This is a Bid Notice and Contract Proposal document issued by the Kansas Department of Transportation (KDOT) for a grading, bridge, and surfacing project in Sedgwick County. The project involves work on US-54 Bridge 132 (Flood Control Canal) located 0.20 miles east of Hoover Road, covering a length of 0.175 miles. The scope of work includes grading, bridge construction, and surfacing operations with multiple construction phases. Electronic proposals must be submitted through the Bid Express website by 1:00 P.M. Local Time on the letting date of July 22, 2026, with proposals opening and bids read at 3:00 P.M. that same day. The contractor shall execute the contract within ten business days after notice of award and complete the work according to the times specified in the Project Special Provision "Work Schedule." The project includes 148 line items spanning multiple sections including common items, road items, bridge construction for two bridge structures, concrete and asphalt surfacing, signing, pavement marking, lighting, seeding, and traffic control. Set prices are established for specific items including water for various purposes ($40.00 per million gallons), flagger services ($30.00 per hour), and foundation stabilization ($40.00 per cubic yard).

The project is funded through Federal/State sources under Federal Project Number NHPP-A016(105) and State Project Number U054-087 KA 0161-05. Contractors must be prequalified with KDOT and obtain a current Tax Clearance Certificate from the Kansas Department of Revenue at the time of contract award. Required contract provisions include certifications for noncollusion and debarment history, financial prequalification, limitations on federal funds for lobbying, EEO and affirmative action compliance, price adjustment options for fuel and asphalt materials, and compliance with federal restrictions on foreign unmanned aerial systems. Contractors may accept or reject provisions for fuel price adjustment and asphalt material price adjustment. The proposal must include completion of Special Provisions I through IV and potentially V through XVII, with the secretary having authority to reject non-responsive proposals. Contractors must notify KDOT of their intent to bid as prime contractors by 5:00 P.M. on the Monday preceding the letting date and examine bidding documents through KDOT's website or the Sedgwick County Clerk's Office.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dwight D. Eisenhower State Office Building 700 S.W. Harrison Street Topeka, KS 66603-3745

Phone: 785-296-3576 Hearing Impaired - 711 publicinfo@ksdot.org http://www.ksdot.org

Bureau of Construction and Materials

FEDERAL PROJECT NUMBER: NHPP-A016(105)

STATE PROJECT NUMBER: U054-087 KA 0161-05

CALL ORDER NUMBER: 253

PROPOSAL NUMBER: 526072535

LETTING DATE 07/22/2026

COUNTY: SEDGWICK

FUND TYPE: FEDERAL

WICHITA WESTKDOT CONSTRUCTION OFFICE:

PROJECT DESCRIPTION

GRADING, BRIDGE AND SURFACING. US-54: BR 132 (FLOOD

CONTROL CANAL) LOC .20 MI E OF HOOVER RD IN SG CO. LGTH IS

0.175 MI.

RESTRICTED DAYS

(See Special Provisions)

TOTAL CONTRACT DAYS

(See Special Provisions)

SEE SPECIAL PROVISION

SEE SPECIAL PROVISION

Earliest Start Date:

Latest Start Date:

9:46:59AM6/16/2026 @

Letting 07/22/2026 Kansas Department of Transportation Project No. U054-087 KA 0161-05

Contract No. 526072535

U054-087 KA 0161-05 NHPP-A016(105)

CONTRACT PROPOSAL

DOT Form No. 202 Rev. 02/19

Contract ID: 526072535

1. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas, said work known as Project No.:

U054-087 KA 0161-05 / NHPP-A016(105)

The general scope, location and net length are:

GRADING, BRIDGE AND SURFACING. US-54: BR 132 (FLOOD

CONTROL CANAL) LOC .20 MI E OF HOOVER RD IN SG CO. LGTH IS

0.175 MI.

2. This is the Proposal of

[Contractor] to complete the Project for the amount set out in the accompanying Unit

Prices List.

3. The Contractor makes the following ties and riders as part of its Proposal in addition to state ties, if any:

4. Contractors and other interested entities may examine the Bidding Proposal Form/

Contract Documents (see paragraph 11 below) at the County Clerk's Office in the County in which the Project is located and at the Kansas Department of Transportation [KODT] Bureau of Construction and Materials, Eisenhower State Office Building, 700 SW Harrison, Topeka, Kansas 66603. Contractors may examine and print the Bidding Proposal Form/Contract

Documents by using KDOT's website at http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors" and "Highway Letting Information",and using the links provided in the Project information for this project. KDOT will not print and mail paper copies of Proposal Forms. Contractors shall notify KDOT of their intent to bid as a prime contractor by identifying themselves as a Bid Holder on the website above.

Contractors shall furnish this notice no later than 5:00 P.M. on the Monday preceding the scheduled Letting Date. For a fee, Contractors and other interested entities may order paper copies of the KDOT Standard Specifications for State Road and Bridge Construction, 2015 Edition, [Standard Specifications] by using KDOT's website of http://www.ksdot.org and choosing the following selections: "Doing Business", "Highway Contractors", "Contractor Resources and "Specifications".

5. Contractors shall use the AASHTO's Project Bids software in combination with the electronic bidding system file created for the Project with Project Bids software [EBSX file] to generate an electronic internet proposal. The Project Bids software and Project

EBSX file are available on Bid Express' website at http://ui.bidx.com.

Contractor: Page 1 Check: 6B5FFC2469

6. Contractors shall only use the Project Bids software to create a proposal and submit an electronic internet proposal to KDOT using the Bid Express website at http:// ui.bidx.com.

7. The KDOT Bureau of Construction and Materials will only accept electronic internet proposals on-line using Bid Express until 1:00 P.M. Local Time on the Letting Date. KDOT will open and read these proposals at the Eisenhower State Office Building, 700 SW

Harrison, Topeka, Kansas 66603 at 3:00 P.M. Local Time on the Letting Date. Bids are read on a conference call at 785-414-8630. The conference ID is 856 616 050#.

8. The Contractor shall execute a contract for the proposed work within ten (10) business days after notice of the award of the contract.

9. The Contractor shall complete the work within the times specified in the Project

Special Provision "Work Schedule".

10. The Contractor shall complete the Project according to the plans, Standard

Specifications, provisions identified in the Special Provision List and all other

Contract Documents identified in Standard Specifications subsection 101.3

11. The undersigned declares that the Contractor has carefully examined the Bidding

Proposal Form for the Project. The Contractor understands the following:

A. The Bidding Proposal Form consists of the following documents: the Project EBSX files on the Bid Express website (which includes DOT Form 202, required contract provisions, and the Unit Prices List), special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, any addenda, all questions and answers posted on the Bid Express website, and any amendments the Secretary provides for the Project. The Contractor can obtain these documents at KDOT's website (see paragraph 4).

B. The special provision list identifies all required contract provisions, project special provisions and special provisions that apply to the Project.

C. The Bidding Proposal form becomes the Contractor's Proposal after the Contractor completes the EBSX file, electronically signs the Proposal where required on DOT Form

202, and submits the completed EBSX file documents and bid bond to KDOT using Bid

Express. The special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, all questions and answers posted on the Bid Express website, and any addenda are incorporated by reference into the Proposal. These documents are part of the

Contractor's Proposal.

D. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the contents of the Proposal or the procurement process.

12. The Contractor has inspected the actual location of the work. The Contractor has determined the availability of materials. The Contractor has evaluated all quantities and conditions. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the scope of the work.

Contractor: Page 2 Check: 6B5FFC2469

13. SPECIAL PROVISIONS REQUIRING INFORMATION. The following Required Contract Provisions

(I-XVII) require the Contractor to furnish information. The current versions of these provisions are contained in the Project EBSX file. Some or all of these apply to the

Project as indicated in the Special Provision List. The Contractor shall complete these provisions within the EBSX file. When these documents are required, the Secretary will reject proposals that fail to contain completed Provisions I, II, III, or IV in the EBSX file, and may reject proposals that fail to contain completed Provisions V, VI, VII, VIII, IX, X, XI, XII, XIII, XIV, XV, XVI, or XVII in the EBSX file.

I. 08-10-66 Certification-Noncollusion & History of Debarment

II. 04-30-82 Certification-Financial Prequalification Amount

III. 04-26-90 Declaration-Limitations on Use of Federal Funds for Lobbying

IV. 08-04-92 Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm

V. 10-10-00 Price Adjustment for Fuel

VI. 06-01-06 Price Adjustment for Asphalt

VII. 08-31-09 Price Adjustment for Emulsified Asphalt

VIII. 08-08-01 Furnishing and Planting Plant Materials Unit Cost

IX. 05-18-07 Repair (Structures) Unit Cost

X. 11-15-17 Electric Lighting System Unit Cost

XI. 04-06-09 ITS Unit Cost

XII. 08-17-16 Water System Unit Cost

XIII. 06-19-19 Sanitary Sewer System Unit Cost

XIV. 01-01-18 Smart Work Zone System Unit Cost

XV. 08-12-24 CORS Unit Cost

XVI. 04-06-26 Federal Restrictions on Foreign Drones

XVII. 01-01-11 Kansas Department of Revenue Tax Clearance Certificate

14. The funding source for this Project is FEDERAL/STATE. On Projects involving City or

County funds, the Secretary acts as the Agent of the City or County and as the administrator of federal or state funds. Each governmental entity's responsibilities are described in a contract between the entities which is available on request.

15. FEDERAL AID DOCUMENTS INCLUDED IN PROPOSAL. If the Project is supported in whole or in part by Federal funds, the latest revisions of the following provisions (I - IV) also apply to the Project. These documents are not included in the Project EBSX file but are accessible on KDOT's website and incorporated by reference into the proposal like other provisions and the exploratory work documents.

I. 11-03-80 Affirmative Action For EEO

II. 11-15-96 Affirmative Action & EEO Policies

III. 09-06-94 U.S. DOT Fraud Hotline

IV. FHWA-1273 Federal-Aid Required Contract Provisions

16. The Secretary reserves the right to reject any and all proposals and to waive any or all technicalities.

Contractor: Page 3 Check: 6B5FFC2469

17. SIGNATURE SECTION:

A. Electronic Internet Proposal

The person submitting the electronic internet Proposal, on the Contractor's behalf, shall be the person whose digital identification is used to submit this Proposal. That person shall complete paragraphs B and C. The person whose digital identification is used to electronically sign this Proposal binds the Contractor to this Proposal and binds the named individual to the certification in paragraph B.

B. Certification

I CERTIFY THAT I AM AUTHORIZED TO REPRESENT THE CONTRACTOR IN PREPARING AND PRESENTING

THIS PROPOSAL. I CERTIFY UNDER PENALTY OF PERJURY THAT THE FOREGOING (INCLUDING BUT NOT

LIMITED TO THE INFORMATION CONTAINED IN THE SPECICIAL PROVISIONS REFERENCED IN PARAGRAPH

13) IS TRUE AND CORRECT.

EXECUTED ON

C. Signature

Number of company or joint venture:

Name of company or joint venture:

Name of person signing:

Title of the person signing:

Signature: Electronic Internet Proposal

RELEASED FOR CONSTRUCTION:

Date:____________________________________

Chief of Construction and Materials

Contractor: Page 4 Check: 6B5FFC2469

KANSAS DEPARTMENT OF TRANSPORTATION

SPECIAL PROVISION LIST

PAGE:

DATE:

06/12/26

STATE PROJECT NO: U054-087 KA 0161-05 STATE CONTRACT NO: 526072535

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: SEDGWICK5

GRADING, BRIDGE AND SURFACING. US-54: BR 132 (FLOOD CONTROL CANAL)

LOC .20 MI E OF HOOVER RD IN SG CO. LGTH IS 0.175 MI.

NHPP-A016(105)

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

REQUIRED CONTRACT PROVISION-NONCOLLUSION / HISTORY-DEBARMENT08-10-66-R05

REQUIRED CONTRACT PROVISION-FINANCIAL PREQUALIFICATION04-30-82-R07

REQUIRED CONTRACT PROVISION-CONTRACTUAL SERVICES-LEGISLATOR08-04-92-R03

REQUIRED CONTRACT PROVISION-LIMITS OF FED FUNDS FOR LOBBYING04-26-90-R05

REQUIRED CONTRACT PROVISION-PRICE ADJUSTMENT FOR FUEL10-10-00-R09

REQUIRED CONTRACT PROVISION-PRICE ADJUSTMENT FOR ASPHALT06-01-06-R01

REQUIRED CONTRACT PROVISION-FEDERAL RESTRICTIONS ON FOREIGN DRONES04-06-26

REQUIRED CONTRACT PROVISION-NOTICE FOR AFFIRMATIVE ACTION11-03-80-R09

REQUIRED CONTRACT PROVISION-EEO REQUIREMENT11-15-96-R06

REQUIRED CONTRACT PROVISION - BOYCOTT OF ISRAEL PROHIBITED07-01-17-R1

REQUIRED CONTRACT PROVISION-NDAA 889 TELECOMM PROHIBITION12-17-20

MINIMUM WAGE RATE (SEDGWICK COUNTY)KS20260147

REQUIRED CONTRACT PROVISION-TAX CLEARANCE CERTIFICATE01-01-11-R01

NOTICE TO CONTRACTORS (USDOT HOTLINE)09-06-94-R01

REQUIRED CONTRACT PROVISION-FEDERAL-AID CONSTRUCTION CONTRACTSFHWA-1273

REQUIRED CONTRACT PROVISION - ELECTRIC LIGHTING SYSTEM UNIT COST11-15-17-R02

POLICY AGAINST SEXUAL HARASSMENT03-01-18

ERRATA SHEET FOR STD SPEC BOOK FOR RD & BR CONST, 2015 ED15-ER-1-R23

INFORMATION TO CONTRACTORS (STATUS OF UTILITIES)15-01002

HIGHWAY CONSTRUCTION TRAINEES15-01007-R01

FUEL ADJUSTMENT15-01008-R02

ASPHALT PRICE ADJUSTMENT15-01009-R01

ENVIRONMENTAL CONCERNS - MIGRATORY BIRD TREATY ACT15-01011-R06

PROSECUTION AND PROGRESS15-01016-R04

CONTROL OF MATERIALS15-01018-R01

CONTROL OF WORK15-01019-R02

BIDDING REQUIREMENTS AND CONDITIONS15-01021-R03

SCOPE OF WORK15-01022-R04

BIDDING REQUIREMENTS AND CONDITIONS15-01023

AWARD AND EXECUTION OF CONTRACT15-01024

ASPHALT SURFACING AND ASPHALT RECYCLING EQUIPMENT15-01501

REMOVAL OF EXISTING STRUCTURES15-02001

STRUCTURAL CONCRETE15-04002-R01

ON GRADE CONCRETE15-04003

CONCRETE FOR PRESTRESSED CONCRETE MEMBERS15-04004

PAGE:

DATE:

06/12/26

STATE PROJECT NO: U054-087 KA 0161-05 STATE CONTRACT NO: 526072535

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: SEDGWICK5

GRADING, BRIDGE AND SURFACING. US-54: BR 132 (FLOOD CONTROL CANAL)

LOC .20 MI E OF HOOVER RD IN SG CO. LGTH IS 0.175 MI.

NHPP-A016(105)

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

GENERAL CONCRETE15-04005-R04

PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA)15-05002-R01

ASPHALT PAVEMENT SMOOTHNESS15-06006-R01

HOT MIX ASPHALT (HMA)-COMMERCIAL GRADE15-06010-R02

PRESTRESSED CONCRETE MEMBERS15-07002-R02

STRUCTURAL STEEL FABRICATION15-07003-R04

STRUCTURAL METALS FABRICATION15-07004-R02

QUALIFICATION OF FIELD WELDERS15-07005-R02

DRILLED SHAFT (SPECIAL)15-07007-R01

SIGN STRUCTURES AND BRIDGE MOUNTED SIGN ATTACHMENTS15-07008-R01

CONCRETE STRUCTURE CONSTRUCTION15-07011-R01

FIELD ERECTION15-07013

STRUCTURAL STEEL CONSTRUCTION15-07016-R01

PILING15-07017

FALSEWORK AND FORM CONSTRUCTION15-07018

ABUTMENT DRAINAGE SYSTEMS15-07026

PERMANENT SIGNING15-08010-R02

PAVEMENT WIDENING, SHOULDERING AND PAVEMENT EDGE WEDGE15-08011-R02

CONCRETE SAFETY BARRIER15-08014

CONTRACTOR CONSTRUCTION STAKING15-08015

MAINTENANCE AND RESTORATION OF HAUL ROADS15-08018

WORK ZONE TRAFFIC CONTROL AND SAFETY15-08019-R03

DURABLE PAVEMENT MARKING15-08020-R02

PIPE AND END SECTIONS15-08022-R01

FIELD OFFICE AND LABORATORY15-08023-R01

ELECTRIC LIGHTING SYSTEMS AND TRAFFIC SIGNALS15-08028-R01

WORK ZONE TRAFFIC CONTROL AND SAFETY (WORKERS PRESENT SIGNS)15-08029

STORMWATER POLLUTION MANAGEMENT15-09002-R05

MULCHING15-09003-R02

TEMPORARY EROSION AND SEDIMENT CONTROL/SEEDING15-09004-R03

MULCHING15-09006-R01

STONE FOR RIPRAP, DITCH LINING AND OTHER MISCELLANEOUS USES15-11001-R04

AGGREGATE FOR HMA15-11002-R01

AGGS FOR CONCRETE NOT PLACED ON GRADE15-11003-R04

AGGREGATE FOR ON GRADE15-11004-R03

PAGE:

DATE:

06/12/26

STATE PROJECT NO: U054-087 KA 0161-05 STATE CONTRACT NO: 526072535

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: SEDGWICK5

GRADING, BRIDGE AND SURFACING. US-54: BR 132 (FLOOD CONTROL CANAL)

LOC .20 MI E OF HOOVER RD IN SG CO. LGTH IS 0.175 MI.

NHPP-A016(105)

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

AGGREGATES FOR BACKFILL15-11009-R03

GENERAL REQUIREMENT DIVISION 120015-12001-R01

PERFORMANCE GRADED ASPHALT BINDER15-12002-R01

AIR-ENTRAINING ADMIXTURES FOR CONCRETE15-14001-R01

SHEET MATERIALS FOR CURING CONCRETE15-14002

LIQUID MEMBRANE FORMING COMPOUNDS15-14003

HOT JOINT SEALING COMPOUND15-15001-R01

PREFORMED EXPANSION JOINT FILLER FOR CONCRETE15-15002

COLD APPLIED CHEMICALLY CURED JOINT SEALANT15-15004

BACKER ROD15-15005

MEMBRANE SEALANT15-15007

STRUCTURAL STEEL TUBING15-16001-R01

STEEL SIGN POSTS15-16002-R03

STEEL WIRE & WELDED WIRE FABRIC FOR CONCRETE REINFORCEMENT15-16003-R01

STRUCTURAL STEEL15-16005-R01

ANCHOR BOLTS FOR STRUCTURAL USES15-16006-R01

STEEL FASTENERS15-16007-R02

STEEL PLATE GUARDRAIL AND PROPRIETARY END TERMINALS15-16008-R01

HELICAL REINFORCEMENT15-16009

PORTABLE CHANGEABLE MESSAGE SIGNS15-17001

GEOFOAM15-17003-R02

RELEASE COMPOUND FOR ASPHALT MIXES15-17004-R05

GEOSYNTHETICS15-17007-R04

PLASTIC PIPE FOR UNDERDRAINS, OUTLETS AND DRAIN TILE15-19002-R01

USES OF PIPE15-19005-R04

PORTLAND CEMENT AND BLENDED HYDRAULIC CEMENT15-20001-R02

HYDRATED LIME15-20002

FLYASH FOR USE IN CONCRETE15-20004-R01

SILICA FUME15-20005

SLAG CEMENT FOR USE IN CONCRETE AND MORTAR15-20006

SEEDS15-21001

MULCH TACKING SLURRY15-21002

THERMOPLASTIC15-22001-R01

MULTI - COMPONENT LIQUID PAVEMENT MARKING MATERIAL15-22003-R02

IMAGE SYSTEMS15-22005-R03

PAGE:

DATE:

06/12/26

STATE PROJECT NO: U054-087 KA 0161-05 STATE CONTRACT NO: 526072535

FEDERAL PROJ NO.

PRIMARY DISTRICT:

DESCRIPTION:

PRIMARY COUNTY: SEDGWICK5

GRADING, BRIDGE AND SURFACING. US-54: BR 132 (FLOOD CONTROL CANAL)

LOC .20 MI E OF HOOVER RD IN SG CO. LGTH IS 0.175 MI.

NHPP-A016(105)

PROVISION NO. DESCRIPTION

NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.

OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED

PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.

RETROREFLECTIVE SHEETING15-22006-R01

PREFORMED THERMOPLASTIC PAVEMENT MARKING MATERIAL15-22008-R01

ROLL-UP SIGNS15-22011

HIGH DURABILITY PAVEMENT MARKING MATERIAL15-22014

TEMPORARY PAVEMENT MARKING TAPE15-22016

WOOD POSTS15-23001-R03

FIELD HANDLING AND PRESERVATIVE TREATMENT OF WOOD PRODUCTS15-23003-R02

PART V15-25001-R07

MATERIALS CERTIFICATIONS15-26001-R13

CRITICAL PATH METHOD SCHEDULE15-PS0263-R1

WORK SCHEDULE15-WS0394

SMART WORK ZONE (ADVANCED QUEUE WARNING SYSTEM, AQWS)15-WZ0083

SIGNIFICANT PROJECT (TRAFFIC CONTROL INSPECTION)15-WZ0084

END OF SPECIAL PROVISION LIST

REQUIRED CONTRACT PROVISION - 08-10-66-R05 (Rev. 07/05)

CERTIFICATION - NONCOLLUSION AND HISTORY OF DEBARMENT

K.A.R. 36-30-4, 49 C.F.R. 29.335, 23 U.S.C. 112(c), 49 U.S.C. 322

Complete the exceptions below if applicable. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this

Certificate.

NONCOLLUSION

I certify that the Contractor submitting this bid has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid.

HISTORY OF DEBARMENT

I certify that, except as noted below, the Contractor submitting this bid and any person associated with this Contractor in the capacitiy of owner, partner, director, officer, principal, investigator, project director, manager, auditor, or any position involving the administration of federal funds:

1. Are not currently suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency;

2. Have not been suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency within the past three years;

3. Do not have a proposed debarment pending;

4. Within the past three years, have not been convicted or had a civil judgment rendered against them by a court of competent jurisdiction in any matter involving fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and

5. Are not currently indicted or otherwise criminally or civilly charged by a federal, state, or local government with fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and

6. Have not had one or more federal, state, or local government contracts terminated for cause or default within the past three years.

Answer 'Yes' if there are exceptions to the above described circumstances. Answer 'No' if there are no exceptions.

Yes No

The exceptions, if any, are:

Contractor: Page 5 Check: 6B5FFC2469

REQUIRED CONTRACT PROVISION - 04-30-82-R07 (Rev. 01/11)

CERTIFICATION - FINANCIAL PREQUALIFICATION AMOUNT

Select the appropriate response below to indicate whether this Proposal exceeds the

Contractor's financial prequalification amount. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

I understand that I may be required to identify the outstanding contract and subcontract work of my firm, association or corporation on DOT Form 284 prior to an award of contract. Unless I obtain approval, I understand that the Secretary may reject this

Proposal if the dollar value of work on this Contract combined with unearned amounts on our unfinished contract and subcontract work exceeds our prequalification amount.

I certify that the amount of this Proposal plus the total unearned amount of other contracts with the Kansas Department of Transportation plus the unearned amount of all other contracts in this state or other states exceeds does not exceed the financial prequalification amount of our firm, association or corporation. I also certify that our firm, association or corporation has the financial ability to do the work.

If this Proposal exceeds the financial prequalification amount, I certify that I obtained approval to submit this bid from the KDOT representative I have listed below. (Prior approval to exceed the prequalification limit may be made by telephone or personal contact).

KDOT Approval Granted by:

KDOT Approval Date:

Contractor: Page 6 Check: 6B5FFC2469

REQUIRED CONTRACT PROVISION - 08-04-92-R03 (Rev. 07/05)

CERTIFICATION - CONTRACTUAL SERVICES WITH A CURRENT

LEGISLATOR OR A CURRENT LEGISLATOR'S FIRM

Select the appropriate response below to indicate whether this contract is with a legislator or a firm in which a legislator is a member. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

Kansas Law, K.S.A. 46-239(c), requires this agency to report all contracts entered into with any legislator or any member of a firm of which a legislator is a member, under which the legislator or member of the firm is to perform services for this agency for compensation. The Contractor certifies that:

This Contract is is not with a legislator or a firm in which a legislator is a member. That Legislator is:

Name:

Address:

City State Zip:

Business Telephone:

Contractor: Page 7 Check: 6B5FFC2469

REQUIRED CONTRACT PROVISION- 04-26-90-R05 (Rev. 07/13)

DECLARATION

LIMITATIONS ON USE OF FEDERAL FUNDS FOR LOBBYING

PURSUANT TO 31 U.S.C. 1352

The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.

DEFINITIONS:

1. Designated Entity: an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress.

2. Federal Grant: an award of financial assistance by the Federal government. (Federal

Aid Highway Program is considered a grant program.)

3. Influencing (or attempt): making, with the intent to influence, any communication to or appearance before any designated entity in connection with the making of a Federal contract or Federal grant.

4. Person: an individual, corporation, company, association, authority, firm, partnership, society, State or local government.

5. Recipient: all contractors, subcontractors, subgrantees, at any tier, and other persons receiving funds in connection with a Federal grant.

EXPLANATION:

As of December 23, 1989, 31 U.S.C. section 1352 limits the use of appropriated Federal funds to influence Federal contracting. Under this law, recipients of Federal grants shall not use appropriated funds to pay any person for influencing or attempting to influence a designated entity in connection with the making of a Federal grant or the extension, continuation, renewal, amendment or modification of a Federal grant. These restrictions apply to contracts and grants exceeding $100,000.00. Federal law requires submission of this declaration. If a recipient fails to file the declaration or amend a declaration, the recipient shall be subject to a civil penalty of not less than

$10,000.00 and not more than $100,000.00 for each failure. If the recipient uses appropriated Federal funds to influence or to attempt to influence a designated entity contrary to this provision, the recipient shall be subject to a civil penalty of not less than $10,000.00 and not more than $100,000.00 for each such payment.

CERTIFICATIONS:

I certify that the Contractor recipient (including its owners, partners, directors, officers, or principals) has not paid and will not pay federally appropriated funds to any person for influencing or attempting to influence a designated entity in connection with the making of a Federal grant, or the extension, continuation, renewal, amendment or modification of a Federal grant.

Contractor: Page 8 Check: 6B5FFC2469

Answer 'Yes' if a person registered under the Lobbying Disclosure Act of 1995

(Registrant) has made lobbying contacts on the Contractor recipient's behalf with respect to this contract. Answer 'No' if no Registrant has lobbied on the Contractor recipient's behalf with respect to this contract.

Yes No

The Registrants, if any, are:

I certify that the Contractor recipient will report payments made to a person for influencing or attempting to influence a designated entity, that come from funds other than appropriated Federal funds. The Contractor recipient shall report such payments on

Form LLL "DISCLOSURE FORM TO REPORT LOBBYING" according to the instructions and may obtain Form LLL from the KDOT Bureau of Construction and Materials.

I certify that, if information contained in this DECLARATION changes, the Contractor recipient will amend the DECLARATION within 30 days of the change(s).

I certify that the Contractor recipient will provide to and require subcontractors to sign a like DECLARATION, if the subcontract work exceeds $100,000.00.

The Contractor recipient understands that this declaration is a material representation of fact and the Secretary will have relied upon this declaration in entering into a contract with the Contractor recipient.

NOTE: This Reporting requirement does not apply to payments made to the recipient's regular employees and contracts, subcontracts, and grants less than $100,000.00.

Contractor: Page 9 Check: 6B5FFC2469

REQUIRED CONTRACT PROVISION - 10-10-00-R09 (Rev. 01/20)

PRICE ADJUSTMENT FOR FUEL

The Contractor may accept or reject the application of Special Provision 15-01008 (latest revision) "Price Adjustment for Fuel". Any items listed on Special Provision 15-01008

(latest revision) that are included in this project are eligible for the fuel price adjustment unless otherwise stated in the contract documents.

Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.

Accept Reject

If the Contractor accepts 15-01008 (latest revision), the Contractor shall mark the checkboxes below for the eligible items/sections listed in Special Provision 15-01008

(latest revision). Then they should indicate their desire for the specific fuel price adjustment by selecting the 'Yes' or 'No' option.

Road Items (Earthwork)

Concrete Surfacing Items

Asphalt Surfacing Items

Contractor: Page 10 Check: 6B5FFC2469

REQUIRED CONTRACT PROVISION - 06-01-06-R01 (Rev. 03/15)

PRICE ADJUSTMENT FOR ASPHALT MATERIAL

The Contractor may accept or reject the application of Special Provision 15-01009 (latest revision) "Price Adjustment for Asphalt Material."

Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.

Accept Reject

Contractor: Page 11 Check: 6B5FFC2469

REQUIRED CONTRACT PROVISION - 11-15-17-R02 (Rev. 03/26)

ELECTRIC LIGHTING SYSTEM UNIT COST

Prior to award, the contractor shall submit a spreadsheet for the Unit Costs. A spreadsheet template is available on KDOT’s website - https://www.ksdot.gov/doing-business/highway-contractors/contractor-resources under “Other Resources”. The completed spreadsheet shall be submitted to the Letting Engineer no later than noon on the Friday after letting day. Once approved, the spreadsheet will be placed on KDOT’s Exploratory

Site and incorporated into the contract by reference.

The Contractor shall comply with Section 814 of the Standard Specifications when providing and installing elements of the Electric Lighting System. Add the following at the end of Section 814.4 Measurement and Payment.

The Contractor will submit a unit cost in this Required Contract Provision for each individual Electric Lighting item the contract requires. Even though the bid item is a lump sum price, the Engineer will adjust the lump sum price by any increase or decrease in the quantities indicated in the Summary of Quantities shown in the plans. To calculate the adjustment, the Engineer will determine the overrun or underrun quantity for each

Electric Lighting System item list in the contract. The Engineer will multiply any overrun or underrun quantity by the unit cost the Contractor provided below. The Engineer will increase the lump sum price by the cost of any overruns and decrease the lump sum price by the cost of any underruns. The sum of the unit costs multiplied by the items listed in the *Summary of Quantities for each site or the entire project must be less than or equal to the lump sum bid, or the unit cost submittal will be rejected.

Contractor will then be required to resubmit this Required Contract Provision that meets this requirement for the bid to be accepted. The Engineer will only negotiate or receive new prices on Electric Lighting System items if they were not identified in the original

Summary of Quantities.

Furnished items shall comply with either the List of Prequalified Roadway Lighting

Systems and Equipment, or the specifications in the contract document or otherwise approved by the Engineer.

The Secretary may reject this Proposal if the Contractor fails to complete this Required

Contract Provision before noon on Friday after letting day.

CONTRACTOR MUST ACKNOWLEDGE Yes

*Refer to the Plans for the ID #

Contractor: Page 12 Check: 6B5FFC2469

REQUIRED CONTRACT PROVISION - 04-06-26

CERTIFICATION OF COMPANY NOT CURRENTLY ENGAGED IN THE PROCUREMENT OR

USE OF PROHIBITED FOREIGN UNMANNED AERIAL SYSTEMS

Effective December 22, 2025, the American Security Drone Act of 2023 (ASDA) and OMB

Memorandum M-26-02 strictly prohibits the use of federal funds for unmanned aerial systems (UAS) manufactured by covered foreign entities including any aircraft, flight controller, camera, or ground control station supplied by a manufacturer that is based in, or subject to the control of, a foreign adversary country, specifically the People’s

Republic of China. This prohibition restricts the use of drones from these countries on any federal-aid project even if the drone related costs are billed separately or not at all. Any use of these covered drones including operation, maintenance or data processing on federal aid projects is prohibited.

The Contractor agrees that the procurement and/or use of any drone (UAS) to complete any primary or supporting tasks within the scope of this Contract, as well as any subcontracts, will comply with the following directives:

• National Defense Authorization Act (NDAA) – American Security Drone Act of 2023

(ASDA, Pub. L. No. 118-31).

• Office of Management and Budget Memorandum M-26-02 – Restrictions on using federal funds to purchase or operate prohibited foreign UAS.

• Federal Acquisition Regulation Clause 52.240-1 – Prohibition on Unmanned Aircraft

Systems Manufactured or Assembled by American Security Drone Act-Covered

Foreign Entities.

If Contractor has violated, misrepresented, or otherwise fails to comply with this certification document as determined by KDOT, KDOT may terminate this Contract according to Section 108.11 of the State Specifications for State Road and Bridge Construction

(2015 Edition).

By signing the below, Contractor acknowledges and agrees to comply with the provisions of this policy.

CONTRACTOR

Signature, Title

Date

*4/6/26 C&M (JVN)

April-2026 Letting

Contractor: Page 13 Check: 6B5FFC2469

REQUIRED CONTRACT PROVISION - 01-01-11-R01 (01-01-11-R01)

TAX CLEARANCE CERTIFICATE

Answer 'Yes' if the Contractor has a current Tax Clearance Certificate. Answer 'No' if the Contractor does not have a current Tax Clearance Certificate.

Yes No

Insert the Tax Clearance Confirmation Number if available at the time of bidding:

Contractors shall have a current Tax Clearance Certificate from the Kansas Department of

Revenue [KDOR] at the time of contract award. The Tax Clearance process is a tax account review by KDOR to determine that the Contractor's account is compliant with Kansas tax laws administered by the Director of Taxation. The Secretary will reject the Contractor's

Proposal as non-responsive if the Contractor does not have a current Tax Clearance

Certificate at the time of the contract award.

To obtain a Tax Clearance Certificate, the Contractor shall complete and submit to KDOR an Application for Tax Clearance obtained from KDOR's website at http:// www.ksrevenue.org/taxclearance.htm. The Application Form can be completed and submitted on-line, by mail, or by fax. After the Contractor submits the Application, KDOR will provide the Contractor a Transaction ID number. The Contractor shall use the Transaction

ID number to retrieve the Tax Clearance Certificate. Decisions on on-line applications are generally available the following business day.

After the Contractor obtains the Tax Clearance Certificate, the Contractor shall insert on this Required Contract Provision the Confirmation Number contained in the Certificate or the Contractor shall submit a copy of the Tax Clearance Certificate to the KDOT Bureau of Construction and Materials by hand delivery, mail, e-mail or fax. Before awarding a contract, the Bureau of Construction and Materials will authenticate the Certificate through the Confirmation Number inserted on this Required Contract Provision or contained on the Certificate submitted.

If the Contractor is unable to retrieve the Tax Clearance Certificate or if KDOR denies the Contractor's Application for Tax Clearance, the Contractor shall call KDOR's Special

Projects Team at 785-296-3199 to determine why KDOR failed to issue the certificate.

Tax Clearance Certificates are valid for 90 days after issue. To renew a clearance, submit a new Tax Clearance Application. Information pertaining to a Tax Clearance is subject to change for various reasons, including a state tax audit, federal tax audit, agent actions, hearings, and other legal actions. The Tax Clearance Certificate is not

"clearance" for all types of taxes the State of Kansas may assess.

Subcontractors also shall have a current Tax Clearance Certificate from KDOR before the

Secrtary approves them for subcontract work. The Contractor shall submit to the KDOT

Field Office the Subcontractor's Tax Clearance Certificate with KDOT Form 259, Request for Approval of Subcontractor.

Contractor: Page 14 Check: 6B5FFC2469

Line Number Item Number Quantity Unit Unit Price Extension Price

Section 01

COMMON ITEMS

1 020100 1.000 LS

CONTRACTOR CONSTRUCTION STAKING /

2 025600 1.000 EACH

FIELD OFFICE AND LABORATORY (TYPE A) /

3 025323 1.000 LS

MOBILIZATION /

4 025200 1.000 LS

REMOVAL OF EXISTING STRUCTURES /

5 040707 1.000 LS

CURING ENVIRONMENT /

6 071554 1.000 CUYD $225.000 $225.00

CONCRETE FOR SEAL COURSE (SET PRICE) /

7 012340 1.000 CUYD $40.000 $40.00

FOUNDATION STABILIZATION (SET PRICE) /

8 020001 1.000 LS $4,000.000 $4,000.00

MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / NON PART

9 055660 2900.000 HOUR $2.000 $5,800.00

TRAINEES HIGHWAY CONSTRUCTION (SET PRICE) / NON PART

10 070580 1.000 HOUR $30.000 $30.00

FLAGGER (SET PRICE) /

Section 01 Total $10,095.00

Section 02

ROAD ITEMS

11 060359 1.000 LS

CLEANING EXISTING STRUCTURE /

12 025361 1.000 LS

CLEARING AND GRUBBING /

13 012412 3474.000 CUYD

COMMON EXCAVATION (URB) /

14 012420 3521.000 CUYD

ROCK EXCAVATION /

15 012319 1547.000 CUYD

COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) /

16 012317 901.000 CUYD

COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) /

17 010114 1.000 MGAL $40.000 $40.00

WATER (GRADING) (SET PRICE) /

18 030189 5484.000 SQYD

SALVAGED TOPSOIL /

19 023456 503.250 LNFT

GUARDRAIL, STEEL PLATE (MGS) /

20 030567 4.000 EACH

GUARDRAIL END TERMINAL (MGS-FLEAT) /

21 012907 1.000 EACH

INLET (GRATE) (SPECIAL) /

Contractor: Page 15 Check: 6B5FFC2469

22 012918 2.000 EACH

INLET (MANHOLE) (SPECIAL) /

23 013063 2.000 EACH

MANHOLE (REINFORCED CONCRETE) /

24 012281 31.000 LNFT

SLOPE DRAIN (STONE) /

25 056101 32.000 LNFT

STORM SEWER (15") (RCP) /

26 056251 145.000 LNFT

STORM SEWER (18") (RCP) /

27 056551 44.000 LNFT

STORM SEWER (24") (RCP) /

28 030700 0.800 PMPS

MOWING /

Section 02 Total $40.00

Section 03

TEMP PRJ WTR POL CTL-SOIL EROSION

29 072222 82.400 LBS.

TEMPORARY FERTILIZER (15-30-15) /

30 065001 80.300 LBS.

TEMPORARY SEED (MIX) /

31 030537 33.300 LBS.

SOIL EROSION MIX /

32 072286 652.000 SQYD

EROSION CONTROL (CLASS 1) (TYPE D) /

33 072287 612.000 SQYD

EROSION CONTROL (CLASS 2) (TYPE E) /

34 071291 1.000 CUYD $50.000 $50.00

SEDIMENT REMOVAL (SET PRICE) /

35 072400 1.000 LNFT $2.000 $2.00

TEMPORARY BERM (SET PRICE) /

36 071320 2.000 EACH

TEMPORARY INLET SEDIMENT BARRIER /

37 070828 280.000 LNFT

FILTER SOCK (12") /

38 072411 500.000 SQYD

GEOTEXTILE (EROSION CONTROL) /

39 000098 1.000 LS

SWPPP DESIGN /

40 000097 117.000 EACH

SWPPP INSPECTION /

41 000103 117.000 EACH

WATER POLLUTION CONTROL MANAGER /

42 030635 986.000 LBS.

MULCHING TACKING SLURRY /

43 030638 2.200 TON

MULCHING /

Contractor: Page 16 Check: 6B5FFC2469

44 010123 1.000 MGAL $40.000 $40.00

WATER (EROSION CONTROL) (SET PRICE) /

Section 03 Total $92.00

Section 04

BR. NO. 54-87-212.15 (869)

45 012400 571.000 CUYD

CLASS I EXCAVATION /

46 012401 1177.000 CUYD

CLASS II EXCAVATION /

47 072350 483.300 CUYD

CONCRETE (GRADE 4.0) (AE) /

48 032816 1324.400 CUYD

CONCRETE (GRADE 4.0) (AE) (SA) (MPC) /

49 025103 281110.000 LBS.

REINFORCING STEEL (GRADE 60) (EPOXY COATED) /

50 025100 134560.000 LBS.

REINFORCING STEEL (GRADE 60) /

51 014069 7521.000 LNFT

PILES (STEEL) (HP10X42) /

52 014053 422.000 LNFT

TEST PILES (SPECIAL) (HP10X42) /

53 014094 118.000 EACH

CAST STEEL PILE POINTS /

54 012161 4760.000 LNFT

PRESTRESSED CONCRETE BEAM (NU53+1) /

55 014018 341.000 CUYD

ABUTMENT AGGREGATE DRAIN /

56 071021 192.000 SQYD

BRIDGE BACKWALL PROTECTION SYSTEM /

57 070974 207.000 CUYD

SLOPE PROTECTION (RIPRAP STONE) /

58 013333 3420.000 SQYD

BRIDGE DECK GROOVING /

59 010300 1.000 LS

FALSEWORK INSPECTION /

60 014477 1.000 LS

TEMPORARY SHORING /

Section 04 Total

Section 05

BR. NO. 54-87-212.16 (870)

61 012400 525.000 CUYD

CLASS I EXCAVATION /

62 012401 1215.000 CUYD

CLASS II EXCAVATION /

63 072350 455.600 CUYD

Contractor: Page 17 Check: 6B5FFC2469

CONCRETE (GRADE 4.0) (AE) /

64 032816 1181.300 CUYD

CONCRETE (GRADE 4.0) (AE) (SA) (MPC) /

65 025103 244890.000 LBS.

REINFORCING STEEL (GRADE 60) (EPOXY COATED) /

66 025100 119140.000 LBS.

REINFORCING STEEL (GRADE 60) /

67 014069 6859.000 LNFT

PILES (STEEL) (HP10X42) /

68 014053 397.000 LNFT

TEST PILES (SPECIAL) (HP10X42) /

69 014094 115.000 EACH

CAST STEEL PILE POINTS /

70 012161 3931.000 LNFT

PRESTRESSED CONCRETE BEAM (NU53+1) /

71 014018 274.000 CUYD

ABUTMENT AGGREGATE DRAIN /

72 071021 177.000 SQYD

BRIDGE BACKWALL PROTECTION SYSTEM /

73 070974 202.000 CUYD

SLOPE PROTECTION (RIPRAP STONE) /

74 013333 2867.000 SQYD

BRIDGE DECK GROOVING /

75 010300 1.000 LS

FALSEWORK INSPECTION /

76 014477 1.000 LS

TEMPORARY SHORING /

Section 05 Total

Section 06

CONCRETE SURFACING ITEMS

77 061597 27.000 LNFT

CURB AND GUTTER, COMBINED (AE) /

78 061576 72.000 LNFT

CURB AND GUTTER, COMBINED (AE) (SPECIAL) /

79 012491 104.000 LNFT

CONCRETE SAFETY BARRIER (TYPE I) /

80 012492 33.000 LNFT

CONCRETE SAFETY BARRIER (TYPE II) /

81 013504 154.000 LNFT

CONCRETE SAFETY BARRIER (TYPE II) (51") /

82 012433 742.000 LNFT

CONCRETE SAFETY BARRIER (TYPE IV) /

83 070348 127.000 LNFT

CONCRETE SAFETY BARRIER (TYPE IV) (SPECIAL) /

84 013642 1141.000 SQYD

CONCRETE PAVEMENT (11" UNIFORM) (AE) (BR APP) /

85 025509 160.900 CUYD

Contractor: Page 18 Check: 6B5FFC2469

BRIDGE APPROACH SLAB FOOTING /

Section 06 Total

Section 07

ASPHALT SURFACING ITEMS

86 041003 5334.000 TON

HMA-COMMERCIAL GRADE (CLASS A) /

87 010169 8065.000 SQYD

AGGREGATE BASE (AB-3) ( 6") /

88 025600 1.000 EACH

FIELD OFFICE AND LABORATORY (TYPE A) /

89 010107 1.000 MGAL $40.000 $40.00

WATER (AGGREGATE BASE) (SET PRICE) /

90 081050 505.000 TON

PAVEMENT EDGE WEDGE (ROCK) /

91 011478 1.000 MGAL $40.000 $40.00

WATER (EARTHWORK COMPACTION) (SET PRICE) /

Section 07 Total $80.00

Section 08

SIGNING ITEMS

92 025500 52.000 SQFT

SIGN (FLAT SHEET) (HIGH PERFORMANCE) /

93 025501 90.000 SQFT

SIGN (REINFORCED PANEL) (HIGH PERFORMANCE) /

94 026176 80.000 LNFT

SIGN POST (4" X 6" WOOD) (FLAT SHEET SIGN) /

95 026184 96.000 LNFT

SIGN POST (4" X 6" WOOD) (REINFORCED PANEL SIGN) /

96 026173 14.000 LNFT

SIGN POST (3 LB/FT "U" STEEL) /

97 026090 4.000 LNFT

SIGN POST (1-3/4" PERFORATED SQUARE STEEL TUBE) /

98 026381 32.000 LNFT

SIGN POST (W10X12 STEEL BEAM) /

99 026382 118.000 LNFT

SIGN POST (W10X22 STEEL BEAM) /

100 026398 2.000 EACH

SIGN POST STUB AND BREAKAWAY BASE PLATE (W10X12) /

101 026399 6.000 EACH

SIGN POST STUB AND BREAKAWAY BASE PLATE (W10X22) /

102 023208 2.000 EACH

SIGN POST BREAKAWAY BASE PLATE (W10X12) /

103 023209 6.000 EACH

SIGN POST BREAKAWAY BASE PLATE (W10X22) /

104 026048 16.000 LNFT

SIGN POST FOOTING (24" STEEL BEAM POST CONCRETE) /

Contractor: Page 19 Check: 6B5FFC2469

105 026049 66.000 LNFT

SIGN POST FOOTING (30" STEEL BEAM POST CONCRETE) /

106 026036 30.000 LNFT

SIGN POST FOOTING (18" WOOD POST CONCRETE) /

107 026089 1.000 EACH

SIGN POST FOOTING ( 1-3/4" PERFORATED SQUARE STEEL TUBE) /

108 014176 3.000 EACH

SIGNING OBJECT MARKER (TYPE 2) /

109 026052 7.000 EACH

SIGNING DELINEATOR (TYPE A) (WHITE FLEXIBLE) (TYPE 1 ANCHOR) /

110 026055 1.000 EACH

SIGNING DELINEATOR (TYPE A) (YELLOW FLEX) (TY 1 ANCHOR) /

111 026058 6.000 EACH

SIGNING DELINEATOR (TYPE B) (WHITE FLEXIBLE) (TYPE 1 ANCHOR) /

112 026004 5.000 EACH

SIGNING DELINEATOR (TYPE A) (BRACKET MOUNT) (WHITE) /

113 026015 3.000 EACH

SIGNING DELINEATOR (TYPE B) (BRACKET MOUNT) (WHITE) /

114 026494 1.000 LS

SIGN (REMOVE AND RESET) /

115 026796 1.000 EACH

OVERHEAD SIGN STRUCTURE ( 70.1'- 80.0') (STEEL) /

Section 08 Total

Section 09

PAVEMENT MARKING ITEMS

116 023140 24060.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 6") /

117 023141 8192.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) ( 8") /

118 023428 1856.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (WHITE) (12") /

119 023192 16617.000 LNFT

PAVEMENT MARKING (MULTI-COMPONENT) (YELLOW) ( 6") /

120 070732 3.000 EACH

PAVEMENT MRK SYM (INTERSECTION GRADE)(WHITE)MERGE LEFT ARROW /

121 013019 18334.000 LNFT

PAVEMENT MARKING REMOVAL /

Section 09 Total

Section 10

LIGHTING ITEMS

122 025300 1.000 LS

ELECTRIC LIGHTING SYSTEM /

Section 10 Total

Contractor: Page 20 Check: 6B5FFC2469

Section 11

SEEDING ITEMS

123 030563 225.000 LBS.

FERTILIZER (13-13-13) /

124 010002 100.000 LBS.

SEED (DISTRICT TWO/FIVE SHOULDER MIX) /

125 030344 10.000 LBS.

FERTILIZER (15-30-15) /

126 010003 6.000 LBS.

SEED (DISTRICT TWO/FIVE OTHER MIX) /

127 083463 1.400 LBS.

SEED (NATIVE WILDFLOWER MIX 1) /

Section 11 Total

Section 12

TRAFFIC CONTROL ITEMS

128 025331 52130.000 EADA

WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) /

129 025332 47260.000 EADA

WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) /

130 025333 9730.000 EADA

WORK ZONE SIGNS (16.26 SQ.FT. & OVER) /

131 025376 9730.000 EADA

WORK ZONE BARRICADES (TYPE 3 - 4 TO 12 LIN. FT.) /

132 011492 175140.000 EADA

CHANNELIZER (PORTABLE) /

133 025343 31280.000 EADA

WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) /

134 070916 532.400 STAL

PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I) /

135 070914 37.200 STAL

PAVEMENT MARKING (TEMP) 4" BROKEN (8')(TYPE I) /

136 070918 4.400 STAL

PAVEMENT MARKING (TEMP) 4" DOTTED EXTENSION (TYPE I) /

137 013019 31899.000 LNFT

PAVEMENT MARKING REMOVAL /

138 082002 5.000 EACH

WORK ZONE SIGN (SPECIAL) (16.26 SQ.FT. & OVER) /

139 072116 1.000 LS

TRAFFIC CONTROL (INITIAL SETUP) /

140 050280 1.000 LS

SMART WORK ZONE SYSTEM DEPLOYMENT /

141 050281 700.000 EADA

SMART WORK ZONE SYSTEM /

142 072259 700.000 EADA

TRAFFIC CONTROL INSPECTION /

143 011927 4363.000 LNFT

CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY) /

Contractor: Page 21 Check: 6B5FFC2469

144 011929 6050.000 LNFT

CONCRETE SAFETY BARRIER (TYPE F3) (TEMPORARY - RELOCATE) /

145 046038 4.000 EACH

INERTIAL BARRIER SYSTEM (TL-3) /

146 018154 15.000 EACH

REPLACEMENT MODULES (IBS) /

147 011074 2.000 EACH

IMPACT ATTENUATOR (TL-3) (TEMPORARY) /

148 018158 10.000 EACH

REPLACEMENT MODULES (IMPACT ATTENUATOR) /

Section 12 Total

Item Total $10,307.00

Contractor: Page 22 Check: 6B5FFC2469

�� ������������������������������������������������������������������������������,-,�����.�������/�����������������������������������������������������������0����������������������1���$��,-,� 02�23�444444444444444444444444444444444444444445���4����������������������4�6................................................................�207�����.��6����������������������������������������������������������������0����������������������1���$��207�870�,09�� 0:� :03-4444444444444444444444444444445�/64��������������������/�4��................................................................��:�����6.��������6����6�����������������������������������������������������0����������������������1���$�� 0:��� 02;,0��711�073 � 0:��4444444444444444444444445��64���������������������4�� 0:��� 02;,0��1-3 <, �3� �-78<7=444444444444444444445��/4�/������������������64�6 0:��� 02;,0�� :*+�3� � 3� ,*444444444444444444444445���4���������������������4�� 0:��� 02;,0���83 ,0� 0:��444444444444444444444444445���46���������������������4�� 03112���2��3-2>3 27��� 03112���2��3-�2�� 3--3 27��?�07:� *3�@444444444444444444444444444444444444444445���4���������������������4�� 03112���7� 07-�����,0;2�,� 02;,044444444444444444445���4�/�������������������4��7+,03 70��� 02+2���*3�#2�,444444444444444444444444445���4����������������������4��7+,03 70��07 7�*2--��07:� *3�444444444444444444444445���4/��������������������4��7+,03 70��07 7�*2--4444444444444444444444444444444445���4���������������������4��7+,03 70��� 03� 7044444444444444444444444444444444445���4���������������������4��7+,03 70�����0,, 444444444444444444444444444444444445���4���������������������4��7+,03 70�����03+,044444444444444444444444444444444445���4���������������������4��7+,03 70���07--,0444444444444444444444444444444444445���4�6�������������������4��7+,03 70���+3;,0��?3�+#3- 9�3��0,�3 ,9�3� ��7��0, ,@44444444444444444444444444444444444444444445���4/��������������������4��7+,03 70���*,�#3�2�4444444444444444444444444444444445���46��������������������4��7+,03 70���*3 ,023-� 03��1,0�;,#2�-,44444444444444445���4���������������������4��7+,03 70���-73 ,0444444444444444444444444444444444445���4���������������������4��7+,03 70����03 ,0�<-3 ,444444444444444444444444444445���4/��������������������4��7+,03 70��� 2� 02<: 704444444444444444444444444444445���4���������������������4��7+,03 70����03�,4444444444444444444444444444444444445���46��������������������4��7+,03 70����7��0, ,��38444444444444444444444444444445���46��������������������4��7+,03 70����7��0, ,�12�2�#2���*3�#2�,4444444444444445���4���������������������4��7+,03 70���<:-- 7>,0444444444444444444444444444444445��64���������������������4��7+,03 70���<077*��8,,+,044444444444444444444444444445���4�/�������������������4��7+,03 70���<7<�3 ���2 �� ,,0���2 �-73 ,04444444444445���4���������������������4��7+,03 70���<3��#7,�,A�3;3 70� 03��#7,4444444444444445���4���������������������4��-3<70,0���+2+,-3=,04444444444444444444444444444444445���4���������������������/4��

BCDCEBF�DGHE�IJ KIJLMNO

PQQRSGCCSTULMNOCVTMWXYWQWZU[\TQ[N\C]KÊEB̂H_̀CH HC_

����)*)+,)�-./)�0-)1*-+2)3�45-�*-.4/�0)-45-6+7850)-./+57�/5�9:+*:�9);3+78�+1�+7*+3)7/.;�<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<�5/)���=)*>/+,)��-3)-����"�����$&��1/.2;+1:+78�%.+3� +*?��).,)45-��)3)-.;��57/-.*/5-1�.00;+)1�/5�.;;�*57/-.*/1�1>2@)*/�/5�/:)

.,+1��.*57��*/�45-�9:+*:�/:)�*57/-.*/�+1�.9.-3)3��.73�.7A15;+*+/./+57�9.1�+11>)3"�57�5-�.4/)-�B.7>.-A��&��������!4�/:+1*57/-.*/�+1�*5,)-)3�2A�/:)���&�/:)�*57/-.*/5-�6>1/�0-5,+3))60;5A))1�9+/:���:5>-�54�0.+3�1+*?�;).,)�45-�),)-A����:5>-1/:)A�95-?&�>0�/5��$�:5>-1�54�0.+3�1+*?�;).,)�).*:�A).-��60;5A))1�6>1/�2)�0)-6+//)3�/5�>1)�0.+3�1+*?�;).,)�45-�/:)+-597�+;;7)11&�+7@>-A�5-�5/:)-�:).;/:�-);./)3�7))31&�+7*;>3+780-),)7/+,)�*.-)C�/5�.11+1/�.�4.6+;A�6)62)-��5-�0)-157�9:5�+1;+?)�4.6+;A�/5�/:)�)60;5A))"�9:5�+1�+;;&�+7@>-)3&�5-�:.1�5/:)-:).;/:�-);./)3�7))31&�+7*;>3+78�0-),)7/+,)�*.-)C�5-�45-�-).1571-)1>;/+78�4-56&�5-�/5�.11+1/�.�4.6+;A�6)62)-��5-�0)-157�9:5�+1;+?)�4.6+;A�/5�/:)�)60;5A))"�9:5�+1�.�,+*/+6�54&�356)1/+*,+5;)7*)&�1)=>.;�.11.>;/&�5-�1/.;?+78����33+/+57.;�+745-6./+5757�*57/-.*/5-�-)D>+-)6)7/1�.73�95-?)-�0-5/)*/+571�>73)-�/:)���+1�.,.+;.2;)�./://01���999�35;�85,�.8)7*+)1�9:3�85,)-76)7/�*57/-.*/1��5/)���=)*>/+,)��-3)-���$���8)7)-.;;A�.00;+)1�/5�*57/-.*/1�1>2@)*/�/5�/:)� .,+1��.*57��*/�/:./�9)-)�.9.-3)3�57�5-�2)/9))7�B.7>.-A��&������.73�B.7>.-A���&�����&�.73�/:./�:.,)�75/�2))7�-)7)9)3�5-�)=/)73)3�57�5-�.4/)-�B.7>.-A���&��������=)*>/+,)��-3)-���$���35)1�75/�.00;A�/5�*57/-.*/1�1>2@)*/�57;A�/5�/:)� .,+1��.*57��);./)3��*/1�-)8.-3;)11�54�9:)7�/:)A�9)-)�.9.-3)3��!4�.�*57/-.*/�+1�1>2@)*/�/5��=)*>/+,)��-3)-���$��&�/:)�*57/-.*/5-�6>1/�0.A�.;;�*5,)-)3�95-?)-1�./�;).1/�����$��0)-�:5>-��5-�/:)�.00;+*.2;)�9.8)�-./)�;+1/)3�57�/:+1�9.8)�3)/)-6+7./+57&�+4�+/�+1�:+8:)-"�45-�.;;�:5>-1�10)7/�0)-45-6+78�57�/:)�*57/-.*/�4-56� .A���&����$&�/:-5>8:�…