Bldg 9 Vol. 1-8.pdf
PDF 5 MB Posted
- Attached to
- Y1DA--Replace Building 7 and Building 9 Roofs Federal contract opportunity
- Solicitation number
- 36C24620R0093
About this file
This set of construction documents details requirements for replacing the roofs on Buildings 7 and 9 at the Salem VA Medical Center in Salem, Virginia. The project involves demolishing existing slate roof tiles and flashing, removing dormer louvers and wood trim, and installing new roofing. The drawings show demolition plans, keyed notes, elevations, and exit protection requirements. Bidders are advised to follow provided phasing and scheduling. The contract will require maintaining egress and life safety systems during construction, while keeping adjacent areas occupied. Overhead protection must be installed within 10 feet of building exits.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bldg 9 Vol. 9-17.pdf | ||
| 36C24620R0093_1.docx | DOCX document | |
| Building 9_FINAL SPECIFICATIONS.pdf | ||
| Building 7_FINAL SPECIFICATIONS.pdf | ||
| P07 Wage Determintions VA20200172 Roanoke.pdf | ||
| Bldg 9 Vol. 18-23.pdf | ||
| Bldg 7 Vol. 1-8.pdf | ||
| Bldg 7 Vol. 18-23.pdf | ||
| Bldg 7 Vol. 9-17.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
LOCATION
SALEM VA MEDICAL CENTER, SALEM, VA.
NTS
1 23
TLRWCB
GI001
COVER SHEET: DRAWING INDEX, MAPS,
GENERAL NOTES
SALEM VETERANS AFFAIRS MEDICAL CENTER
FOR
1970 ROANOKE BOULEVARD SALEM, VA 24153PROJECT # 658-16-101
REPLACE ROOF AND TUCKPOINT
(BUILDING 9)
INDEX OF DRAWINGS
DRAWING TITLESHEET # DWG.#
GENERAL NOTES
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c h e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t s i n c e f o o t o n e q u a r t e r i n c e f o o t o n e e i g h t i n c e f o o t
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
Date Revisions
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
658-16-101
7 January 2019
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE
Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #450
Charlotte, NC 28217
704.535.6374 www.wmba.net
Quality Consulting
Engineers, PLLC
6277-600 Carolina Commons Drive, #350
Indian Land SC 29707
803.207.5450 djones@qualityconsultingengineers.com
FINAL CONSTRUCTION DOCUMENTS
7 JAN 2019
4191RE
G
IS
TERED ARCHITECT
NORT H CA ROL I N
AC
H
A R L OT T E , N
. C
C
HA
RL
ES W I LL IAM BEV
IN
S
2 23
TLRWCB
GI002
ARCHITECTURAL ABBREVIATIONS
AND SYMBOLS
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t s i n c e f o o t o n e q u a r t e r i n c e f o o t o n e e i g h t i n c e f o o t
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
Date Revisions
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
658-16-101
7 January 2019
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE
Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #450
Charlotte, NC 28217
704.535.6374 www.wmba.net
Quality Consulting
Engineers, PLLC
6277-600 Carolina Commons Drive, #350
Indian Land SC 29707
803.207.5450 djones@qualityconsultingengineers.com
FINAL CONSTRUCTION DOCUMENTS
7 JAN 2019
4191RE
G
IS
TERED ARCHITECT
NORT H CA ROL I N
AC
H
A R L OT T E , N
. C
C
HA
RL
ES W I LL IAM BEV
IN
S
F1
AD201
C
A D
C1
AD201
F
A D
D-5
D-5 D-5
D-5
LIMITED ACCESS
ABOVE PORTICO
WALKABLE ATTIC
LIMITED ACCESS
ABOVE PORTICO
C
A D
C
A D
E
A D
E
A D
E
A D
C
A D
MECHANICAL
ROOM
ELEVATOR
OVERUN
EXISTING
STAIRWELL
D-5
D-5
AHU
1. EXISTING ADJACENT ROOMS, ABOVE AND BELOW WILL REMAIN
OCCUPIED DURING CONSTRUCTION. NO DISRUPTION OF BUILDING
SYSTEMS OR OPERATIONS ARE PERMITTED WITHOUT PRIOR
APPROVAL BY THE BUILDING OWNER.
2. REFER TO NEW CONSTRUCTION PLANS TO COORDINATE THE
EXTENT OF DEMOLITION WITH NEW CONSTRUCTION.
3. DEMOLITION OF BUILDING SYSTEMS INCLUDING CONDUIT AND
WIRING MAY EXTEND BEYOND THE LIMITS SHOWN ON THE
DEMOLITION PLANS. THIS WORK SHALL BE INCLUDED IN THE
CONTRACTORS SCOPE OF WORK.
4. THE GENERAL CONTRACTOR SHALL SEAL OR PROVIDE FILTERS ON
ALL REMAINING DUCTWORK TO PREVENT INFILTRATION OF DUST.
MAINTAIN FILTERS AS REQUIRED.
5. GENERAL CONTRACTOR SHALL MAINTAIN EGRESS AND INTEGRITY
OF LIFE SAFETY SYSTEMS DURING ALL DEMOLITION AND NEW
CONSTRUCTION.
6. PROTECT EXISTING MTL CANOPIES TO REMAIN DURING
CONSTRUCTION.
7. BUILDING 9 WILL REMAIN FULLY OPERATIONAL DURING THE
CONSTRUCTION PERIOD. OVERHEAD PROTECTION AT ALL EXTERIOR
EXIT-WAYS (EXIT-WAYS AT THE GROUND LEVEL AND UPPER LEVELS)
IS A REQUIREMENT OF THIS CONTRACT FOR THE PROTECTION OF
THE SALEM VA MEDICAL CENTER STAFF AND THE GENERAL PUBLIC.
1. DEMOLISH EXISTING SLATE ROOF TILES AND ALL DAMAGED
WOOD SUBSTRATE.
2. DEMOLISH ALL EXISTING FLASHING IN ROOF VALLEYS AND
HIPS.
3. REMOVE EXISTING BALUSTRADE HARDWARE.
4. REMOVE EXISTING LOUVER, TRIM, & FLASHING.
5. DEMOLISH EXISTING DORMER LOUVERS & WOOD TRIM.
6. DEMOLISH INTEGRAL GUTTER & COPPER COVER.
7. DEMOLISH EXISTING COPPER CHIMNEY CAP.
8. DEMOLISH EXISTING DOWNSPOUTS. BASE RECEPTOR TO
REMAIN
9. DEMOLISH EXISTING SLATE TILE FROM VERTICAL SURFACE OF
DORMER.
10. DEMOLISH EXISTING ASPHALT ROOF & COPING.
11. REMOVE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE
BELOW THE BUILT-IN COPPER GUTTER THAT IS DETERIORATED
BEYOND THE ABILITY TO SCRAPE/PRIME/REPAINT.
12. REMOVE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE AT
THE GABLE ENDS THAT IS DETERIORATED BEYOND THE ABILITY
TO SCRAPE/PRIME/REPAINT.
D-#
33 5 5
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:3 P
M
DEMOLITION PLAN - ATTIC SLAB
7 JANUARY, 2019
7 JANUARY, 2019
AD101
MJC SEC
AD101
1/8" = 1'-0" F1
FLR - ATTIC SLAB - DEMO
DEMOLITION GENERAL NOTES
DEMOLITION PLAN KEYED NOTES
1/16" = 1'-0" F7
FLR - ROOF - NEW PHASING
GC TO FOLLOW PHASING & PROPOSE
SCHEDULES WITH THEIR BID
F1
AD201
C
A D
C1
AD201
F
A D
D-1
D-1 D-1
D-1
D-1
D-1D-1
D-1
D-1
D-1D-1
D-1 D-1
D-1
D-1 D-1
D-1
D-1
D-1 D-1
D-1
D-1 D-1 D-1 D-1
D-1 D-1
D-1
D-1
D-1 D-1
D-1
D-1
D-2
D-2
D-2
D-2
D-2
D-2
D-2 D-2
D-2 D-2
D-2 D-2 D-2 D-2D-2D-2D-2
D-2 D-2
D-2D-2
D-2
D-2
D-2
D-2
D-2
D-2
D-2
D-2 D-2
D-2
D-2
D-2
D-2
D-2
D-2
D-2
D-2
D-2 D-2
D-5
D-7
D-7
D-7
D-7
D-7 D-7
D-9 D-9D-9
D-9D-9 D-9 D-9D-9D-9 D-9
D-9
D-9 D-9D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-9
D-1D-1
D-1D-1D-1D-1D-1D-1
D-1D-1
D-1 D-1D-1
D-1
D-1 D-1
HEALING GARDEN LABYRINTH BELOW, NIC
ROOF OF CONNECTOR. NIC
METAL CANOPY
BELOW, NIC
C
A D
C
A D
D-4
D-4
E
A D
E
A D
E
A D
C
A D
D-3
D-3
D-4
D-3
D-4
D-3
D-3
D-3
D-4
D-3
D-4
D-3
D-4
D-5
D-5
D-5
D-5
D-2
D-2
D-2
D-2
D-2
D-2 D-2 D-2
D-2
D-2
D-2
D-2
D-2
D-10
D-6
D-6 D-6
D-6
D-6D-6
D-6
D-6
D-6
D-6
D-6
D-6
D-6
D-6D-6
D-8
D-8
D-8
D-8
D-8
D-8
D-8D-8 D-8
D-8
D-8
D-8
D-8
D-8
D-8
D-8
D-8
D-8 D-8 D-8
D-4
D-4
D-4 D-4
D-4
D-2
D-12
D-11
D-11
D-11
D-11
D-11
D-11
D-11
D-11
D-11
D-11
D-11
D-11
D-11
D-11
D-11
D-11D-11
D-11
D-11
D-11
D-11
D-12
D-12
D-12
D-12D-12
D-11
D-11
1. EXISTING ADJACENT ROOMS, ABOVE AND BELOW WILL REMAIN
OCCUPIED DURING CONSTRUCTION. NO DISRUPTION OF BUILDING
SYSTEMS OR OPERATIONS ARE PERMITTED WITHOUT PRIOR
APPROVAL BY THE BUILDING OWNER.
2. REFER TO NEW CONSTRUCTION PLANS TO COORDINATE THE
EXTENT OF DEMOLITION WITH NEW CONSTRUCTION.
3. DEMOLITION OF BUILDING SYSTEMS INCLUDING CONDUIT AND
WIRING MAY EXTEND BEYOND THE LIMITS SHOWN ON THE
DEMOLITION PLANS. THIS WORK SHALL BE INCLUDED IN THE
CONTRACTORS SCOPE OF WORK.
4. THE GENERAL CONTRACTOR SHALL SEAL OR PROVIDE FILTERS ON
ALL REMAINING DUCTWORK TO PREVENT INFILTRATION OF DUST.
MAINTAIN FILTERS AS REQUIRED.
5. GENERAL CONTRACTOR SHALL MAINTAIN EGRESS AND INTEGRITY
OF LIFE SAFETY SYSTEMS DURING ALL DEMOLITION AND NEW
CONSTRUCTION.
6. PROTECT EXISTING MTL CANOPIES TO REMAIN DURING
CONSTRUCTION.
7. BUILDING 9 WILL REMAIN FULLY OPERATIONAL DURING THE
CONSTRUCTION PERIOD. OVERHEAD PROTECTION AT ALL EXTERIOR
EXIT-WAYS (EXIT-WAYS AT THE GROUND LEVEL AND UPPER LEVELS)
IS A REQUIREMENT OF THIS CONTRACT FOR THE PROTECTION OF
THE SALEM VA MEDICAL CENTER STAFF AND THE GENERAL PUBLIC.
1. DEMOLISH EXISTING SLATE ROOF TILES AND ALL DAMAGED
WOOD SUBSTRATE.
2. DEMOLISH ALL EXISTING FLASHING IN ROOF VALLEYS AND
HIPS.
3. REMOVE EXISTING BALUSTRADE HARDWARE.
4. REMOVE EXISTING LOUVER, TRIM, & FLASHING.
5. DEMOLISH EXISTING DORMER LOUVERS & WOOD TRIM.
6. DEMOLISH INTEGRAL GUTTER & COPPER COVER.
7. DEMOLISH EXISTING COPPER CHIMNEY CAP.
8. DEMOLISH EXISTING DOWNSPOUTS. BASE RECEPTOR TO
REMAIN
9. DEMOLISH EXISTING SLATE TILE FROM VERTICAL SURFACE OF
DORMER.
10. DEMOLISH EXISTING ASPHALT ROOF & COPING.
11. REMOVE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE
BELOW THE BUILT-IN COPPER GUTTER THAT IS DETERIORATED
BEYOND THE ABILITY TO SCRAPE/PRIME/REPAINT.
12. REMOVE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE AT
THE GABLE ENDS THAT IS DETERIORATED BEYOND THE ABILITY
TO SCRAPE/PRIME/REPAINT.
D-#
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:3 P
M
DEMOLITION PLAN - ROOF
7 JANUARY, 2019
7 JANUARY, 2019
AD102
MJC SEC
AD102
1/8" = 1'-0" F1
FLR - ROOF - DEMO
DEMOLITION GENERAL NOTES
DEMOLITION PLAN KEYED NOTES
1. EXISTING ADJACENT ROOMS, ABOVE AND BELOW WILL REMAIN
OCCUPIED DURING CONSTRUCTION. NO DISRUPTION OF BUILDING
SYSTEMS OR OPERATIONS ARE PERMITTED WITHOUT PRIOR
APPROVAL BY THE BUILDING OWNER.
2. REFER TO NEW CONSTRUCTION PLANS TO COORDINATE THE
EXTENT OF DEMOLITION WITH NEW CONSTRUCTION.
3. DEMOLITION OF BUILDING SYSTEMS INCLUDING CONDUIT AND
WIRING MAY EXTEND BEYOND THE LIMITS SHOWN ON THE
DEMOLITION PLANS. THIS WORK SHALL BE INCLUDED IN THE
CONTRACTORS SCOPE OF WORK.
4. THE GENERAL CONTRACTOR SHALL SEAL OR PROVIDE FILTERS ON
ALL REMAINING DUCTWORK TO PREVENT INFILTRATION OF DUST.
MAINTAIN FILTERS AS REQUIRED.
5. GENERAL CONTRACTOR SHALL MAINTAIN EGRESS AND INTEGRITY
OF LIFE SAFETY SYSTEMS DURING ALL DEMOLITION AND NEW
CONSTRUCTION.
6. PROTECT EXISTING MTL CANOPIES TO REMAIN DURING
CONSTRUCTION.
7. BUILDING 9 WILL REMAIN FULLY OPERATIONAL DURING THE
CONSTRUCTION PERIOD. OVERHEAD PROTECTION AT ALL EXTERIOR
EXIT-WAYS (EXIT-WAYS AT THE GROUND LEVEL AND UPPER LEVELS)
IS A REQUIREMENT OF THIS CONTRACT FOR THE PROTECTION OF
THE SALEM VA MEDICAL CENTER STAFF AND THE GENERAL PUBLIC.
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
D-1D-1
D-1 D-1D-1D-1
D-1
D-1
D-7 D-7D-7D-7
D-8 D-8 D-8D-8 D-8 D-8
D-1 D-1 D-1D-1 D-1D-1
D-5 D-9D-9 D-9 D-9
D-2D-2 D-2D-2
CURVED WALL BEYOND, NIC
D-6 D-6 D-6
D-6D-6D-6D-6
D-5
D-11 D-11 D-11
D-11
D-11 D-11
D-11
D-12
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
D-1 D-1
D-1 D-1
D-1D-1
D-1D-1 D-1D-1 D-1D-1
D-7 D-7D-7D-7
D-1 D-1 D-1 D-1
D-8D-8D-8 D-8D-8 D-8
CURVED WALL BEYOND, NIC
D-6 D-6
D-6 D-6
D-6
D-9 D-9 D-9 D-9 D-9 D-9
D-11
D-12
D-11
D-11
D-12
D-11
D-12
1. DEMOLISH EXISTING SLATE ROOF TILES AND ALL DAMAGED
WOOD SUBSTRATE.
2. DEMOLISH ALL EXISTING FLASHING IN ROOF VALLEYS AND
HIPS.
3. REMOVE EXISTING BALUSTRADE HARDWARE.
4. REMOVE EXISTING LOUVER, TRIM, & FLASHING.
5. DEMOLISH EXISTING DORMER LOUVERS & WOOD TRIM.
6. DEMOLISH INTEGRAL GUTTER & COPPER COVER.
7. DEMOLISH EXISTING COPPER CHIMNEY CAP.
8. DEMOLISH EXISTING DOWNSPOUTS. BASE RECEPTOR TO
REMAIN
9. DEMOLISH EXISTING SLATE TILE FROM VERTICAL SURFACE OF
DORMER.
10. DEMOLISH EXISTING ASPHALT ROOF & COPING.
11. REMOVE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE
BELOW THE BUILT-IN COPPER GUTTER THAT IS DETERIORATED
BEYOND THE ABILITY TO SCRAPE/PRIME/REPAINT.
12. REMOVE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE AT
THE GABLE ENDS THAT IS DETERIORATED BEYOND THE ABILITY
TO SCRAPE/PRIME/REPAINT.
D-#
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:3 P
M
DEMOLITION EXTERIOR ELEVATIONS
7 JANUARY, 2019
7 JANUARY, 2019
AD201
MJC SEC
AD201
DEMOLITION GENERAL NOTES
1/8" = 1'-0" C1
NORTHEAST ELEVATION - DEMO
1/8" = 1'-0" F1
SOUTHWEST ELEVATION - DEMO
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
D-1 D-1
D-5
D-1 D-1 D-1
D-1
D-7D-7D-7
D-8 D-8D-8 D-8
CURVED WALL, NIC
D-5 D-6
D-6D-6
D-4
D-4
D-12
D-11 D-11
D-11
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
D-7D-7D-7
D-1 D-1
D-1
D-1
D-1 D-1
D-8 D-8D-8 D-8
D-5
D-6
D-6 D-6D-6
D-4
D-4
D-12
D-11 D-11 D-5
D-11
D-11
1. EXISTING ADJACENT ROOMS, ABOVE AND BELOW WILL REMAIN
OCCUPIED DURING CONSTRUCTION. NO DISRUPTION OF BUILDING
SYSTEMS OR OPERATIONS ARE PERMITTED WITHOUT PRIOR
APPROVAL BY THE BUILDING OWNER.
2. REFER TO NEW CONSTRUCTION PLANS TO COORDINATE THE
EXTENT OF DEMOLITION WITH NEW CONSTRUCTION.
3. DEMOLITION OF BUILDING SYSTEMS INCLUDING CONDUIT AND
WIRING MAY EXTEND BEYOND THE LIMITS SHOWN ON THE
DEMOLITION PLANS. THIS WORK SHALL BE INCLUDED IN THE
CONTRACTORS SCOPE OF WORK.
4. THE GENERAL CONTRACTOR SHALL SEAL OR PROVIDE FILTERS ON
ALL REMAINING DUCTWORK TO PREVENT INFILTRATION OF DUST.
MAINTAIN FILTERS AS REQUIRED.
5. GENERAL CONTRACTOR SHALL MAINTAIN EGRESS AND INTEGRITY
OF LIFE SAFETY SYSTEMS DURING ALL DEMOLITION AND NEW
CONSTRUCTION.
6. PROTECT EXISTING MTL CANOPIES TO REMAIN DURING
CONSTRUCTION.
7. BUILDING 9 WILL REMAIN FULLY OPERATIONAL DURING THE
CONSTRUCTION PERIOD. OVERHEAD PROTECTION AT ALL EXTERIOR
EXIT-WAYS (EXIT-WAYS AT THE GROUND LEVEL AND UPPER LEVELS)
IS A REQUIREMENT OF THIS CONTRACT FOR THE PROTECTION OF
THE SALEM VA MEDICAL CENTER STAFF AND THE GENERAL PUBLIC.
1. DEMOLISH EXISTING SLATE ROOF TILES AND ALL DAMAGED
WOOD SUBSTRATE.
2. DEMOLISH ALL EXISTING FLASHING IN ROOF VALLEYS AND
HIPS.
3. REMOVE EXISTING BALUSTRADE HARDWARE.
4. REMOVE EXISTING LOUVER, TRIM, & FLASHING.
5. DEMOLISH EXISTING DORMER LOUVERS & WOOD TRIM.
6. DEMOLISH INTEGRAL GUTTER & COPPER COVER.
7. DEMOLISH EXISTING COPPER CHIMNEY CAP.
8. DEMOLISH EXISTING DOWNSPOUTS. BASE RECEPTOR TO
REMAIN
9. DEMOLISH EXISTING SLATE TILE FROM VERTICAL SURFACE OF
DORMER.
10. DEMOLISH EXISTING ASPHALT ROOF & COPING.
11. REMOVE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE
BELOW THE BUILT-IN COPPER GUTTER THAT IS DETERIORATED
BEYOND THE ABILITY TO SCRAPE/PRIME/REPAINT.
12. REMOVE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE AT
THE GABLE ENDS THAT IS DETERIORATED BEYOND THE ABILITY
TO SCRAPE/PRIME/REPAINT.
D-#
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:4 P
M
DEMOLITION EXTERIOR ELEVATIONS
7 JANUARY, 2019
7 JANUARY, 2019
AD202
MJC SEC
AD202
1/8" = 1'-0" C1
NORTHWEST ELEVATION - DEMO
1/8" = 1'-0" F1
SOUTHEAST ELEVATION - DEMO
DEMOLITION GENERAL NOTES
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
D-1 D-1
D-8
D-8
D-6
D-11
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
D-1 D-1
D-8D-8
D-6
D-11
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
D-1 D-1
D-1
D-6D-6 D-6
D-11 D-11 D-11
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
D-1 D-1
D-1
D-8 D-8D-8
D-6 D-6
D-11 D-11
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
D-1 D-1
D-1
D-8 D-8
D-6 D-6 D-6
D-11 D-11
D-11
LEVEL 01
1,091'-0"
LEVEL 02
1,102'-11"
BASEMENT -
LEVEL 00
1,079'-0"
PIPE BASEMENT -
LEVEL 0A
1,073'-0"
ATTIC SLAB
1,115'-9"
D-1 D-1
D-8D-8
D-1
D-6D-6
D-11D-11
1. DEMOLISH EXISTING SLATE ROOF TILES AND ALL DAMAGED
WOOD SUBSTRATE.
2. DEMOLISH ALL EXISTING FLASHING IN ROOF VALLEYS AND
HIPS.
3. REMOVE EXISTING BALUSTRADE HARDWARE.
4. REMOVE EXISTING LOUVER, TRIM, & FLASHING.
5. DEMOLISH EXISTING DORMER LOUVERS & WOOD TRIM.
6. DEMOLISH INTEGRAL GUTTER & COPPER COVER.
7. DEMOLISH EXISTING COPPER CHIMNEY CAP.
8. DEMOLISH EXISTING DOWNSPOUTS. BASE RECEPTOR TO
REMAIN
9. DEMOLISH EXISTING SLATE TILE FROM VERTICAL SURFACE OF
DORMER.
10. DEMOLISH EXISTING ASPHALT ROOF & COPING.
11. REMOVE UP TO 250LF (LINEAR FEET) OF WOOD CORNICE
BELOW THE BUILT-IN COPPER GUTTER THAT IS DETERIORATED
BEYOND THE ABILITY TO SCRAPE/PRIME/REPAINT.
12. REMOVE UP TO 100LF (LINEAR FEET) OF WOOD CORNICE AT
THE GABLE ENDS THAT IS DETERIORATED BEYOND THE ABILITY
TO SCRAPE/PRIME/REPAINT.
D-#
1. EXISTING ADJACENT ROOMS, ABOVE AND BELOW WILL REMAIN
OCCUPIED DURING CONSTRUCTION. NO DISRUPTION OF BUILDING
SYSTEMS OR OPERATIONS ARE PERMITTED WITHOUT PRIOR
APPROVAL BY THE BUILDING OWNER.
2. REFER TO NEW CONSTRUCTION PLANS TO COORDINATE THE
EXTENT OF DEMOLITION WITH NEW CONSTRUCTION.
3. DEMOLITION OF BUILDING SYSTEMS INCLUDING CONDUIT AND
WIRING MAY EXTEND BEYOND THE LIMITS SHOWN ON THE
DEMOLITION PLANS. THIS WORK SHALL BE INCLUDED IN THE
CONTRACTORS SCOPE OF WORK.
4. THE GENERAL CONTRACTOR SHALL SEAL OR PROVIDE FILTERS ON
ALL REMAINING DUCTWORK TO PREVENT INFILTRATION OF DUST.
MAINTAIN FILTERS AS REQUIRED.
5. GENERAL CONTRACTOR SHALL MAINTAIN EGRESS AND INTEGRITY
OF LIFE SAFETY SYSTEMS DURING ALL DEMOLITION AND NEW
CONSTRUCTION.
6. PROTECT EXISTING MTL CANOPIES TO REMAIN DURING
CONSTRUCTION.
7. BUILDING 9 WILL REMAIN FULLY OPERATIONAL DURING THE
CONSTRUCTION PERIOD. OVERHEAD PROTECTION AT ALL EXTERIOR
EXIT-WAYS (EXIT-WAYS AT THE GROUND LEVEL AND UPPER LEVELS)
IS A REQUIREMENT OF THIS CONTRACT FOR THE PROTECTION OF
THE SALEM VA MEDICAL CENTER STAFF AND THE GENERAL PUBLIC.
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:4 P
M
DEMOLITION EXTERIOR ELEVATIONS
7 JANUARY, 2019
7 JANUARY, 2019
AD203
MJC SEC
AD203
1/8" = 1'-0" C1
WEST ELEVATION A - DEMO
1/8" = 1'-0"
C3
EAST ELEVATION A - DEMO
1/8" = 1'-0" E1
EAST ELEVATION C - DEMO
1/8" = 1'-0"
E6
WEST ELEVATION C - DEMO
1/8" = 1'-0" E3
WEST ELEVATION B - DEMO
1/8" = 1'-0" C5
EAST ELEVATION B - DEMO
DEMOLITION PLAN KEYED NOTES
DEMOLITION GENERAL NOTES
10' BUILDING
PERIMETER
EXIT
1 HR FIRE RATED ENCLOSURE TO 10'
AWAY FROM BUILDING PERIMETER FOR
OVERHEAD PROTECTION. MAINTAIN 4'
INSIDE CLEAR MINIMUM.
N
FINAL CONSTRUCTION DOCUMENTS
A f f a ir s
V e te ra n s
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e in ch es o ne fo ot on e an d on e-ha lf in ch es o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-ei gh ts in ch o ne fo ot on e-qu ar te r in ch o ne fo ot on e-ei gh t i nc h o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
BUILDING 9
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 9)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #
Charlotte, NC 28217 704.535.6374 www.wmba.net
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com
100% FINAL CONSTRUCTION
DOCUMENTS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
658-16-101
C U s e r s
\m c h ri s te n s e n \D o c u m e n ts
\3
V
A S
A L E
M B
L D
G
R O
O F
R E
P L A
C E
M E
N T
A
R C
H m c h ri s te n s e n w m b a .n e t.
rv t
/3 /2
:3
:4 P
M
EXIT PROTECTION PLAN
7 JANUARY, 2019
7 JANUARY, 2019
AE100
MJC SEC
AE100
1/8" = 1'-0"
SITE - LEVEL 01 - NEW
| Building 9_FINAL CD DRAWINGS 1 |
| Building 9_FINAL CD DRAWINGS 2 |
| Building 9_FINAL CD DRAWINGS 3 |
| Building 9_FINAL CD DRAWINGS 4 |
| Building 9_FINAL CD DRAWINGS 5 |
| Building 9_FINAL CD DRAWINGS 6 |
| Building 9_FINAL CD DRAWINGS 7 |
| Building 9_FINAL CD DRAWINGS 8 |
File details come from the government source that posted it. Updated .