R E

P L A

C E

M E

N T

A

R C

H m c h ri s te n s e n w m b a .n e t.

rv t

/3 /2

:3

:3 P

M

DEMOLITION EXTERIOR ELEVATIONS

7 JANUARY, 2019

7 JANUARY, 2019

AD201

MJC SEC

AD201

DEMOLITION GENERAL NOTES

1/8" = 1'-0" C1

NORTHEAST ELEVATION - DEMO

1/8" = 1'-0" F1

SOUTHWEST ELEVATION - DEMO

LEVEL 01

1,091'-0"

LEVEL 02

1,102'-11"

BASEMENT -

LEVEL 00

1,079'-0"

PIPE BASEMENT -

LEVEL 0A

1,073'-0"

ATTIC SLAB

1,115'-9"

D-1 D-1

D-5

D-1 D-1 D-1

D-1

D-7D-7D-7

D-8 D-8D-8 D-8

CURVED WALL, NIC

D-5 D-6

D-6D-6

D-4

D-4

D-12

D-11 D-11

D-11

LEVEL 01

1,091'-0"

LEVEL 02

1,102'-11"

BASEMENT -

LEVEL 00

1,079'-0"

PIPE BASEMENT -

LEVEL 0A

1,073'-0"

ATTIC SLAB

1,115'-9"

D-7D-7D-7

D-1 D-1

D-1

D-1

D-1 D-1

D-8 D-8D-8 D-8

D-5

D-6

D-6 D-6D-6

D-4

D-4

D-12

D-11 D-11 D-5

D-11

D-11

1. EXISTING ADJACENT ROOMS, ABOVE AND BELOW WILL REMAIN

OCCUPIED DURING CONSTRUCTION. NO DISRUPTION OF BUILDING

SYSTEMS OR OPERATIONS ARE PERMITTED WITHOUT PRIOR

APPROVAL BY THE BUILDING OWNER.

2. REFER TO NEW CONSTRUCTION PLANS TO COORDINATE THE

EXTENT OF DEMOLITION WITH NEW CONSTRUCTION.

3. DEMOLITION OF BUILDING SYSTEMS INCLUDING CONDUIT AND

WIRING MAY EXTEND BEYOND THE LIMITS SHOWN ON THE

DEMOLITION PLANS. THIS WORK SHALL BE INCLUDED IN THE

CONTRACTORS SCOPE OF WORK.

4. THE GENERAL CONTRACTOR SHALL SEAL OR PROVIDE FILTERS ON

ALL REMAINING DUCTWORK TO PREVENT INFILTRATION OF DUST.

MAINTAIN FILTERS AS REQUIRED.

5. GENERAL CONTRACTOR SHALL MAINTAIN EGRESS AND INTEGRITY

OF LIFE SAFETY SYSTEMS DURING ALL DEMOLITION AND NEW

CONSTRUCTION.

6. PROTECT EXISTING MTL CANOPIES TO REMAIN DURING

CONSTRUCTION.

7. BUILDING 9 WILL REMAIN FULLY OPERATIONAL DURING THE

CONSTRUCTION PERIOD. OVERHEAD PROTECTION AT ALL EXTERIOR

EXIT-WAYS (EXIT-WAYS AT THE GROUND LEVEL AND UPPER LEVELS)

IS A REQUIREMENT OF THIS CONTRACT FOR THE PROTECTION OF

THE SALEM VA MEDICAL CENTER STAFF AND THE GENERAL PUBLIC.

1. DEMOLISH EXISTING SLATE ROOF TILES AND ALL DAMAGED

WOOD SUBSTRATE.

2. DEMOLISH ALL EXISTING FLASHING IN ROOF VALLEYS AND

HIPS.

3. REMOVE EXISTING BALUSTRADE HARDWARE.

4. REMOVE EXISTING LOUVER, TRIM, & FLASHING.

5. DEMOLISH EXISTING DORMER LOUVERS & WOOD TRIM.

6. DEMOLISH INTEGRAL GUTTER & COPPER COVER.

7. DEMOLISH EXISTING COPPER CHIMNEY CAP.

8. DEMOLISH EXISTING DOWNSPOUTS. BASE RECEPTOR TO

REMAIN

9. DEMOLISH EXISTING SLATE TILE FROM VERTICAL SURFACE OF

DORMER.

10. DEMOLISH EXISTING ASPHALT ROOF & COPING.

11. REMOVE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE

BELOW THE BUILT-IN COPPER GUTTER THAT IS DETERIORATED

BEYOND THE ABILITY TO SCRAPE/PRIME/REPAINT.

12. REMOVE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE AT

THE GABLE ENDS THAT IS DETERIORATED BEYOND THE ABILITY

TO SCRAPE/PRIME/REPAINT.

D-#

N

FINAL CONSTRUCTION DOCUMENTS

A f f a ir s

V e te ra n s

Approved: Infection Control Officer

Approved: Safety Manager

Approved: GEMS Coordinator

Approved: Energy Engineer

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot

DRAWING NO.

Dwg. Of

Project No.

Date

DrawnChecked

Location

Building Number

Project Title

Approved: Medical Center Director

Approved: Chief of Facility Management Svc.

Drawing Title

DateRevisions

BUILDING 9

VA MEDICAL CENTER, SALEM, VA 24153

REPLACE ROOF AND TUCKPOINT (BUILDING 9)

102 3rd Ave., NE Hickory, NC 28601

828.315.9962 www.atriaxgroup.com

2105 Water Ridge Pkwy #

Charlotte, NC 28217 704.535.6374 www.wmba.net

Quality Consulting Engineers, PLLC

6277-600 Carolina Commons Drive, #

Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com

100% FINAL CONSTRUCTION

DOCUMENTS

1 2 3 4 5 6 7 8

A

B

C

D

E

F

658-16-101

C U s e r s

\m c h ri s te n s e n \D o c u m e n ts

\3

V

A S

A L E

M B

L D

G

R O

O F

R E

P L A

C E

M E

N T

A

R C

H m c h ri s te n s e n w m b a .n e t.

rv t

/3 /2

:3

:4 P

M

DEMOLITION EXTERIOR ELEVATIONS

7 JANUARY, 2019

7 JANUARY, 2019

AD202

MJC SEC

AD202

1/8" = 1'-0" C1

NORTHWEST ELEVATION - DEMO

1/8" = 1'-0" F1

SOUTHEAST ELEVATION - DEMO

DEMOLITION GENERAL NOTES

LEVEL 01

1,091'-0"

LEVEL 02

1,102'-11"

BASEMENT -

LEVEL 00

1,079'-0"

PIPE BASEMENT -

LEVEL 0A

1,073'-0"

ATTIC SLAB

1,115'-9"

D-1 D-1

D-8

D-8

D-6

D-11

LEVEL 01

1,091'-0"

LEVEL 02

1,102'-11"

BASEMENT -

LEVEL 00

1,079'-0"

PIPE BASEMENT -

LEVEL 0A

1,073'-0"

ATTIC SLAB

1,115'-9"

D-1 D-1

D-8D-8

D-6

D-11

LEVEL 01

1,091'-0"

LEVEL 02

1,102'-11"

BASEMENT -

LEVEL 00

1,079'-0"

PIPE BASEMENT -

LEVEL 0A

1,073'-0"

ATTIC SLAB

1,115'-9"

D-1 D-1

D-1

D-6D-6 D-6

D-11 D-11 D-11

LEVEL 01

1,091'-0"

LEVEL 02

1,102'-11"

BASEMENT -

LEVEL 00

1,079'-0"

PIPE BASEMENT -

LEVEL 0A

1,073'-0"

ATTIC SLAB

1,115'-9"

D-1 D-1

D-1

D-8 D-8D-8

D-6 D-6

D-11 D-11

LEVEL 01

1,091'-0"

LEVEL 02

1,102'-11"

BASEMENT -

LEVEL 00

1,079'-0"

PIPE BASEMENT -

LEVEL 0A

1,073'-0"

ATTIC SLAB

1,115'-9"

D-1 D-1

D-1

D-8 D-8

D-6 D-6 D-6

D-11 D-11

D-11

LEVEL 01

1,091'-0"

LEVEL 02

1,102'-11"

BASEMENT -

LEVEL 00

1,079'-0"

PIPE BASEMENT -

LEVEL 0A

1,073'-0"

ATTIC SLAB

1,115'-9"

D-1 D-1

D-8D-8

D-1

D-6D-6

D-11D-11

1. DEMOLISH EXISTING SLATE ROOF TILES AND ALL DAMAGED

WOOD SUBSTRATE.

2. DEMOLISH ALL EXISTING FLASHING IN ROOF VALLEYS AND

HIPS.

3. REMOVE EXISTING BALUSTRADE HARDWARE.

4. REMOVE EXISTING LOUVER, TRIM, & FLASHING.

5. DEMOLISH EXISTING DORMER LOUVERS & WOOD TRIM.

6. DEMOLISH INTEGRAL GUTTER & COPPER COVER.

7. DEMOLISH EXISTING COPPER CHIMNEY CAP.

8. DEMOLISH EXISTING DOWNSPOUTS. BASE RECEPTOR TO

REMAIN

9. DEMOLISH EXISTING SLATE TILE FROM VERTICAL SURFACE OF

DORMER.

10. DEMOLISH EXISTING ASPHALT ROOF & COPING.

11. REMOVE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE

BELOW THE BUILT-IN COPPER GUTTER THAT IS DETERIORATED

BEYOND THE ABILITY TO SCRAPE/PRIME/REPAINT.

12. REMOVE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE AT

THE GABLE ENDS THAT IS DETERIORATED BEYOND THE ABILITY

TO SCRAPE/PRIME/REPAINT.

D-#

1. EXISTING ADJACENT ROOMS, ABOVE AND BELOW WILL REMAIN

OCCUPIED DURING CONSTRUCTION. NO DISRUPTION OF BUILDING

SYSTEMS OR OPERATIONS ARE PERMITTED WITHOUT PRIOR

APPROVAL BY THE BUILDING OWNER.

2. REFER TO NEW CONSTRUCTION PLANS TO COORDINATE THE

EXTENT OF DEMOLITION WITH NEW CONSTRUCTION.

3. DEMOLITION OF BUILDING SYSTEMS INCLUDING CONDUIT AND

WIRING MAY EXTEND BEYOND THE LIMITS SHOWN ON THE

DEMOLITION PLANS. THIS WORK SHALL BE INCLUDED IN THE

CONTRACTORS SCOPE OF WORK.

4. THE GENERAL CONTRACTOR SHALL SEAL OR PROVIDE FILTERS ON

ALL REMAINING DUCTWORK TO PREVENT INFILTRATION OF DUST.

MAINTAIN FILTERS AS REQUIRED.

5. GENERAL CONTRACTOR SHALL MAINTAIN EGRESS AND INTEGRITY

OF LIFE SAFETY SYSTEMS DURING ALL DEMOLITION AND NEW

CONSTRUCTION.

6. PROTECT EXISTING MTL CANOPIES TO REMAIN DURING

CONSTRUCTION.

7. BUILDING 9 WILL REMAIN FULLY OPERATIONAL DURING THE

CONSTRUCTION PERIOD. OVERHEAD PROTECTION AT ALL EXTERIOR

EXIT-WAYS (EXIT-WAYS AT THE GROUND LEVEL AND UPPER LEVELS)

IS A REQUIREMENT OF THIS CONTRACT FOR THE PROTECTION OF

THE SALEM VA MEDICAL CENTER STAFF AND THE GENERAL PUBLIC.

N

FINAL CONSTRUCTION DOCUMENTS

A f f a ir s

V e te ra n s

Approved: Infection Control Officer

Approved: Safety Manager

Approved: GEMS Coordinator

Approved: Energy Engineer

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot

DRAWING NO.

Dwg. Of

Project No.

Date

DrawnChecked

Location

Building Number

Project Title

Approved: Medical Center Director

Approved: Chief of Facility Management Svc.

Drawing Title

DateRevisions

BUILDING 9

VA MEDICAL CENTER, SALEM, VA 24153

REPLACE ROOF AND TUCKPOINT (BUILDING 9)

102 3rd Ave., NE Hickory, NC 28601

828.315.9962 www.atriaxgroup.com

2105 Water Ridge Pkwy #

Charlotte, NC 28217 704.535.6374 www.wmba.net

Quality Consulting Engineers, PLLC

6277-600 Carolina Commons Drive, #

Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com

100% FINAL CONSTRUCTION

DOCUMENTS

1 2 3 4 5 6 7 8

A

B

C

D

E

F

658-16-101

C U s e r s

\m c h ri s te n s e n \D o c u m e n ts

\3

V

A S

A L E

M B

L D

G

R O

O F

R E

P L A

C E

M E

N T

A

R C

H m c h ri s te n s e n w m b a .n e t.

rv t

/3 /2

:3

:4 P

M

DEMOLITION EXTERIOR ELEVATIONS

7 JANUARY, 2019

7 JANUARY, 2019

AD203

MJC SEC

AD203

1/8" = 1'-0" C1

WEST ELEVATION A - DEMO

1/8" = 1'-0"

C3

EAST ELEVATION A - DEMO

1/8" = 1'-0" E1

EAST ELEVATION C - DEMO

1/8" = 1'-0"

E6

WEST ELEVATION C - DEMO

1/8" = 1'-0" E3

WEST ELEVATION B - DEMO

1/8" = 1'-0" C5

EAST ELEVATION B - DEMO

DEMOLITION PLAN KEYED NOTES

DEMOLITION GENERAL NOTES

10' BUILDING

PERIMETER

EXIT

1 HR FIRE RATED ENCLOSURE TO 10'

AWAY FROM BUILDING PERIMETER FOR

OVERHEAD PROTECTION. MAINTAIN 4'

INSIDE CLEAR MINIMUM.

N

FINAL CONSTRUCTION DOCUMENTS

A f f a ir s

V e te ra n s

Approved: Infection Control Officer

Approved: Safety Manager

Approved: GEMS Coordinator

Approved: Energy Engineer

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot

DRAWING NO.

Dwg. Of

Project No.

Date

DrawnChecked

Location

Building Number

Project Title

Approved: Medical Center Director

Approved: Chief of Facility Management Svc.

Drawing Title

DateRevisions

BUILDING 9

VA MEDICAL CENTER, SALEM, VA 24153

REPLACE ROOF AND TUCKPOINT (BUILDING 9)

102 3rd Ave., NE Hickory, NC 28601

828.315.9962 www.atriaxgroup.com

2105 Water Ridge Pkwy #

Charlotte, NC 28217 704.535.6374 www.wmba.net

Quality Consulting Engineers, PLLC

6277-600 Carolina Commons Drive, #

Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com

100% FINAL CONSTRUCTION

DOCUMENTS

1 2 3 4 5 6 7 8

A

B

C

D

E

F

658-16-101

C U s e r s

\m c h ri s te n s e n \D o c u m e n ts

\3

V

A S

A L E

M B

L D

G

R O

O F

R E

P L A

C E

M E

N T

A

R C

H m c h ri s te n s e n w m b a .n e t.

rv t

/3 /2

:3

:4 P

M

EXIT PROTECTION PLAN

7 JANUARY, 2019

7 JANUARY, 2019

AE100

MJC SEC

AE100

1/8" = 1'-0"

SITE - LEVEL 01 - NEW

Building 9_FINAL CD DRAWINGS 1
Building 9_FINAL CD DRAWINGS 2
Building 9_FINAL CD DRAWINGS 3
Building 9_FINAL CD DRAWINGS 4
Building 9_FINAL CD DRAWINGS 5
Building 9_FINAL CD DRAWINGS 6
Building 9_FINAL CD DRAWINGS 7
Building 9_FINAL CD DRAWINGS 8

File details come from the government source that posted it. Updated .