This document package includes final construction documents for replacing the roof on Building 7 at the VA Medical Center in Salem, Virginia. The documents provide specifications for demolishing the existing roof, installing a new roof system, and installing a lightning protection system. Key details include specifications for slate roofing materials and underlayment, roof insulation, flashing, roof drainage, snow retention, and 23 roofing details. The documents also include specifications for installing a Class I copper lightning protection system with air terminals, conductors, mounting hardware, connections to ground rods, bonding to rooftop equipment, and 24 lightning protection details.
The related federal contract opportunity is solicitation number 36C24620R0093 to replace the roofs on Building 7 and Building 9 at the VA Medical Center in Salem, Virginia. The opportunity was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The solicitation seeks offers to demolish the existing roofs and install new roof systems and lightning protection on both buildings in accordance with the provided specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Building 7_FINAL SPECIFICATIONS.pdf | ||
| P07 Wage Determintions VA20200172 Roanoke.pdf | ||
| Bldg 9 Vol. 18-23.pdf | ||
| Bldg 7 Vol. 1-8.pdf | ||
| Bldg 7 Vol. 9-17.pdf | ||
| Bldg 9 Vol. 1-8.pdf | ||
| Bldg 9 Vol. 9-17.pdf | ||
| 36C24620R0093_1.docx | DOCX document | |
| Building 9_FINAL SPECIFICATIONS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FINAL CONSTRUCTION DOCUMENTS
Af fa ir s
Ve te ra ns
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com 23
ROOFING DETAILS
AE304
fa ir s
Ve te ra ns
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com 23
ROOFING DETAILS
AE305
fa ir s
Ve te ra ns
Quality Consulting Engineers, PLLC
6277-600 Carolina Commons Drive, #
Indian Land SC 29707 803.207.5450 djones@qualityconsultingengineers.com 23
ROOFING DETAILS - FLAT ROOF
AE306
3" = 1'-0"F1 RAILING/BALUSTER
3" = 1'-0"F2 CORNER PEDESTAL ELEVATION
3" = 1'-0"B1 BALUSTER
RE
G
IS
TERED ARCHITECT
NORT H CA ROL I N
AC
H
A R L OT T E , N
. C
C
HA
RL
ES WI LL IAM BEV
IN
S
(TYPICAL)
(TYPICAL)
(TYPICAL)
(TYPICAL)
DORMERS
(TYP.)
(TYPICAL)
ROUTE CONDUCTORS NEAR SNOW GUARD
BANDS AND ALONG BUILDING CONTOURS
AND OTHER ARCHITECTURAL FEATURES
WHERE POSSIBLE. (TYPICAL)
RI
DG
E
RI
DG
E
RI
DG
E
RI
DG
E
RI
DG
E
RIDGERIDGE RIDGERIDGE
RI
DG
E
VALLE
Y
HIP
VALLEY
HIP
VALLEY VALLE
Y
VALLEY VALLEY
HIP HIP
CHIMNEY
FLAT/LOW SLOPE
ROOF AREA
VALLEY
HIP
VALLE
Y
HIP
VALLE
YVALLEY
VALLEYVALLEY
HIPHIP
CHIMNEY
RI
DG
E
VALLEY VALLE
Y
HIP
VALLE
YVALLE
Y
HIPVALLEY
VALLEY
DORMERS
(TYP.)
G
GG
G
G G
G G
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e inc he s = o ne fo ot on e an d on e-ha lf i nc he s = o ne fo ot on e inc h on e fo ot th re e-qu ar te rs in ch o ne fo ot on e-ha lf i nc h on e fo ot th re e-eig ht s i nc h on e fo ot on e-qu ar te r i nc h on e fo ot on e-eig ht in ch o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
658-16-101
01/15/2020
BUILDING 7
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 7)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #450 Charlotte, NC 28217
704.535.6374 www.wmba.net
FINAL CONSTRUCTION DOCUMENTS
Quality Consulting Engineers, LLC
6277-600 Carolina Commons Drive, #350 Indian Land SC 29707
803.207.5450 djones@qualityconsultingengineers.com
QCE Project # 19010 01/15/2020
SCALE: 1/8" = 1'-0"
1.
2. ALUMINUM LIGHTNING PROTECTION SYSTEM COMPONENTS SHALL NOT BE
MOUNTED TO COPPER SURFACES. COPPER COMPONENTS SHALL BE USED
TO AVOID ELECTROLYTIC CORROSION. COPPER LIGHTNING PROTECTION
MATERIALS SHALL NOT BE PLACED ON ALUMINUM, GALVANIZED STEEL,
GALVALUME SURFACES OR ANY OTHER DISSIMILAR METAL SURFACES,
PAINTED OR NOT.
3. GROUNDED METAL BODIES WITHIN THE BONDING DISTANCE DETERMINED
BY NFPA 780 - 2017 EDITION SHALL BE BONDED TO THE SYSTEM IN
ACCORDANCE WITH THOSE REQUIREMENTS.
4. UNDERGROUND METALLIC PIPING FOR EVERY UTILITY ENTERING THE
BUILDING SHALL BE BONDED TO THE NEAREST DOWN CONDUCTOR OR
GROUND ELECTRODE. FIELD VERIFY EXACT LOCATIONS.
5. ADHESIVE USED WITH ADHESIVE AIR TERMINAL BASES AND CONDUCTOR
FASTENERS SHALL BE COMPATIBLE WITH ROOFING MEMBRANE - VERIFY
WITH ROOFING CONTRACTOR.
6. AIR TERMINALS HAVE BEEN LOCATED ON THE ROOF TOP EQUIPMENT AS
BEST DETERMINED BY THE ENGINEER. IF THE METAL THICKNESS OF AN
OBJECT IS 3/16" OR GREATER, AIR TERMINALS MAY BE ELIMINATED IF THE
OBJECT IS PROPERLY CONNECTED TO THE SYSTEM.
7. ROOF TOP METALLIC EQUIPMENT OR OBJECTS NOT SHOWN ON THIS
DRAWING SHALL BE PROTECTED AS REQUIRED TO MEET THE
REQUIREMENTS LISTED ABOVE INCLUDING THE INSTALLATION OF AIR
TERMINALS AND OR BONDING. IF THE METAL THICKNESS OF AN OBJECT IS
3/16" OR GREATER, AIR TERMINALS MAY BE ELIMINATED IF THE OBJECT IS
PROPERLY CONNECTED TO THE SYSTEM.
8. ALL ELEVATIONS ARE APPROXIMATE AND ARE TAKEN FROM AVERAGE
GRADE.
9. AIR TERMINALS SHALL BE PLACED WITHIN 24” OF THE OUTSIDE CORNER OR
EDGE OF THE OBJECT THEY ARE PROTECTING AND SHALL PROJECT A
MINIMUM OF 10" ABOVE THE PROTECTED EDGE OR OBJECT. THE SPACING
BETWEEN AIR TERMINALS ARE NOT TO EXCEED 20 FEET. AIR TERMINALS
THAT EXTEND 24" ABOVE THE PROTECTED EDGE ARE NOT TO EXCEED1 A
SPACING GREATER THAN 25', EXCEPT FOR MID-ROOF AIR TERMINALS (50'
MAX SPACING).
10. ALL LIGHTNING CONDUCTORS ARE TO MAINTAIN A HORIZONTAL OR
DOWNWARD PATH. ALL BENDS IN THE CONDUCTOR SHALL HAVE A RADIUS
BEND OF 8 INCHES OR GREATER, AND SHALL HAVE AN ANGLE BEND OF 90
DEGREES OR GREATER.
11. EACH INDIVIDUAL ITEM OF THE LIGHTNING PROTECTION SYSTEM IS NOT LABELED FOR THE SAKE OF CLARITY. ITEMS ARE INDICATED AT RANDOM LOCATIONS ONLY, BUT A COMPLETE SYSTEM SHALL BE
PROVIDED TO MEET THE REQUIREMENTS LISTED ABOVE.
LPS NOTES
1 CLASS I COPPER HORIZONTAL LIGHTNING CONDUCTOR RUN EXPOSED ON
SLATE ROOF. FASTEN EVERY 3 FEET MAXIMUM WITH COPPER CABLE
HOLDER SET IN ADHESIVE.
2 CLASS I COPPER DOWN CONDUCTOR CONNECTED TO GROUND ROD AND
INSTALLED EITHER: A) CONCEALED IN 1" PVC SCHEDULE 40 CONDUIT PER
THE DOWN CONDUCTOR DETAIL, B) EXPOSED ON EXTERIOR OF BUILDING
IF PERMITTED BY THE VA OR C) BONDED TO INTEGRAL BUILDING STEEL
AT TOP AND BOTTOM OF DOWN CONDUCTOR PENETRATION ONLY IF
STEEL IS 3/16" THICK, AN 8" SQUARE AREA OF WELDING TO STEEL IS
POSSIBLE & THE STEEL IS CONTINUOUS. COORDINATE WITH VA RESIDENT
ENGINEER AND UL INSPECTOR.
4 BOND TO COPPER GUTTER WITH COPPER BONDING LUG AND SECURE
WITH APPROPRIATE SCREW FASTENER.
3 ROUTE CONDUCTORS ALONG AND DOWN CHIMNEY TO MATCH SURFACE
CONTOURS AND ARCHITECTURAL FEATURES WHERE POSSIBLE.
PLAN NOTES
12. ROOF PADS, PAVERS, FLASHINGS OR ANY OTHER SPECIAL ROOFING
MATERIALS REQUIRED FOR THE INSTALLATION OF THE LIGHTNING
PROTECTION SYSTEM SHALL BE FURNISHED AND INSTALLED BY THE
ROOFING CONTRACTOR.
13. ACTUAL JOB SITE CONDITIONS MAY REQUIRE ITEMS SHOWN ON THE
DRAWING TO BE EITHER LOCATED IN DIFFERENT LOCATIONS OR MADE OF
DIFFERENT MATERIALS. ALL CHANGES MADE TO THE LIGHTNING
PROTECTION SYSTEM AND THE COMPLETED INSTALLATION SHALL MEET
OR EXCEED THE REQUIREMENTS LISTED ABOVE.
14. MAXIMUM HEIGHT OF BUILDING ~ 60' ABOVE FINISHED GRADE.
15. IN ORDER FOR THESE SYSTEMS TO BE COMPLETE LIGHTNING PROTECTION
SYSTEMS, THE ELECTRICAL SERVICE, WATER SERVICE AND GAS SERVICE
MUST BE BONDED TO THE NEAREST DOWN CONDUCTOR OR GROUND
ELECTRODE AS WELL AS ANY AND ALL UNDERGROUND METALLIC PIPING
ENTERING THE STRUCTURE. BOND SERVICES WITH TINNED PIPE CLAMP.
16. PROVIDE UL LETTER OF FINDINGS UPON INSPECTION TO ALLOW FOR
FUTURE UL MASTER LABEL AFTER ALL CONNECTED STRUCTURES HAVE
LIGHTNING PROTECTION SYSTEM INSTALLED.
17. BOND ALL METALLIC OBJECTS ON ROOF INCLUDING GUTTER SYSTEM AND
MECHANICAL UNITS/DUCTS/FLUES, LADDERS, HATCHES, ETC.
CLASS I ALUMINUM LIGHTNING
CONDUCTOR (24 STRANDS OF 14 AWG
WIRE - 95 LBS. PER 1000 FEET). SEE
AIR TERMINAL DETAILS FOR METHOD
OF FASTENING. SECURE TO BUILDING
EVERY THREE FEET MAXIMUM. (NOT
USED UNLESS REQUIRED FOR
BONDING TO SIMILAR METALS.)
CLASS I COPPER LIGHTNING
CONDUCTOR (29 STRANDS OF 16 AWG
WIRE - 203 LBS. PER 1000 FEET).
COPPER PARALLEL CABLE
CONNECTOR.
3/4" X 10'-0" COPPER CLAD GROUND
ROD WITH ULTRAWELD CONNECTIONS.
SEE DETAIL "G" AND "H"
ULTRAWELD CONNECTION WITH WELD
METAL. NOT USED THIS PROJECT.
G
LPS LEGEND
18. ISOLATED METAL BODIES THAT SHOW NO CONDUCTANCE TO GROUND
SHALL NOT REQUIRE BONDING. A GROUNDED METAL BODY WITHIN THE
SIX-FOOT RULE SHALL BE BONDED TO THE SYSTEM.
19. CONNECTIONS TO GROUND COUNTERPOISE SHALL BE MADE AT A POINT
NOT LESS THAN 1'-0” BELOW GRADE, AND 2'-0” AWAY FROM FOUNDATION
WALL
20. CONNECTIONS TO GROUND SHALL BE MADE AT A POINT NOT LESS THAN
1'-0” BELOW GRADE, AND 2'-0” AWAY FROM FOUNDATION WALL
21.
22. A LIGHTNING ARRESTOR, PROTECTOR, OR ANTENNA-DISCHARGE UNIT
MUST BE INSTALLED ON EACH ELECTRIC, TELEPHONE, AND TELEVISION
SERVICE ENTRANCE.
CONDUCTORS SHALL MAINTAIN A HORIZONTAL OR DOWNWARD PATH FREE
FROM “U” AND “V” POCKETS. ANY RISE IN HORIZONTAL CONDUCTOR SHALL
NOT EXCEED 8 INCHES. CONDUCTOR MAY RISE UPWARDS AT A RATE OF NO
MORE THAN 3” OF RISE PER 1'-0” RUN.
23. ALL ADHESIVE FIXTURES SHALL BE SET WITH AN ADHESIVE COMPOUND
COMPATIBLE WITH THE ROOFING MATERIAL. ADHESIVES SHALL BE
APPROVED IN ADVANCE BY THE ROOFING CONTRACTOR.
24. CONDUCTOR SHALL BE FASTENED EVERY 3'-0” ON CENTER MAXIMUM.
25. WHEN ANCHORING IN MASONRY, HOLES MADE TO RECEIVE THE BODY OF
THE ANCHOR SHALL BE MADE IN THE BRICK, STONE, OR OTHER MASONRY
UNIT RATHER THAN IN MORTAR JOINTS.
26. BOND TO METALLIC PLUMBING WASTE VENTS ON ROOF AND TO
STRUCTURAL STEEL WITHIN BUILDING.
LIGHTNING PROTECTION SYSTEM SHALL BE INSTALLED BY QUALIFIED
PERSON(S) PER THE LIGHTNING PROTECTION STANDARDS: LPI-175, NFPA
780, UL96A, VA OFFICE OF OCCUPATIONAL SAFETY AND HEALTH, AND VA
DESIGN GUIDE STANDARDS. THESE STANDARDS MUST BE FOLLOWED
DURING THE DESIGN, INSTALLATION, AND INSPECTION OF A LIGHTNING
PROTECTION SYSTEM.
27. THE ROOF LINES OF THIS BUILDING ARE NON-STANDARD AND NEED TO BE
THOROUGHLY SURVEYED. THE ROOF IS ARCHITECTURAL IN NATURE AS
WELL AND EXTRA CARE IS REQUIRED WITH REGARDS TO LPS CONDUCTOR
ROUTING .
ELECTRICAL ROOF PLAN - LPS
28. JOB CONDITIONS MAY DICTATE VARIATIONS IN AIR
TERMINAL, CONDUCTORS, AND GROUND ROD LOCATIONS AND A
THOROUGH SITE SURVEY MUST BE COMPLETED PRIOR TO SHOP DRAWING
FABRICATION.
LIGHTNING PROTECTION SYSTEMS SHALL BE INSTALLED IN A NEAT,
PROFESSIONAL MANNER.
29.
E401
1/2" X 12" GENTLY TAPERED SOLID
COPPER AIR TERMINAL WITH
UNIVERSAL BASE MOUNTED
HORIZONTALLY.
SEE DETAIL "C"
1/2" X 12" GENTLY TAPERED SOLID
COPPER AIR TERMINAL WITH RIDGE
SADDLE BASE.
SEE DETAIL "D"
XX XX
GSBDAJ
E401
ELECTRICAL - ROOF PLAN - LPS
GROUND ROD DETAIL "G"
CLASS I COPPER
LIGHTNING
CONDUCTOR
ULTRAWELD MOLD WITH
WELD METAL
3/4" X 10' COPPER
CLAD GROUND ROD
1" PVC SCH. 40
CONDUIT
TYPICAL BOND TO
BASE OF STEEL COLUMN
ULTRAWELD MOLD WITH
WELD METAL
SEE GROUND ROD
DETAIL "G" FOR
CONTINUATION
STUB OUT PVC
BELOW
FOOTING
CLASS I COPPER
LIGHTNING CONDUCTOR
HLPUL
50H2
1 BOLT PARALLEL CLAMP BONDING LUG BONDING LUG COPPER FLANGE
BONDING PLATE
TINNED
U-BOLT PIPE CLAMP
THRU ROOF DETAIL "T"
CLASS I COPPER LIGHTNING
CONDUCTOR
BIMETAL THRU-ROOF
ASSEMBLY
1" PVC SCHEDULE 40
CONDUIT
CLASS I COPPER LIGHTNING
CONDUCTOR
DOWN CONDUCTOR DETAIL
CLASS I COPPER
LIGHTNING
CONDUCTOR SECURED
EVERY 3' WITH COPPER
CABLE HOLDER SET IN
ADHESIVE
1" PVC SCH. 40
CONDUIT
BRONZE FLANGE
BONDING PLATE (TYP.
OF 2)
AIR TERMINAL DETAIL "C" AIR TERMINAL DETAIL "D"
GENTLY TAPERED AIR
TERMINAL
UNIVERSAL CONCEALED
AIR TERMINAL BASE
MOUNTED HORIZONTALLY
CABLE FASTENER
COPPER, CLASS I
LIGHTNING PROTECTION
CONDUCTOR
AIR TERMINAL ADAPTER
HORIZONTAL BASE
GENTLY TAPERED AIR
TERMINAL
RIDGE SADDLE AIR
TERMINAL BASE
CABLE FASTENER
COPPER, CLASS I
LIGHTNING PROTECTION
CONDUCTOR
RIDGE SADDLE BASE
ALL CONDUCTOR BENDS
SHALL HAVE A RADIUS
OF 8" OR GREATER AND
SHALL HAVE AN ANGLE
BEND OF 90° OR
GREATER.
CONNECT TO
GROUND ROD BELOW
GRADE. -SEE DETAIL
"G"
CLASS I COPPER
LIGHTNING
CONDUCTOR
SEE THRU
ROOF DETAIL
"T"
GROUND ROD TEST WELL DETAIL "H"
1 SCALE: NTS
ELECTRICAL - LPS - DETAILS
GROUND PLATE DETAIL "G"
ALTERNATE METHOD
24"
24"
1/4"
COPPER GROUND PLATE, TO BE USED AS AN
ALTERNATIVE INSTALLATION METHOD, WHERE ROCK
IS ENCOUNTERED LIMITING THE BURAL DEPTH;
BURY AT A MINIMUM OF 24" BFG
BASE METHOD
E801
XX XX
GSBDAJ
E801
ELECTRICAL LPS - DETAILS
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief th re e inc he s = o ne fo ot on e an d on e-ha lf i nc he s = o ne fo ot on e inc h on e fo ot th re e-qu ar te rs inc h on e fo ot on e-ha lf i nc h on e fo ot th re e-eig ht s i nc h on e fo ot on e-qu ar te r in ch o ne fo ot on e-eig ht in ch o ne fo ot
DRAWING NO.
Dwg. Of
Project No.
Date
DrawnChecked
Location
Building Number
Project Title
Approved: Medical Center Director
Approved: Chief of Facility Management Svc.
Drawing Title
DateRevisions
Approved: Infection Control Officer
Approved: Safety Manager
Approved: GEMS Coordinator
Approved: Energy Engineer
658-16-101
01/15/2020
BUILDING 7
VA MEDICAL CENTER, SALEM, VA 24153
REPLACE ROOF AND TUCKPOINT (BUILDING 7)
102 3rd Ave., NE Hickory, NC 28601
828.315.9962 www.atriaxgroup.com
2105 Water Ridge Pkwy #450 Charlotte, NC 28217
704.535.6374 www.wmba.net
FINAL CONSTRUCTION DOCUMENTS
Quality Consulting Engineers, LLC
6277-600 Carolina Commons Drive, #350 Indian Land SC 29707
803.207.5450 djones@qualityconsultingengineers.com
QCE Project # 19010 01/15/2020 23 of 23
| Building 7_FINAL CD DRAWINGS 18 |
| Building 7_FINAL CD DRAWINGS 19 |
| Building 7_FINAL CD DRAWINGS 20 |
| Building 7_FINAL CD DRAWINGS 21 |
| Building 7_FINAL CD DRAWINGS 22 |
| Building 7_FINAL CD DRAWINGS 23 |
File details come from the government source that posted it. Updated .