BID SCHEDULE - Swanson-Peterson 1 Plugging and Abandonment - Copy.doc
DOC document 41 KB Posted
- Attached to
- Plug & Abandon Swanson-Peterson #1
- Solicitation number
- DQ1 PHAA 2016000356 2
- Issued by
- Rio Grande County, Denver City, Colorado
About this file
This is an Engineer's Estimate Bid Schedule for the Swanson-Peterson #1 Plugging and Abandonment project issued under Project PHA A-2016-356. The project involves the plugging, abandonment, and reclamation of a well through a series of defined work categories. The scope of work includes five primary line items: mobilization and demobilization (1 each), plug and abandon services (30 hours), cement services (1,080 sacks), solid waste management (1 lump sum), and liquid waste management (2 loads). The quantities and measurements provided serve as a basis for bid comparison only, with actual payment to be rendered solely for verified quantities as determined by the project manager in accordance with the documented quotation specifications and standards.
The engineer's estimate establishes a grand total price of $63,500, with individual line item costs ranging from $3,000 for liquid waste management to $27,000 for cement services. Funding for the project is provided through bond claims and/or the Oil and Gas Conservation and Environmental Response Fund. Bidders are required to submit completed bid schedules with their proposals, including company information, tax identification number, and authorized signatures. The bid schedule serves as the formal pricing document for comparative evaluation and forms the basis for contract award and payment administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Clarifications.docx | DOCX document | |
| List of Equipment offered (2).doc | DOC document | |
| DNR POGeneralConditions 3-17-2015.pdf | ||
| Special Provisions 1-1-09.pdf | ||
| REVISED_DOCUMENTED QUOTATION - Ridgway PA 9-30.doc | DOC document | |
| WBD - Swanson-Peterson 1.xls | XLS spreadsheet | |
| CORRECTED BID SCHEDULE - Contractor Bid (2).doc | DOC document | |
| DQ-PHAA-216-356 Ridgway PA Final.pdf | ||
| POTerms&Conditions1-1-09.pdf | ||
| OGCCContractGeneralConditions 07232014 Final MSVC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEER’S ESTIMATE
BID SCHEDULE
SWANSON-PETERSON #1
PLUGGING AND ABANDONMENT PROJECT
PHA A-2016-356
The funds to plug and abandon and reclaim this well is provided through bond claims and/or the Oil and Gas Conservation and Environmental Response Fund.
Specifications and standards for cost categories shown below are listed in the DOCUMENTED QUOTATION. The quantities and measurements set forth below are in no case exact and in some instances the exact quantities and measurements are impossible to determine until after conditions have become known during construction. The quantities shown below are for use as a basis for comparing bids only. Payment will be made only for the actual quantities verified by the PROJECT MANAGER in accordance with Section 3.0 – Measurement and Payment in the DOCUMENTED QUOTATION.
| Item No. |
| Description |
| Units |
| Quantity |
| Unit Cost |
| Amount |
| 1 |
| Mobilization - Demobilization |
| Each |
| 1 |
| $15,000 |
| $15,000 |
| 2 |
| Plug and Abandon |
| Hours |
| 30 |
| $450 |
| $13,500 |
| 3 |
| Cement Services |
| Sacks |
| 1,080 |
| $25 |
| $27,000 |
| 4 |
| Solid Waste Management |
| Lump Sum |
| 1 |
| $5,000 |
| $5,000 |
| 5 |
| Liquid Waste Management |
| Load |
| 2 |
| $1,500 |
| $3,000 |
| GRAND TOTAL PRICE |
| $63,500 |
DATE:
AUTHORIZED SIGNATURE:
NAME (PRINT OR TYPE):
COMPANY NAME TAX ID#
ADDRESS
PHONE #
FAX #
PAGE
RETURN THIS BID SCHEDULE WITH YOUR BID
File details come from the government source that posted it. Updated .