Bid Notice-Tokay High School Pool Bulkhead Replacement.pdf

PDF 2 MB Posted

Attached to
Tokay High School Pool Bulkhead Replacement
Solicitation number
0876-8876-600-79
Issued by
San Joaquin County, California

About this file

Tokay High School Pool Bulkhead Replacement Project Summary

This is a Bid Notice and Project Manual for the Lodi Unified School District in California for the replacement of an existing movable competition swimming pool bulkhead at Tokay High School with a new competition-quality fiberglass/composite bulkhead. The project scope includes removal and disposal of the existing bulkhead, furnishing and installation of a new corrosion-resistant bulkhead meeting NCAA, FINA, USA Swimming, and World Aquatics competition standards, full installation services, deck cleaning, and staff training. The project is located at Tokay High School, 1111 Century Boulevard, Lodi, California 95240. The mandatory pre-bid conference and site visit is scheduled for Tuesday, August 18, 2026, at 10:00 A.M. Requests for Information (RFI) are due Wednesday, August 26, 2026, by 1:00 P.M., with the final addendum due Thursday, September 3, 2026, by 1:00 P.M. Sealed bids are due Tuesday, September 22, 2026, by 1:00 P.M. Board award is anticipated in October 2026, with construction scheduled from November 1, 2026, through June 30, 2027. The contract term covers pre-construction activities, construction, substantial completion, and closeout, with completion anticipated by July 2, 2027.

Bidders must hold a California State contractor's license (Class B or C-53) and be registered as a public works contractor with the Department of Industrial Relations. A mandatory bid bond of ten percent (10%) of the total bid price is required. The bid pricing includes a base bid amount plus a 20% owner-controlled contingency for unforeseen conditions and scope gaps, with unused contingency retained by the District. Prevailing wage requirements apply to all workers in accordance with California Labor Code sections 1770 et seq., and the project is subject to labor compliance monitoring by the Department of Industrial Relations. Performance and Payment Bonds (100% each) are required upon contract award. The District may utilize an owner-controlled insurance program (OCIP) for the project. Disabled Veteran Business Enterprise (DVBE) participation goals of at least three percent (3%) annually apply if state School Facility Program funds are used. The District reserves the right to prequalify bidders and award the contract to the lowest responsive responsible bidder based on the base bid amount. Bidders must attend the mandatory site visit and submit a Site Visit Certification with their bid; failure to attend will render the bid ineligible for consideration.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOKAY HIGH SCHOOL POOL BULKHEAD REPLACEMENT

PROJECT MANUAL

0876-8876-600-79

August 8, 2026

Tokay High School Pool Bulkhead Replacement Project No. 0876-8876-600-79

LODI UNIFIED SCHOOL DISTRICT

DOCUMENT 00 01 10

TABLE OF CONTENTS

Procurement and Contracting Requirements

Division 0 Section Title

00 01 01 Project Title Page

00 01 10 Table of Contents

00 01 15 List of Drawings and Tables

00 01 20 List of Schedules

Solicitation

Division 0 Section Title

00 11 16 Notice to Bidders

Instructions for Procurement

Division 0 Section Title

00 21 13 Instructions to Bidders

00 21 13.1 Bidder Information and Forms

Available Information

Division 0 Section Title

00 31 19 Existing Conditions

00 31 32 Geotechnical Data

Procurement Forms and Supplements

Division 0 Section Title

00 41 13 Bid Form and Proposal

00 43 13 Bid Bond

00 43 36 Designated Subcontractors List

00 45 01 Site Visit Certification

00 45 19 Non-Collusion Declaration

00 45 19.01 Iran Contracting Act Certification

00 45 19.02 Off-Road Diesel-Fueled Fleet Certification

00 45 26 Workers’ Compensation Certification

00 45 46.01 Prevailing Wage and Related Labor Requirements

Certification

00 45 46.02 Disabled Veteran Business Enterprise

Participation Certification

00 45 46.03 Drug-Free Workplace Certification

00 45 46.04 Tobacco-Free Environment Certification

00 45 46.05 Hazardous Materials Certification

00 45 46.06 Lead-Based Materials Certification

00 45 46.07 Imported Materials Certification

00 45 46.08 Criminal Background Investigation/Fingerprinting

Certification

00 45 46.09 Drug and Alcohol-Free Schools Certification

00 45 46.10 Roofing Project Certification

00 45 46.11 Federal Debarment Certification

00 45 46.12 Federal Byrd Anti-Lobbying Certification

00 45 49 Registered Subcontractors List

00 45 90 Post Bid Interview

Contracting Forms and Supplements

Division 0 Section Title

00 51 00 Notice of Award

00 52 13 Agreement Form

00 55 00 Notice to Proceed

00 56 00 Escrow Bid Documentation

00 57 00 Escrow Agreement in Lieu of Retention

Project Forms

Division 0 Section Title

00 61 13.13 Performance Bond

00 61 13.16 Payment Bond

00 63 40

00 63 40.1

Contingency Expenditure Directive Form

Allowance Expenditure Directive Form

00 63 47 Daily Force Account Report

00 63 57 Proposed Change Order Form

00 63 63 Change Order Form

00 65 19.26 Agreement and Release of Any and All Claims

00 65 36 Guarantee Form

Conditions of the Contract

Division 0 Section Title

00 72 13 General Conditions

00 73 13 Special Conditions

00 73 56 Hazardous Materials Procedures and

Requirements

General Requirements

Division 1 Section Title

01 11 00 Summary of Work

Price and Payment Procedures

Division 1 Section Title

01 21 00 Allowance

01 22 00 Alternatives and Unit Prices

01 25 13 Product Options and Substitutions

01 26 00 Changes in the Work

01 29 00 Application for Payment and Conditional and

Unconditional Waiver and Release Forms

Administrative Requirements

Division 1 Section Title

01 31 19 Project Meetings

01 32 13 Scheduling of Work

01 33 00 Submittals

01 35 13.23 Site Standards

Quality Requirements

Division 1 Section Title

01 41 00 Regulatory Requirements

01 42 13 Abbreviations and Acronyms

01 42 16 Definitions

01 42 19 References

01 43 00 Materials and Equipment

01 45 00 Quality Control

Temporary Facilities and Controls

Division 1 Section Title

01 50 00 Temporary Facilities and Controls

01 50 13 Construction Waste Management and Disposal

01 52 13 Field Offices

Product Requirements

Division 1 Section Title

01 64 00 Owner-Furnished Products

01 66 00 Product Delivery, Storage and Handling

Execution and Closeout Requirements

Division 1 Section Title

01 71 23 Field Engineering

01 73 29 Cutting and Patching

01 76 00 Alteration Project Procedures

01 77 00 Contract Closeout and Final Cleaning

01 78 23 Operation and Maintenance Data

01 78 36 Warranties

01 78 39 Record Documents

Life Cycle Activities

Division 1 Section Title

01 91 00 Commissioning

DOCUMENT 00 01 15

LIST OF DRAWINGS AND TABLES

DOCUMENT 00 01 15

See Website if any

END OF DOCUMENT

DOCUMENT 00 01 20

LIST OF SCHEDULES

The following schedule summarizes the major activity dates (Dates are approximate and actual start dates are subject to change):

a. Bid Dates

1. Advertise to Bid (first) Saturday, August 8, 2026.

2. Advertise to Bid (second) Saturday, August 15, 2026.

3. Pre-Bid Conference/walk Tuesday, August 18, 2026, at 10:00 A.M. (Meet at Front

Entrance of Tokay High School).

4. RFI Due Wednesday, August 26, 2026, by 1:00 P.M.

5. Addendum (last) Thursday, September 3, 2026, by 1:00 P.M.

6. Bids Due Tuesday, September 22, 2026, by 1:00 P.M.

7. Board Award October 2026.

b. Contracts

1. Bond Preparation TBD

2. Contract Execution TBD

c. Pre-Construction Activities

1. Start and End Date from November 1, 2026, thru June 30, 2027, Approved for

After Hours, Nights, Weekends & Holiday Work

2. Submittals and Approvals TBD

3. Materials Ordering/Stockpiling TBD

d. Construction

1. Date of facility availability November 1, 2026

2. Begin turning over spaces to District June 30, 2027

e. Occupancy: The Contractor will turn the grounds over for occupancy as follows:

1. Occupancy – June 30, 2027

f. Completion/Close-out

1. Substantial Completion Date June 30, 2027

2. Complete Minor Finish Work June 30, 2027

3. Complete Punch List Work July 1, 2027

4. Closeout/Completion July 2, 2027

NOTICE TO BIDDERS

DOCUMENT 00 11 16

1. Notice is hereby given that the governing board (“Board”) of the Lodi Unified School

District (“District”) will receive sealed bids for the following project, Tokay High

School Pool Bulkhead Replacement Project No. 0876-8876-600-79 (“Project” or

“Contract”):

• The Project consists of: Replacement of the Pool Bulkhead located at Tokay High School.

• See project manual on website for scope and further details.

• Other work as shown in the documents and as required for completing an operational project.

• Pay prevailing wage.

• Provide Insurance and Bonds.

2. To bid on this Project, the Bidder is required to possess one or more of the following

State of California contractors’ license(s):

“B or C53”

The Bidder's license(s) must remain active and in good standing throughout the term of the Contract.

3. To bid on this Project, the Bidder is required to be registered as a public works contractor with the Department of Industrial Relations pursuant to the Labor Code.

4. Contract Documents will be available on or after August 8, 2026, for review at the

District Facilities Office, and may be downloaded from the District’s website, www.lodiusd.net/about/projects#facilities, under the “Facilities & Planning” section. In addition, Contract Documents are available for bidders’ review at the following builders’ exchanges:

a. Central California Builders Exchange: (559) 237-1831

b. Builder’s Exchange of Stockton: (209) 478-1000

c. Builder’s Exchange of Sacramento: (916) 442-8991

d. Valley Builders Exchange: (209) 522-9031

5. RESERVED

6. Sealed bids will be received until 1:00 P.M., Tuesday, September 22, 2026, at the

District Facilities & Planning Office (M&O Department), 880 N Guild Avenue, Lodi, California 95240 at or after which time the bids will be opened and publicly read aloud. Any bid that is submitted after this time shall be nonresponsive and returned to the bidder. Any claim by a bidder of error in its bid must be made in compliance with section 5100 et seq. of the Public Contract Code.

7. The District reserves the right to prequalify bidders for this Project pursuant to Public

Contract Code section 20111.5, as deemed necessary by the District. When prequalification is applied, only prequalified Bidders will be eligible to submit a Bid for this Project. Any Bid submitted by a Bidder who has not been prequalified shall be deemed nonresponsive and will not be considered. Pre-qualification is completed on the web at https://pqbids.com/lodi.

8. Pursuant to Public Contract Code section 20111.6, only prequalified bidders will be eligible to submit a bid for a public project involving a projected expenditure of

$1 million or more using or planning to use state general fund or state school bond funds. Any bid submitted by a bidder who is not prequalified shall be non-responsive and returned unopened to the bidder. Moreover, any bid listing subcontractors holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or

C-46 licenses for the performance of electrical, mechanical or plumbing components who have not been prequalified shall be deemed nonresponsive.

9. All bids shall be on the form provided by the District. Each bid must conform and be responsive to all pertinent Contract Documents, including, but not limited to, the

Instructions to Bidders.

10. A bid bond by an admitted surety insurer on the form provided by the District a cashier's check or a certified check, drawn to the order of the Lodi Unified School

District, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the

District for the performance of the services as stipulated in the bid.

11. A mandatory pre-bid conference and site visit will be held on Tuesday, August 18, 2026, at 10:00 A.M.: Meet at Front Entrance of Tokay High School, 1111 Century

Blvd., Lodi, California, 95240 (“Site Visit”). All participants in a mandatory site visit are required to sign-in. Failure to attend, or tardiness at, a mandatory site visit will render a bid ineligible for consideration. The Site Visit Certification, provided at the end of the Site Visit, must be submitted with the Bid when a site visit is required.

12. The successful Bidder shall be required to furnish a 100% Performance Bond and a

100% Payment Bond if it is awarded the Contract for the Work.

13. The inclusion of an owner-controlled or wrap-up insurance program (“OCIP”) for this

Project is at the discretion of the District. When the District elects to provide an

OCIP, the policy limits, known exclusions, and the duration for which the policy is intended to remain effective are detailed in the OCIP Manual. In such cases, it is mandatory for all bidders to comply with the following minimum requirements: no serious and willful violations of Labor Code section 6300 et seq., a workers’ compensation experience modification factor of 1.00 or less, and an instituted injury prevention program pursuant to Labor Code section 3201.5 or 6401.7.

14. Bidders are required to submit the Off-Road Diesel-Fueled Fleet Certification along with their Bids, but only in cases where the project involves the use of off-road diesel-fueled vehicles and equipment subject to regulation. Bids submitted without the Off-Road Diesel-Fueled Fleet Certification, when this certification is applicable to the project, shall be deemed non-responsive and will not be considered.

15. The successful Bidder may substitute securities for any monies withheld by the

District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code.

16. If applicable or required by the District for projects utilizing funds from the State of

California School Facility Program, as outlined in Section 17076.11 of the Education

Code, there is a mandate to achieve a participation goal for disabled veteran business enterprises (“DVBE”) of at least three percent (3%) annually of the overall dollar amount expended on state-funded projects. To fulfill this mandate by demonstrating a good faith effort, Bidders must actively seek DVBE-certified subcontractors and suppliers prior to bid submission. For any state-funded project, the selected Bidder must, upon contract award, certify compliance with DVBE participation goal procedures. The DVBE Certification Participation Form, provided for this purpose, should not be submitted with the Bid but is required with the execution of the Contract.

This requirement is contingent upon the specific funding and requirements of a project as determined by the District.

17. The Contractor and all Subcontractors under the Contractor shall pay all workers on all Work performed pursuant to this Contract not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of

California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to section 1770 et seq. of the California Labor Code. Prevailing wage rates are also available from the District or on the Internet at: <http://www.dir.ca.gov>.

18. This Project is subject to labor compliance monitoring and enforcement by the

Department of Industrial Relations pursuant to Labor Code section 1771.4 and subject to the requirements of Title 8 of the California Code of Regulations. The successful Bidder shall comply with all requirements of Division 2, Part 7, Chapter 1, Articles 1-5 of the Labor Code.

19. The District’s Board may, pursuant to Public Contract Code section 3400(c), find and determine that certain item(s) must be used on this Project for the reasons outlined below. This designation is subject to Board Resolution and will only be applied based on one of the statutorily allowed bases:

a. Field Test or Experiment: To determine the product’s suitability for future use, the following item(s) have been designated.

b. Matching Products: To match other products in use on a particular public improvement either completed or in the course of completion, the following item(s) have been designated.

c. Sole Source Availability: To obtain a necessary item that is only available from one source, the following item(s) have been designated.

d. Emergency Response: To respond to an emergency declared by a local agency, the following item(s) have been designated.

The Board has identified the following items which must be used on this Project:

[“N/A”].

20. This Project may be funded, in whole or in part, with federal funds. In instances where federal funding is utilized, the Contractor and all Subcontractors under the

Contractor are required to comply with the Davis-Bacon Act, applicable reporting requirements, and any other relevant federal funding requirements. Should a conflict arise between state and federal requirements, the more stringent provision shall control to ensure compliance with all applicable regulations.

21. The District shall award the Contract, if it awards it at all, to the lowest responsive responsible bidder based on:

A. The base bid amount.

22. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made.

Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening.

DOCUMENT 00 21 13

INSTRUCTIONS TO BIDDERS

Bidders shall follow the instructions in this document, and shall submit all documents, forms, and information required for consideration of a bid.

Lodi Unified School District (“District”) will evaluate information submitted by the apparent low Bidder and, if incomplete or unsatisfactory to District, Bidder’s bid may be rejected at the sole discretion of District.

1. Bids are requested for a general construction contract, or work described in general, for the following project (“Project” or “Contract”):

Tokay High School Pool Bulkhead Replacement Project No. 0876-8876-600-79

2. A Bidder and its subcontractors must possess the appropriate State of California contractors’ license and must maintain the license throughout the duration of the project. Bidders must also be registered as a public works contractor with the

Department of Industrial Relations pursuant to the Labor Code. Bids submitted by a contractor who is not properly licensed or registered shall be deemed nonresponsive and will not be considered.

3. The District reserves the right to prequalify bidders for this Project pursuant to Public

Contract Code section 20111.5, as deemed necessary by the District. When prequalification is applied, only prequalified Bidders will be eligible to submit a Bid for this Project. Any Bid submitted by a Bidder who has not been prequalified shall be deemed nonresponsive and will not be considered.

4. Pursuant to Public Contract Code section 20111.6, only prequalified bidders will be eligible to submit a bid for a public project involving a projected expenditure of

$1 million or more using or planning to use state general fund or state school bond funds. Any bid submitted by a bidder who is not prequalified shall be non-responsive and returned unopened to the bidder. Moreover, any bid listing subcontractors holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or

C-46 licenses for the performance of electrical, mechanical or plumbing components who have not been prequalified shall be deemed nonresponsive.

5. District will receive sealed bids from bidders as stipulated in the Notice to Bidders.

a. All bids must be sealed in an envelope, marked with the name and address of the Bidder, name of the Project, the Project Number and/or bid number, and time of bid opening.

b. Bids must be submitted to the Facilities and Planning Office (M&O), 880

N. Guild Avenue, Lodi California 95240 by date and time shown in the

Notice to Bidders.

c. Bids must contain all documents as required herein.

6. Bidders are advised that on the date that bids are opened, telephones will not be available at the District Offices for use by bidders or their representatives.

7. Bids will be opened at or after the time indicated for receipt of bids.

8. Bidders must submit bids on the documents titled Bid Form and Proposal and must submit all other required District forms. Bids not submitted on the District's required forms shall be deemed nonresponsive and shall not be considered. Additional sheets required to fully respond to requested information are permissible.

9. Bidders shall not modify the Bid Form and Proposal or qualify their bids. Bidders shall not submit to the District a re-formatted, re-typed, altered, modified, or otherwise recreated version of the Bid Form and Proposal or other District-provided document.

10. Bids shall be clearly written and without erasure or deletions. District reserves the right to reject any bid containing erasures, deletions, or illegible contents.

11. Bidders must supply all information required by each Bid Document. Bids must be full and complete. District reserves the right in its sole discretion to reject any bid as nonresponsive as a result of any error or omission in the bid. Bidders must complete and submit all of the following documents with the Bid Form and Proposal:

a. Bid Bond on the District's form, or other security.

b. Designated Subcontractors List.

c. Site Visit Certification, if applicable.

d. Non-Collusion Declaration.

e. Iran Contracting Act Certification, if applicable.

f. Off-Road Diesel-Fueled Fleet Certification.

g. Federal Debarment Certification, if federal funds used.

h. Federal Byrd Anti-Lobbying Certification, if federal funds used.

i. OCIP Insurance forms, if District has elected to use OCIP.

12. Bidders must submit with their bids cash, a cashier's check or a certified check payable to District, or a bid bond by an admitted surety insurer of not less than ten percent (10%) of amount of Base Bid, plus all additive alternates (“Bid Bond”). If

Bidder chooses to provide a Bid Bond as security, Bidder must use the required form of corporate surety provided by District. The Surety on Bidder’s Bid Bond must be an insurer admitted in the State of California and authorized to issue surety bonds in the State of California. Bids submitted without necessary bid security will be deemed nonresponsive and will not be considered.

13. If Bidder to whom the Contract is awarded fails or neglects to enter into the Contract and submit required bonds, insurance certificates, and all other required documents, within SEVEN (7) calendar days after the date of the Notice of Award, District may deposit Bid Bond, cash, cashier's check, or certified check for collection, and proceeds thereof may be retained by District as liquidated damages for failure of

Bidder to enter into Contract, in the sole discretion of District. It is agreed that calculation of damages District may suffer as a result of Bidder's failure to enter into the Contract would be extremely difficult and impractical to determine and that the amount of the Bidder’s required bid security shall be the agreed and conclusively presumed amount of damages.

14. Bidders must submit with the bid the Designated Subcontractors List for those subcontractors who will perform any portion of Work, including labor, rendering of service, or specially fabricating and installing a portion of the Work or improvement according to detailed drawings contained in the plans and specifications, in excess of one half of one percent (0.5%) of total bid. Failure to submit this list when required by law shall result in bid being deemed nonresponsive and the bid will not be considered.

15. All of the listed subcontractors are required to be registered as a public works contractor with the Department of Industrial Relations pursuant to the Labor Code.

a. An inadvertent error in listing the California contractor license number on the

Designated Subcontractors List shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive if the correct contractor’s license number is submitted to the District within 24 hours after the bid opening and the corrected number corresponds with the submitted name and location for that subcontractor.

b. An inadvertent error listing an unregistered subcontractor shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive provided that any of the following apply:

(1) The subcontractor is registered prior to the bid opening.

(2) The subcontractor is registered and has paid the penalty registration fee within 24 hours after the bid opening.

(3) The subcontractor is replaced by another registered subcontractor pursuant to Public Contract Code section 4107.

16. If a mandatory pre-bid conference and site visit (“Site Visit”) is required as referenced in the Notice to Bidders, then Bidders must submit the Site Visit

Certification with their Bid. District will transmit to all prospective Bidders of record such Addenda as District in its discretion considers necessary in response to questions arising at the Site Visit. Oral statements shall not be relied upon and will not be binding or legally effective. Addenda issued by the District as a result of the

Site Visit, if any, shall constitute the sole and exclusive record and statement of the results of the Site Visit.

17. Bidders shall submit the Non-Collusion Declaration with their bids. Bids submitted without the Non-Collusion Declaration shall be deemed nonresponsive and will not be considered.

18. Bidders are required to submit the Off-Road Diesel-Fueled Fleet Certification along with their Bids, but only in cases where the Project involves the use of off-road diesel-fueled vehicles and equipment subject to regulation. Bids submitted without the Off-Road Diesel-Fueled Fleet Certification, when this certification is applicable to the Project, shall be deemed non-responsive and will not be considered.

This requirement applies solely to projects for which Off-Road Diesel-Fueled Fleet

Certification is relevant due to the nature of the work and the equipment used.

19. The Contractor and all Subcontractors under the Contractor shall pay all workers on all work performed pursuant to the Contract not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of

California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code. Copies of the general prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the Contract, as determined by Director of the Department of Industrial Relations, are available upon request at the District’s principal office. Prevailing wage rates are also available on the internet at http://www.dir.ca.gov.

This Project may be funded, in whole or in part, with federal funds. In instances where federal funding is utilized, the Contractor and all Subcontractors under the

Contractor are required to comply with the Davis-Bacon Act, applicable reporting requirements, and any other relevant federal funding requirements. Should a conflict arise between state and federal requirements, the more stringent provision shall control to ensure compliance with all applicable regulations.

20. If applicable, pursuant to Education Code section 17550, the District may require the

Bidder to purchase and to remove from the school grounds all old materials required by the specifications to be removed from any existing school building on the same school grounds and not required for school purposes and to state in his or her bid the amount which he or she will deduct from the price bid for the work as the purchase price of the old materials. In this instance, the board shall let the contract to any responsible bidder whose net bid is the lowest, or shall reject all bids.

21. If the District has elected to provide an owner-controlled insurance policy (“OCIP”), the policy limits, known exclusions, and the duration for which the policy is intended to remain effective are detailed in the OCIP Manual. In such cases, it is mandatory for all bidders to comply with the following minimum requirements: no serious and willful violations of Labor Code section 6300 et seq., a workers’ compensation experience modification factor of 1.00 or less, and an instituted injury prevention program pursuant to Labor Code section 3201.5 or 6401.7.

22. If applicable or required by the District for projects utilizing funds from the State of

California School Facility Program, as outlined in Section 17076.11 of the Education

Code, there is a mandate to achieve a participation goal for disabled veteran business enterprises (“DVBE”) of at least three percent (3%) annually of the overall dollar amount expended on state-funded projects. To fulfill this mandate by demonstrating a good faith effort, Bidders must actively seek DVBE-certified subcontractors and suppliers prior to bid submission. For any state-funded project, the selected Bidder must, upon contract award, certify compliance with DVBE participation goal procedures. The DVBE Certification Participation Form, provided for this purpose, should not be submitted with the Bid but is required with the execution of the Contract.

23. Submission of bid signifies careful examination of Contract Documents and complete understanding of the nature, extent, and location of Work to be performed. Bidders must complete the tasks listed below as a condition to bidding, and submission of a bid shall constitute the Bidder's express representation to District that Bidder has fully completed the following:

a. Bidder has visited the Site, if required, and has examined thoroughly and understood the nature and extent of the Contract Documents, Work, Site, locality, actual conditions, as-built conditions, and all local conditions and federal, state and local laws, and regulations that in any manner may affect cost, progress, performance, or furnishing of Work or that relate to any aspect of the means, methods, techniques, sequences, or procedures of construction to be employed by Bidder and safety precautions and programs incident thereto;

b. Bidder has conducted or obtained and has understood all examinations, investigations, explorations, tests, reports, and studies that pertain to the subsurface conditions, as-built conditions, underground facilities, and all other physical conditions at or contiguous to the Site or otherwise that may affect the cost, progress, performance, or furnishing of Work, as Bidder considers necessary for the performance or furnishing of Work at the Contract Sum, within the Contract Time, and in accordance with the other terms and conditions of Contract Documents, including specifically the provisions of the

General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies, or similar information or data are or will be required by Bidder for such purposes;

c. Bidder has correlated its knowledge and the results of all such observations, examinations, investigations, explorations, tests, reports, and studies with the terms and conditions of the Contract Documents;

d. Bidder has given the District prompt written notice of all conflicts, errors, ambiguities, or discrepancies that it has discovered in or among the Contract

Documents and the actual conditions, and the written resolution(s) thereof by the District is/are acceptable to Bidder;

e. Bidder has made a complete disclosure in writing to the District of all facts bearing upon any possible interest, direct or indirect, that Bidder believes any representative of the District or other officer or employee of the District presently has or will have in this Contract or in the performance thereof or in any portion of the profits thereof;

f. Bidder must, prior to bidding, perform the work, investigations, research, and analysis required by this document and that Bidder represented in its Bid

Form and Proposal and the Agreement that it performed prior to bidding.

Contractor under this Contract is charged with all information and knowledge that a reasonable bidder would ascertain from having performed this required work, investigation, research, and analysis. Bid prices must include entire cost of all work “incidental” to completion of the Work.

g. Conditions Shown on the Contract Documents: Information as to underground conditions, as-built conditions, or other conditions or obstructions, indicated in the Contract Documents, e.g., on Drawings or in

Specifications, has been obtained with reasonable care, and has been recorded in good faith. However, District only warrants, and Bidder may only rely, on the accuracy of limited types of information.

(1) As to above-ground conditions or as-built conditions shown or indicated in the Contract Documents, there is no warranty, express or implied, or any representation express or implied, that such information is correctly shown or indicated. This information is verifiable by independent investigation and Bidder is required to make such verification as a condition to bidding. In submitting its Bid, Bidder shall rely on the results of its own independent investigation.

In submitting its Bid, Bidder shall not rely on District-supplied information regarding above-ground conditions or as-built conditions.

(2) As to any subsurface condition shown or indicated in the Contract

Documents, Bidder may rely only upon the general accuracy of actual reported depths, actual reported character of materials, actual reported soil types, actual reported water conditions, or actual obstructions shown or indicated. District is not responsible for the completeness of such information for bidding or construction; nor is

District responsible in any way for any conclusions or opinions that the

Bidder has drawn from such information; nor is the District responsible for subsurface conditions that are not specifically shown (for example, District is not responsible for soil conditions in areas contiguous to areas where a subsurface condition is shown).

h. Conditions Shown in Reports and Drawings Supplied for Informational

Purposes: Reference is made to the document entitled Geotechnical Data, and the document entitled Existing Conditions, for identification of:

(1) Subsurface Conditions: Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that have been utilized by Architect in preparing the Contract Documents; and

(2) Physical Conditions: Those drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site that has been utilized by Architect in preparing the Contract

Documents.

(3) These reports and drawings are not Contract Documents and, except for any “technical” data regarding subsurface conditions specifically identified in Geotechnical Data and Existing Conditions, and underground facilities data, Bidder may not in any manner rely on the information in these reports and drawings. Subject to the foregoing, Bidder must make its own independent investigation of all conditions affecting the Work and must not rely on information provided by

District.

24. Bids shall be based on products and systems specified in Contract Documents or listed by name in Addenda. Whenever in the Specifications any materials, process, or article is indicated or specified by grade, patent, or proprietary name, or by name of manufacturer, that Specification shall be deemed to be followed by the words “or equal.” Bidder may, unless otherwise stated, offer any material, process, or article that shall be substantially equal or better in every respect to that so indicated or specified. The District is not responsible and/or liable in any way for a Contractor’s damages and/or claims related, in any way, to that Contractor’s basing its bid on any requested substitution that the District has not approved in advance and in writing.

Contractors and materials suppliers who submit requests for substitutions prior to the award of the Contract must do so in writing and in compliance with Public

Contract Code section 3400. All requests must comply with the following:

a. District must receive any notice of request for substitution of a specified item a minimum of TEN (10) calendar days prior to bid opening. The Successful

Bidder will not be allowed to substitute specified items unless properly noticed.

b. Within 35 days after the date of the Notice of Award, the Successful Bidder shall submit data substantiating the request(s) for all substitution(s) containing sufficient information to assess acceptability of product or system and impact on Project, including, without limitation, the requirements specified in the Special Conditions and the Specifications. Insufficient information shall be grounds for rejection of substitution.

c. Approved substitutions, if any, shall be listed in Addenda. District reserves the right not to act upon submittals of substitutions until after bid opening.

d. Substitutions may be requested after Contract has been awarded only if indicated in and in accordance with requirements specified in the Special

Conditions and the Specifications.

25. Bidders may examine any available “as-built” drawings of previous work by giving

District reasonable advance notice. District will not be responsible for accuracy of

“as-built” drawings. The document entitled Existing Conditions applies to all supplied

“as-built” drawings.

26. All questions about the meaning or intent of the Contract Documents are to be directed via email to the District to Desiree Wise: dwise@Lodiusd.net and

Jeremy Souza: Jsouza@Lodiusd.net. Interpretations or clarifications considered necessary by the District in response to such questions will be issued in writing by

Addenda and emailed, faxed, mailed, or delivered to all parties recorded by the

District as having received the Contract Documents or posted on the District’s website https://www.lodiusd.net/about/bonds#facilities. Questions received less than SEVEN (7) calendar days prior to the date for opening bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

27. Addenda may also be issued to modify other parts of the Contract Documents as deemed advisable by the District.

28. Each Bidder must acknowledge each Addendum in its Bid Form and Proposal by number or its Bid shall be considered non-responsive. Each Addendum shall be part of the Contract Documents. A complete listing of Addenda may be secured from the

District.

29. This Contract may include alternates. Alternates are defined as alternate products, materials, equipment, systems, methods, or major elements of the construction that may, at the District's option and under terms established in the Contract and pursuant to section 20103.8 of the Public Contract Code, be selected for the Work.

30. The District shall award the Contract, if it awards it at all, to the lowest responsive responsible bidder based on the criteria as indicated in the Notice to Bidders. In the event two or more responsible bidders submit identical bids, the District shall select the Bidder to whom to award the Contract by lot.

31. Discrepancies between written words and figures, or words and numerals, will be resolved in favor of figures or numerals.

32. Bidders in contention for contract awards shall be required to attend a Post-Bid interview, which will be set within three (3) calendar days following bid opening. A duly authorized representative of the apparent low bidder is required to attend the

Post Bid Interview, in person. The apparent low bidder’s authorized representative(s) must have (1) knowledge of how the bid submitted was prepared,

(2) the person responsible for supervising performance of the Work, and (3) the authority to bind the apparent low bidder. Failure to attend the Post Bid Interview as scheduled will be considered just cause for the District to reject the Bid as nonresponsive.

33. Any bid protest by any Bidder regarding any other bid must be submitted in writing to the District, before 5:00 p.m. of the THIRD (3rd) business day following bid opening.

a. Only a Bidder who has actually submitted a bid, and who could be awarded the Contract if the bid protest is upheld, is eligible to submit a bid protest.

Subcontractors are not eligible to submit bid protests. A Bidder may not rely on the bid protest submitted by another Bidder.

b. A bid protest must contain a complete statement of any and all bases for the protest and all supporting documentation. Materials submitted after the bid protest deadline will not be considered.

c. The protest must refer to the specific portions of all documents that form the basis for the protest.

(1) Without limitation to any other basis for protest, an inadvertent error in listing the California contractor’s license number on the Designated

Subcontractors List shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive if the correct contractor’s license number is submitted to the District within 24 hours after the bid opening and the corrected number corresponds with the submitted name and location for that subcontractor.

(2) Without limitation to any other basis for protest, an inadvertent error listing an unregistered subcontractor shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive provided that any of the following apply:

(a) The subcontractor is registered prior to the bid opening.

(b) The subcontractor is registered and has paid the penalty registration fee within 24 hours after the bid opening.

(c) The subcontractor is replaced by another registered subcontractor pursuant to Public Contract Code section 4107.

d. The protest must include the name, address and telephone number of the person representing the protesting party.

e. The party filing the protest must concurrently transmit a copy of the protest and any attached documentation to all other parties with a direct financial interest that may be adversely affected by the outcome of the protest. Such parties shall include all other bidders or proposers who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest.

f. The procedure and time limits set forth in this paragraph are mandatory and are each bidder’s sole and exclusive remedy in the event of bid protest.

Failure to comply with these procedures shall constitute a waiver of any right to further pursue the bid protest, including filing a Government Code Claim or legal proceedings.

34. The Bidder to whom Contract is awarded shall execute and submit the following documents by 5:00 p.m. of the SEVENTH (7th) calendar day following the date of the Notice of Award. Failure to properly and timely submit these documents entitles

District to reject the bid as nonresponsive.

a. Agreement: To be executed by successful Bidder. Submit three (3) copies, each bearing an original signature with Notary.

b. Escrow of Bid Documentation: This must include all required documentation.

See the document titled Escrow Bid Documentation for more information.

(If Used)

c. Performance Bond (100%): On the form provided in the Contract Documents and fully executed as indicated on the form.

d. Payment Bond (Contractor's Labor and Material Bond) (100%): On the form provided in the Contract Documents and fully executed as indicated on the form.

e. Insurance Certificates and Endorsements as required.

f. Workers’ Compensation Certification.

g. Prevailing Wage and Related Labor Requirements Certification.

h. Disabled Veteran Business Enterprise Participation Certification.

i. Drug-Free Workplace Certification.

j. Tobacco-Free Environment Certification.

k. Drug and Alcohol-Free Schools Certification.

l. Hazardous Materials Certification.

m. Lead-Based Materials Certification.

n. Imported Materials Certification.

o. Criminal Background Investigation/Fingerprinting Certification.

p. Roofing Project Certification: from Contractor, Material Manufacturer and/or

Vendor. (If applicable)

q. Registered Subcontractors List: Must include Department of Industrial

Relations (DIR) registration number of each subcontractor for all tiers.

35. Time for Completion: District may issue a Notice to Proceed within NINETY (90) days from the date of the Notice of Award. Once Contractor has received the Notice to Proceed, Contractor shall complete the Work within the period of time indicated in the Contract Documents.

a. In the event that the District desires to postpone issuing the Notice to

Proceed beyond this 90-day period, it is expressly understood that with reasonable notice to the Contractor, the District may postpone issuing the

Notice to Proceed.

b. It is further expressly understood by Contractor that Contractor shall not be entitled to any claim of additional compensation as a result of the postponement of the issuance of the Notice to Proceed beyond a 90-day period. If the Contractor believes that a postponement of issuance of the

Notice to Proceed will cause a hardship to the Contractor, the Contractor may terminate the Contract. Contractor’s termination due to a postponement beyond this 90-day period shall be by written notice to District within TEN

(10) calendar days after receipt by Contractor of District's notice of postponement.

c. It is further understood by the Contractor that in the event that Contractor terminates the Contract as a result of postponement by the District, the

District shall only be obligated to pay Contractor for the Work that Contractor had performed at the time of notification of postponement and which the

District had in writing authorized Contractor to perform prior to issuing a

Notice to Proceed.

d. Should the Contractor terminate the Contract as a result of a notice of postponement, District shall have the authority to award the Contract to the next lowest responsive responsible bidder.

36. District reserves the right to reject any or all bids, including without limitation the right to reject any or all nonconforming, nonresponsive, unbalanced, or conditional bids, to re-bid, and to reject the bid of any bidder if District believes that it would not be in the best interest of the District to make an award to that bidder, whether because the bid is not responsive or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by District.

District also reserves the right to waive any inconsequential deviations or irregularities in any bid. For purposes of this paragraph, an “unbalanced bid” is one having nominal prices for some work items and/or enhanced prices for other work items.

37. It is the policy of the District that no qualified person shall be excluded from participating in, be denied the benefits of, or otherwise be subjected to discrimination in any consideration leading to the award of contract, based on race, religious creed, color, national origin, ancestry, physical disability, mental disability, reproductive health decision-making, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or veteran or military status. The Successful Bidder and its subcontractors shall comply with applicable federal and state laws, including, but not limited to the California Fair

Employment and Housing Act, beginning with Government Code section 12900, and

Labor Code section 1735.

38. Prior to the award of Contract, District reserves the right to consider the responsibility of the Bidder. District may conduct investigations as District deems necessary to assist in the evaluation of any bid and to establish the responsibility, including, without limitation, qualifications and financial ability of Bidders, proposed subcontractors, suppliers, and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to District's satisfaction within the prescribed time.

DOCUMENT 00 21 13.1

BIDDER INFORMATION AND FORMS

District Contacts

• Desiree Wise, Maintenance & Facilities Supervisor, dwise@lodiusd.net

• Jeremy Souza, Interim Construction Project Specialist, jsouza@lodiusd.net

INTRODUCTION

The Lodi Unified School District ("District") invites proposals from qualified contractors to furnish all labor, materials, equipment, supervision, permits, transportation, installation, testing, training, and incidental services necessary to remove and dispose of the existing movable swimming pool bulkhead and provide a complete, fully operational replacement bulkhead at the Tokay High School swimming pool.

The successful proposer shall provide a turnkey installation that is complete and ready for District use.

PROJECT LOCATION

Tokay High School

1111 Century Boulevard

Lodi, California 95240

PROJECT DESCRIPTION

The project consists of replacing the existing movable competition swimming pool bulkhead with a new competition-quality fiberglass/composite bulkhead that meets current competitive swimming standards and is compatible with the existing pool configuration.

SCOPE OF SERVICES

The successful contractor shall provide all labor, supervision, materials, equipment, transportation, permits, inspections, testing, and incidentals necessary to complete the project.

Removal and Disposal of Existing Bulkhead

The Contractor shall:

• Remove the existing movable bulkhead.

• Remove all associated hardware, anchors, accessories, and obsolete components.

• Legally transport and dispose of the existing bulkhead and all associated materials off-site in accordance with all applicable federal, state, and local regulations.

• Protect all existing pool finishes, deck surfaces, gutters, lane line anchors, utilities, and surrounding facilities during demolition. Repair any damage caused by demolition or construction activities at no additional cost to the district.

Furnish New Pool Bulkhead

Provide new movable fiberglass/composite swimming pool bulkhead meeting or exceeding the following requirements:

• Custom manufactured for the existing Tokay High School pool.

• Corrosion-resistant construction suitable for continuous aquatic use.

• Meets applicable NCAA, FINA, USA Swimming, and World Aquatics competition requirements.

• Easily movable by two trained staff members.

• Positive locking system.

• Non-slip walking surface.

• Compatible with existing lane lines, gutter system, and timing equipment or provide all modifications necessary for compatibility.

• Color selected by the District.

• Equal to or better than the performance of an S.R. Smith movable bulkhead.

Installation

The Contractor shall:

• Verify all field dimensions prior to fabrication.

• Deliver and install the bulkhead.

• Perform all necessary adjustments.

• Test all moving components.

• Commission the completed installation.

Cleaning

Upon completion:

• Power wash the entire pool deck.

• Power wash accessible pool walls impacted by construction.

• Remove all construction debris.

• Leave the facility clean and ready for operation.

Training

• Provide on-site training for District staff including:

• Safe operation

• Moving procedures

• Locking procedures

• Routine maintenance

• Preventative maintenance recommendations

• The successful contractor shall comply with all prevailing wage requirements, including certified payroll reporting and all applicable California Labor Code requirements.

Minimum one (2) year warranty on installation workmanship.

Licenses Required are B or C-53

DOCUMENT 00 31 19

EXISTING CONDITIONS

1. Summary

This document describes existing conditions at or near the Project, and use of information available regarding existing conditions. This document is not part of the

Contract Documents. See General Conditions for definition(s) of terms used herein.

2. Reports and Information on Existing Conditions

a. Documents providing a general description of the Site and conditions of the

Work may have been collected by the Lodi Unified School District (“District“), its consultants, contractors, and tenants. These documents may, but are not required to, include previous contracts, contract specifications, tenant improvement contracts, as-built drawings, utility drawings, and information regarding underground facilities.

b. Information regarding existing conditions may be inspected at the District offices or the Construction Manager’s offices, if any, and copies may be obtained at cost…