BID SCHEDULE - Swanson-Peterson 1 Plugging and Abandonment - Copy.doc

DOC document 41 KB Posted

Attached to
Plug & Abandon Swanson-Peterson #1
Solicitation number
DQ1 PHAA 2016000356 2
Issued by
Rio Grande County, Denver City, Colorado

About this file

This is an Engineer's Estimate Bid Schedule for the Swanson-Peterson #1 Plugging and Abandonment project issued under Project PHA A-2016-356. The project involves the plugging, abandonment, and reclamation of a well through a series of defined work categories. The scope of work includes five primary line items: mobilization and demobilization (1 each), plug and abandon services (30 hours), cement services (1,080 sacks), solid waste management (1 lump sum), and liquid waste management (2 loads). The quantities and measurements provided serve as a basis for bid comparison only, with actual payment to be rendered solely for verified quantities as determined by the project manager in accordance with the documented quotation specifications and standards.

The engineer's estimate establishes a grand total price of $63,500, with individual line item costs ranging from $3,000 for liquid waste management to $27,000 for cement services. Funding for the project is provided through bond claims and/or the Oil and Gas Conservation and Environmental Response Fund. Bidders are required to submit completed bid schedules with their proposals, including company information, tax identification number, and authorized signatures. The bid schedule serves as the formal pricing document for comparative evaluation and forms the basis for contract award and payment administration.

View the file

Other files

File Type Posted
Bid_Clarifications.docx DOCX document
List of Equipment offered (2).doc DOC document
DNR POGeneralConditions 3-17-2015.pdf PDF
Special Provisions 1-1-09.pdf PDF
REVISED_DOCUMENTED QUOTATION - Ridgway PA 9-30.doc DOC document
WBD - Swanson-Peterson 1.xls XLS spreadsheet
CORRECTED BID SCHEDULE - Contractor Bid (2).doc DOC document
DQ-PHAA-216-356 Ridgway PA Final.pdf PDF
POTerms&Conditions1-1-09.pdf PDF
OGCCContractGeneralConditions 07232014 Final MSVC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEER’S ESTIMATE

BID SCHEDULE

SWANSON-PETERSON #1

PLUGGING AND ABANDONMENT PROJECT

PHA A-2016-356

The funds to plug and abandon and reclaim this well is provided through bond claims and/or the Oil and Gas Conservation and Environmental Response Fund.

Specifications and standards for cost categories shown below are listed in the DOCUMENTED QUOTATION. The quantities and measurements set forth below are in no case exact and in some instances the exact quantities and measurements are impossible to determine until after conditions have become known during construction. The quantities shown below are for use as a basis for comparing bids only. Payment will be made only for the actual quantities verified by the PROJECT MANAGER in accordance with Section 3.0 – Measurement and Payment in the DOCUMENTED QUOTATION.

Item No.
Description
Units
Quantity
Unit Cost
Amount
1
Mobilization - Demobilization
Each
1
$15,000
$15,000
2
Plug and Abandon
Hours
30
$450
$13,500
3
Cement Services
Sacks
1,080
$25
$27,000
4
Solid Waste Management
Lump Sum
1
$5,000
$5,000
5
Liquid Waste Management
Load
2
$1,500
$3,000
GRAND TOTAL PRICE
$63,500

DATE:

AUTHORIZED SIGNATURE:

NAME (PRINT OR TYPE):

COMPANY NAME TAX ID#

ADDRESS

PHONE #

FAX #

PAGE

RETURN THIS BID SCHEDULE WITH YOUR BID

File details come from the government source that posted it. Updated .