biddoc.pdf
PDF 223 KB Posted
- Attached to
- Regional Welding and Fabrication Services
- Solicitation number
- UDOT270026MP
- Issued by
- Utah
About this file
This is a Request for Proposals (RFP) issued by the Utah Department of Transportation (UDOT) Procurement Services seeking qualified firms to provide welding and fabrication services under regional contracts. The scope of work includes welding, dump body rebuild and installation, tow plow repair, spreader repair and rebuild, snowplow and wing plow repair, and hydraulic cylinder and snowplow installation. UDOT anticipates awarding multiple contracts to one or more offerors. The RFP does not specify response deadlines, site visits, or bidder conferences within the document provided. Contract awards will be determined following a four-stage evaluation process, and successful offerors will enter into five-year agreements with no renewal options. The contract term begins upon full execution of the Purchase Order or contract and continues for the specified five-year period.
All pricing must be guaranteed for one year following contract award, with price adjustments permitted thereafter only at equal guarantee periods of at least 30 days' notice and supported by documented justification such as Federal commodity indices. Price adjustments may occur no more frequently than the guarantee period and only if there is a net change of five percent or more. Delivery terms are F.O.B. destination with freight prepaid and shipping charges added as separate invoice items. Offerors must hold a current Utah business license and have a minimum of five years' experience in the requested services. The evaluation process awards points based on welding and fabrication experience (300 points), personnel qualifications and expertise (100 points), service scheduling processes (75 points), and references (25 points) for a total technical score of 500 points. Cost proposals are evaluated independently with a maximum of 100 points assigned to the lowest bidder, with other offerors receiving proportional points based on their cost relative to the lowest bid. Only proposals achieving a minimum of 300 technical points (60 percent) proceed to cost evaluation, and only those scoring within 70 percent of the highest combined score are eligible for award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I. General Overview and Instructions
This Request for Proposals (“RFP”) is intended to provide interested offerors with sufficient basic information to submit proposals meeting minimum requirements. It is not intended to limit a proposal's content or exclude any relevant or essential data.
This solicitation is issued in accordance with the State of Utah Procurement Code, Utah Code Annotated (UCA) Chapter 63G-6a, and applicable Rules found in the Utah Administrative Code (UAC). If any provision of this solicitation conflicts with the UCA or UAC, the UCA or UAC will take precedence.
NOTICE: In this solicitation, if an item is defined through use of a trade name, brand name, or a manufacturer and/or model number, it is intended that the words, “or equivalent” apply; and invites the submission of equivalent products by the Offerors.
CANCELLATION OF PROCUREMENT
The Utah Department of Transportation (the State) reserves the right to cancel this solicitation at any time and not award a contract if such action is determined in writing to be in the best interest of the State (UCA §63G-6a-709).
FUTURE PROCUREMENTS
UDOT reserves the right to reopen this solicitation or create a new solicitation if it determines there may be more need for the procurement item than when the original solicitation was issued. Should a re-solicitation occur, previously awarded contracts will remain active, and all new contracts will be structured to terminate on the same date as the initial awards.
QUESTIONS AND ANSWERS
Questions MUST be submitted through the online bidding system during the designated Question and Answer period. Questions submitted through any other channel will not be answered.
Answers disseminated by the State through the online bidding system may modify the specifications or requirements of this solicitation and will constitute an addendum to this solicitation.
Questions or notifications to the State of any ambiguity, inconsistency, excessively restrictive requirement, or errors in this solicitation MUST be submitted as a question during the Q&A period.
Issues with the solicitation that have not been previously addressed within the Q&A period of the procurement are not allowed to be addressed within a proposal and may result in the Offeror’s proposal being considered non-responsive.
RFP Document
Page of 1 20
It is the responsibility of the Offeror to submit their proposal as required by this solicitation, including any requirements contained in an answered question and/or addenda.
Exceptions to the scope of work or other content of the Solicitation not previously addressed within the Q&A period of the procurement may result in the Offeror’s proposal being considered non-responsive.
ADDENDA
Any modification to this procurement will be made by addendum issued by the State. Addenda to this solicitation may be made for the purpose of making changes to the scope of work, the schedule, the qualification requirements, the criteria, the weighting, or other requirements of this solicitation.
Authorized and properly issued addenda shall constitute the official and binding position of the State. Any response to this solicitation which has as its basis any communications or information received from sources other than this solicitation, or related addenda, may be considered non-responsive and be rejected at the sole discretion of the State.
The State accepts no responsibility for a prospective Offeror not receiving solicitation documents and/or revisions to the solicitation. It is the responsibility of the prospective Offeror to monitor the bidding system to obtain addenda or other information relating to the solicitation.
RESTRICTIONS ON COMMUNICATIONS
From the issue date of this solicitation until an award is published, Offerors are prohibited from communications regarding this solicitation with staff, evaluation committee members, or other associated individuals EXCEPT the UDOT procurement officers overseeing this solicitation. Failure to comply with this requirement may result in disqualification.
PROPOSAL SUBMISSION
All materials submitted become the property of the State. Materials may be evaluated by anyone designated by the state as part of the proposal evaluation committee. Materials submitted may be returned only at the State's option.
Proposals must be received by the due date and time (“deadline”). Proposals received after the deadline will be late and ineligible for consideration.
Electronic submission instructions: When submitting a proposal electronically through the online bidding system, please allow sufficient time to complete the online forms and to upload proposal documents. The solicitation will end at the deadline. If an Offeror is in the middle of uploading a proposal when the deadline arrives, the system will stop the upload process and
Page of 2 20 the proposal will not be accepted by the bidding system, and the attempted submission will be considered late and ineligible for consideration.
Electronic proposals may require uploading of electronic attachments. The online bidding system will accept a wide variety of document types as attachments. However, the State is unable to view certain documents. Therefore, DO NOT submit documents that are embedded (zip files), or encrypted. All documents must be uploaded in the bidding system as separate files (system limit for file size is 50 MB).
Files submitted electronically must NOT be password protected or locked in any way.
Cost Proposal submission instructions: Cost Proposals are evaluated independently from the technical proposal, pursuant to the Utah Procurement Code, and as such, must be submitted separately from the technical proposal and as per solicitation requirements. Failure to submit cost or pricing data separately and as directed may result in your proposal being judged as non-responsive and ineligible for contract award.
Sample submission instructions: Offerors may be required to submit product samples to demonstrate whether a procurement item meets the specifications and other requirements set forth in the solicitation.
Samples must be received prior to the solicitation due date and time and must be furnished free of charge unless otherwise stated in the solicitation. Submitted samples will not be subject to return. Samples must be labeled or otherwise identified as specified in the solicitation.
All costs incurred by an Offeror in the preparation and submission of a proposal, including any costs incurred during interviews, oral presentations, and/or product demonstrations are the responsibility of the Offeror and will not be reimbursed.
PROTECTED INFORMATION
Portions of a proposal may be protected by submitting a Claim of Business Confidentiality Form.
However, an entire proposal cannot be identified as “PROTECTED”, “CONFIDENTIAL” or “PROPRIETARY”, and if so identified, shall be considered non-responsive unless the Offeror removes the designation.
Pricing may not be classified as confidential or protected and will be considered public information after award of the contract.
Process for Requesting Non-Disclosure: Any Offeror requesting that a record be protected must provide with their proposal the following information:
1. Must provide a completed Claim of Business Confidentiality at the time the information (proposal) is provided to the state, and
2. Must include a concise statement of reasons supporting the claim of business confidentiality (UCA § 63G-2-309(1)).
Page of 3 20
3. Must submit an electronic “redacted” (excluding protected information) copy of the proposal. Copy must clearly be marked “Redacted Version.”
Redacted Copy: If an Offeror submits a proposal that contains information claimed to be business confidential or protected information, the Offeror MUST submit two separate proposals: one redacted version for public release, with all protected business confidential information either blacked-out or removed, clearly marked as "Redacted Version"; and one non-redacted version for evaluation purposes, clearly marked as "Protected Business Confidential."
Offeror acknowledges that its proposal or redacted copy will be made public upon the State’s receipt of a GRAMA request. The Offeror will not be notified of any GRAMA request made to the State for offeror’s proposal. If the offeror submits a redacted copy, then the State will respond to a GRAMA request for offeror’s proposal with offeror’s redacted copy. However, if the offeror fails to submit a redacted copy, then the State will respond to a GRAMA request with offeror’s proposal, which will result in offeror’s protected/proprietary information, if any, being made public. Contractor acknowledges that notations in the header, footer or watermark of the proposal will not be considered sufficient to constitute a request for non-disclosure of protected/ proprietary information.
Failure to comply with the requirements regarding Protected Information releases the State from any obligation or liability arising from the inadvertent release of Offeror information.
CORRECTION OR WITHDRAWAL OF PROPOSAL
Proposals may be modified or withdrawn by written or electronic notice received by the procurement officer prior to the established due date.
A decision to permit the correction or withdrawal of a proposal or the cancellation of an award or a contract shall be supported in a written document, signed by the chief procurement officer or head of a procurement unit with independent procurement authority.
The State reserves the right to waive minor informalities as well as minor deviations. The State also reserves the right to seek clarification on any proposal response.
DISCUSSIONS OR CLARIFICATIONS
Discussions may be held with an Offeror to obtain a more complete understanding of whether the Offeror is responsible, or the Offeror’s submitted proposal is responsive. Following discussions, a proposal may be rejected if it is determined that the Offeror is not responsible, or the proposal is not responsive.
INTERVIEWS AND PRESENTATIONS
Page of 4 20
Interviews and presentations may be held at the option of the State. The State shall establish a date and time for the interviews or presentations and shall notify eligible Offerors of the procedures. Interviews or presentations shall be limited to those Offerors meeting the minimum requirements specified in the RFP. Interviews and presentations will be at the Offeror's expense.
Representations made by an Offeror during interviews or presentations shall become an addendum to the Offeror's proposal and shall be documented. Representations must be consistent with the Offeror's original proposal and may only be used for purposes of clarifying or filling in gaps in the Offeror's proposal.
BEST AND FINAL OFFER
A Best and Final Offer (BAFO) may be issued if it is determined to be necessary. The Best and Final Offer process is a formal request for offerors to amend specific portions of the technical proposal or cost proposal.
Under the Utah Procurement Code, a Best and Final Offer may be requested if:
(i) no single proposal adequately addresses all the specifications stated in the request for proposals;
(ii) all proposals are unclear or deficient in one or more respects;
(iii) all cost proposals exceed the identified budget or the procurement unit’s available funding; or
(iv) two or more proposals receive an identical evaluation score that is the highest score.
PROPOSAL EVALUATION
All responsive and responsible proposals that have not been disqualified from consideration under the provisions of Part 7 of Utah Code 63G-6a, using the criteria established in this RFP will be evaluated by an evaluation committee in accordance with the Utah Procurement Code, Administrative Rules, policies, and the evaluation criteria set forth in this solicitation.
All proposals shall remain valid for a minimum of 120 calendar days after the Proposal Due Date to allow adequate time for evaluation.
SOLICITATION AWARD IS NOT A CONTRACT
A solicitation award does not constitute a contract. Any award made through the bid system, notifications received from the bid system, email notifications received directly from the procurement unit, documents received by the vendor, or documents posted in the bid system, DO NOT constitute or create a contract. Only a fully executed Purchase Order (PO) or a fully executed contract constitutes a binding contract.
Between the notification of award and the receipt of a fully executed PO or contract, the
Page of 5 20 procurement unit may cancel the award and/or the solicitation in full, or in part, in accordance with UCA 63G-6a-902 and 63G-6a-120.
If awarded, vendor may not begin work, purchase materials, or enter into subcontracts relating to this solicitation until they receive a fully executed PO or contract.
After the evaluation and final scoring of proposals is completed, the State shall award the contract as soon as practicable, provided the solicitation is not canceled without awarding a contract.
QUANTITY ESTIMATES AND NO GUARANTEE OF VOLUME OF PURCHASE
Historical usage may not be representative of forthcoming need, and as such, UDOT does not guarantee to purchase any amount under this contract.
The issuance of a contract under this RFP does not guarantee a minimum or maximum amount in expenditure. UDOT is not obligated to purchase any devices or services from an awarded Offeror.
Purchases will be made on an as-needed basis at the Department’s sole discretion.
UDOT reserves the right to perform testing on a limited number of devices from a vendor to assess compatibility and performance before deciding whether to purchase more devices.
PROTEST PROCESS
Offerors are directed to Utah Code Part 16 and Utah Administrative Code Rule R33-16 for available appeal processes.
CONTRACT TERMS AND CONDITIONS, EXCEPTIONS, AND NEGOTIATIONS
Any contract resulting from this solicitation will include, but not be limited to the following:
• Scope of Work Specifications, Requirements, and Instructions.
• Any addendums to the solicitation as issued through the bidding system.
• Attachment A- State of Utah Standard Terms and Conditions.
Exceptions and/or additions to the Standard Terms and Conditions are strongly discouraged. Any requested exceptions and/or additions to the Standard Terms and Conditions must be submitted with the proposal. Exceptions and/or additions submitted after the date and time for receipt of proposals will not be considered. Offerors may not submit requests for exceptions and/or additions by reference to a vendor's website or URL.
The State may refuse to negotiate exceptions and/or additions that are determined to be excessive; that are inconsistent with similar contracts of the procurement unit; to warranties, insurance, or indemnification provisions that are necessary to protect the procurement unit after consultation with the Attorney General's Office or other applicable legal counsel; where the
Page of 6 20 solicitation specifically prohibits exceptions and/or additions; or that are not in the best interest of the procurement unit.
In a multiple award situation, the State reserves the right to negotiate exceptions and/or additions to terms and conditions in a manner resulting in expeditious resolutions. This process may include beginning negotiations with the Offeror having the least number of exceptions and/or additions and conclude with the Offeror submitting the greatest number of exceptions and/or additions. Contracts may be executed and become effective as negotiations are completed.
If negotiations are required, Offerors must provide all documents in Microsoft Word format for redline editing. Offerors must also provide the name, contact information, and access to the person(s) that will be directly involved in legal negotiations.
Any mandatorily required acceptance of an Offeror’s terms and conditions may result in the proposal being determined to be non-responsive.
An award resulting from this solicitation is subject to successful contract terms and conditions negotiation (if required). The State, at its sole discretion, will determine when contract terms and conditions negotiations become unproductive and will result in termination of award to that Offeror and the State may move to the next eligible Offeror.
PERFORMANCE EVALUATION
Contracts resulting from this solicitation are subject to performance evaluations. Continuous negative performance evaluations and documented feedback from end users may impact a vendor’s ability to participate in future solicitations. Performance evaluations may include end user surveys, performance audits, reports, interviews, or other reasonable methods of performance evaluation. Vendors will be notified of any negative performance evaluations or end user feedback collected.
STABILITY OF VENDOR
The State reserves the right to request financial and other information it deems relevant as necessary to evaluate a vendor’s stability and capability to complete the Scope of Work.
SUBCONTRACTORS
The planned use of any and all subcontractors must be clearly explained in the Executive Summary.
The Offeror, if awarded the contract, shall be responsible for all costs and contract performances if subcontractors are used. The State reserves the right to review and approve all subcontractors, review services conducted by subcontractors, and refuse payment on projects where subcontractors are used without foreknowledge or approval by the State.
Subcontractors must be authorized to do business in the State of Utah. Subcontractors must include
Page of 7 20 information, in the same detail as the prime contractor or offeror, of any and all personnel and companies who are not in the direct employ of the Contractor. Freelance/contracted labor may not be billed above the prevailing labor rate in the contract and is not considered a reimbursable expense. The prime Offeror shall be responsible for all costs and contract performances by subcontractors if used.
Joint Bids: Where two or more Bidders desire to submit a single bid in response to a solicitation, they must do so on a prime/subcontractor basis rather than as a joint venture. The State intends to contract with a single firm or multiple firms, but not with multiple firms doing business as a joint venture.
TECHNOLOGY MODIFICATIONS
Pursuant to Utah Administrative Rule R33-12-502 the awarded contract(s) may be modified to incorporate new technology or technological upgrades associated with the procurement item being solicited, including new or upgraded:
(i) systems;
(ii) apparatuses;
(iii) modules;
(iv) components; and
(v) other supplementary items.
Further, a maintenance or service agreement associated with the procurement item under the resulting contract(s) may be modified to include any new technology or technological upgrades.
Any contract modification incorporating new technology or technological upgrades will be specific to the procurement item being solicited and substantially within the scope of the original procurement or contract.
Page of 8 20
II. Solicitation Specifics NOTICE: The electronic bidding system’s Event Number must be referred to on all proposals, correspondence, and documentation relating to this solicitation.
PURPOSE OF REQUEST FOR PROPOSAL (RFP)
The purpose of this Request for Proposal (RFP) is to enter into Regional Contracts to provide Welding and Fabrication Services:
• The repair services involved will include but are not limited to:
o welding;
o dump body rebuild, o install, repair; and replacement;
o tow plow repair;
o repair, and rebuild various brands of spreaders;
o repair of snowplows and wing plows;
o install hydraulic cylinders and snowplows.
CONTRACT AWARD INTENT
It is anticipated that this solicitation will result in Multiple Contract Awards and may be awarded to more than one offeror.
LENGTH OF CONTRACT AND PRICING GUARANTEE
The contract(s) resulting from this solicitation will be for a period of Five (5) years with no renewal options for additional years.
All pricing must be guaranteed for One (1) year. Following the guarantee period, any request for price adjustment must be for an equal guarantee period and must be made at least 30 days prior to the effective date. Requests for price adjustment must include sufficient documentation supporting the request (ie through Federal commodity indices) and demonstrating a logical mathematical link between the current price and the proposed price.
Price adjustments may occur no more frequently than pricing guarantee period. An "Exception" will be considered if there is a net change in price of five (5) percent or more based on a change in the index(es). If a price adjustment is granted earlier than the price guarantee period, that adjustment must be in effect for a full price guarantee period unless there is a subsequent Exception.
Any adjustment or amendment to the contract will not be effective unless approved by the State.
The State will be given the immediate benefit of any decrease in the market, or allowable discount.
Page of 9 20
In a multiple award situation, any adjustment made by one contractor may result in the necessity of providing the same opportunity to all other contracted vendors to adjust pricing on the same item(s).
DELIVERY REQUIREMENTS
Delivery shall be F.O.B. destination freight prepaid - with shipping charges allowed and added as a separate item on the invoice. Items delivered to the FOB points, which do not meet specifications in every aspect, will be rejected.
At no time may the shipping charge exceed the amount normally charged for shipment from the Contractor’s place of business.
The Contractor shall retain title and control of all goods until they are delivered, and the contract of coverage has been completed. All risk of transportation and all related charges shall be the responsibility of the Contractor. All claims for visible or concealed damage shall be filed by the Contractor. The State will notify the Contractor promptly of any damaged goods and shall assist the Contractor in arranging for inspection. The Contractor shall ship using the best and least costly way. The State shall be made aware of all shipping charges at the time of order.
ORDERING
a. Requestors of materials or services must provide a written request for all products and services.
i. Verbal requests are not allowed.
ii. Requests must identify item/course number, description, quantity, individual and total price.
b. Requestor must also provide:
i. Contact name
ii. Address
iii. City, State, and Zip
iv. Phone, fax, and email address
v. Invoicing Address.
INVOICING
The Contract Number shall appear on all invoices and correspondence.
Billings must be itemized clearly identifying all products or services purchased. Invoices must be submitted in a timely manner. In the event UDOT is entitled to a discount, the period of computation shall commence on the delivery date or the date of a correct invoice, whichever is later. If an adjustment in payment is necessary due to damage, the discount period shall commence on the date final approval is authorized. UDOT reserves the right to adjust incorrect invoices.
Page of 10 20
Upon approval of the invoice by the State’s Representative, payments will be processed every other week. UDOT will remit payment by mail or electronically.
CONTRACTOR PERFORMANCE
If the contractor at any time is not meeting project schedule, standards or specifications as agreed upon for the project, the UDOT representative may do any of the following:
• Issue a written warning.
• Stop award of any future projects until current work is complete or rectified.
• Withdraw work and award to another contractor.
Page of 11 20
III. Scope of Work and Associated Requirements
All Scope of Work Requirements MUST be demonstrably met by an Offeror in order for their response to be considered. Any breach of requirements once the Contract has been awarded constitutes breach of Contract by the vendor and the Contract may be terminated immediately.
The Scope of Work is subject to change based on the awarded contract(s).
DETAILED SCOPE OF WORK AND ASSOCIATED REQUIREMENTS
For specifics, see documents titled:
• “Scope of Work and Associated Requirements”
Page of 12 20
IV. REQUIRED PROPOSAL SUBMISSION INFORMATION
PROPOSAL RESPONSE
All offerors must submit proposals that detail their experience and qualifications in the requested areas (each area must be addressed. Do not list “not applicable”).
For ease of evaluation, the submitted proposals must provide a point-by-point response, addressing in detail each area of the evaluation criteria. The criteria are not intended to limit a proposal's content or exclude any relevant or essential data. Offerors are at liberty and are encouraged to expand upon the criteria to demonstrate the Offeror’s capability to provide the State with a solution.
Offerors bear sole responsibility for providing evidence in their response that they are capable of performing the requested Scope of Work.
PROPOSAL FORMAT and RESPONSE REQUIREMENTS
Proposals should be concise, straightforward, and prepared simply and economically. Expensive displays, bindings or promotional materials are neither desired nor required. However, there is no intent in these instructions to limit a proposal’s content or to exclude any relevant or essential data.
Proposals should be organized as follows:
1. Section Title: UDOT Vendor Setup Form.
UDOT’s Vendor Setup Form fully completed and signed by the offeror.
a. See document titled “Submittal Form- Vendor Setup Form.pdf”.
2. Section Title: Cover Letter.
Include a one-page cover letter that identifies the name and primary contact information of the person who will be authorized to execute an agreement with the State of Utah on behalf of the Offeror.
3. Section Title: Business Confidential/Protected Information.
All protected/proprietary information must be indicated by submitting a completed Claim of Business Confidentiality form.
If offeror’s proposal contains protected/proprietary information (please refer to the Protected Information section of this solicitation for additional information) then offeror must also submit a redacted copy of the proposal at the same time as the offeror submits its proposal.
The redacted copy of the offeror’s proposal must be submitted in compliance with the other sections of this solicitation.
Page of 13 20
If there is no protected information, check the “None” box on the submittal form.
Failure to comply with this Section releases the State from any obligation or liability arising from the inadvertent release of Offeror information.
a. See document titled “Submittal Form- Business Confidentiality- Yes No.doc”.
4. Section Title: Potential Conflicts of Interest.
Offerors must identify any conflict, or potential conflict of interest, that might arise during the contract.
If no conflicts are identified or expected, write “None” in this section.
a. See document titled “Submittal Form- Certifications- Yes No.docx”.
5. Section Title: Exceptions and/or Additions to the Standard Terms and Conditions.
Proposed exceptions and/or additions to the Standard Terms and Conditions must be submitted. Offeror must provide all proposed exceptions and/or additions, including an Offeror’s terms and conditions in Microsoft Word redline format. Offerors must also provide the name, contact information, and access to the person(s) that will be directly involved in terms and conditions negotiations.
If there are no exceptions and additions to the Standard Terms and Conditions, check the “No” boxes on the submittal form.
a. See document titled “Submittal Form- Attachment A- Standard Terms and Conditions- Yes No.docx”.
6. Section Title: Mandatory Minimum Requirements/Qualifications (Pass/Fail Criteria).
Offerors must provide the required evidence and/or documentation/narratives demonstrating compliance with the stated Mandatory Minimum Requirements/Qualifications. An Offeror’s failure to meet any one of the mandatory requirements will result in the proposal being classified as non-responsive and will be rejected under the provisions of the Utah Procurement Code.
Vendors should review the scope of work and/or specifications in the files before submitting their responses to the mandatory minimum requirements.
All of the items described as mandatory minimums are non-negotiable. If it is determined that a response does not meet the mandatory minimum requirements, at any time during the solicitation process, it will be deemed non-responsive and disqualified from further consideration.
Offerors must provide sufficient evidence and/or documentation demonstrating that the offeror is compliant with the Mandatory Minimum Requirements:
Page of 14 20
7. Section Title: Detailed Technical Proposal (Scored Criteria).
This section should constitute the major portion of the proposal and must be a concise overview of the Offeror's assessment of the work to be performed, the Offeror’s ability and approach, and the resources necessary to fulfill the requirements. This section should demonstrate the Offeror's understanding of the desired overall performance expectations, deliverables, if any, and outcomes. Clearly indicate any options or alternatives proposed. In any case wherein the Offeror cannot comply with a provision outlined in the “Detailed Scope
Evaluation Criteria Submission Requirement Evaluation
1. Company must be currently licensed to perform services in the State of Utah.
Offeror must provide a copy of a current business license.
Pass/Fail
2. Company must have a minimum of 5 years or experience providing services required in the scope.
Offeror must provide an affirmative statement that the offeror complies with this requirement.
Pass/Fail
3. All offerors submitting bids in response to this RFP must list all claims of nonperformance, breach of contract, and other related claims filed against the offeror that have occurred in the last five years.
Offerors must include a list of all claims of nonperformance, breach of contract, and other related claims filed against all subcontractors to be utilized in fulfilling the obligations under a resulting contract that have occurred in the last five years.
For each incident, offerors must include a detailed description of each claim, its resolution, and if any damage amounts were awarded. Further, offerors must provide descriptions of what preventative measures have been implemented to prevent future occurrences of these problems. Information provided under this disclosure will be reviewed by legal counsel and as a result offeror disqualification may occur. Respondent must provide required detailed information or a statement of “none”.
Pass/Fail
Page of 15 20 of Work”, such inability must be stated in response to the applicable requirement.
Offerors should reference the Scope of Work in their response.
For ease of evaluation, the Detailed Technical Proposal Section must be a specific point-by-point response, addressing in detail each of the Technical Evaluation Criteria.
The offeror bears sole responsibility for the items included or not included within their submitted. Each area of the evaluation criteria must be addressed in detail in the response. The criteria are not intended to limit a response's content or exclude any relevant or essential data. Vendors are at liberty and are encouraged to expand upon the criteria to demonstrate the vendor’s capability to provide the State with a solution.
Offerors must provide a detailed narrative demonstrating their capability, capacity, depth of experience, and prior accomplishments, as follows:
Evaluation Criteria Submission Requirement Points Possible
1. Welding and Fabrication Experience and Services.
Offeror must provide:
• Detailed discussion of your Experience in providing Welding and Fabrication services; years in the business, etc.
• Information on your facilities and their associated capacities (bays, sizes, etc.).
300 Points
2. Qualification and Expertise of Personnel.
Offeror must provide:
• Names and experience/background of all personnel who will provide the requested services.
• Copies of relevant Certifications.
100 Points
3. Process for Scheduling Services.
Offeror must provide:
• Detailed outline of how your services are to be procured/ scheduled. Including information such as service phone numbers, texting information, contact information, lead times, etc.
75 Points
Page of 16 20
NOTICE: In any case wherein the offeror cannot comply with a provision outlined within the Scope of Work and Requirements, such inability must be stated in response to the applicable requirement.
8. Section Title: Cost Proposal. All costs are to be enumerated on the Cost Proposal Form (see Submittal Form- Cost Proposal Form).
Cost Proposals will be evaluated independently from the Technical Proposal and must be submitted as an independent and separate document (Cost Form) from the Technical Proposal. Inclusion of any cost or pricing data within the Technical Proposal will result in the proposal being judged as non-responsive.
4. References. Offeror must provide:
• Minimum of two references that will be able and willing to be contacted and discuss the offeror’s previous experience. Please include name, phone and e-mail address of all individuals.
References must be valid, accurate, and current (within the past 5 years).
The State will conduct reference checks to verify the accuracy of submitted materials and to ascertain the quality of the engagements. The State reserves the right to pursue any or all references; either submitted or state-researched, to assist in completing the Technical Proposal Evaluation.
References will be evaluated in regards to the following:
• How comparable were the services provided by the offeror to those requested in the Scope of Work?
• How comparable were the references to the State?
• How well do the references support the services of the offeror?
25 Points
Page of 17 20
Offerors must provide the following:
NOTICE: Offerors may not change/modify the format of the Price Response Form and must submit pricing in the exact format requested for a fair comparison of pricing among all offerors. Altering the format or conditioning the cost on acceptance of additional/conflicting terms or limitations may result in a finding that your proposal is non-responsive.
The cost proposal must address all costs associated with the services described in the RFP over the life of the project. The cost of this project should be defined according to the specific tasks or steps to be taken.
Evaluation Criteria Submission Requirement Points Possible
1. Cost Proposal Offerors are to provide costs as per Submittal Form- Cost Proposal
100 Points
Page of 18 20
V. Proposal Evaluation and Contract Award
PROPOSAL EVALUATION PROCESS
All responses submitted in response to this solicitation will be evaluated in a manner consistent with the Utah Procurement Code, Administrative Rules, policies and the evaluation criteria in this solicitation.
This solicitation will be evaluated under a Multiple Stage process. Offerors must pass each stage in order to move to the next stage in the evaluation process.
Stage 1: Determination of Responsiveness (Pass/Fail)
In Stage One of the evaluation process, all proposals timely received will be reviewed for responsiveness to solicitation requirements. Proposals not conforming to solicitation requirements or unable to meet the Minimum and/or Mandatory Requirements will not proceed on to Stage 2 Technical Proposal Evaluation.
Stage 2: Detailed Technical Proposal Evaluation
Stage Two will consist of an evaluation committee conducting a detailed Technical Evaluation of each responsive and responsible proposal that has not been previously disqualified or rejected.
Responsive proposals will be evaluated against the Technical Evaluation Criteria. The evaluation committee will tally the final scores for the Technical Criteria to arrive at a Consensus Score by an average of the individual scores. The Consensus Score will then be multiplied by any weighting factor assigned to a criteria to arrive at the points earned for that criterion.
Only those Proposals that achieve a minimum 60% (300 points) of the possible Total Technical points (500 points) will proceed on to Stage 3: Cost Proposal Evaluation.
Proposals with a score of less than the minimum required technical score will be deemed non-responsive and ineligible for further consideration.
Stage 3: Cost Proposal Evaluation
Stage Three will consist of the Cost Proposal Evaluation of each responsive and responsible proposal that has not been previously disqualified or rejected.
COST EVALUATION CRITERIA POINTS POSSIBLE
see Submittal Form- Pricing Form 100
Page of 19 20
• Cost Evaluation (100 Cost Points Available)
Evaluation of Cost Proposals: The offeror with the lowest total cost will receive the maximum available Cost points. All other offerors will receive points as determined by the ratio* of their cost to the lowest offered cost. Final cost scores will be calculated based on the following:
*Ratio Calculation: Points assigned to each offeror’s Cost Proposal will be based on the Lowest Proposed Cost. The offeror with the Lowest Proposed Cost will receive 100% of the cost points.
All other offerors will receive a portion of the total cost points based on what percentage higher their proposed cost is than the Lowest Proposed Cost. An Offeror whose proposed cost is more than double (200%) the Lowest Proposed Cost will receive no points. The formula to compute the points is: Cost Points x (2- (Proposed Cost/ Lowest Proposed Cost)).
Stage 4: Determination of Contract Award
Multiple Award:
In regards to this solicitation, UDOT has determined to enter into Multiple Contract Awards.
The Highest Scoring Proposal AND all offerors whose TOTAL combined Technical and Cost point score PER REGION are within 70% of the High Score will be determined to provide best value to the State and eligible for contract award. Proposals with a score of less than the minimum required TOTAL combined score will be deemed unacceptable and ineligible for contract award.
After the evaluation and final scoring of proposals is completed, the State shall award the contract as soon as practicable, provided the RFP is not canceled in accordance with Utah Procurement Code requirements.
Page of 20 20
| Offerors are directed to Utah Code Part 16 and Utah Administrative Code Rule R33-16 for available appeal processes. |
| IV. Required Proposal Submission Information |
File details come from the government source that posted it. Updated .