Bid Notice-Storm Drain Repair Project.pdf

PDF 16 MB Posted

Attached to
Storm Drain Repair Project
Solicitation number
500259
Issued by
Placer County, California

About this file

Summary of Bid Notice - Storm Drain Repair Project

This is a sealed bid notice issued by the City of Roseville, Department of Public Works, for a storm drain repair project across five locations in the city (Royer Park/Edgemont Way/Piedmont Way, PFE Road, and East Street). The project involves re-lining aging drain pipes using cure-in-place liner technology and installing new drain pipes. Sealed proposals must be received at the City Clerk's Office, 311 Vernon Street, Roseville, California by August 4, 2026 at 3:00 p.m., with public opening and reading at 3:05 p.m. the same day. A pre-bid meeting will be held on July 21, 2026 at 3:00 p.m. at the corner of East Street and Center Street. The project manual and bidding documents are available on the City's website at https://www.roseville.ca.us/business/procurement_services/bids_rfps. Questions must be submitted by July 28, 2026. Bids will be examined and reported to the City Council within 60 business days of the bid opening, with contract award expected within 60 business days thereafter.

The City intends to award the contract to the lowest responsible bidder based on the Grand Total Bid Price and reserves the right to reject any or all bids. A bid guaranty equal to at least 10 percent of the bidder's Grand Total Price is required in the form of a Certificate of Deposit, certified or cashier's check, bidder's bond, or irrevocable standby letter of credit. Successful bidders must possess a valid Class A General Engineering Contractor's license at the time of bid submittal and maintain it throughout contract performance. The work is subject to prevailing wage requirements under California Labor Code Section 1773 for Placer County, and contractors must be registered with the Department of Industrial Relations to perform public work. All contractors and subcontractors performing work exceeding 0.5 percent of the total bid amount must be listed with their license numbers. The successful bidder must furnish two performance and payment bonds, each in an amount equal to 100 percent of the contract price, along with comprehensive insurance coverage including commercial general liability (minimum $2,000,000 per occurrence), automobile liability ($1,000,000), workers' compensation, and pollution liability insurance ($2,000,000).

View the file

Other files

File Type Posted
Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

Streets & Bridges Project Manual Name of project:

STORM DRAIN REPAIR PROJECT

Department:

Public Works - Engineering

City Project # 500259

A PE

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

TABLE OF CONTENTS

Pagination Notation

Notice to Contractors NTC

Instructions to Bidders INT

Proposal PROP

Insurance Broker Information Packet INS

Standard Construction Specifications SCS

Assembly Bill No. 626 AB 626

Special Provisions (if applicable) SP

Construction Details CD

NTC - 1

[B:\Public Works\CIP\1_Current Projects\Storm Drain Repair Project\03 Bid Documents\Project_ Manual\Working Documents\SDRP - NTC 2026.07.13.docx; 7/14/2026]

CITY OF ROSEVILLE

DEPARTMENT OF PUBLIC WORKS

Name of Project: STORM DRAIN REPAIR PROJECT

NOTICE TO CONTRACTORS

NOTICE IS HEREBY GIVEN THAT sealed Proposal will be received at the Office of the City Clerk, 311 Vernon Street, Roseville, California, until August 4th, 2026 at 3:00 p.m.

Late proposals will be rejected. No exceptions.

The Proposals will be publicly opened and read by the City Clerk or designee of the City of Roseville at 3:05 p.m. on August 4th, 2026 at the Office of the City Clerk located at 311

Vernon Street, Roseville California for the following project: STORM DRAIN REPAIR

PROJECT.

A pre-bid meeting will be held at the corner of East Street and Center Street in Roseville, California on July 21st at 3:00pm.

A Project Manual, including all Contract Documents and the Proposal forms for bidding this project, may be obtained on-line from the City of Roseville’s website at https://www.roseville.ca.us/business/procurement_services/bids_rfps. All communications relative to this project shall be conducted through Public Purchase.

Bids shall be submitted on the City’s Proposal Forms included in the Project Manual, plainly endorsed with the Bidder’s name together with signed acknowledgement of any and all addenda. Proposal Forms shall be securely sealed in a suitable envelope marked with the name

NTC - 2

[B:\Public Works\CIP\1_Current Projects\Storm Drain Repair Project\03 Bid Documents\Project_ Manual\Working Documents\SDRP - NTC 2026.07.13.docx; 7/14/2026] and address of the Bidder, and marked in capital letters on the front and back of the envelope as follows:

[NAME OF PROJECT]

(Name of Bidder)

(Address of Bidder)

Whether mailed or personally delivered, all bids shall be addressed to the City of

Roseville, Office of the City Clerk, 311 Vernon Street, Roseville, California, 95678.

Each bid must be accompanied by a Bid Guaranty in the form of a Certificate of Deposit, Certified or Cashier’s Check, Bidder’s Bond or Irrevocable Standby Letter of Credit in an amount equal to at least ten percent (10%) of the Bidder’s Grand Total Price. The Bid Guaranty will be retained by the City and applied to any and all damages sustained by the City in the event that the successful Bidder fails or refuses to enter into the Contract awarded to it and to furnish all required bonds and Certificates of Insurance. The City intends to award the Contract to the lowest responsible Bidder based on the Grand Total Bid Price for all components of the Project.

To the extent allowed by law, the City reserves the right to reject any and all bids and/or to waive any irregularities or informalities in any bid or in the bidding procedure. The City specifically reserves the right to not award the Contract after the opening of bids.

Any bid may be withdrawn at any time prior to the time fixed in the public notice for the deadline submission of bids only by written request for the withdrawal of the bid filed with the

City Clerk. The request shall be executed by the Bidder or his or her duly authorized representative. The withdrawal of a bid does not prejudice the right of the Bidder to file a new bid by the submission deadline. Whether or not bids are opened exactly at the time fixed in the

NTC - 3

[B:\Public Works\CIP\1_Current Projects\Storm Drain Repair Project\03 Bid Documents\Project_ Manual\Working Documents\SDRP - NTC 2026.07.13.docx; 7/14/2026] public notice for opening bids, a bid will not be received after the deadline submission of bids nor may any bid be withdrawn after the time fixed in the public notice for deadline for submission of bids. Immediately following the deadline for submission of bids all bids shall become the property of the City of Roseville and the City is under no obligation to return bids.

Bids will be examined and reported to the City Council within sixty (60) business days after the bid opening. Except as permitted by applicable law, no Bidder may withdraw its bid for a period of sixty (60) business days after the date of bid opening. Each Bidder will be notified of any award of the Contract by the City.

The City will affirmatively ensure non-discrimination on the basis of one or more of the following: race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, age, sexual orientation, or military and veteran status in the award and administration of contracts that it awards.

Pursuant to Public Contract Code Section 22300, the successful Bidder may submit certain securities in lieu of the City withholding retention of payments during the Project.

The City has determined that the Contractor shall possess a valid Class A, General

Engineering Contractor's license at the time that the bid is submitted, as well as any other license classification as may be required by the laws of California for the performance of the work specified in the Contract Documents. Said license shall be maintained during the Contract period. Failure to possess the specified license shall render the bid nonresponsive and will act as a bar to the award of the Contract to any Bidder not possessing such a license at the time of bid submittal. The Contractor shall provide certification of the license, its number and the expiration date on the proposal form.

NTC - 4

[B:\Public Works\CIP\1_Current Projects\Storm Drain Repair Project\03 Bid Documents\Project_ Manual\Working Documents\SDRP - NTC 2026.07.13.docx; 7/14/2026]

The work is to be done in Placer County. Pursuant to California Labor Code Section

1773, the City has ascertained the General Prevailing Rate of Wages in the County in which the work is to be done to be as determined by the Director of Industrial Relations of the State of

California. The Contractor is hereby made aware that information regarding prevailing wage rates may be obtained from the State Department of Industrial Relations and/or the following website address: http://www.dir.ca.gov/dlsr/DPreWageDetermination.htm. The Contractor is required to post a copy of the applicable wage rates at the job site. Attention is directed to

Section 7 “Legal Relations and Responsibility” of the Standard Construction Specifications.

Pursuant to Labor Code Section 1771.1(b), notice is hereby given that a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in Labor Code Sections 1720, et seq., unless currently registered and qualified to perform public work pursuant to Labor Code Section 1725.5 or exempt from registration requirements pursuant to Labor Code Section 1725.5(f). It is not a violation of Labor Code Section 1771.1 for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or

20103.5 of the Public Contract Code, provided the contractor is registered to perform work pursuant to Labor Code Section 1725.5 at the time the contract is awarded or is exempt from registration requirements pursuant to Labor Code Section 1725.5(f). The Contractor is hereby notified that this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

All questions prior to the deadline for bid submissions shall be directed to the attention of

Joe Arino via Public Purchase. The deadline for submissions of questions and clarifications

NTC - 5

[B:\Public Works\CIP\1_Current Projects\Storm Drain Repair Project\03 Bid Documents\Project_ Manual\Working Documents\SDRP - NTC 2026.07.13.docx; 7/14/2026] regarding the Contract Documents is July 28th, 2026. Only Addenda issued by the City are binding.

City Clerk, City of Roseville

Dated: _____________________________

Published: ________________________

INT - 1

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

INSTRUCTIONS TO BIDDERS

SECTION 1. GENERAL

1-1.01 GENERAL. These Instructions to Bidders form a part of the Contract

Documents. Capitalized terms are defined in Standard Construction Specifications Section 1.

1-1.02 EXAMINATION OF PLANS, CONTRACT DOCUMENTS AND

SITE OF THE WORK. The Bidder shall examine carefully the site of the Work and all the

Contract Documents, including these Instructions to Bidders, and shall inform itself of the conditions relating to the execution of the Work. Failure to do so will not relieve the successful

Bidder of its obligation to enter into an Agreement and complete the Work in strict accordance with the Contract Documents. Conditions relating to the execution of the Work include the requirements of federal, state, and local laws, statutes and ordinances relative to the execution of

Work, including, but not limited to, applicable regulations concerning prevailing wage rates, non-discrimination in the employment of labor, protection of the public, employee health and safety, and environmental protection.

The submission of a bid shall be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and scope of Work to be performed, the quantities of materials to be furnished, and as to the requirements of all the

Contract Documents.

1-1.03 EXISTING INFORMATION. Where the Department has made investigations of site conditions, including subsurface conditions in areas where Work is to be performed under the Contract, such investigations are made only for the purpose of study and design. City does not represent that such conditions as found in these investigations or inferences or conclusions drawn as a result of these investigations will represent actual site

INT - 2

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024] conditions and hereby disclaims any liability as a result of Contractor’s or Bidder’s reliance on such investigations. City will presume that all Bidders have conducted their own site investigations, including investigations of subsurface conditions. Where such investigations have been made, Bidders or Contractors may, upon written request, inspect the records of the

Department as to such investigations subject to the conditions set forth in these Instructions to

Bidders. Such inspection of records may be made only at the location noted above. The records of such investigations are not a part of the Contract Documents and are shown solely for the convenience of the Bidder or Contractor. The City assumes no responsibility whatsoever with respect to the sufficiency or accuracy of the investigations made, the records thereof, or of the interpretations set forth therein or made by the City in its use thereof. The City makes no warranty or guarantee, either express or implied, that the conditions indicated by such investigations or records are representative of those existing throughout such areas, or any part thereof, or that unforeseen developments may not occur, or that materials other than, or in proportions different from those indicated, may not be encountered.

No information derived from such inspection of records of investigations or compilation thereof made by the City, the Department or from the Engineer, or his or her assistants, will in any way relieve the Bidder or Contractor from properly examining the site and making such additional investigations as it may elect, or from properly fulfilling the terms of the Contract.

INT - 3

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

SECTION 2: BID REQUIREMENTS

2-1.01 PROPOSAL FORMS. The Department will furnish to each Bidder standard Proposal Forms, which, when filled out and executed may be submitted as the bid.

Proposals shall include all pages in the Project Manual with page numbers marked “PROP” plus the Addendum acknowledgment form (front sheet) from all Addenda received by the Bidder.

Proposals shall be removed from the Project Manual. The full Project Manual shall not be submitted with the proposal. Bids not presented on forms so furnished will be disregarded.

The Proposal and one (1) copy thereof shall be submitted as directed in the “Notice to

Contractors” under sealed cover plainly marked as a Proposal, and identifying the project to which the Proposal relates and the date of the bid opening therefor. Proposals which are not properly marked may be disregarded.

All blank spaces in the Proposal must be completed, as required, in ink. All price information shall be shown, clearly legible, in figures where required.

The Bidder shall sign the Proposal in the blank space provided therefor. If the Bidder is the sole owner, the Proposal shall be signed by the owner. If the Bidder is a corporation, the legal name of the corporation and its State of incorporation shall be set forth and the Proposal shall be signed by at least two officers authorized to sign contracts on behalf of the corporation.

If the Bidder is a partnership, the true name of the firm shall be set forth, the names and addresses of all partners shall be given and the Proposal shall be signed by a partner in the firm authorized to sign contracts on behalf of the partnership. If the Bidder is a joint venture, the

Proposal shall be signed on behalf of each participating company by officers or other individuals who have the full and proper authorization to do so. If the Proposal is signed by an agent of the

Bidder other than an officer of a corporation or a member of a partnership, a notarized Power of

INT - 4

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

Attorney must be on file with the City prior to opening of bids or must be submitted with the

Proposal. If requested by the City, the Bidder shall promptly submit evidence satisfactory to the

City of the authority of the person signing the Proposal.

2-1.02 SUBMISSION OF BIDS. Bids must be submitted at the prescribed time and location specified in the Notice to Contractors. Any submission received after the prescribed time shall be rejected, regardless of whether or not bids are opened exactly at the prescribed time.

Any unauthorized conditions or qualifications entered on, or changes made to, the

Proposal may render it invalid and may cause its rejection.

No telegraphic, telephonic, or facsimile or other electronically transmitted bids will be considered.

2-1.03 REQUIRED LISTING OF PROPOSED SUBCONTRACTORS. Each

Proposal shall list the name, address and Contractor license number of each Subcontractor to whom the Bidder proposes to subcontract portions of the Work in an amount in excess of one-half of one percent (0.5%) of its total bid, in accordance with Section 4100 to 4114, inclusive, of the Public Contract Code for the State of California. The Bidder shall list the Subcontractor’s license number and the portion of the Work that will be done by each Subcontractor. If the

Bidder fails to specify a Subcontractor for any portion of the Work, the Bidder agrees to perform that portion of the Work itself, and represents that it is qualified to perform that portion of the

Work itself. The Bidder's attention is invited to other provisions of the Public Contract Code related to the imposition of penalties for a failure to observe its provisions by using unauthorized

Subcontractors or by making unauthorized substitutions.

INT - 5

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

2-1.04 CONTRACTOR’S LICENSING LAWS. Attention is directed to the provisions of Business and Professions Code Chapter 9 of Division 3 concerning the licensing of

Contractors.

All Bidders at the time of bid submittal shall be licensed as Contractors in accordance with the laws of this State. Any Bidder or Contractor not so licensed is subject to the penalties imposed by such laws. The form of Contractor's license required is stated in the Notice to

Contractors, provided that the City makes no representation as to whether the State may require other or additional licenses. It is the Bidder's and Contractor's responsibility to obtain the correct

Contractor's licenses. Bidders shall be skilled and regularly engaged in the general class or type of Work called for under this Contract.

All Bidders and Contractors, including Subcontractors, shall have a current City business license before undertaking any Work.

2-1.05 NONCOLLUSION DECLARATION. By submitting a bid, the Bidder represents and warrants that such bid is genuine and not a sham or collusive or made in the interest or on the behalf of any person therein named, and that the Bidder has not, directly or indirectly, included or solicited any other Bidder to put in a sham bid, or any other person, firm, or corporation to refrain from bidding, and that the Bidder has not in any manner sought collusion to secure the Bidder an advantage over any other Bidder.

Bidders shall submit a properly completed and executed “Noncollusion Declaration” in the form required by Public Contract Code Section 7106 and provided with the Proposal (PROP-

11).

2-1.06 DISQUALIFICATION, REMOVAL OR OTHER PREVENTION OF

BIDDING. A bid may be rejected on the basis of a Bidder, any officer of such Bidder, or any

INT - 6

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024] employee of such Bidder who has a proprietary interest in such Bidder, having been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local project because of a violation of law or a safety regulation.

2-1.07 PROPOSAL GUARANTY. All bids shall be accompanied by one of the following forms of Bidder's security: Cash, a cashier's check, a certified check, or a Bidder's bond executed by an admitted California surety insurer, made payable to the City of Roseville, or any other form of security deemed acceptable by the City Attorney. The security shall be in an amount equal to at least ten percent (10%) of the amount bid. A bid will not be considered unless one of the form of Bidder's security is enclosed with it.

A Bidder's bond shall conform to the City's bond form in the Proposal and shall be properly filled out and executed.

2-1.08 SCHEDULE OF BID PRICES. Bidders are directed to submit firm unit and lump sum prices for all Work set forth in the Contract Documents on the Proposal Form entitled “Schedule of Bid Prices.”

Unit prices and lump sum prices, as indicated, must be entered in the appropriate spaces provided in the Schedule of Bid Prices. If applicable, unit prices shall be multiplied by the quantities shown, and the total shall be inserted in the Amount column. In the event of any error or discrepancy between the unit price and the calculated amount, the unit prices shall govern.

The City may correct any mathematical errors apparent on the face of the bid.

The amounts shown in the Amount column must be added together in arriving at the

Grand Total Bid Price.

Amounts for Allowance bid items must be entered in the exact amount in the Amount column.

INT - 7

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

The prices included within the Schedule of Bid Prices shall include all costs for labor, materials, tools, equipment, services, Subcontractors, suppliers, taxes, insurance, shipment, delivery, overhead, profit, and all other costs necessary to perform the Work in accordance with the Contract Documents.

The Grand Total Bid Price shall be indicated in the Summary table form included with the Schedule of Bid Prices. The Grand Total Bid Price shall be the sum of the amounts bid for each of the designated portions of the Work, as more specifically described on the Schedule of

Bid Prices form itself.

Full compensation for complying with the Contract Documents, including requirements of the Standard Specifications, the Standard Construction Specifications, Supplemental

Conditions, and all warranties, shall be considered included in the bid items and no additional compensation shall be allowed therefor.

Full compensation for completion of all work as shown on the plans, as specified in the

Specifications, and as directed by the City, shall be considered included in the bid items and no additional compensation shall be allowed.

Bidders are strongly discouraged from submitting unbalanced bids. As used herein, the term “unbalanced bid” is defined as any bid that does not include a reasonable proportionate allocation of indirect costs and profit of each bid item indicated in the Schedule of Bid Prices.

The City reserves the right to reject any unbalanced bid if the City determines that there is a reasonable doubt that an acceptance of the bid will not result in the lowest ultimate cost to the

City with regard to the work or a disproportionate distribution of contract funds.

The City reserves the right to delete any bid item in its entirety and/or significantly reduce the quantity of Work under a bid item. The City makes no representation that any Work

INT - 8

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024] under a bid item will be performed during the course of the Project or that the Work will be performed at the quantities included in the Schedule of Bid Prices. As provided in the Standard

Construction Specifications, for any deleted Work, Contractor shall not be entitled to payment of the indirect costs and profit included for said bid item. All bid items shall be considered distinct and severable from the remaining bid items, and each Bidder acts at its peril if its bid is unbalanced.

The City shall compare bids on the basis of the Grand Total Bid Price, which includes the base bid and any alternates designated on the Schedule of Bid Prices. Alternates may or may not be awarded, or may be awarded in any combination, at the City’s discretion.

2-1.09 WITHDRAWAL OF PROPOSALS. Any bid may be withdrawn at any time prior to the time fixed in the Notice to Contractors for the opening of bids, provided that a request in writing, executed by the Bidder or its duly authorized representative, for the withdrawal of such bid is filed with the City Clerk. Facsimile and electronic mail requests are not acceptable. The withdrawal of a bid shall not prejudice the right of a Bidder to file a new bid. The withdrawal of any bid after the time fixed in the Notice to Contractors for the opening of bids will not be permitted.

2-1.10 ADDENDUM. Proposals shall include all costs and account for all

Addenda issued prior to opening of bids. The Bidder is responsible for verifying that all issued

Addenda have been received. An Addendum acknowledgment form for each Addendum shall be included as part of the Proposal submittal.

2-1.11 PUBLIC OPENING OF PROPOSALS. Proposals will be publicly opened and read at the time and place indicated in the Notice to Contractors. Bidders or their authorized agents are invited to be present.

INT - 9

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

2-1.12 TRENCHING AND EXCAVATION WORK. In accordance with the provisions of California Labor Code Section 6707, if the Work involves construction of a pipeline, sewer, sewage disposal system, boring or jacking pits, or similar trenches or open excavations, which are five feet (5') or deeper, each bid submitted shall contain, as a bid item, adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life or limb, which shall conform to all applicable safety orders.

INT - 10

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

SECTION 3: EVALUATION OF BIDS

3-1.01 BID EVALUATION PROCESS. Bids will be evaluated to determine the apparent low Bidder. The apparent low Bidder will be determined on the basis of the Grand

Total Bid Price, as shown in the Schedule of Bid Prices. If additive or deductive alternates are used in the Schedule of Bid Prices, the apparent low Bidder will be the Bidder with the lowest total of the bid prices for base contract items plus the alternates designated by the City as those that will be used for determining the lowest bid price. However, the City reserves the right to (1) not award any alternates or (2) award any combination of alternates.

In case of discrepancy between the total of the base contract items and any specified alternates and the stated Grand Total Bid Price, the total of the base contract items plus specified alternates shall prevail. Any mathematical errors that appear on the face of the bid will be corrected by the City and the City will use the mathematically corrected addition. For example, if the mathematical total of Bidder’s base contract items plus specified alternates equals

$1,000,000, but the Bidder has written $1,250,000 as the Grand Total Bid Price, the City will consider $1,000,000 to be the Bidder’s Grand Total Bid Price for purposes of comparison to other Bidders and actual bid award. The City reserves its rights to reject or accept bids based on discrepancies between the stated Grand Total Bid Price and the actual mathematical total of the base contract bid items, plus specified alternates.

3-1.02 REJECTION OF IRREGULAR PROPOSALS. Proposals may be rejected in the City's sole discretion if they show any alterations of form, additions not called for, conditional bids, incomplete bids, erasures, or irregularities of any kind. However, the City reserves the right to waive any minor irregularities and informalities in any bid or in the bid procedure for any reason.

INT - 11

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

3-1.03 COMPETITIVE BIDDING. If more than one proposal is offered by any individual, firm, partnership, corporation, association, or any combination thereof, under the same or different names, all such proposals may be rejected. A party who has quoted prices on materials or Work to a Bidder is not thereby disqualified from quoting prices to other Bidders, or from submitting a bid directly for the materials or Work.

All Bidders are put on notice that any collusive agreement to control or affect the awarding of this Contract is in violation of the competitive bidding requirements of the City

Charter, State Contract Act and the Business and Professions Code and may render void any

Contract let under such circumstances.

3-1.04 RELIEF OF BIDDERS. If the Bidder claims a mistake was made in its bid, the Bidder shall give the Department written notice within five (5) Days after the opening of the bids of the alleged mistake, specifying in the notice in detail how the mistake occurred. No relief from a claimed mistaken bid shall be granted unless such mistake clearly appears on the face of the bid submitted to the City. Claimed mistakes on backup worksheets, spreadsheets, computerized bidding programs, or any other similar calculative bidding mistake which is not apparent on the face of the bid shall not under any circumstance be considered as a basis for relief. The burden of proving the occurrence of a mistake entitling a Bidder to relief from its bid rests entirely on the Bidder. Relief from bids shall be in the City's sole discretion.

INT - 12

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

SECTION 4: AWARD AND EXECUTION OF CONTRACT

4-1.01 AWARD OF CONTRACT. The City reserves the right to reject any and all proposals and to award (or not award) any combination of bid items at its option. Any such award will be to the lowest responsible Bidder whose proposal complies with the requirements prescribed for the bid items awarded. Such award, if made, will be made within sixty (60) business days after the opening of the proposals. If the lowest responsible Bidder refuses or fails to execute the Contract, or provide an acceptable Performance Bond, Payment Bond, and insurance certificate(s), the City may award the Contract to the second lowest responsible

Bidder. Such award, if made, will be made within eighty-two (82) business days after the opening of proposals. If the second lowest responsible Bidder refuses or fails to execute the

Contract, or provide an acceptable Performance Bond, Payment Bond, and insurance certificate(s), the City may award the Contract to the third lowest responsible Bidder. Such award, if made, will be made within one hundred four (104) business days after the opening of the proposals. The above time periods within which the award of Contract may be made are subject to extension for such further period as may be agreed upon in writing between the City and the Bidder concerned.

4-1.02 RETURN OF BIDDER’S SECURITIES. Within ten (10) Days after the award of the Contract, the City Clerk will return all Bidders' securities, other than Bidders' bonds, accompanying the proposals that are not to be further considered in making the award.

Retained Bidders' securities will be held until the Contract has been fully executed, after which all Bidders' securities, except Bidders' bonds and any Bidders' securities that have been forfeited, will be returned.

INT - 13

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

4-1.03 CONTRACT BONDS. The successful Bidder shall furnish two (2) bonds in the form contained in the section entitled Insurance Broker Information Packet and

Bonds. One (1) bond shall secure the payment of the claims of laborers, mechanics or materialmen employed on the Work under the Contract, and the other bond shall guarantee the faithful performance of the Contract.

Each of the two (2) bonds shall be in a sum equal to one hundred percent (100%) of the

Contract Price. If the Contract Price increases by the issuance of Change Orders, the penal amounts of the bonds required shall increase accordingly. Sureties on each of said bonds shall be satisfactory to the City.

All alterations, extensions of time, extra and additional Work, and other changes authorized by the Standard Specifications, the Standard Construction Specifications, the

Supplemental Conditions or any part of the Contract may be made without securing the consent of the surety or sureties on the Contract bonds.

Furthermore, the successful Bidder shall furnish a certificate from the County Clerk as required by California Civil Code of Procedure Section 995.660(a)(3).

4-1.04 INSURANCE. At the time of the execution of the Contract, the

Contractor shall, at its own expense, procure, and at all times during the prosecution of the Work maintain in full force and effect Worker's Compensation Insurance, and Liability Insurance as specified in the Standard Construction Specifications. The Contractor shall provide a Certificate of Insurance in the form contained in the section entitled Insurance Broker Information Packet.

4-1.05 EXECUTION OF CONTRACT. The Contract shall be signed by the successful Bidder and returned, together with all the required Contract bonds and insurance

INT - 14

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024] certificates, within fifteen (15) Days after the Contract has been awarded, or as otherwise directed, in writing, by the City.

If the Bidder is an individual, the Contract shall be executed personally by the Bidder. If the Bidder is a partnership, it is desirable that the Contract be executed by all of the partners, but it may be executed by one of them. If the Bidder is a corporation, it must be executed by two officers of the corporation consisting of (1) the chairman of the board, president or vice president; and (2) the secretary, assistant secretary, chief financial officer, treasurer or assistant treasurer, or by a person authorized by the corporation to execute written contracts on its behalf, and the corporate seal affixed thereto. In the alternative, a person other than an officer may sign the Contract, provided evidence satisfactory to the City is provided indicating the individual’s authority to bind the corporation. If the corporate seal is not affixed to the Contract, or if it is executed by a person other than officers, or only by one officer, there must be attached to the

Contract a certified copy of a resolution of the corporation authorizing such officer or person to execute written contracts for and on behalf of the corporation. If the Bidder is a joint venture, the Contract must be executed on behalf of each participating firm by officers or other individuals who have the full and proper authorization to do so.

4-1.06 FAILURE TO EXECUTE CONTRACT. Failure of the lowest responsible Bidder, the second lowest responsible Bidder, or the third lowest responsible Bidder to execute the Contract and file acceptable bonds and insurance as provided within fifteen (15)

Days after the Contract has been awarded, or as otherwise directed, in writing, by the City, shall be just cause for annulment of the award and forfeiture of the Bidder's security. The successful

Bidder may file with the City Clerk a written notice, signed by the Bidder or Bidder's authorized representative, specifying that the Bidder will refuse to execute the Contract if presented to

INT - 15

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

Bidder. The filing of such notice shall have the same force and effect as the failure of the Bidder to execute the Contract and furnish acceptable bonds within the time prescribed.

INT - 16

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

SECTION 5: BID PROTEST PROCEDURES

5-1.01 POLICY/PROCEDURES. It is the policy of the City to consider fully and adjudicate promptly protests filed by prospective Bidders relating to the City’s bidding procedure or award of the Contract. Protests shall be filed and processed in accordance with

Section 4.12.150 of the Roseville Municipal Code. A Bidder’s failure to follow the bid protest procedures may result in rejection of the protest by the City.

PROP - 1

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

PROPOSAL TO THE DEPARTMENT OF ________________________

Project:_______________________________________

Name of Bidder _________________________________ Business Phone ________________

Business Address _______________________________________________________________

Place of Business _______________________________________________________________

Contractor’s License No. ______________________________________

License Expiration Date_______________________________________

License Classification Type __________________________________________

DIR Registration No. _________________________________________

Type of business organization:

*If a Corporation, incorporated under the laws of the State of:

The undersigned Bidder herewith submits this Proposal and binds itself on award by the

City of Roseville under this bid to execute a Contract in accordance with its bid and the Contract

Documents.

The Notice to Contractors, Instructions to Bidders, Form of Agreement, Standard

Specifications, Standard Construction Specifications, Supplemental Conditions, Contract

Drawings, and Addenda, if any, are made part of this bid and all provisions thereof are hereby accepted, and all representations and warranties are required thereby are hereby affirmed.

The work to be done is described in the Bidding Documents entitled _______________

____________________________________________________, City of Roseville, California.

This offer shall be irrevocable for a period of sixty (60) Days after the date on which bids are opened.

PROP - 2

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

The undersigned Bidder understands that any clarification made to the above or any new and different conditions or information submitted on or with its Proposal, other than that requested, may render the bid non-responsive.

The undersigned, as Bidder, declares that the only persons or parties interested in this

Proposal as principals are those named herein; that this Proposal is made without collusion with any other person, firm, or corporation; that the Bidder has carefully examined the location of the proposed Work, the attached Form of Agreement, and the plans, Specifications, and other

Contract Documents; and agrees if this Proposal is accepted, that it will contract with the City of

Roseville, in the form of a copy of the Agreement contained in the Project Manual, to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the Contract Documents, in the manner and time therein prescribed, and according to the requirements of the Director, as therein set forth, and that the

Bidder will take in full payment therefore prices indicated in the Schedule of Bid Items, including all work modified by addendum numbers ________________. (IF NONE, STATE

NONE).

Bids are required for all Bid Items. The amount of the Bid for comparison purposes will be the total of all items awarded.

The Bidder shall set forth for each item of work, in clearly legible figures, an item

(“unit”) price and a total for the item in the respective spaces provided for this purpose in the

Schedule of Bid Items.

The prices included within the Schedule of Bid Items include all costs for labor, materials, tools, equipment, services, Subcontractors, suppliers, taxes, insurance, shipment, PROP - 3

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024] delivery, overhead, profit, and for all other costs necessary to perform the Work in accordance with the Contract Documents.

Accompanying this Proposal is _______________________________________________.

(Notice: Insert the words “Cash $_________,” “Cashier's Check,” “Certified Check,” or

“Bidder's Bond,” as the case may be, in an amount equal to at least ten percent (10%) of the total of the Bid.)

The names of all persons interested in the foregoing Proposal as Principals, are as follows: ______________________________________________________________________

If SOLE OWNER, execute here:

I sign as sole owner of the business named above:

If PARTNERSHIP, one or more partners sign here:

The undersigned certify that we are partners in the business named above and that we sign this bid with the full authority to do so:

PROP - 4

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

If CORPORATION, execute here:

Corporate Name: _______________________________________

Incorporated under the laws of the State of ____________________________________

The undersigned certify that they sign this bid with the full and proper authorization so to do:

By Signature of Authorized Official*

Title

Typewritten or Printed Name

By

If JOINT VENTURE, execute here:

Joint Venture name composed of:

The undersigned certify that they sign this bid with the full and proper authorization so to do:

*If Bidder is a partnership or Joint Venture, give the full names of all partners and/or Joint

Ventures in the space provided (use additional sheet if required). If Bidder is a corporation, two signatures are required as follows: (1) the Chairman, President, or Vice-President and (2) the

Secretary, Assistant Secretary, Chief Financial Officer, Treasurer, or Assistant Treasurer. In the alternative, this Agreement may be executed by a single officer or a person other than an officer provided that evidence satisfactory to City is provided demonstrating that such individual is

PROP - 5

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024] authorized to bind the corporation (example, a copy of a certified resolution from the corporation’s board or a copy of the corporation’s bylaws).

[LIST OF SUBCONTRACTORS FOLLOWS ON NEXT PAGE.]

PROP - 6

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

LIST OF SUBCONTRACTORS

Contractor’s Name: _________________________________

The Bidder is required to furnish the following information in accordance with the provisions of Section 4100 and 4114, inclusive, of the Public Contract Code of the State of

California. This list and information shall include all Subcontractors that perform work, provide labor or render services to the Bidder in connection with the Project in an amount in excess of one-half of one percent (0.5%) of the total amount of the Bidder Grand Total Price.

PORTION/

TYPE OF

WORK

% OF

CONTRACT

SUB-

CONTRACTOR’S

NAME

CONTRACTOR

LICENSE NO. DIR REG NO. BUSINESS ADDRESS

(CITY, STATE)

PROP - 7

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

SECURITY FOR COMPENSATION CERTIFICATE

(Required by California Labor Code Section 1861)

TO: City Council City of Roseville

I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.

(Signature of Bidder)

Business Address

Telephone

PROP - 8

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

BIDDER’S BOND

City Council of the City of Roseville

KNOW ALL MEN BY THESE PRESENTS:

That we ________________________________________________________________

___________________________________________________________, as PRINCIPAL, and a, __________________________________________ and duly authorized to transact business under the laws of the State of California, as SURETY, are held and firmly bound unto the City of

Roseville in the penal sum of _______________________________________________ dollars

($________________), being at least TEN PERCENT (10%) OF THE TOTAL AMOUNT OF

THE BID of the Principal above named, submitted by said Principal to the City of Roseville, acting by and through the Public Works Director, for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, to the Director of the Department to which said Bid was submitted, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH,

That whereas the Principal has submitted the above-mentioned Bid to the City Council of the City of Roseville, as aforesaid, for certain construction specifically described as follows, for which Bids are to be opened at the Office of the City Clerk located at 311 Vernon Street, Roseville, California, on ____________________________, 20__ FOR

(Copy here the exact title of work as it appears on the Proposal.)

PROP - 9

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

NOW, THEREFORE, IF THE AFORESAID PRINCIPAL is awarded the Contract and, within the time and manner required under the Contract Documents, after the prescribed forms are presented for signature, enters into a written Contract, in the prescribed form, in accordance with the Bid, and files all insurance and two (2) Bonds with the Department, one (1) to guarantee

Faithful Performance and the other to guarantee Payment for Labor and Materials, as required by law, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.

IN WITNESS WHEREOF, we have hereunto set our hands and seals on this _____ day of _____________________, 20___.

______________________________(Seal)

______________________________(Seal)

______________________________(Seal) Principal

______________________________(Seal)

______________________________(Seal)

______________________________(Seal) Surety

Business Address

NOTE: To be considered complete, both the Principal and the Surety must sign this Bidder’s

Bond. In addition, signatures of those executing for the Surety must be properly acknowledged.

PROP - 10

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

Project ____________________________

Contractor _________________________

SCHEDULE OF BID ITEMS

2026 Storm Drain Repair Project 500259 Contractor ___________________________________________

Item No. Unit Quantity Unit Price

1 LS 1 $_________

2 LS 1 $_________

3 LS 1 $_________

4 CY 100 $_________

5 SF 9,050 $_________

6 TON 170 $_________

7 LF 17 $_________

8 EA 4 $_________

9 EA 2 $_________

10 EA 4 $_________

11 LF 54 $_________

12 LF 250 $_________

13 LF 88 $_________

14 LF 754 $_________

15 EA 3 $_________

16 EA 1 $_________

17 EA 1 $_________

18 LF 150 $_________

19 LF 682 $_________

20 LF 898 $_________

21 SF 200 $_________

22 LS 1 $_________

23 SF 200 $_________

Base Bid Construction Total $_______________

TEMPORARY PAVEMENT DELINEATION $_______________

THERMOPLASTIC PAVEMENT MARKINGS, STRIPING, AND MARKERS $_______________

REMOVE PAVEMENT MARKINGS, STRIPING, AND MARKERS $_______________

DYNALINER 12" $_______________

DYNALINER 15" $_______________

DYNALINER 18" $_______________

72" DRAINAGE MANHOLE $_______________

84" DRAINAGE MANHOLE $_______________

REMOVE AND REPLACE 4" VCP SEWER SERVICE $_______________

42" RCP CL4 $_______________

48" RCP CL4 $_______________

10" DIP $_______________

12" RCP CL4 $_______________

TYPE-C DRAIN INLET $_______________

REMOVE EXISTING DRAIN PIPE AND DI $_______________

CURB RAMPS ST-26 $_______________

HOT MIX ASPHALT (1/2", TYPE A) $_______________

SLURRY CEMENT INVERT REPAIR $_______________

UNSUITABLE MATERIAL REMOVAL $_______________

COLD PLANE 2"

TRAFFIC CONTROL $_______________

$_______________PLACEMENT AND MAINTENANCE OF BMPS

Project Name:

Project No.

Item Description Item Total

MOBILIZATION $_______________

Project: Royer Park, Edgemont Wy., Piedmont Wy.

Schedule of Bid Items - Base Bid

Item No. Unit Quantity Unit Price

A1 LS 1 $_________

A2 LS 1 $_________

A3 EA 2 $_________

A4 LS 1 $_________

A5 TON 10 $_________

A6 CY 5 $_________

A7 LF 229 $_________

A8 LF 102 $_________

A9 EA 2 $_________

A10 EA 1 $_________

A11 LF 60 $_________

Item No. Unit Quantity Unit Price

B1 LS 1 $_________

B2 LS 1 $_________

B3 LS 1 $_________

B4 CY 53 $_________

B5 TON 5 $_________

B6 CY 485 $_________

B7 LF 16 $_________

B8 EA 1 $_________

B9 EA 1 $_________

B10 LF 312 $_________

B11 EA 2 $_________

B12 LF 50 $_________

B13 LF 50 $_________

Add-Alt 2 Bid Construction Total $_______________

REMOVE AND REPLACE FRENCH DRAIN $_______________

6' GOOD-NEIGHBOR WOOD FENCE $_______________

48" DRAINAGE MANHOLE $_______________

12" DIP $_______________

TYPE-C DRAIN INLET (HOODLESS) $_______________

TYPE-C DRAIN INLET $_______________

TYPE-1 ROLLED CURB AND GUTTER $_______________

AGGREGATE BASE CLASS II $_______________

HOT MIX ASPHALT (1/2", TYPE A) $_______________

PLACEMENT AND MAINTENANCE OF BMPS $_______________

ROADWAY EXCAVATION $_______________

MOBILIZATION $_______________

TRAFFIC CONTROL $_______________

Item Description Item Total

Schedule of Bid Items - Add-Alternate 1

Project: PFE Rd.

Schedule of Bid Items - Add-Alternate 2

Add-Alt 1 Bid Construction Total $_______________

15" HDPE $_______________

Project: East St.

TYPE-C DRAIN INLET $_______________

TYPE-2 VERTICAL CURB AND GUTTER $_______________

PCC 3' V-GUTTER $_______________

REMOVE DI $_______________

HOT MIX ASPHALT (1/2", TYPE A) $_______________

AGGREGATE BASE CLASS II $_______________

Item Description Item Total

MOBILIZATION $_______________

TRAFFIC CONTROL $_______________

PORTABLE CHANGEABLE MESSAGE SIGNS (PCMS) $_______________

PLACEMENT AND MAINTENANCE OF BMPS $_______________

PROP - 11

[B:\City Attorney\agreement\form agreements\Project Manuals\streets & bridges project manual.docx; 1/18/2024]

NONCOLLUSION DECLARATION TO BE EXECUTED BY

BIDDER AND SUBMITTED WITH BID

The undersigned declares:

I am the _________________ of ______________________, the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other Bidder. All statements contained in the bid are true.

This is the start of the file's text. The full file is on GovTribe.