bidnotice.pdf
PDF 116 KB Posted
- Attached to
- Bridge Reconstruction on Iron Belle Trail Bridge
- Solicitation number
- 50000-224759
- Issued by
- Macomb County, Michigan
About this file
This is a bid notice for a bridge reconstruction project administered by the State of Michigan for a Local Agency project located in Utica, Macomb County. The project involves reconstruction of the Iron Belle Trail Bridge, including replacement of the pedestrian superstructure with a prefabricated superstructure, partial abutment replacement, and approach work. The bridge spans from the north side of the Clinton River to the south side of the Clinton River at Davis Street. The letting is scheduled for October 16, 2026, at 10:30 AM local time at 425 W. Ottawa Street, Lansing, Michigan 48933. The contract identifier is 50000-224759, with project number 26A0992 and federal project number 50000. The project plans consist of approximately 19 pages and are available for online examination. The estimated project completion date is November 12, 2027.
The net classification required for this project is 763 Fa. The project requires 2.00% Disadvantaged Business Enterprise (DBE) participation and 0.00% Small Business Participation (SBP). Bidders are required to provide a guaranty as specified in the proposal documentation. No information regarding pricing terms, incumbent contractors, current environment conditions, or specific funding sources and amounts is provided in this bid notice.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting of: 261106
10:30 AM, Local Time 425 W. OTTAWA ST., LANSING, MI 48933
Call Number Contract ID Control Section Project Number Federal Project Number
058 50000-224759 224759AEAR 50000 26A0992
Description: Bridge reconstruction including replacement of pedestrian superstructure with prefabricated superstructure with partial abutment replacement and approach work on Iron Belle Trail Bridge from north side of Clinton River to south side of Clinton River at Davis Street in the city of Utica, Macomb County. This is a Local Agency project.
Required DBE Participation: 2.00%
Required SBP Participation: 0.00%
Net Classification Required For This Project: ** 763 Fa **
Estimated Pages For Plans: 19
Completion Date: 11/12/2027
12:00:00 AM
Date Advertised: 10/16/2026
See proposal for bidder guaranty information.
Proposal and plans, if applicable, are available for examination online at <http://mdotcf.state.mi.us/public/eprop/login/index.cfm>
Notice of Advertisement Report v1
AASHTOWare Project™ Version 5.04.04 Revision 047
File details come from the government source that posted it. Updated .