2026 Storm Sewer Video Inspection Services
Solicitation number
N26-612
Issued by
Weld County, Colorado

About this file

Summary of 2026 Storm Sewer Video Inspection Services Contract

This is a General Services Contract document issued by the Town of Erie, Colorado for 2026 Storm Sewer Video Inspection Services (Project Number N26-612). The project requires CCTV camera inspections of storm sewer piping across six subdivisions: Erie Commons, Erie Highlands, Grandview, Fever Lot 1, Coal Creek Center, and Right Move subdivision. The scope encompasses approximately 60,107.90 linear feet of storm sewer piping ranging from 6 inches to 68 inches in diameter, including manholes and inlets. Inspections must comply with the most current NASSCO standards and include continuous digital recording, identification, coding, and documentation of structural, operational, and maintenance defects. Electronic bids are due by 10:00 a.m. local time on August 18, 2026, submitted through the Rocky Mountain E-Purchasing System (RMEPS) at https://www.bidnetdirect.com/colorado. All questions must be submitted by 12:00 p.m. on August 10, 2026, with responses provided by addendum by August 11, 2026. The contract is effective through December 31, 2026, with the option to extend for up to four additional one-year periods at the sole discretion of the Town. All work must be completed by December 30, 2026.

Compensation is structured on a unit-price basis with specified quantities for each storm line diameter and type (PVC, RCP, and HERC configurations), plus lump-sum line items for report preparation, mobilization, and traffic control. Contractor pricing must be presented in both words and figures, and must not include any sales or excise taxes as the Town is tax-exempt. The contractor is responsible for all labor, equipment, traffic control, coordination, water usage (via hydrant meter), temporary toilet facilities, and bi-weekly progress reports as well as a comprehensive final report delivered within two weeks of project completion. Work hours are restricted to 8:00 a.m. to 4:00 p.m., Monday through Friday, with any weekend, holiday, or evening work requiring written approval from the Project Manager (Jared Muir) and subject to additional overhead charges borne entirely by the contractor. The contractor must maintain Commercial General Liability insurance with minimum combined single limits of $1,000,000 per occurrence and $2,000,000 general aggregate, plus additional required coverages including Worker's Compensation, Automobile Liability, and Excess/Umbrella Liability of $2,000,000.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Services Contract Documents for

2026 Storm Sewer Video Inspection Services

Project Number N26-612

Town of Erie 645 Holbrook Street Erie, Colorado 80516

July 2026

Table of Contents

Invitation to Bid

Instructions to Bidders

Unit-Price Bid Form

Agreement for Services

Invitation to Bid

Electronic Bids will be received by the Town of Erie (the “Town”) through the Rocky Mountain E-Purchasing System (“RMEPS”), until 10:00 a.m., local time, August 18, 2026 for the 2026 Storm Sewer Video Inspection Services (N26-612).

Bids will be time-stamped by RMEPS upon receipt.

Bid Submittals: All bids must be submitted electronically using the portal at https://www.bidnetdirect.com/colorado.

The required Bid documents must be received in the RMEPS submission portal on or before the Bid due date and time. Hardcopy submittals will not be accepted. It is the Bidder’s sole responsibility to ensure all required Bid documents are submitted through RMEPS by the submission deadline. RMEPS does not allow for uploading Bid documents after the Bid due date and time has closed.

Bids will be time-stamped by RMEPS upon receipt. After uploading Bid documents, Bidders must click the SUBMIT button. The Town will not accept uploads that are “saved” but not “submitted”. To verify that a Bid has been submitted successfully, Bidders may contact BidNet Support or verify, via the Bid Management tab in Bidder’s account, that the documents are not in “Draft” status. The Town does not have access to or control of the vendor side of RMEPS. If website or other problems arise during response submission, vendor MUST contact RMEPS to resolve issue prior to the response deadline at 800-835-4603.

A brief summary of Work for which the Bid is requested consists of:

Performing CCTV camera inspections in Erie Commons, Erie Highlands, Grandview, Fever Lot 1, Coal Creek Center, and Right Move subdivision, approximately 60107.90 linear feet of Storm sewer piping from 6-inches to 68-inches in diameter, including manholes, and inlets.

Inspections are to be conducted in designated areas and noted on the mapping sheets. Contractor will collect, collate and prepare reporting and deliver to the Town as stated in the Scope of Services. Contractor will provide all traffic control related to this work.

The Town intends to issue to the successful bidder an on-going maintenance Agreement for Services, with the option to extend the Agreement for up to https://www.bidnetdirect.com/colorado four (4) additional one (1) year periods.

All questions related to this bid should be submitted through the RMEPS website by 12:00 pm local time, on August 10, 2026. All answers to questions received will be sent in a formal addendum (if needed), by August 11, 2026.

The Town assumes no responsibility for payment of any expenses incurred by any respondent to this Invitation to Bid.

The Town of Erie is an Equal Opportunity Employer.

Dated July 28, 2026

Town of Erie, Colorado

Instructions to Bidders

1. Contract Documents

1.1. General. The following documents as indicated by an “X” constitute the Contract Documents for this project. By submitting a Bid, the Bidder certifies and represents that the Bidder has been furnished with all the Contract Documents, is familiar with them, and intends to be bound by them.

Invitation to Bid Instructions to Bidders Sample Agreement Bid Form Other:

1.2. Interpretations, Modifications, and Addenda. It is the Bidder’s responsibility to advise the Town prior to the Bid deadline of conflicting requirements or missing information which requires clarification. The Bidder must inquire into any apparent inconsistencies, or any matter seeming to require explanation or interpretation, at least 72 hours (excluding weekends and holidays) prior to the Bid deadline. Any interpretation or modification will be made only by addendum emailed to each person receiving a set of such documents.

2. Bid

2.1. Preparation. Each Bidder must submit an original Bid on the form bound herewith. No other Bid form will be considered by the Town. Entries on the Bid form must be legibly written. All prices must be stated in words and figures except where the forms provide for figures only. In case of a discrepancy between the unit price and the extended price, the unit price will prevail. A standard unit of measure must be used for the Bid. Bids may be based on a combination lump sum or unit price basis.

2.2. Bidder Qualifications. No Bid shall be accepted from any person, firm, or corporation that is in arrears to the Town. If requested, Bidders must submit satisfactory evidence that they have a practical knowledge of the services and that they have the necessary financial resources to provide the proposed services.

2.3. Confidential Information. Pursuant to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1, et seq. (the “Act”), all information contained in a Bid is subject to public disclosure unless it meets one of the exceptions in the Act. To avoid disclosure of trade secrets, privileged information, or confidential commercial, financial, geological, or geophysical data (collectively “Confidential Information”), the Bidder must clearly mark all Confidential Information as such and provide a written, detailed justification of the protected nature of the Confidential Information. This justification must address, at a minimum, the specific competitive harm that may result from any disclosure, the intrinsic value of the Confidential Information to the Bidder, and any safeguards the Bidder uses to protect the Confidential Information from disclosure. By submitting a Bid, the Bidder agrees to hold the Town harmless from any claim arising from the release of Confidential Information.

2.4. Deviations. Any deviation from the Contract Documents must be noted in detail and submitted in writing on the Bid form. Complete specifications must be attached for any substitutions offered or when amplifications are desirable or necessary. The absence of the specification deviation statement on the bid form and accompanying specifications will hold the Bidder strictly accountable to the Contract Documents as written.

2.5. Taxes. The Town is exempt from federal, state, local, and county sales/excise taxes, and no Bid shall include taxes.

2.6. Submittal. All Bids shall be submitted electronically using the portal at https://www.bidnetdirect.com/colorado and signed by the Bidder and must include the Bidder’s contact name, business name, address and telephone number. Bids by partnerships must be signed with the partnership name followed by the signature and designation of one of the partners or other authorized representative. A complete list of partners must be included with the bid. Bids by a corporation must be signed in the official corporate name, followed by the signature and designation of the president, secretary, or other person authorized to bind the corporation, and shall display the corporate seal. Corporations must designate the state in which they are incorporated, the address of their principal office, and the name and address of their agent for service of process.

2.7. Withdrawal/Amendments. Bids may be withdrawn, altered, and resubmitted at any time before the deadline time set for receiving the bids. Bids may not be withdrawn, altered, or resubmitted for a period of 30 days thereafter, and the bid of the lowest and second lowest responsible bidders may not be withdrawn for a period of 60 days thereafter, or until execution of the Agreement by the lowest responsible bidder, whichever occurs earliest.

3. Bid Opening

3.1. Receipt by Town. Bids will be time-stamped by RMEPS upon receipt.

After uploading bid documents, Bidders must click the SUBMIT button. The Town will not accept uploads that are “saved” but not “submitted”. To verify that a Bid has been submitted successfully, Bidders may contact BidNet Support or verify, via the Bid Management tab in Bidder’s account, that the documents are not in “Draft” status. The Town does not have access to or control of the vendor side of https://www.bidnetdirect.com/colorado

RMEPS. If website or other problems arise during response submission, vendor MUST contact RMEPS to resolve issue prior to the response deadline. (800-835- 4603).

3.2. Bid Results. Bid results will be published on the RMEPS after the submittal deadline. Bid results will not be given over the telephone. Following bid deadline.

4. Award

4.1. Acceptance and Rejection of Bids. The Town reserves the right to accept any and all Bids or parts thereof; to reject any and all bids; and to waive any irregularities and informalities. Bids received after the Bid deadline will be rejected. The Town reserves the right to inspect any Bidder’s facilities prior to award and to negotiate optional items with the successful Bidder.

4.2. Agreement Award. The Town will notify the successful Bidder to start the award process.

5. Work Standards and Details

5.1. Project Manager. The Project Manager is Jared Muir.

5.2. Work Hours. Contractor shall maintain hours of operation from 8:00 a.m.

till 4:00 p.m. Monday through Friday. Should the Contractor desire to work on Saturdays, Sundays, legal holidays, or at night between the hours of 4:00 p.m.

and 8:00 a.m. on Contract Days the Contractor shall submit a written request to the Project Manager at least twenty-four hours in advance. If approval is given by Project Manager to Contractor for authorized overtime work, Project Manager’s and Project Manager’s authorized personnel will charge overtime and other incidental administrative expenses necessary for performing inspections on Saturdays, Sundays, legal holidays, or at night between the hours of 4:00 p.m.

and 8:00 a.m., the Contractor will be responsible to pay for all such rates and charges, and shall not be granted a Contract Price increase for such charges. All work related to this initial contract must be completed before December 30, 2021.

5.3. Work Standards. All work to be completed to the Town of Erie Standards and Specifications for the Design and Construction of Public Improvements. All standards and details are available for download from the Town’s website at www.erieco.gov.

5.4. Lane Restrictions. Contractor shall only be allowed to restrict lane usage between the hours of 8:00 a.m. till 4:00 p.m. Monday through Friday. A minimum of one lane with flaggers must be provided during the restricted lane usage.

Should the contractor desire to restrict lane usage on Saturdays, Sundays, legal holidays, or at night between the hours of 4:00 p.m. and 8:00 a.m. on Contract Days the Contractor shall follow the requirements in Section 5.2. Traffic Control http://www.erieco.gov/ plans need to be submitted and approved prior to any lane restrictions requiring traffic control devices and/or flagger(s).

5.5. Water Usage. Contractor will be responsible for water consumption and will be required to use a hydrant meter. Fees include the water hydrant deposit fee and water consumption billed at current commercial rate and base fee per month. All gallon usage is calculated by rounding to the nearest 1,000 gallons.

Contractor is responsible for reporting usage to the Town on a monthly basis.

5.6. Toilet Facilities. There are no existing toilet facilities on site for use by Contractor. Contractor must provide and pay for temporary facilities.

5.7. Report:

A report shall be provided at the end of each two-week period that summarizes the results of the camera inspection for that period. The report shall include at a minimum:

• Dates and times that inspection was conducted

• Overall area inspected (street names, cross streets, manhole numbers)

• Debris and suspected problem areas discovered

A final report (both electronic on a portable USB stick and paper) shall be provided within two-weeks of completion of the project. The report shall include at a minimum:

• An electronic copy of all video inspections completed

• A summary of the areas camera inspected

• Other observations made for the area inspected

• Dates and times that camera inspection were conducted

• A description of equipment and techniques used to conduct the inspection

• The specific location of all detected debris and problem areas

• If identified problem areas were repaired by the Town

• Results of the reinspection of problem areas

Unit-Price Bid Form

2026 Storm Sewer Video Inspection Services (N26-612)

Description UOM Quantity Unit Price Total Price

6” PVC Storm Line – Camera Inspection LF 69.98 $ $

8" PVC Storm Line - Camera Inspection LF 46.69 $ $

8” RCP Storm Line- Camera Inspection LF 20 $ $

12" PVC Storm Line - Camera Inspection LF 96.75 $ $

12" RCP Storm Line - Camera Inspection LF 280.12 $ $

15" RCP Storm Line - Camera Inspection LF 1015.80 $ $

18" PVC Storm Line - Camera Inspection LF 10 $ $

18" RCP Storm Line - Camera Inspection LF 13309.46 $ $

21" RCP Storm Line - Camera Inspection LF 88.22 $ $

24" RCP Storm Line - Camera Inspection LF 14676.72 $ $

30" RCP Storm Line - Camera Inspection LF 9258.01 $ $

36" RCP Storm Line - Camera Inspection LF 6376.88 $ $

42" RCP Storm Line - Camera Inspection LF 5204.72 $ $

48" RCP Storm Line - Camera Inspection LF 6509.59 $ $

54” RCP Storm Line – Camera Inspection LF 523.22 $ $

60” RCP Storm Line – Camera Inspection LF 1914.03 $ $

18” by 30” HERC Storm Line - Camera Inspection

LF 404.80 $ $

24” by 48” HERC Storm Line – Camera Inspection

LF 197.42 $ $

43” by 68” HERC Storm Line – Camera Inspection

LF 105.45 $ $

Report - Storm LS 1 $ $

Mobilization – Storm LS 1 $ $

Traffic Control – Storm LS 1 $ $

Total Bid Pricing $ __________________

Please note any exceptions you take to this bid, e.g., minimum quantity requirements:

Bidder’s Information:

Company Name: ______________________________________________________

Mailing Address: ______________________________________________________

Telephone Number: _______________________ Email: _____________________

The bidder hereby acknowledges receipt of Addendum Nos. , , , , , , to these specifications. (Insert number of each addendum received.)

Name and Title of Authorized Company Representative:

Name (Please print) Title

Signature

Dated this ______ day of _______________________________, 20___.

Agreement for Services

(2026 Storm Sewer Video Inspection Services (N26-612)

This Agreement for Services (the "Agreement") is made and entered into this _____ day of ____________, 2026 (the "Effective Date"), by and between the Town of Erie, a Colorado municipal corporation with an address of 645 Holbrook Street, P.O. Box 750, Erie, CO 80516 (the "Town"), and ___________________, an independent contractor with a principal place of business at ____________________ ("Contractor") (each a "Party" and collectively the "Parties").

Whereas, the Town requires services; and

Whereas, Contractor has held itself out to the Town as having the requisite expertise and experience to perform the required services.

Now Therefore, for the consideration hereinafter set forth, the receipt and sufficiency of which are hereby acknowledged, the Parties agree as follows:

I. Scope of Services

A. Contractor shall furnish all labor and materials required for the complete and prompt execution and performance of all duties, obligations, and responsibilities which are described or reasonably implied from the Scope of Services set forth in Exhibit A, attached hereto and incorporated herein by this reference.

B. A change in the Scope of Services shall not be effective unless authorized as an amendment to this Agreement. If Contractor proceeds without such written authorization, Contractor shall be deemed to have waived any claim for additional compensation, including a claim based on the theory of unjust enrichment, quantum merit or implied contract. No agent, employee, or representative of the Town is authorized to modify any term of this Agreement, either directly or implied by a course of action.

II. Term and Termination

A. This Agreement shall commence on the Effective Date, and shall continue until December 31, 2026, or until terminated as provided herein.

B. This Agreement may be extended up to an additional four 12 month periods, at the sole discretion of the Town. An amendment is not binding until signed by the Town.

C. Either Party may terminate this Agreement upon 30 days advance written notice. The Town shall pay Contractor for all work previously authorized and completed prior to the date of termination. If, however, Contractor has substantially or materially breached this Agreement, the Town shall have any remedy or right of set-off available at law and equity.

III. Compensation

In consideration for the completion of the Scope of Services by Contractor, the Town shall pay Contractor $ . This amount shall include all fees, costs and expenses incurred by Contractor, and no additional amounts shall be paid by the Town for such fees, costs and expenses. Contractor may submit periodic invoices, which shall be paid by the Town within 30 days of receipt.

IV. Responsibility

A. Contractor hereby warrants that it is qualified to assume the responsibilities and render the services described herein. The work performed by Contractor shall be in accordance with generally accepted practices and the level of competency presently maintained by other practicing contractors in the same or similar type of work in the applicable community.

B. The Town's review, approval or acceptance of, or payment for any services shall not be construed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement.

C. Contractor shall at all times comply with all applicable law, including all federal, state and local statutes, regulations, ordinances, decrees and rules relating to the emission, discharge, release or threatened release of a hazardous material into the air, surface water, groundwater or land, the manufacturing, processing, use, generation, treatment, storage, disposal, transportation, handling, removal, remediation or investigation of a hazardous material, and the protection of human health and safety, including without limitation the following, as amended: the Comprehensive Environmental Response, Compensation and Liability Act; the Hazardous Materials Transportation Act; the Resource Conservation and Recovery Act; the Toxic Substances Control Act; the Clean Water Act; the Clean Air Act; the Occupational Safety and Health Act; the Solid Waste Disposal Act; the Davis Bacon Act; the Copeland Act; the Contract Work Hours and Safety Standards Act; the Byrd Anti-Lobbying Amendment; the Housing and Community Development Act; and the Energy Policy and Conservation Act.

D. Contractor shall comply with the accessibility standards for an individual with a disability adopted by the State Office of Information Technology pursuant to C.R.S.

§ 24-85-103, and shall indemnify, hold harmless and assume liability on behalf of the Town and its officers, employees, agents and attorneys for all costs, expenses, claims, damages, liabilities, court awards, attorney fees and related costs, and any other amounts incurred by the Town in relation to Contractor's noncompliance with such accessibility standards.

V. Ownership

Any materials, items, and work specified in the Scope of Services, and any and all related documentation and materials provided or developed by Contractor shall be exclusively owned by the Town. Contractor expressly acknowledges and agrees that all work performed under the Scope of Services constitutes a "work made for hire."

To the extent, if at all, that it does not constitute a "work made for hire," Contractor hereby transfers, sells, and assigns to the Town all of its right, title, and interest in such work. The Town may, with respect to all or any portion of such work, use, publish, display, reproduce, distribute, destroy, alter, retouch, modify, adapt, translate, or change such work without providing notice to or receiving consent from Contractor; provided that Contractor shall have no liability for any work that has been modified by the Town.

VI. Independent Contractor

Contractor is an independent contractor. Notwithstanding any other provision of this Agreement, all personnel assigned by Contractor to perform work under the terms of this Agreement shall be, and remain at all times, employees or agents of Contractor for all purposes. Contractor shall make no representation that it is a Town employee for any purposes.

VII. Insurance

A. Contractor agrees to procure and maintain, at its own cost, a policy or policies of insurance sufficient to insure against all liability, claims, demands, and other obligations assumed by Contractor pursuant to this Agreement. At a minimum, Contractor shall procure and maintain, and shall cause any subcontractor to procure and maintain, the insurance coverages listed below, with forms and insurers acceptable to the Town.

1. Worker's Compensation insurance as required by law.

2. Commercial General Liability insurance with minimum combined single limits of $1,000,000 each occurrence and $2,000,000 general aggregate. The policy shall be applicable to all premises and operations, and shall include coverage for bodily injury, broad form property damage, personal injury (including coverage for contractual and employee acts), blanket contractual, products, and completed operations. The policy shall contain a severability of interests provision, and shall include the Town and the Town's officers, employees, and contractors as additional insureds. No additional insured endorsement shall contain any exclusion for bodily injury or property damage arising from completed operations.

3. Automobile Liability with minimum limits of $1,000,000 combined single limit applicable to all owned, hired, and non-owned vehicles used in performing services under this Agreement.

4. Builder’s Risk or Installation Floater with limits equal to the completed value of the project. Coverage shall be written on an all risk, replacement cost basis including coverage for soft costs, flood and earth movement, if in a flood or quake zone, and, if applicable, equipment breakdown including testing. The Town, Contractor, and subcontractors shall be Additional Named Insureds under the policy. Policy shall remain in force until acceptance of the project by the Town.

5. Excess/Umbrella Liability with excess liability limits of $2,000,000.

Coverage must be written on a “follow form” or broader basis. Any combination of primary and excess coverage may be used to achieve required limits.

B. Such insurance shall be in addition to any other insurance requirements imposed by law. The coverages afforded under the policies shall not be canceled, terminated or materially changed without at least 30 days prior written notice to the Town. In the case of any claims-made policy, the necessary retroactive dates and extended reporting periods shall be procured to maintain such continuous coverage. Any insurance carried by the Town, its officers, its employees, or its contractors shall be excess and not contributory insurance to that provided by Contractor. Contractor shall be solely responsible for any deductible losses under any policy.

C. Contractor shall provide to the Town a certificate of insurance as evidence that the required policies are in full force and effect. The certificate shall identify this Agreement.

VIII. Indemnification

Contractor agrees to indemnify and hold harmless the Town and its officers, insurers, volunteers, representatives, agents, employees, attorneys, heirs and assigns from and against all claims, liability, damages, losses, expenses and demands, including attorney fees, on account of injury, loss, or damage, including without limitation claims arising from bodily injury, personal injury, sickness, disease, death, property loss or damage, or any other loss of any kind whatsoever, which arise out of or are in any manner connected with this Agreement if such injury, loss, or damage is caused in whole or in part by the omission, error, professional error, mistake, negligence, or other fault of Contractor, any subcontractor of Contractor, or any officer, employee, representative, or agent of Contractor, or which arise out of a worker's compensation claim of any employee of Contractor or of any employee of any subcontractor of Contractor.

IX. Miscellaneous

A. Governing Law and Venue. This Agreement shall be governed by the laws of the State of Colorado, and any legal action concerning the provisions hereof shall be brought in Boulder County, Colorado.

B. No Waiver. Delays in enforcement or the waiver of any one or more defaults or breaches of this Agreement by the Town shall not constitute a waiver of any of the other terms or obligation of this Agreement.

C. Integration. This Agreement constitutes the entire agreement between the Parties, superseding all prior oral or written communications.

D. Third Parties. There are no intended third-party beneficiaries to this Agreement.

E. Notice. Any notice under this Agreement shall be in writing, and shall be deemed sufficient when directly presented or sent pre-paid, first class U.S. Mail to the Party at the address set forth on the first page of this Agreement.

F. Severability. If any provision of this Agreement is found by a court of competent jurisdiction to be unlawful or unenforceable for any reason, the remaining provisions hereof shall remain in full force and effect.

G. Modification. This Agreement may only be modified upon written agreement of the Parties.

H. Assignment. Neither this Agreement nor any of the rights or obligations of the Parties shall be assigned by either Party without the written consent of the other.

I. Governmental Immunity. The Town and its officers, attorneys and employees, are relying on, and do not waive or intend to waive by any provision of this Agreement, the monetary limitations or any other rights, immunities, and protections provided by the Colorado Governmental Immunity Act, C.R.S. § 24-10-101, et seq., as amended, or otherwise available to the Town and its officers, attorneys or employees.

J. Rights and Remedies. The rights and remedies of the Town under this Agreement are in addition to any other rights and remedies provided by law. The expiration of this Agreement shall in no way limit the Town's legal or equitable remedies, or the period in which such remedies may be asserted, for work negligently or defectively performed.

K. Subject to Annual Appropriation. Consistent with Article X, § 20 of the Colorado Constitution, any financial obligation of the Town not performed during the current fiscal year is subject to annual appropriation, shall extend only to monies currently appropriated, and shall not constitute a mandatory charge, requirement, debt or liability beyond the current fiscal year.

L. Force Majeure. No Party shall be in breach of this Agreement if such Party's failure to perform any of the duties under this Agreement is due to Force Majeure, which shall be defined as the inability to undertake or perform any of the duties under this Agreement due to acts of God, floods, fires, sabotage, terrorist attack, strikes, riots, war, labor disputes, forces of nature, the authority and orders of government or pandemics.

In Witness Whereof, the Parties have executed this Agreement as of the Effective Date.

Town of Erie, Colorado

Meredyth Muth, Interim Town Manager

Attest:

Debbie Stamp, Town Clerk

Contractor

By: ________________________________

State of Colorado ) ) ss.

County of __________________ )

The foregoing instrument was subscribed, sworn to and acknowledged before me this ___ day of ________________, 2026, by ____________________________ as _________________ of ________________________.

My commission expires:

(Seal) ________________________________

Notary Public

Exhibit A Scope of Services

Contractor's Duties

During the term of this Agreement, Contractor shall perform the following services:

• Contractor shall provide all labor, equipment, traffic control, and coordination necessary to perform CCTV inspection of existing storm mains as specified.

• Work shall include CCTV inspection in accordance with the most up to date

NASSCO standards and requirements. Continuous digital recording, identification, coding, and documentation of structural operational, and maintenance defects will be required.

• Deliverables shall be provided electronically in NASSCO compliant format, including coded inspection, photos and video files.

• Work is to be done in conformance with the requirements of the Town of Erie Standards and Specifications.

• Contractor shall perform CCTV camera inspections in Erie Commons, Erie Highlands, Grandview, Fever Lot 1, Coal Creek Center, and Right Move subdivision, approximately 60107.90 linear feet of Storm sewer piping from 6-inches to 68-inches in diameter, including manholes, and inlets.

• Inspections are to be conducted in designated areas and noted on the mapping sheets. Contractor will collect, collate and prepare reporting and deliver to the Town as stated in the Scope of Services. Contractor will provide all traffic control related to this work.

5. Work Standards and Details

5.1. Project Manager. The Project Manager is Jared Muir.

5.2. Work Hours. Contractor shall maintain hours of operation from 8:00 a.m.

till 4:00 p.m. Monday through Friday. Should the Contractor desire to work on Saturdays, Sundays, legal holidays, or at night between the hours of 4:00 p.m.

and 8:00 a.m. on Contract Days the Contractor shall submit a written request to the Project Manager at least twenty-four hours in advance. If approval is given by Project Manager to Contractor for authorized overtime work, Project Manager’s and Project Manager’s authorized personnel will charge overtime and other incidental administrative expenses necessary for performing inspections on Saturdays, Sundays, legal holidays, or at night between the hours of 4:00 p.m.

and 8:00 a.m., the Contractor will be responsible to pay for all such rates and charges, and shall not be granted a Contract Price increase for such charges. All work related to this initial contract must be completed before December 30, 2021.

5.3. Work Standards. All work to be completed to the Town of Erie Standards and Specifications for the Design and Construction of Public Improvements. All standards and details are available for download from the Town’s website at www.erieco.gov.

5.4. Lane Restrictions. Contractor shall only be allowed to restrict lane usage between the hours of 8:00 a.m. till 4:00 p.m. Monday through Friday. A minimum of one lane with flaggers must be provided during the restricted lane usage.

Should the contractor desire to restrict lane usage on Saturdays, Sundays, legal holidays, or at night between the hours of 4:00 p.m. and 8:00 a.m. on Contract Days the Contractor shall follow the requirements in Section 5.2. Traffic Control plans need to be submitted and approved prior to any lane restrictions requiring traffic control devices and/or flagger(s).

5.5. Water Usage. Contractor will be responsible for water consumption and will be required to use a hydrant meter. Fees include the water hydrant deposit fee and water consumption billed at current commercial rate and base fee per month. All gallon usage is calculated by rounding to the nearest 1,000 gallons.

Contractor is responsible for reporting usage to the Town on a monthly basis.

5.6. Toilet Facilities. There are no existing toilet facilities on site for use by Contractor. Contractor must provide and pay for temporary facilities.

5.7. Report:

A report shall be provided at the end of each two-week period that summarizes the results of the camera inspection for that period. The report shall include at a minimum:

• Dates and times that inspection was conducted

• Overall area inspected (street names, cross streets, manhole numbers)

• Debris and suspected problem areas discovered

A final report (both electronic on a portable USB stick and paper) shall be provided within two-weeks of completion of the project. The report shall include at a minimum:

• An electronic copy of all video inspections completed

• A summary of the areas camera inspected

• Other observations made for the area inspected

• Dates and times that camera inspection were conducted

• A description of equipment and techniques used to conduct the inspection

• The specific location of all detected debris and problem areas http://www.erieco.gov/

• If identified problem areas were repaired by the Town

Contractor's Deliverables

In performance of the duties described above, Contractor shall deliver the following items to the Town, during the timeframes established by the Town:

A report shall be provided at the end of each two-week period that summarizes the results of the camera inspection for that period. The report shall include at a minimum:

• Dates and times that inspection was conducted

• Overall area inspected (street names, cross streets, manhole numbers)

• Debris and suspected problem areas discovered

A final report (both electronic on a portable USB stick and paper) shall be provided within two-weeks of completion of the project. The report shall include at a minimum:

• An electronic copy of all video inspections completed

• A summary of the area's camera inspected

• Other observations made for the area inspected

• Dates and times that camera inspection were conducted

• A description of equipment and techniques used to conduct the inspection

• The specific location of all detected debris and problem areas

• If identified problem areas were repaired by the Town

All work related to this contract is to be completed by December 30, 2026.

Exhibit B Compensation

Contractor shall be paid based on the unit prices listed below.

Description UOM Quantity Unit Price Total Price

6” PVC Storm Line – Camera Inspection LF 69.98 $ $

8" PVC Storm Line - Camera Inspection LF 46.69 $ $

8” RCP Storm Line- Camera Inspection LF 20 $ $

12" PVC Storm Line - Camera Inspection LF 96.75 $ $

12" RCP Storm Line - Camera Inspection LF 280.12 $ $

15" RCP Storm Line - Camera Inspection LF 1015.80 $ $

18" PVC Storm Line - Camera Inspection LF 10 $ $

18" RCP Storm Line - Camera Inspection LF 13309.46 $ $

21" RCP Storm Line - Camera Inspection LF 88.22 $ $

24" RCP Storm Line - Camera Inspection LF 14676.72 $ $

30" RCP Storm Line - Camera Inspection LF 9258.01 $ $

36" RCP Storm Line - Camera Inspection LF 6376.88 $ $

42" RCP Storm Line - Camera Inspection LF 5204.72 $ $

48" RCP Storm Line - Camera Inspection LF 6509.59 $ $

54” RCP Storm Line – Camera Inspection LF 523.22 $ $

60” RCP Storm Line – Camera Inspection LF 1914.03 $ $

18” by 30” HERC Storm Line - Camera Inspection

LF 404.80 $ $

24” by 48” HERC Storm Line – Camera Inspection

LF 197.42 $ $

43” by 68” HERC Storm Line – Camera Inspection

LF 105.45 $ $

Report - Storm LS 1 $ $

Mobilization – Storm LS 1 $ $

Traffic Control – Storm LS 1 $ $

Total Bid Pricing $ __________________

The total annual compensation under this Agreement shall not exceed $ for 2026.