Bid Sheet.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Nederman Exhaust System State and local contract opportunity
- Solicitation number
- 6065AB
- Issued by
- Colorado
About this file
The provided file is a Bid Sheet for the City of Aurora Public Safety Training Center (CAPSTC) Nederman Exhaust System project located in Colorado. The project involves completely removing the existing Plymovent diesel exhaust removal system from three truck bays and installing a new Nederman diesel exhaust removal system that will run the length of the 2nd and 3rd truck bays and part of the 1st bay. The scope includes removing existing system components, installing new ductwork, exhaust fan, electrical connections, and integrating CO/NO2 sensors with the Nederman control panel. LONG Building Technologies will handle the system installation, with a separate licensed electrical contractor responsible for electrical work.
The bid sheet breaks down the project into multiple divisions including General Requirements, Existing Conditions, Masonry, Thermal and Moisture Protection, Openings, Finishes, HVAC, and Electrical. The bid requires contractors to provide a base bid price across these divisions, with third-party commissioning by NORESCO to ensure proper system installation and performance. While specific pricing details are not fully disclosed, the document provides a structured framework for bidders to price out the comprehensive exhaust system replacement project, indicating a complex technical infrastructure upgrade for the public safety training facility.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Project Manual Nederman Exhaust System.pdf | ||
| Attachment A.pdf | ||
| Attachment B.pdf | ||
| Attachment C.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID BREAKDOWN SHEET | ||||
| CAPSTC - NEDERMAN EXHAUST SYSTEM | ||||
| Date: | ||||
| Bidder (Name of Firm): | ||||
| Bidder (Representative): | ||||
| Division # | Division Name | Division Description | Base Bid Price | Alternate #1 |
| Division 1 | General Requirements | Site Access, Storage, Quality Control, Temporary Facilities and Controls, Execution, Cleaning and Waste Management, Starting and Adjusting, Etc. | ||
| Division 2 | Existing Conditions | Maintenance of Existing Conditions, Assessment, Demolition, Removal and Diversion of Construction Materials, etc. | ||
| Division 4 | Masonry | |||
| Division 7 | Thermal and Moisture Protection | |||
| Division 8 | Openings | |||
| Division 9 | Finishes | |||
| Division 23 | Heating, Ventilating, and Air Conditioning (HVAC) | |||
| Division 26 | Electrical | |||
| Total Bid |
File details come from the government source that posted it. Updated .