bidnotice.pdf
PDF 112 KB Posted
- Solicitation number
- 59032-221364
- Issued by
- Macomb County, Michigan
About this file
This is a bid notice from the State of Michigan for a road improvement project in Montcalm County. The project involves 2.09 miles of hot mix asphalt cold milling and single course resurfacing, joint repairs, concrete sidewalk ramp grades, and pavement markings on M-91 from the Flat River northerly to Peck Road in the city of Greenville. The letting is scheduled for 10:30 AM local time at 425 W. Ottawa Street, Lansing, MI 48933. The contract completion date is October 15, 2027. The project is identified by Call Number 020, Contract ID 59032-221364, Control Section 221364AST, Project Number 59032, and Federal Project Number 26A0978. The notice was advertised on September 4, 2026. Proposals and plans, if applicable, are available for examination online.
The project requires prime contractors to maintain prequalification in Net Classification 1602 Cb and subclassification N3; if the prime contractor lacks N3 prequalification, a prequalified N3 subcontractor must be designated prior to contract award. There is no required Disadvantaged Business Enterprise (DBE) participation; however, a 3.00% Small Business Program (SBP) participation is required. Bidders must provide a bidder guaranty as specified in the proposal.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting of: 261002
10:30 AM, Local Time 425 W. OTTAWA ST., LANSING, MI 48933
Call Number Contract ID Control Section Project Number Federal Project Number
020 59032-221364 221364AST 59032 26A0978
Description: 2.09 mi of hot mix asphalt cold milling and single course resurfacing, joint repairs, concrete sidewalk ramp grades and pavement markings on M-91 from the Flat River northerly to Peck Road in the city of Greenville, Montcalm County.
Required DBE Participation: 0.00%
Required SBP Participation: 3.00%
Net Classification Required For This Project: ** 1602 Cb **
Estimated Pages For Plans: 0
Completion Date: 10/15/2027
12:00:00 AM
In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N3. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.
Date Advertised: 9/4/2026
See proposal for bidder guaranty information.
Proposal and plans, if applicable, are available for examination online at <http://mdotcf.state.mi.us/public/eprop/login/index.cfm>
Notice of Advertisement Report v1
AASHTOWare Project™ Version 5.04.04 Revision 047
File details come from the government source that posted it. Updated .