This is a bidding document for the University of Colorado Boulder's ECCE-Rm 141-CEAS Meeting Room renovation project located in Colorado. The project involves the conversion of approximately 2,000 square feet of existing computer lab space into a premier conference room with seating capacity for 60-75 people within the Civil Engineering Department. The scope of work includes selective demolition, interior reconfiguration, new ceilings, lighting systems, flooring, wall finishes, and mechanical, electrical, and plumbing modifications to support the revised layout. Additionally, the project encompasses two exterior precast shrouded openings to refresh the currently dark computer lab area and integrate it with the department's needs.
The document establishes bidding procedures and requirements for interested contractors to submit proposals for this renovation project. Key contract terms, pricing structures, and specific bid submission requirements are outlined to guide potential bidders through the proposal process. The project represents a capital improvement initiative to enhance the university's conference and meeting facilities while modernizing the existing infrastructure and finishes within the designated space.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OSA-AFB-1 pg. 1
REV 7/2025
ADVERTISEMENT FOR BIDS
Design / Bid / Build State of Colorado
University of Colorado Boulder
Notice Number: 26-52 Project Number: UCB001217 Project Title: ECCE – Rm 141 – CEAS Meeting Room Estimated Project Cost: $400,000.00
NOTICES
1. For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.
2. For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.
3. All respondents accept the conditions of this AFB, including but not limited to, the following:
a. All submittals shall become the property of the State of Colorado and will not be returned.
b. Late submittals shall not be evaluated.
c. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information.
d. The State shall not be liable for any costs incurred by respondents in the preparation of submittals and proposals nor in costs related to any element of the selection and contract negotiation process.
4. The respondent has reviewed Appendix F and by responding has agreed that the terms and conditions of the sample Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.21) and General Terms and Conditions of the Contractor’s Design/Bid/Build Agreement (SC- 6.23) are expressly workable without reservation. Any exceptions to the contract must be communicated formally in writing before the bid closes.
5. Per C.R.S. §24-92-115 unless prohibited by applicable federal law, contract for any public project in the amount of one million dollars or more, that does not receive federal money, in the amount of one million dollars or more shall
OSA-AFB-1 pg. 2 require the general contractor to which the contract is awarded to submit, at the time the mechanical, electrical, or plumbing subcontractor is put under contract, documentation that Identifies the contractors or subcontractors that will be used for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical, and plumbing work required on the project and certifies that all firms identified participate in apprenticeship programs registered with the United States department of labor’s employment and training administration or state apprenticeship councils recognized by the United States department of labor and have a proven record of graduating a minimum of 15% of its apprentices for at least three of the past five years.
6. Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements. The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global warming potential (GWP) limit for each category of eligible materials, which include asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. For any solicitation for a contract for the design of an eligible project, a State Agency or institution shall require the designer who is awarded the contract to include, in project specifications when final construction documents are released, a current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP limits for each eligible material specified for the project. A contractor that is awarded a contract for an eligible project shall not install any eligible materials on the project until the contractor submits an EPD for each eligible material procured for the project.
7. Per C.R.S. §24-92-Part 2, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the State prevailing wage rate, of the regular, holiday, and overtime wages paid and the general prevailing payments on behalf of employees to lawful welfare, pension, vacation, apprentice training, and educational funds in the State, for each employee needed to execute the contract. Payments to the funds must constitute an ordinary business expense deduction for federal income tax purposes by contractors and subcontractors. Contractors are required to pay their employees at weekly intervals and shall comply with the enforcement provisions of C.R.S. §24-92-209. Contractors awarded a project of this size will be required to utilize the LCPTracker cloud-based labor compliance and certified payroll application.
8. Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.
9. Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.
PROJECT OVERVIEW
OSA-AFB-1 pg. 3
Introduction The University of Colorado Boulder is soliciting bids from qualified general contractors for the ECCE-Rm 141-CEAS Meeting Room project.
The ECCE-Rm 141-CEAS Meeting Room project includes renovation of approximately 2,000SF of existing computer lab space and converts it into a premiere conference room for the Civil Engineering Department seating approximately 60-75 people.
The scope includes selective demolition, interior reconfiguration, and full finish upgrades to refresh the existing dark computer lab area, and two exterior precast shrouded openings. Work will involve new ceilings, lighting, flooring, wall finishes, along with mechanical, electrical, and plumbing modifications required to support the revised layout.
General Contractors should anticipate coordination with Engineering Department stakeholders, adherence to University facilities standards, and execution of work within an active academic environment. The project excludes LEED certification;
however, the project needs to demonstrate adherence to the Buy Clean Colorado Act should the construction value exceed $500,000.
The selected contractor will be responsible for providing all labor, materials, equipment, scheduling, and site management necessary to deliver a complete and fully functional renovation aligned with the design intent and project schedule spanning from October 15th (preconstruction) through construction completion in spring of 2027.
Scope of Services
The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project.
Per C.R.S. §38-26-106, if a contract amounts to $150,000 or more, the awarded contractor shall provide payment and performance bonds not less than 50% of the value of the contract. The costs associated with this bond are to be included in the contractor’s bid.
MINIMUM REQUIREMENTS
Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should be prepared to show evidence of the following to be considered as qualified, as a minimum:
OSA-AFB-1 pg. 4
1. Not previously terminated by the State for non-performance on a State Buildings contract or procurement.
2. The bidding contractor must have been in the same business, under the same name for the last two (5) years.
3. Demonstrated specific contracting experience in projects within Higher Education of similar scope and complexity for at least four (4) projects each in excess of $500,000.00, utilizing the expertise present in their Colorado Office;
and
4. Demonstrated bonding capability up to $500,000 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity.
5. Attended and signed in at the Mandatory Pre-Bid Conference.
6. As indicated in the Scope Acknowledgement Form, General contractor has included pre-approved subcontractors for all MEP trades, including fire sprinkler. All Standing Order Contractors (SOC) have previously been vetted by the University, so they are approved to work on campus. If any alternate contractor is being proposed, they must be proposed and approved by the University prior to bidding (subcontractors will need to meet or exceed the qualifications of the SOC program).
7. General Contractor must be able to provide (3) alternate projects larger than $500,000 where active construction was effectively coordinated without impeding adjacent ongoing operations. Satisfactory client references required upon request.
Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.
University of Colorado Boulder – Open Notices https://www.bidnetdirect.com/colorado/universityofcoloradodesignandconstruction
MANDATORY PRE-BID MEETING
A mandatory Pre-Bid Meeting will be held at:
Address: ECCE Wing of the Engineering Center (1111 Engineering Dr, Boulder, CO 80309, USA) Room: Room 141 Date/Time: Tuesday September 15th, 2026 @8AM MT
Schedule/Submission Details
1. The schedule of events for the AFB process and an outline of the schedule for the balance of the project is as follows:
OSA-AFB-1 pg. 5
Advertisement September 8th, 2026 Mandatory Pre-Bid Conference and Tour September 15th, 2026 @ 8AM Questions Due via Bidnet September 22nd, 2026 @2PM Answers Issued via Bidnet September 25th, 2026 Sealed Bids Due via Bidnet/Public Bid Opening October 2nd, 2026 @1PM Execution of General Contractor Contract October 16th, 2026 Anticipated Design Start Complete Anticipated General Contractor Start October 16th, 2026 Anticipated Construction Start/Finish December 15th, 2026 – April
15th, 2026
QUESTIONS, CLARIFICATIONS AND ADDENDA
2. One (1) electronic copies of the sealed bid are due Friday October 2nd, 2026 and shall be received no later than 1PM MT, and shall be submitted/accepted via Bidnet, at the following address:
Agency: University of Colorado Boulder Contact Name: Ryan Moeller, Project Manager
Felicity DeGaetano, Project Coordinator
Comments: Late sealed bids will be rejected without consideration. The University of Colorado Boulder and the State of Colorado assume no responsibility for costs related to the preparation of submittals.
3. The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner posted on Bidnet at:
OSA-AFB-1 pg. 6
Point of Contact/Clarification
Name: Ryan Moeller, Project Manager and
Felicity DeGaetano, Project Coordinator Agency: University of Colorado Boulder
Appendix A: Information for Bidders (SBP-6.12) Appendix B: Bid Form (SBP-6.13) Appendix B1: Bid Alternates (SBP-6.131) (if Applicable) Appendix B2: Unit Pricing (SBP-6.133) (if Applicable) Appendix B3: Bid Bond (SBP-6.14) (if Applicable) Appendix C: Sample: Direct Labor Burden Calculation (SBP-6.18) Appendix D: Applicable Prevailing Wage and Apprenticeship and Fringe
Rates (if Applicable) Appendix E: Sample: Apprenticeship Utilization Certifications (SBP-6.17)
(if Applicable) (Appendix F: Sample: SC6.21 and SC6.23 Design/Bid/Build Contractor’s
Agreement and General Conditions of the Contract)
| NOTICES |
| PROJECT OVERVIEW |
| Introduction |
| Scope of Services |
| MINIMUM REQUIREMENTS |
| MANDATORY PRE-BID MEETING |
| QUESTIONS, CLARIFICATIONS AND ADDENDA |
File details come from the government source that posted it. Updated .