Bid Document.pdf

PDF 461 KB Posted

Attached to
RFP Vacant Unit Turn Services
Solicitation number
RFB#26010
Issued by
Lake County, Illinois

About this file

This is a Request for Bid (RFB) document issued by the Lake County Housing Authority (LCHA) for vacant unit turn services at five residential properties located throughout Illinois. The LCHA seeks qualified contractors to complete turnover renovations and repairs at the following locations: Shiloh Towers in Zion (Studio, approximately 400 sq ft), Millview Manor in Antioch (1 Bedroom, approximately 550 sq ft), Orchard Manor in Antioch for two units (both 1 Bedroom, approximately 550 sq ft and 450 sq ft respectively), and John Kuester Manor in Wauconda (1 Bedroom, approximately 450 sq ft). Contractors must submit detailed proposals with separate line items for materials, labor, and permits by August 24, 2026, at 2:00 p.m. CST through the eProcurement Housing Agency Marketplace. Building tours are scheduled for August 14, 2026, with question submission deadlines between August 10-21, 2026. Each project includes comprehensive scope of work requirements covering entry and common areas, general interior, living rooms, kitchens, bedrooms, bathrooms, cleaning checklists, and mechanical systems checks. Work must comply with Illinois state law, local building codes, LCHA policies, and the Davis-Bacon Prevailing Wage Act.

Contract award will be granted to the most responsive and responsible contractor offering the lowest cost per individual unit rather than the lowest aggregate total. All projects over $2,000 must include Davis-Bacon wage determinations and certified payroll submissions using the current General Decision Number IL20260008 from SAM.gov. Contractors must submit required HUD forms including HUD-5370-EZ or HUD-5370, HUD-5370-C, HUD-2530, and HUD-5369-A through HUD-5369-C, along with the Davis-Bacon wage determination. The LCHA retains the right to reject any quote that does not meet budget requirements. Change orders require written documentation signed by both parties and must be submitted within 10 business days; increases in payable amounts may require approval by the LCHA Executive Director or Board. All waste materials must be disposed of in compliance with local, state, and federal guidelines. Contractors are responsible for inspecting finished work to ensure customer satisfaction and maintaining the highest standards of workmanship.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lake County Housing Authority 33928 North U.S. Highway 45, Grayslake, IL 60030

LCHA is a Fair Housing and Equal Opportunity Agency

847-223-1170 www.lakecountyha.org

REQUEST FOR BID No. RFB#26010; VACANT UNIT TURN SERVICES for Services to be provided at multiple sites

(5) Vacant Unit Turn Services

Purpose

The Lake County Housing Authority (LCHA) is seeking a qualified contractor to complete (5)

Vacant Unit Turn Services in accordance with the following Scope of Work at the listed locations.

Please submit a detailed proposal that includes separate line items for materials, labor and permits (if applicable) to address and repair the identified deficiencies.

By submitting a proposal, the vendor agrees that all work performed under this contract shall comply with the laws of the State of Illinois, applicable local building codes, and LCHA Policies and Procedures—including, but not limited to, the Illinois Employee Classification Act.

Please note that this project is subject to the Davis-Bacon Prevailing Wage Act. Certified payrolls must be submitted with all pay requests.

General Wage Determinations

A general wage determination reflects wage rates determined by WHD to be prevailing in a specific geographic area for a certain type of construction and does not expire.

General Davis-Bacon wage determinations are published online at www.sam.gov and are available for contracting agencies to incorporate into covered contracts and for contractors to post at the job site of covered projects.

The current wage determinations

SAM.gov

General Decision Number: IL20260008 05/18/2026

Modification No: 2 - 5/18/2026

County: Lake

Submit Certified Payroll forms with invoice https://www.dol.gov/sites/dolgov/files/WHD/legacy/files/wh347.pdf

You can find the full article at https://www.dol.gov/agencies/whd/government-contracts/construction/faq/conformance

#1 Shiloh Towers

1525 27th St. #304

Zion, IL 60099

Studio

Approx. 400 sq ft

#2 Millview Manor

801 Cunningham

#202 St Antioch, IL

60002 - 1 BR

Approx 550 sq ft

#3 Orchard Manor

465 Orchard Ave

#200 Antioch, IL

60002 - 1 BR

Approx 550 sq ft

#4 Orchard Manor

465 Orchard Ave

#203 Antioch, IL

60002 - 1 BR

Approx 550 sq ft

#5 John Kuester

Manor 310 Osage

Ave #106

Wauconda, IL

60084 - 1 BR

Approx 550 sq ft http://www.sam.gov/ https://sam.gov/wage-determination/2015-4935/28 https://www.dol.gov/sites/dolgov/files/WHD/legacy/files/wh347.pdf https://www.dol.gov/agencies/whd/government-contracts/construction/faq/conformance

In the event changes to the scope of the project or additional work become necessary or desired

(a “Change”), the parties shall follow the procedures set forth in this Section to memorialize the change (a “Change Order”). A Change Order shall be effective only if documented in writing, dated and signed by both parties, and expressly referencing this Agreement. The Change Order shall set forth in detail: (i) the Change requested, (ii) the reason for the proposed Change; (iii) the cost of the Change; and (iv) the Change’s impact on the time for completing the project.

If LCHA does not accept the Change Order in writing within 10 business days, the receiving party shall be deemed to have rejected the Change Order. If the parties cannot reach agreement on a proposed Change, Contractor shall nevertheless continue to render performance under this

Agreement in accordance with its (unchanged) terms and conditions.

Changes that involve modifying or increase in the amounts payable by LCHA may require execution by the Executive Director. Some increases may also require approval by LCHA Board.

AGENCY CONTACT PERSON (Note: Unless otherwise specified, all references herein to the

“Contracting Officer” or “CO” shall refer to the

Procurement Director.)

Stacy Davis-Wynn Program Procurement Director

Telephone: (847) 223-1170 Ext. 2210

E-mail: sdaviswynn@lakecountyha.org

TDD/TTY: (847) 223-1170

HOW TO OBTAIN THE IFB DOCUMENTS ON

THE EPROCUREMENT HOUSING AGENCY

MARKETPLACE

1. Access ha.internationaleprocurement.com

2. Click on the Login or “Sign-up now” button in the upper left side.

3. Follow the listed directions.

4. If you have any problems in accessing or registering on the eProcurement Housing Agency Marketplace, please call customer support at (866)526-9266.

BUILDING TOURS

Shiloh Towers

1525 27th St. Zion, IL

Friday – 8/14/2026 10:00 am thru 10:30 am CST

Millview Manor

801 Cunnigham St

Antioch, IL 60002

Friday – 8/14/2026 11:15 am thru 11:45 pm CST

Orchard Manor

465 Orchard Ave

Antioch, IL 60002

Friday – 8/14/2026 12:00 pm thru 12:45 pm CST

John Kuester Manor

310 Osage Ave

Wauconda, IL 60084

Friday – 8/14/2026 1:30 pm thru 2:00 pm CST

QUESTION SUBMITTAL DEADLINE 8/10/2026 through 8/21/2026 no later than 12 pm CST. Any questions must be submitted through the eProcurement Housing Agency

Marketplace portal ha.internationaleprocurement.com.

https://ha.internationaleprocurement.com/

HOW TO FULLY RESPOND TO THIS IFB BY

SUBMITTING A BID SUBMITTAL

1. As directed within Section 2.1.1 of the IFB document, enter proposed pricing provided within the eProcurement Housing

Agency Marketplace.

2. As instructed within Section 2.0 of the IFB document.

BID SUBMITAL RETURN & DEADLINE * 8/24/2026 by 2:00 pm CST

All submittals must be submitted electronically to ha.internationaleprocurement.com. No exceptions.

This timeline is subject to change.

#1 Scope of Work: Shiloh Towers 1525 27th St. #304 Zion, IL 60099

Unit Details:

Studio 1 Bath with approx. 400 sq ft

Entry & Common Areas

• Clean and inspect entry doors for proper function

• Sweep/mop hallways; ensure adequate lighting

• Test and replace smoke detectors as needed

• Repair holes, dents, chipped paint or any deficiencies on the doors attached to the unit

(interior, exterior)

General Interior

• Clean, patch, sand, prime (once), and paint (twice) as needed, walls, ceiling, doors, closets, shelves

• Clean ceiling fans, light fixtures, vents and corners

• Clean baseboards and trim replace as needed

• Clean windows, sills, frame and tracks

• Remove any cobwebs

• Add a new plunger to the unit LCHA will supply materials

• Make sure all outlets and light switches are operational if not, replace

• Test all light fixtures; replace bulbs as needed

• Test smoke and carbon monoxide detectors if missing install a new one

• Ensure thermostats are operational if not replace

• Clean air vents

• Clean interior and exterior window surfaces; confirm windows lock properly

• Make sure the screens are installed in all windows

• Check blinds/shades for damage and functionality replacement (if applicable) LCHA will supply materials

• Ensure doors are aligned, knobs and locks work properly

• Disinfect all surfaces (i.e. countertops, handles, outlets, switches)

• Remove all trash from the property

• Install new outlet covers and switch covers (i.e. discolored, painted, missing, damages, chipped, missing screws etc.) – Color white

• Strip and wax flooring

Living Room closets, shelves

• Clean windows, sills, frame and tracks

• Verify light fixtures and ceiling fans are working if not, replace if needed

• Remove old, antiquated intercom phone system

• Install new blinds LCHA will supply materials

• Install new baseboards

Kitchen closets, shelves

• Ensure countertops are clean and free of debris

• Make sure sink and faucet are functional with no leaks

• Clean the refrigerator inside and out; confirm it is cooling properly

• Clean oven range hood filter

• Clean oven hood

• Clean and test stove/oven ensure it works properly

• Clean pantry shelves (if needed)

• Install a new backsplash White in color LCHA will supply materials

• Install shelves if missing

• Make sure all plugs are GFCI and are functioning as intended

• Make sure GFCI outlet(s) is installed in the kitchen

• Clean baseboards

Bathroom(s)

• Make sure all plugs are GFCI and are functioning as intended

• Make sure GFCI outlet(s) is installed in the bathroom

• Make sure the mirror is clean

• Replace damaged/missing/discolored tiles in shower (if needed)

• Clean shower/tub; ensure proper drainage

• Re-caulk tub, shower, sink

• Clean, patch, sand, prime (once), and paint (twice) as needed, walls, ceiling, doors, closets, shelves

• Clean vanity, sink, and mirror; replace if needed

• Verify faucet and drain functionality

• Install a vanity liner underneath the sink LCHA will supply materials

• Ensure exhaust fan is operational

• Clean exhaust fan

• Ensure the towel bars(x2) and toilet paper holder (x1) are securely mounted if missing install new

• Replace flooring

Cleaning Checklist

• Sweep, vacuum, and mop all floors

• Wipe down baseboards and windowsills

• Clean interior windows

• Disinfect all surfaces (countertops, handles, switches)

• Clean all appliances inside and out

• Wipe down cabinets (inside and outside)

• Deep clean and sanitize the bathroom(s)

• Remove all trash from the property

Mechanical Systems Check

• Make sure electrical panels are labeled and accessible o Ensure panel for is not painted shut

• Test all plumbing fixtures (no leaks, proper water pressure)

#2 Scope of Work: Millview Manor 801 Cunningham #202 St Antioch, IL 60002

1 Bedroom 1 Bath with approx. 550 sq ft

Entry & Common Areas

• Clean and inspect entry doors for proper function

• Test doorbells and intercom systems (if needed)

• Sweep/mop hallways; ensure adequate lighting

• Check that handrails are secure; if not, adjust as needed

• Test and replace smoke detectors as needed

• Remove carpet and install flooring

• Clean ceiling fans, light fixtures, vents and corners

• Remove any ceiling fans found in the unit

• Clean windows, sills, frame and tracks

• Remove any cobwebs

• Add a new plunger to the unit LCHA will supply materials

• Make sure all outlets and light switches are operational if not, replace

• Test all light fixtures; replace bulbs as needed

• Test smoke and carbon monoxide detectors if missing install a new one

• Ensure thermostats are operational if not replace

• Clean air vents

• Clean interior and exterior window surfaces; confirm windows lock properly

• Make sure the screens are installed in all windows

• Ensure doors are aligned, knobs and locks work properly

• Disinfect all surfaces (i.e. countertops, handles, outlets, switches)

• Install new outlet covers and switch covers (i.e. discolored, painted, missing, damages, chipped, missing screws etc.)

• Remove carpet and install new flooring

• Verify light fixtures and ceiling fans are working if not, replace if needed closets, shelves

• Install new flooring

• Replace all cabinets (top & bottom) LCHA will supply materials

• Replace all countertops LCHA will supply materials

• Ensure countertops are clean and free of debris

• Make sure sink and faucet are functional with no leaks

• Install new stainless-steel sink LCHA will supply materials

• Install new kitchen sink liner LCHA will supply materials

• Install a new backsplash Almond/White LCHA will supply materials

• Install new kitchen faucet LCHA will supply materials

• Install new water supply lines

• Install new PVC for new kitchen sink

• Clean the refrigerator inside and out; confirm it is cooling properly

• Clean and test stove/oven ensure it works properly

• Clean oven range hood filter

• Clean oven hood

• Clean pantry shelves (if needed)

• Install shelves if missing

• Clean window

• Make sure all plugs are GFCI and are functioning as intended

• Make sure GFCI outlet(s) is installed in the kitchen

• Install baseboards

• Install new flooring

Bedroom #1

• Ensure closets are empty and doors function properly if not, replace (i.e. door, track, hardware)

• Make sure the lights are working if not, replace

• Install missing screens in window

• Clean, patch, sand, prime (once), and paint (twice) as needed, walls, ceiling, doors, closets, shelves

• Remove carpet and install new flooring

• Make sure GFCI outlet(s) is installed in the bathroom

• Make sure the mirror is clean

• Clean shower/tub; ensure proper drainage

• Re-caulk tub, shower, sink, toilet

• Clean, patch, sand, prime (once), and paint (twice) as needed, walls, ceiling, doors, closets, shelves

• Clean vanity, sink, and mirror; replace if needed

• Verify faucet and drain functionality

• Install a vanity liner underneath the sink LCHA will supply materials

• Ensure exhaust fan is operational

• Clean exhaust fan

• Ensure the towel bars(x2) and toilet paper holder (x1) are securely mounted if missing install new

• Wipe down baseboards and windowsills

• Clean interior windows

• Disinfect all surfaces (countertops, handles, switches)

• Clean all appliances inside and out

• Wipe down cabinets (inside and outside)

Mechanical Systems Check

• Make sure electrical panels are labeled and accessible o Ensure panel for is not painted shut

• Ensure panel for is not painted shut

#3 Scope of Work: Orchard Manor 465 Orchard Ave #200 Antioch, IL 60002

1 Bedroom 1 Bath with approx. 550 sq ft

• Test doorbells and intercom systems (if needed)

• Sweep/mop hallways; ensure adequate lighting

• Check that handrails are secure; if not, adjust as needed

• Contact staff if common mailboxes are not functional

• Test and replace smoke detectors as needed

• Clean ceiling fans, light fixtures, vents and corners

• Clean windows, sills, frame and tracks

• Remove any cobwebs

• Add a new plunger to the unit LCHA will supply materials

• Make sure all outlets and light switches are operational if not, replace

• Test all light fixtures; replace bulbs as needed

• Test smoke and carbon monoxide detectors if missing install a new one

• Ensure thermostats are operational if not replace

• Clean air vents

• Clean interior and exterior window surfaces; confirm windows lock properly

• Make sure the screens are installed in all windows

• Check blinds/shades for damage and functionality replacement (if applicable) LCHA will supply materials

• Ensure doors are aligned, knobs and locks work properly

• Disinfect all surfaces (i.e. countertops, handles, outlets, switches)

• Remove all trash from the property

• Install new outlet covers and switch covers (i.e. discolored, painted, missing, damages, chipped, missing screws etc.)

• Clean windows, sills, frames and tracks

• Clean, patch, sand, prime (once), and paint (twice) as needed, walls, ceiling, doors, closets, shelves

• Ensure countertops are clean and free of debris

• Make sure sink and faucet are functional with no leaks

• Install new kitchen sink liner LCHA will supply materials

• Clean oven range hood filter

• Clean oven hood

• Clean pantry shelves

• Install shelves if missing

• Make sure all plugs are GFCI and are functioning as intended

• Make sure GFCI outlet(s) is installed in the kitchen

• Make sure the lights are working if not replace fixture

• Install missing screens in window

• Clean, patch, sand, prime (once), and paint (twice) as needed, walls, ceiling, doors, closets, shelves

• Install new blinds LCHA will supply materials

• Remove carpet inspect flooring then install new flooring

• Make sure the mirror is clean

• Clean shower/tub; ensure proper drainage

• Re-caulk tub, shower, sink

• Clean, patch, sand, prime (once), and paint (twice) as needed, walls, ceiling, doors, closets, shelves

• Clean vanity, sink, and mirror; replace if needed

• Verify faucet and drain functionality

• Install a vanity liner underneath the sink LCHA will supply materials

• Ensure exhaust fan is operational

• Clean exhaust fan

• Ensure the towel bars(x2) and toilet paper holder (x1) are securely mounted if missing install new

• Replace medicine cabinet LCHA will supply materials

• Clean interior windows

• Disinfect all surfaces (countertops, handles, switches)

• Clean all appliances inside and out

#4 Scope of Work: Orchard Manor 465 Orchard Ave #203 Antioch, IL 60002

1 Bedroom 1 Bath with approx. 450 sq ft

• Sweep/mop hallways; ensure adequate lighting

• Test and replace smoke detectors as needed

• Make sure fire extinguishers are present and current (if not, present install new one)

(interior, exterior)

• Clean, patch, sand, prime (twice), and paint (twice) as needed, walls, ceiling, doors,

• Clean ceiling fans, light fixtures, vents and corners

• Clean baseboards and trim replace as needed

• Clean windows, sills, frame and tracks

• Remove any cobwebs

• Add a new plunger to the unit LCHA will supply materials

• Make sure all outlets and light switches are operational if not, replace

• Test all light fixtures; replace bulbs as needed

• Test smoke and carbon monoxide detectors if missing install a new one

• Ensure thermostats are operational if not replace

• Clean air vents

• Clean interior and exterior window surfaces; confirm windows lock properly

• Make sure the screens are installed in all windows

• Check blinds/shades for damage and functionality replacement (if applicable) LCHA will supply materials

• Ensure doors are aligned, knobs and locks work properly

• Disinfect all surfaces (i.e. countertops, handles, outlets, switches)

• Install new outlet covers and switch covers (i.e. discolored, painted, missing, damages, chipped, missing screws etc.)

• Clean, patch, sand, prime (twice), and paint (twice) as needed, walls, ceiling, doors, closets, shelves

• Clean windows, sills, frame and tracks

• Replace all cabinets (top & bottom) LCHA will supply materials

• Replace all countertops LCHA will supply materials

• Ensure countertops are clean and free of debris

• Make sure sink and faucet are functional with no leaks

• Install new kitchen sink liner LCHA will supply materials

• Install a new backsplash Almond/White LCHA will supply materials

• Install new stainless-steel sink LCHA will supply materials

• Install new kitchen faucet LCHA will supply materials

• Install new PVC for new kitchen sink

• Install new water supply lines LCHA will supply materials

• Install new oven/stove LCHA will supply materials

• Clean oven range hood filter

• Install oven hood

• Replace refrigerator

• Install missing screens in windows

• Clean pantry shelves (if needed)

• Install shelves if missing

• Clean window

• Make sure all plugs are GFCI and are functioning as intended

• Make sure GFCI outlet(s) is installed in the kitchen

• Clean flooring

• Install missing screens in window closets, shelves

• Make sure the mirror is clean

• Clean shower/tub; ensure proper drainage

• Re-caulk tub, shower, sink

• Clean, patch, sand, prime (once), and paint (twice) as needed, walls, ceiling, doors, closets, shelves

• Clean vanity, sink, and mirror; replace if needed

• Verify faucet and drain functionality

• Install a vanity liner underneath the sink LCHA will supply materials

• Ensure exhaust fan is operational

• Clean exhaust fan

• Ensure the towel bars(x2) and toilet paper holder (x1) are securely mounted if missing install new

• Install a new ADA toilet LCHA will supply materials

• Install new water line LCHA will supply materials

• Replace medicine cabinet LCHA will supply materials

• Install new vanity and sink LCHA will supply materials

• Install new PVC for new sink

• Clean interior windows

• Disinfect all surfaces (countertops, handles, switches)

• Clean all appliances inside and out

• Deep clean and sanitize the bathroom(s)

#5 Scope of Work: John Kuester Manor 310 Osage Ave #106 Wauconda, IL 60084

1 Bedroom 1 Bath with approx. 450 sq ft

Entry & Common Areas

• Clean and inspect entry doors for proper function

• Sweep/mop hallways; ensure adequate lighting

• Test and replace smoke detectors as needed

• Make sure fire extinguishers are present and current (if not, present install new one)

• Clean windows, sills, frames and tracks

• Clean windows, sills, frame and tracks

• Remove any cobwebs

• Add a new plunger to the unit LCHA will supply materials

• Make sure all outlets and light switches are operational if not, replace

• Test all light fixtures; replace bulbs as needed

• Test smoke and carbon monoxide detectors if missing install a new one

• Ensure thermostats are operational if not replace

• Clean air vents

• Clean interior and exterior window surfaces; confirm windows lock properly

• Make sure the screens are installed in all windows

• Ensure doors are aligned, knobs and locks work properly

• Disinfect all surfaces (i.e. countertops, handles, outlets, switches)

• Install new outlet covers and switch covers (i.e. discolored, painted, missing, damages, chipped, missing screws etc.)

• Install new blinds LCHA will supply materials closets, shelves

• Replace all cabinets (top & bottom) LCHA will supply materials

• Replace all countertops LCHA will supply materials

• Ensure countertops are clean and free of debris

• Make sure sink and faucet are functional with no leaks

• Install new kitchen sink liner LCHA will supply materials

• Install a new backsplash Almond/White LCHA will supply materials

• Install new stainless-steel sink LCHA will supply materials

• Install new kitchen faucet LCHA will supply materials

• Install water supply lines LCHA will supply materials

• Install new PVC for new kitchen sink

• Clean oven range hood filter

• Clean oven hood

• Clean and test stove/oven ensure it works properly

• Install undercabinet LED light

• Clean pantry shelves (if needed)

• Install shelves if missing

• Make sure all plugs are GFCI and are functioning as intended

• Make sure GFCI outlet(s) is installed in the kitchen hardware)

• Remove ceiling fan and replace it with light fixture

• Install missing screens in window

• Clean, patch, sand, prime (once), and paint (twice) as needed, walls, ceiling, doors, closets, shelves

• Install new blinds LCHA will supply materials

• Make sure GFCI outlet(s) is installed in the bathroom

• Make sure the mirror is clean

• Clean shower/tub; ensure proper drainage

• Re-caulk tub, shower, sink

• Clean, patch, sand, prime (once), and paint (twice) as needed, walls, ceiling, doors, closets, shelves

• Verify faucet and drain functionality

• Install a vanity liner underneath the sink LCHA will supply materials

• Ensure exhaust fan is operational

• Clean exhaust fan

• Ensure the towel bars(x2) and toilet paper holder (x1) are securely mounted if missing install new

• Install a new ADA toilet LCHA will supply materials

• Install new water line LCHA will supply materials

• Replace medicine cabinet LCHA will supply materials

• Install new vanity and sink LCHA will supply materials

• Install new bathroom sink

• Install new PVC for new sink

• Wipe down baseboards and windowsills

• Clean interior windows

• Disinfect all surfaces (countertops, handles, switches)

• Clean all appliances inside and out

• Remove all trash from the property

Please provide rates for the following:

Contractors must submit their official proposal along with the attached scope of work and all required documents listed under Attachment A as part of their response to this procurement opportunity. It is the Contractor responsibility to includes separate line items for materials, labor and permits (if applicable).

Contract award will be given to the most responsive and responsible contractor offering the lowest cost per individual unit, rather than the lowest aggregate total.

The Contractor shall dispose of all generated waste materials in compliance with all Local, State and Federal guidelines, regulations, and requirements.

Contractor must *Inspect finished work to ensure customer satisfaction and the highest possible standards of work.

Any construction project over $2,000 must submit Davis Bacon Wage forms.

LCHA will review responses and contact all vendors once the project has been awarded. The factors to be evaluated will include price and ability to fulfill the needs of LCHA.

LCHA Right to Reject any Quote/Proposal. LCHA has the right to reject and not consider any quote that does not meet the requirements of our housing authority budget.

Quotes/proposal are to be submitted no later than Monday, August 24, 2026, by 2 pm CST.

LCHA does not pay for quotes. Please submit your response to eProcurement Housing

Agency Marketplace at ha.internationaleprocurement.com.

Please note that each project is treated independently, and all required documentation must correspond to the specific project. All submitted forms must also reflect dates that align with the project timeline.

Given that conditions and requirements may change, any requested forms—such as HUD forms or the Form of Bid—must be completed and submitted for the current solicitation, even if similar documents were provided for past projects.

#1 Shiloh Towers

1525 27th St. #304

Zion, IL 60099

Approx. 450 sq ft

#2 Millview Manor 801

Cunningham #202 St

Antioch, IL 60002

Approx 550 sq ft

#3 Orchard Manor 465

Orchard Ave #200

Antioch, IL 60002

Approx 550 sq ft

#4 Orchard Manor 465

Orchard Ave #203

Antioch, IL 60002

Approx 550 sq ft

#5 John Kuester Manor

310 Osage Ave

Wauconda, IL 60084

Approx 550 sq ft

HUD Forms:

• Clauses in Table 5.1 of the HUD Procurement Handbook

• HUD-5370- EZ or HUD-5370 (Construction)

• Section II of form HUD-5370-C (Maintenance)

• HUD-2530 Previous Participation Certification

• HUD-5369-A Representations, Certifications, and Other Statements of Bidders

• HUD-5369-B Instructions to Offerors Non-Construction

• HUD-5369-C Certifications and Representations of Offerors

• Davis-Bacon Wage Determination SAM.gov

I agree with these terms, as written.

Name: _____________________________________________

Email: _____________________________________________

Company Name: ______________________________________

Signature: _________________________________________

Date: _________________________ https://www.hud.gov/sites/documents/74608c05pihh.pdf https://www.hud.gov/sites/dfiles/OCHCO/documents/5370-EZ.pdf https://www.hud.gov/sites/dfiles/OCHCO/documents/5370.pdf https://www.hud.gov/sites/dfiles/OCHCO/documents/5370C2.pdf https://www.hud.gov/sites/dfiles/OCHCO/documents/2530.pdf chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https:/www.hud.gov/sites/documents/5369-a.pdf chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https:/www.hud.gov/sites/documents/5369-b.pdf chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https:/www.ckha.com/Form%20HUD-5369C.pdf https://sam.gov/wage-determination/2015-4935/28