Bid #9787.1 Sligo Creek ES Switchboard Specifications.pdf

PDF 376 KB Posted

Attached to
BID 9787. 1 FEDERAL PACIFIC ELECTRICAL SWITCH-GEAR REPLACEMENT AT SLIGO CREEK ELEMENTARY SCHOOL
Solicitation number
BPM056053
Issued by
Montgomery County, Maryland

About this file

Sligo Creek Elementary School Switchboard Replacement - Electrical Specifications

This is a comprehensive electrical specifications document for the Sligo Creek Elementary School Switchboard Replacement project in Montgomery County, Maryland, prepared by James Posey Associates, Inc. The project involves the removal and replacement of an existing Westinghouse switchboard with a new switchboard, installation of new feeder cables from the existing transformer to the new switchboard, and replacement of existing fluorescent strip light fixtures with new LED lighting fixtures. The specifications are divided into multiple sections covering electrical general provisions, common work results, excavation and fill, demolition, firestopping, wiring, grounding and bonding, equipment foundations, conduits, boxes, surface raceways, service entrance, and identification systems. The work must comply with the National Electrical Code (NFPA 70), International Building Code (IBC), Maryland Occupational Safety and Health Act (MOSHA), and applicable state and local electrical codes. The electrical engineer of record is Patrick Marquez of James Posey Associates, Inc., located in Baltimore, Maryland.

The specifications establish detailed requirements for materials, equipment, installation methods, testing, and quality assurance throughout all phases of electrical work. Key provisions include mandatory use of UL-listed electrical components, specific conduit types and installation practices, copper building wire with color-coded identification, proper grounding and bonding systems with resistance-to-earth testing not exceeding 10 ohms, and comprehensive firestopping for fire-rated construction. The contractor must submit manufacturers' lists, shop drawings, product data, and test reports for approval before installation and must provide operation and maintenance manuals, warranty documentation, and record documents upon project completion. The specifications reference coordination with Pepco (the power company) for service entrance modifications, include detailed requirements for temporary facilities and protection measures, and mandate that all work be completed in a first-class, workmanlike manner with correction periods extending two years after substantial completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sligo Creek Elementary School - Switchboard Replacement Seals Page ©2026 James Posey Associates, Inc. 8213-25 00 0107 - 1

DOCUMENT 00 0107

SEALS PAGE

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Professional Seals and administrative information for the firms involved in the project.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE OF SEALS

A. Electrical Engineer Seal/Signature James Posey Associates, Inc. Patrick Marquez 11155 Red Run Blvd, Ste 310 License: Maryland Baltimore, MD 21117 pmarquez@jamesposey.com 410-265-6100

END OF DOCUMENT

8213-25 TOC - 1

Sligo Creek Elementary School Switchboard Replacement

Table of Contents

DIVISION 26 - ELECTRICAL

SECTION PAGES

26 0101 Electrical General Provisions 26 0101 - 1-9 26 0500 Common Work Results for Electrical 26 0500 - 1-4 26 0501 Excavation and Fill for Electrical Work 26 0501 - 1-4 26 0504 Electrical Demolition 26 0504 - 1-2 26 0507 Firestopping for Electrical Work 26 0507 - 1-5 26 0519 Wires and Cables 26 0519 - 1-4 26 0526 Grounding and Bonding 26 0526 - 1-3 26 0528 Equipment Foundations 26 0528 - 1-2 26 0533 Conduits 26 0533 - 1-7 26 0534 Boxes 26 0534 - 1-2 26 0535 Surface Raceways 26 0535 - 1-2 26 0541 Service Entrance 26 0541 - 1-2 26 0553 Identification for Electrical Systems 26 0553 - 1-5 26 0573 Fault Current and Overcurrent Protective Device Study 26 0573 - 1-5 26 2413 Switchboard 26 2413 - 1-7 26 2726 Wiring Device 26 2726 - 1-2 26 4313 Surge Protective Device 26 4313 - 1-3 26 5100 Interior Lighting 26 5100 - 1-4

Sligo Creek Elementary School - Switchboard Replacement Electrical General Provisions ©2026 James Posey Associates, Inc. 8213-25 26 0101 - 1

SECTION 26 0101

ELECTRICAL GENERAL PROVISIONS

A. General provisions and requirements for electrical work.

1.2 RELATED SECTIONS

A. Requirements of this section generally supplement requirements of Division 01.

1.3 REFERENCES

A. NFPA 10: Portable Fire Extinguishers.

B. NFPA 241: Safeguarding Construction, Alteration, and Demolition Operations.

1.4 SYSTEM DESCRIPTION

A. The full set of Contract Documents applies to work of Division 26.

B. Visit the site and study aspects of the project and working conditions, as required by General and Supplementary Conditions, Bidding and Contracting Requirements, Drawings, and Specifications.

Verify field dimensions.

C. The work covered in technical sections includes the furnishing of labor, equipment and materials, and the performance of operations pertinent to the work described.

D. Except as required otherwise in Division 01, promptly obtain and pay for necessary signatures and paperwork, permits, fees and inspections required for work of this division by authorities having jurisdiction, including any utility connection or extension charge. No payment will be made until a copy of the permit is forwarded to the Owner.

E. Electrical work of this project includes, as a brief general description, the following:

1. Replace existing switchboard manufactured by Westinghouse with a new switchboard.

2. Provide new feeder cables from the existing transformer to the new switchboard.

3. Replace existing fluorescent strip light fixtures with new LED lighting fixtures.

F. See Division 01 for requirements related to Owner’s occupancy of the premises, limits on use of site, time restrictions on work, limits on utility outages or shutdowns, and phasing (sequencing) and scheduling.

1.5 PRODUCT OPTIONS

A. Except as modified by provisions of Bidding and Contracting Requirements and Division 01, these options apply to Division 26 specifications.

B. General: Where Contractor is permitted to use a product other than the specified item and model named as the basis of design, Contractor is responsible for coordination and additional costs as specified in article “Substitutions” below for substitutions.

©2026 James Posey Associates, Inc. 8213-25 26 0101 - 2

C. Products specified by reference standards or by description only: Any product meeting those standards or description.

D. Products specified by naming one or more manufacturers, or model name or catalog reference number: Products specified establish a standard of quality, options to be included, and performance.

1. Where other acceptable manufacturers are named, Contractor may provide products of those named manufacturers only, which meet the specifications.

2. Where specification permits “equal” products, without naming other acceptable manufacturers, Contractor may use products of any manufacturer, which meet the specifications.

E. Products specified by naming one manufacturer and particular product, with no provision for other options: No options or substitutions allowed.

1.6 SUBSTITUTIONS

A. Substitutions will be considered only as permitted or required by the Bidding and Contracting Requirements and Division 01. Except as modified by those requirements, the requirements below apply to Division 26 specifications.

B. Substitutions may be considered when a product becomes unavailable through no fault of the

Contractor.

C. Document each request with complete data substantiating compliance of proposed substitution with contract documents.

D. A request constitutes a representation that the Bidder or Contractor:

1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product.

2. Will provide the same warranty for the substitution as for the specified product.

3. Will coordinate installation and make changes to other work which may be required for the work to be complete with no additional cost to Owner.

4. Waives claims for additional costs or time extension which may subsequently become apparent.

5. Will reimburse Owner for review or redesign services associated with re-approval by authorities.

E. Substitutions will not be considered when they are indicated or implied on shop drawing or product data submittals, without separate written request, or when acceptance will require revision to the Contract Documents.

F. Substitution submittal procedure is specified in Bidding and Contracting Requirements and

Division 01.

1.7 MATERIALS AND EQUIPMENT

A. Materials and equipment shall be new and the best of their respective kinds, suitable for the conditions and duties imposed on them by the project, and of representative manufacturer. The description, characteristics and requirements of the materials to be used shall be in accordance with the specifications.

B. Equipment, construction and installation must meet requirements of local, state and federal governing codes.

©2026 James Posey Associates, Inc. 8213-25 26 0101 - 3

C. Singular number: In cases where material, a device, or part of the equipment is referred to in the singular number in the specifications, it is intended that such reference shall apply to as many items of material, devices, or parts of the equipment as are required to complete the installation as shown on the drawings or required for proper operation of the system.

D. Terms have the following meanings:

1. Furnish: Supply item

2. Install: Mount and connect item

3. Provide: Furnish and install

E. Materials and equipment shall be installed and completed in a first class and workmanlike manner and in accordance with the best modern methods, practice and manufacturers’ instructions. Any work which shall not present an orderly and neat or workmanlike appearance shall be removed and replaced with satisfactory work when so directed in writing by the Architect.

F. The specifications and drawings are intended to define the minimum requirements, as to quality of materials, construction, finish and overall workmanship.

G. General Conditions describe the correlation and intent of the Contract Documents. In case of discrepancies between the specifications and drawings, the specifications should be followed as to the general methods and principles and the drawings followed as to sizes, capacities and specifics for corresponding parts. If sizes are omitted, the Architect will determine sizes to be utilized.

H. In cases of doubt, uncertainty, or conflict as to the true meaning of the specifications or drawings, it is the responsibility of the Contractor to notify the Architect of said uncertainty, doubt, or conflict and obtain a decision as to the intent prior to initiating any work which may be affected by this decision.

1.8 COORDINATION

A. Should a situation develop during construction to prevent the proper installation of any equipment or item where shown on the drawings, call the situation to the attention of the Architect and await a written decision.

B. Plan and coordinate work to proceed in an orderly and continuous manner without undue delay, and in conformance with the project schedule. Submit samples, shop drawings, schedules, insurance policies and certificates, and the like in time to avoid delays in actual construction.

Coordinate electrical work so that work of each trade is completed before other construction begins which would obstruct it.

C. Coordinate trades to ensure that proper clearances between work of the various trades allow access to items which require operation and maintenance.

D. Coordinate location and elevation of conduit, light fixtures, equipment, and appurtenances in such a manner that the finished installation is as indicated on drawings. In the event difficulties are encountered which prevent this, it is the Contractor’s responsibility to bring this to the attention of the Architect prior to initiation of work. Correct improperly coordinated installation at no additional cost.

E. The Contractors’ assistants shall include a competent electrical foreman, who shall be on the premises at all times to check, layout, coordinate and superintend the installation of work. The foreman shall establish basic requirements relative to the work before starting, and be responsible for the accuracy thereof.

©2026 James Posey Associates, Inc. 8213-25 26 0101 - 4

1.9 SUBMITTALS

A. Manufacturers’ and subcontractors’ lists:

1. As specified in Division 01, submit a complete list of proposed manufacturers for equipment, materials and subcontractors used for the work of this division. Lists shall follow the sequence of the specifications. No considerations will be given for partial or incomplete lists.

After review of lists, submit shop drawings and product data.

B. Shop drawings and product data:

1. Submit in accordance with the requirements of Division 01 or as established at the preconstruction conference, the required number of copies of Shop Drawings and Product Data for every item of equipment. Shop drawings or product data will not be considered until Manufacturers’ Lists have been approved. Shop drawings and product data shall be submitted, as required by the General Conditions, with sufficient time for checking, return to Contractor, and resubmission as required before Contractor shall install any item.

2. Each item submitted shall be properly labeled, indicating the specific service for which the equipment or material is to be used, section and paragraph number of specification or drawing number to which it applies, Contractor’s name and project name and number. Data submitted shall be specific and shall include product data and printed information in sufficient detail and scope to verify compliance with requirements of the contract documents. Clearly identify each item within the data. Data of a general nature will not be accepted. Each sheet must clearly show the project name and number.

3. The review of a shop drawing or product data shall not be considered as a guarantee of the measurements or building conditions or that the shop drawings or product data have been checked to see that item submitted properly fits the building conditions. This review shall not relieve the Contractor of the responsibility for furnishing material or performing work as required by the contract documents, for correctness of dimensions and quantities, or for proper coordination of details and interfaces among trades.

4. Exclusively electrical items furnished as items associated with mechanical items but not specifically described in the mechanical item submission, shall be submitted as a separate submittal but shall be clearly marked as associated with the mechanical item by identified specification paragraph.

5. Product data sheets shall be 8.5-inches by 11-inches cut sheets for operating and maintenance manual.

C. Submit the results of every test required under any section in this division.

D. After the work is completed, submit required certificates of approval from approved inspection agencies and authorities having jurisdiction over work of this division. Certificates of approval must be received by the Architect prior to final acceptance of the work.

1.10 CONTRACT CLOSEOUT SUBMITTALS

A. Project record documents:

1. Maintain on site one set of the following record documents; record actual revisions to the work of this division:

a. Contract Drawings.

b. Specifications.

c. Addenda.

d. Change Orders and other Modifications to the Contract.

e. Reviewed shop drawings, product data, and samples.

©2026 James Posey Associates, Inc. 8213-25 26 0101 - 5

2. Maintain record documents separate from documents used for construction.

3. Record information concurrent with construction progress.

4. Specifications: Legibly mark and record in each section a description of actual products installed, including the following:

a. Manufacturer’s name and product model and number.

b. Product options, substitutions, or alternates utilized.

c. Changes made by addenda and modifications.

5. Record documents and shop drawings: Legibly mark each item to record actual construction, including:

a. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the work.

b. Field changes of dimension and detail.

c. Details not on original Contract Drawings.

6. Submit documents as specified in Division 01.

B. Operation and maintenance data:

1. Submit data prior to final inspection as specified in Division 01. In addition to requirements specified in Division 01, submit operating and maintenance manuals for the work of this division as specified below.

2. Prepare covers with printed title “OPERATION AND MAINTENANCE INSTRUCTIONS,” and title of project.

3. Internally subdivide the contents with permanent page dividers, logically organized as described below.

4. Contents: Prepare a Table of Contents, with each product or system description identified.

5. Part 1: Directory, listing names, addresses, and telephone numbers of electrical engineers;

contractor; electrical subcontractors; and major electrical equipment suppliers.

6. Part 2: Operation and maintenance instructions, arranged by specification section. For each category, identify names, addresses, and telephone numbers of subcontractors and suppliers. Identify the following:

a. Significant design criteria.

b. List of equipment.

c. Parts list for each component, including recommended spare parts list.

d. Operating instructions.

e. Maintenance instructions for equipment and systems.

f. Maintenance instructions for special finishes, including recommended cleaning methods and materials and special precautions identifying detrimental agents.

7. Part 3: Project documents and certificates, including the following:

a. Shop drawings and product data.

b. Photocopies of certificates.

c. Photocopies of warranties, guarantees, and bonds.

d. Test reports: Copies of the results of tests required under sections of specifications.

8. Submit data in final form 15 days prior to final inspection. This data will be returned after final inspection, with Engineer comments. Revise content of documents as required prior to final submittal.

9. Submit final revised data within ten days after final inspection.

10. Submit operation and maintenance data in electronic format.

©2026 James Posey Associates, Inc. 8213-25 26 0101 - 6

1.11 REGULATORY REQUIREMENTS

A. When these specifications call for materials or construction of a better quality or larger sizes than required by the following codes and standards, the provisions of the specifications shall take precedence.

B. Provide, without extra charge, any additional materials and labor which may be required for compliance with these codes and standards even though the work is not mentioned in these specifications or shown on the contract drawings.

C. Perform the work of this division in strict accordance with the following authorities. The latest revision of these codes accepted by the authority having jurisdiction as of the date of the contract documents shall apply.

1. The electrical, building, fire, and safety codes of the state and county or city in which the work is being performed.

2. The National Electric Code, NFPA 70 (NEC).

3. The National Fire Protection Association Code (NFPA).

4. International Building Code (IBC).

5. International Energy Conservation, Fire, and Electrical Codes (ICC).

1.12 REFERENCE STANDARDS

A. Perform the work of this division using the standards of the following organizations, as referred to in technical sections, as a minimum requirement for construction and testing. Unless specified otherwise in Bidding and Contract Documents or Division 01, the latest revision current as of the date of the contract documents shall apply.

1. American National Standards Institute (ANSI)

2. American Society for Testing and Materials (ASTM)

3. International Code Council (ICC)

4. Institute of Electrical and Electronics Engineers (IEEE)

5. National Electrical Code (NEC) (NFPA 70)

6. National Electrical Manufacturer’s Association (NEMA)

7. National Fire Protection Association (NFPA)

8. The Occupational Safety and Health Act (OSHA)

9. Underwriters Laboratory Inc. (UL)

10. American Association of State Highway and Transportation Officials (AASHTO)

11. American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE)

12. Maryland Occupational Safety and Health Act (MOSHA)

13. Illuminating Engineering Society of North America (IESNA)

1.13 TEMPORARY STORAGE

A. Maintain upon premises, where directed, a storage area, and be responsible for contents within these areas. Provide security measures necessary for this area.

B. Area shall be maintained and shall be returned to original condition at the completion of the project.

C. Store electrical construction materials such as wire, raceways and boxes, devices, and equipment in buildings, enclosed trailers, or portable enclosed warehouses.

1. Materials and products subject to damage from moisture: Store in dry locations. If necessary, protect with protective wraps or covers.

©2026 James Posey Associates, Inc. 8213-25 26 0101 - 7

2. Plastics and other materials and products subject to damage from heat or cold: Store at manufacturer’s recommended temperatures.

3. Plastics and other materials and products subject to damage from sunlight: Protect from sunlight.

D. Electrical equipment such as motor controllers, panelboards and circuit breakers stored before installation and installed during construction: Provide clean, dry locations at manufacturer’s recommended temperatures, and cover or wrap if required to protect from incidental damage.

1.14 PROTECTION

A. Control dust resulting from construction work to prevent its spread beyond the immediate work area, and to avoid creation of a nuisance.

1. Do not use water to control dust. Use drop cloths or other suitable barriers.

2. In areas where dirt or dust is produced as a result of the work, sweep daily, or more often as required.

3. Provide walk-off mats at entries and replace them at regular intervals.

4. Construct dust partitions, where indicated on the drawings or as required.

5. Protect areas occupied by Owner’s personnel or equipment.

B. Each trade and subcontractor is responsible for preventing damage and soiling of work performed by other trades or subcontractors. Each trade and subcontractor is responsible for providing temporary protection of its own work.

1. Protect work from spills, splatters, drippings, adhesives, bitumens, mortars, paints, plasters, and damage from welding or burning.

2. Protect finished work from damage, defacement, staining, or scratching.

3. Protect finishes from cleaning agents, or grinding and finishing equipment.

4. Protect adjacent and finished work from damage, using tape, masking, covers or coatings and protective enclosures.

5. Coordinate installations and temporarily remove items to avoid damage from finishing work.

C. Repair damage or soiling to the complete satisfaction of the Architect; replace any materials or work damaged to such an extent that they cannot be restored to their original condition, at no addition to the Contract sum.

D. Protect work stored in place and supplies stored in the building.

1. Store materials and products, subject to damage from moisture, in dry locations. If necessary, protect in wraps or covers.

2. Store plastics, other materials, and products subject to damage from heat or cold at manufacturer’s recommended temperatures.

E. Protect electrical materials and products from weather events and accidents of construction.

F. Use of sidewalk or roadway areas outside of the property lines shall be with permission and approval of the local authorities having jurisdiction.

1.15 FIRE PROTECTION

A. As a minimum, provide hand-carried, portable, UL-rated extinguishers with each work crew working inside the building.

B. Select extinguishers in accordance with NFPA 10 and NFPA 241 for classification, extinguishing agent, and size required by location and class of fire exposure.

©2026 James Posey Associates, Inc. 8213-25 26 0101 - 8

1.16 PROJECT CONDITIONS

A. Drawings showing utilities in concealed locations are based on the best information available but are not represented as being precisely correct. Work of the contract includes digging, cutting, drilling, using nondestructive methods, and other methods of locating concealed utilities in the field, as well as patching and repairing as specified in “Cutting and Patching” below.

B. If, in the course of the work, workers encounter a material they suspect to present some hazard:

1. Promptly notify the Owner in writing.

2. Do not perform any work which would disturb the suspected material until written instructions have been received.

1.17 WARRANTY

A. Work and equipment provided as work of this division shall be fully warranted under the general project warranty. In addition, provide added special warranties as specified in individual sections.

B. During the correction period, the Contractor shall begin correcting any work found to be not in accordance with the requirements of the Contract Documents within 4-hours of receiving written notice from the Owner. Provide detailed schedule for completion of work within 24-hours of receiving written notice from the Owner and revise schedule based on any Owner comments generated. Except as otherwise required in General Conditions and Division 01, the correction period is two years after the date of substantial completion of the work. Work requiring correction shall promptly be repaired or completely replaced at no addition to the Contract Sum.

1. Service reports for warranty work shall be provided to the Owner.

C. When use of the permanent equipment has been permitted for temporary services during construction of the building, the warranty and correction periods shall nevertheless begin at the time of substantial completion, unless another date of acceptance has been agreed to by the Owner.

D. Special warranties are warranties required by individual specification sections, incidental product warranties, manufacturers’ standard warranties, installer or subcontractor service agreements, and other individual warranties in addition to the general project warranty.

E. Provide copies of warranties as required for Operation and Maintenance Manual specified above, and by Division 01.

F. For items of work delayed beyond date of substantial completion, provide updated submittal within ten days after acceptance, listing date of acceptance as start of warranty period.

PART 2 - PRODUCTS (NOT USED)

3.1 CUTTING AND PATCHING

A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.

B. Cut walls, floors, partitions, roofs, and other appurtenances for the passage or accommodation of conduits. Close superfluous openings and remove debris caused by work of this division.

©2026 James Posey Associates, Inc. 8213-25 26 0101 - 9

C. No cutting of any structure or finish shall be done until the condition requiring such cutting has been examined and approved by the Architect.

D. New or existing surfaces disturbed as a result of such cutting or otherwise damaged shall be restored to match original work and materials used for any patching or mending shall conform to the class of materials originally installed.

E. Refinish surfaces to match adjacent finish. For continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit.

3.2 TEMPORARY FACILITIES

A. Temporary water facilities, electricity, telephone, toilet facilities, and temporary heat, shall be provided as specified in Division 01.

3.3 PROGRESS MEETINGS

A. Progress meetings shall be held as specified in Division 01, and also when and if the Contractor or Engineer finds them necessary or advantageous to progress of work.

B. Contractor, those subcontractors and those material suppliers concerned with current progress or with the scheduling of future progress, Architect and Owner shall each be represented at these meetings by persons familiar with the details of work and authorized to conclude matters relating to work progress.

END OF SECTION

Sligo Creek Elementary School - Switchboard Replacement Common Work Results for Electrical ©2026 James Posey Associates, Inc. 8213-25 26 0500 - 1

SECTION 26 0500

COMMON WORK RESULTS FOR ELECTRICAL

A. Requirements applicable to work of more than one section of Division 26.

B. Basic materials and equipment required for electrical work.

C. Date sensitive equipment.

D. Operating instructions.

E. Testing wiring systems.

A. Project and special warranties: Division 01 and Section 26 0101.

B. Operation and Maintenance Manuals: Division 01 and Section 26 0101.

1.3 DEFINITIONS

A. Project correction period: A period after Substantial Completion of the work during which the Contractor shall correct every part of the work found to be not in accordance with the requirements of the contract documents, promptly after receipt of written notice.

B. Qualified testing agency: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspecting indicated, as documented according to ASTM E 548; and with additional qualifications specified in individual sections; and where required by authorities having jurisdiction, that is acceptable to authorities.

1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7.

2. NVLAP: A testing agency accredited according to NIST's National Voluntary Laboratory

Accreditation Program.

1.4 DESIGN REQUIREMENTS

A. The drawings and system performances have been designed on the basis of using the particular manufacturers’ products specified and scheduled on the drawings.

B. Products of other manufacturers that are listed under the article “Acceptable Manufacturers,” or permitted as “equal,” are permitted provided:

1. Product shall meet the specifications.

2. Contractor shall make, without addition to the contract sum, all adjustments for deviations so that the final installation is complete and functions as the design basis product is intended.

C. Do not propose products with dimensions or other characteristics different from the design basis product that make their use impractical or cause functional fit, access, or connection problems.

©2026 James Posey Associates, Inc. 8213-25 26 0500 - 2

1.5 QUALITY ASSURANCE

A. Provide materials and perform work in accordance with the electrical, building, fire, and safety codes and regulations of the state, county, or city in which the work is performed.

B. Electrical control panels, equipment, materials and devices provided or installed as work of

Division 26 shall bear UL label, or, if UL label is not available, the item shall be tested and labeled by a qualified testing agency, acceptable to authorities having jurisdiction, and in accordance with NFPA 70. Provide testing, if required, without addition to the contract sum.

C. VOC content: Field-applied adhesives and sealants, limits per South Coast Air Quality

Management District (SCAQMD), Rule No. 1168.

D. Products shall contain no urea-formaldehyde content.

PART 2 - PRODUCTS

2.1 GENERAL

A. Techniques, testing, and operating instructions specified in this section apply to products specified in other sections of Division 26.

B. Equipment that uses or processes date and time data in order to perform its function shall be warranted by the manufacturer to properly function and correctly use or process all time-related data for all dates and times which occur during a reasonable life expectancy of the equipment.

2.2 MATERIALS

A. Electrical equipment backing panels: Plywood, DOC PS 1, Exposure 1, C-D Plugged, fire-retardant treated in accordance with AWPA C27, in thickness indicated, not less than 0.5 inches nominal.

1. One side finished.

B. Wood-preservative-treated lumber: Treated by pressure process, AWPA C2, with chemicals acceptable to authorities having jurisdiction, and marked with treatment quality mark of an inspection agency approved by the ALSC Board of Review.

1. Application: Treat items indicated on the drawings, and the following:

a. Wood cants, nailers, curbs, equipment support bases, blocking, stripping, and similar members in connection with roofing, flashing, vapor barriers, or waterproofing.

b. Wood sills, sleepers, blocking, and similar concealed members in contact with masonry or concrete.

c. Wood framing and furring attached directly to the interior of below-grade exterior masonry or concrete walls.

d. Wood framing members that are less than 18 inches above the ground in crawlspaces or unexcavated areas.

e. Wood floor plates that are installed over concrete slabs-on-grade.

C. Aircraft cable: 0.25-inch steel wire rope, galvanized, construction 7 by 19 strands, minimum 7000 pounds breaking strength.

©2026 James Posey Associates, Inc. 8213-25 26 0500 - 3

2.3 DATE-SENSITIVE EQUIPMENT

A. Date-sensitive equipment: Systems, equipment, or components which use or process date and time data in order to perform their functions.

B. Each item of date-sensitive equipment used in the project shall be warranted by the manufacturer to properly function and correctly use or process all time-related data for all dates and times which occur during a reasonable life expectancy of the equipment.

3.1 GENERAL

A. Manufacturers’ instructions: Except as modified by drawings or specifications, install products and equipment in accordance with manufacturers’ instructions and recommendations applicable to the project conditions.

1. Immediately notify Engineer if a difference or discrepancy is found between manufacturers’ instructions and the drawings or specifications.

B. The contract drawings are diagrammatic, and do not indicate all fittings or offsets in conduit or all pull boxes, access panels, or other specialties required. Provide required fittings, offsets, access panels, and specialties to coordinate the work.

C. No conduit shall be run below the head of a window or door.

D. Equipment and conduits installed in areas without a suspended ceiling shall be as tight to structure as possible, but at least above a height of 6'-8", unless otherwise noted.

E. Items which require access for operation or maintenance shall be easily accessible. Do not cut or form hand holes for operation or maintenance of appliances through walls or ceilings.

3.2 INSTALLATION OF PRODUCTS AND EQUIPMENT

A. Install conduit exposed to view parallel with the lines of the building and as close to walls, columns, and ceilings as may be practical, maintaining adequate clearance for access at parts requiring servicing.

B. Install conduit a sufficient distance from other work to permit a clearance of not less than

0.5 inches between its finished covering and adjacent work.

C. Pull boxes and other appurtenances which require operation or maintenance shall be easily accessible. Do not cut or form handholes for operation or maintenance of appliances through walls or ceilings.

D. Install plywood backing panels with finished face exposed.

3.3 OPERATING INSTRUCTIONS (DEMONSTRATION)

A. Furnish the necessary technicians, skilled workers, and helpers to operate the electrical systems and equipment of the entire project for one 8-hour day.

B. Where specified in technical sections, provide longer periods required for specialized equipment.

©2026 James Posey Associates, Inc. 8213-25 26 0500 - 4

C. Instruct the Owner or designated personnel in operation, maintenance, lubrication, and adjustment of systems and equipment.

1. Instructions by manufacturer's technical representative for each type of equipment shall include the performance of the recommended preventive maintenance procedures for that equipment.

D. The Operating and Maintenance Manual shall be available at the time of the instructions for use by instructors and Owner personnel.

E. Schedule the general and specialized instruction periods for a time agreed upon by the Owner and Engineer.

3.4 TESTS

A. During the progress of the work and after completion, test the branch circuits and distribution system, and the low-voltage alarm and signal systems.

B. Results of the tests shall show that the wiring meets the requirements of this specification.

Should any test indicate defect in materials or workmanship, immediately repair, or replace with new, the faulty installation, and retest the affected portions of the work.

C. Furnish equipment and instruments necessary for testing.

D. Tests shall demonstrate the following:

1. Lighting, power, and control circuits are continuous and free from short circuits.

2. Circuits are free from unspecified grounds.

3. The resistance to ground of each non-grounded circuit is not less than one megohm.

4. Circuits are properly connected in accordance with the applicable wiring diagrams.

5. Circuits are operable. Demonstration shall include functioning of each control not less than ten times, and continuous operation of each lighting and power circuit for not less than 0.5 hour.

E. Test circuit breakers larger than 100 amperes at full voltage.

F. Make voltage built-up tests with a voltage sufficient to determine that no short circuits exist.

G. Immediately repair defects and retest until systems are operating correctly.

H. Submit test reports.

Sligo Creek Elementary School - Switchboard Replacement Excavation and Fill for Electrical Work ©2026 James Posey Associates, Inc. 8213-25 26 0501 - 1

SECTION 26 0501

EXCAVATION AND FILL FOR ELECTRICAL WORK

A. Trenching, backfilling, and compacting for electrical work underground.

B. Restoring and reseeding grassed areas.

A. Cutting and patching Section 26 0101.

B. Conduit: Section 26 0533.

C. Identification for electrical systems: Section 26 0553.

A. ASTM D 1557: Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbs/cu ft).

1.4 SUBMITTALS

A. Shop drawings: At the same scale as the contract drawings, showing field verified locations of utilities, and proposed detailed trenching plan.

B. Product data: Seed and mulch.

C. Certifications: Test reports showing that compaction meets specified requirements.

2.1 MATERIALS

A. Backfill: Earth materials, free from perceptible amounts of wood, debris, or topsoil, free of frost at the time of placement, and not containing marl or other elements which tend to stay in a plastic state.

B. Grass seed: Fresh new-crop seed, 90 percent pure and 85 percent germination. Mix: 70 percent

Kentucky Bluegrass, 25 percent Red Fescue and 5 percent Red Top. Only strains of Kentucky Bluegrass found adaptable to Maryland shall be acceptable.

C. Mulch: Free of sticks, weeds, or other foreign matter; either licorice root, tan root, or tan bark;

fibrous by-product of extraction. Use only one type throughout the project.

2.2 EQUIPMENT

A. Mechanical tampers for compacting backfill: Capable of exerting a blow equal to 250 pounds per square foot (12 kPa) of area of the tamping face.

©2026 James Posey Associates, Inc. 8213-25 26 0501 - 2

3.1 PREPARATION

A. Contact local utility company underground information service (Pepco) before beginning excavation outside buildings.

B. The general locations of underground utilities are indicated on the drawings and are not to be assumed to be accurate or complete. Before beginning work, field check the area with the most accurate instruments available, such as Fisher Labs’ Pipe and Cable Locators.

3.2 INSTALLATION

A. Perform excavating, cutting of paved areas, trenching, sheeting, shoring, backfilling, and compacting required for the proper installation of the work.

B. Where obstructions are encountered, obtain written approval and make necessary changes in line, grade, or location.

C. Protect existing utilities from damage during excavation and backfilling. Repair damaged new or existing work at no addition to the contract sum. Bracing, shoring and other protection of existing utilities is part of this work.

3.3 TRENCHING

A. Excavations inside the building shall be carefully planned. Stockpile excavated earth so as not to interfere with other construction. Dig trenches to the proper depths, providing extra depressions where required for hubs of pipes.

B. Excavations outside the building shall generally follow the routes indicated on the drawings.

Stockpile topsoil separately for later replacement. Excavations shall be of sufficient depths to provide, unless indicated otherwise on the drawings, a minimum cover as follows:

1. Electrical conduit: Depth required by NFPA 70 (NEC).

C. Trenches shall be of necessary depth and width for the proper laying of conduit with a minimum of 8 inches on each side of the joint.

1. The sides shall be as nearly vertical as practicable. Unless local regulations are more strict, trenches 4 feet and deeper shall have shored sides as required by OSHA trenching regulations.

2. The bottoms of trenches shall be accurately graded to provide uniform bearing and support for each section of conduit on undisturbed soil at every point along its entire length, except for bell holes.

3. No greater length of trench shall be left open, in advance of the completed structure placed in it, than can be completed in that day’s operation.

4. Except where rock is encountered, do not excavate below the depths required. Where rock excavation is required, excavate to a depth of at least 6 inches (150 mm) below the trench depth and fill the overdepth with compacted crusher run or bank run stone or sand.

Unauthorized overdepths in excavation shall be backfilled with crushed stone, slag or gravel, thoroughly compacted.

5. Whenever wet or otherwise unstable soil is encountered, it shall be removed to the depth and extent directed, and the trench backfilled to the proper grade with crushed stone, slag or gravel.

©2026 James Posey Associates, Inc. 8213-25 26 0501 - 3

D. Should springs be encountered within the work area, or soft soil conditions at the elevations required for load bearing, immediately notify the Engineer and do not place any portion of the work on such surfaces until instructions are received.

E. Furnish and maintain pumps, flumes, gutters, and appurtenances if required to keep the excavations free from water. Water shall be directed to a point remote from building operations, shown on the approved shop drawing.

3.4 BACKFILL

A. Place no backfill until the adjacent construction or the utility to be covered has been inspected, tested, and approved.

B. Installing underground warning tape: Install in backfill above exterior buried lines not encased in concrete. Select legend and color appropriate for type of line. Install metallic lined tape for non-metallic lines. Install approximately 12 inches (305 mm) below grade.

C. Electrical systems backfill:

1. Backfill and compact in 8-inch layers, to level finished grade with the excavated materials approved for backfilling.

2. Surplus earth shall be mounded up on excavation and left to settle. When directed by the

Engineer, surplus earth shall be removed and excavations leveled off to proper grade.

Where direct burial cables are placed in trenches, first cover the cables with clean earth.

3.5 COMPACTION

A. Test in accordance with the requirements of ASTM D 1557.

B. Compact under slabs, roads, and sidewalks to a 95 percent density.

C. Compact unpaved areas to a 90 percent density.

D. Backfill and compact trench in unpaved areas to within 4 inches (102 mm) of existing grade.

Furnish and install compacted select topsoil for the final layer to finish even with existing grade.

Remove surplus earth and rake unpaved areas for final planting.

E. Take particular care in compaction of earth under joints of mechanical piping.

3.6 SEEDING

A. Seed disturbed grass areas at the rate of 5 pounds per 1000 square feet, with the seed mix specified.

B. Uniformly distribute seed with an approved machine to ensure a covering of plus or minus 1/4 inches. Sow half of the seed in one direction and the rest at right angles.

C. Do not seed during windy weather or when ground is wet or otherwise untillable. Seed between the dates of March 1st to May 1st or August 15 to October 15 unless otherwise approved in writing.

©2026 James Posey Associates, Inc. 8213-25 26 0501 - 4

3.7 MULCHING

A. Mulch seeded areas immediately following seeding with fibrous mulch evenly applied at an average rate of 2 tons per acre so as to provide a loose depth of not less than 2 inches.

B. Wet down mulch, unless a heavy rain wets it, to the Engineer’s satisfaction, immediately after application.

Sligo Creek Elementary School - Switchboard Replacement Electrical Demolition ©2026 James Posey Associates, Inc. 8213-25 26 0504 - 1

SECTION 26 0504

ELECTRICAL DEMOLITION

A. Extent and location of demolition are shown on the drawings.

1.2 QUALITY ASSURANCE

A. Demolition shall be carried out as expeditiously as possible, in accordance with accepted practice and applicable building code provisions.

1.3 PROJECT CONDITIONS

A. If, in the course of the work, workers unexpectedly encounter a material not identified for special removal but which they suspect to be asbestos, to contain lead or PCBs, or to present some other hazard:

1. Promptly notify the Owner and Engineer in writing.

2. Do not perform any work which would disturb the suspected material until written instructions have been received.

B. Protect adjacent materials indicated to remain. Install and maintain dust and noise barriers to keep dirt, dust, and noise from being transmitted to adjacent areas. Remove protection and barriers after demolition operations are complete.

C. Locate, identify, and protect mechanical and electrical services passing through demolition area and serving other areas outside the demolition limits. Maintain services to areas outside demolition limits. When services must be interrupted, install temporary services for affected areas.

PART 2 - PRODUCTS (NOT USED)

A. Protect existing building and equipment that is to remain, particularly to prevent entry of either dust or water. Ensure weathertightness at all times. Keep materials on hand to patch and maintain protection.

3.2 DEMOLITION

A. Perform removal work neatly with the least possible disturbance to the building.

B. Provide temporary barriers, danger signals, and appurtenances for protection of personnel and equipment during removal operations.

C. Demolish, remove, demount, and disconnect inactive and obsolete conduit, fittings and specialties, equipment, and fixtures.

1. Conduit and ducts embedded in floors, walls, and ceilings may be abandoned in place if they do not interfere with new installations. Cut back to at least one inch below finished surface.

Sligo Creek Elementary School - Switchboard Replacement Electrical Demolition ©2026 James Posey Associates, Inc. 8213-25 26 0504 - 2

2. Remove materials above accessible ceilings.

3. Disconnect and cap items to remain behind finished surfaces.

4. Patch and repair surface materials as required in Division 01 and Section 26 0101 article, “Cutting and Patching.”

D. Remove the anchors, bolts, and fasteners associated with conduit and equipment to be removed.

3.3 DISPOSAL

A. Dispose of equipment and materials removed, and rubbish and waste material, as work progresses. Do not allow demolition debris to accumulate on site. Remove products of demolition from the building daily.

Sligo Creek Elementary School - Switchboard Replacement Firestopping for Electrical Work ©2026 James Posey Associates, Inc. 8213-25 26 0507 - 1

SECTION 26 0507

FIRESTOPPING FOR ELECTRICAL WORK

A. Through-penetration firestopping in fire-rated construction.

B. Through-penetration smoke-stopping in smoke partitions.

A. Conduit: Section 26 0533.

A. Underwriters Laboratories

1. UL Fire Resistance Directory

2. UL 1479: Through Penetration Firestops.

B. American Society for Testing and Materials Standards:

1. ASTM E 814: Standard Test Method for Fire Tests of Through-Penetration Firestops.

1.4 DEFINITIONS

A. Assembly: Particular arrangement of materials specific to given type of construction described in referenced documents.

B. Barriers: Time-rated fire walls, smoke barrier walls, time-rated ceiling/floor assemblies and structural floors.

C. Firestopping: Methods and materials applied in penetrations and unprotected openings to limit spread of heat, fire, gases, and smoke.

D. Penetration: Opening or foreign materials passing through or into barrier or structural floor such that full thickness of rated materials is not obtained.

E. Sleeve: Metal fabrication or pipe section extending through thickness of barrier and used to permanently guard penetration. Sleeves are described as part of penetrating system in other sections and may or may not be required.

F. System: Specific products and applications, classified and numbered by the rating agency to close specific barrier penetrations.

1.5 SYSTEM DESCRIPTION

A. Design requirements:

1. Fire-rated construction: Maintain barrier and structural floor fire resistant ratings including resistance to cold smoke at penetrations.

2. Smoke barrier construction: Maintain barrier and structural floor resistance to cold smoke at penetrations.

©2026 James Posey Associates, Inc. 8213-25 26 0507 - 2

1.6 SUBMITTALS

A. Product data: Manufacturer’s specifications and technical data including the following:

1. Detailed specification of construction and fabrication.

2. Manufacturer’s installation instructions.

B. Shop drawings: Submit firestop assemblies and devices for openings and through penetrations in fire-rated construction. Indicate dimensions, description of materials and finishes, general construction, specific modifications, component connections, anchorage methods, hardware, and installation procedures, plus the following specific requirements.

1. Details of each proposed assembly identifying intended products and applicable rating agency classification.

2. Manufacturer or manufacturer’s representative shall provide qualified engineering judgments and drawings relating to conditions where rated assemblies do not exist.

C. Quality control submittals: Statement of qualifications.

D. Certifications: Letters or forms showing acceptance by local authorities for systems without acceptance by a rating agency.

1.7 QUALITY ASSURANCE

A. Products and assemblies shall be tested and labeled by an independent, nationally recognized testing and labeling authority.

B. Installer’s qualification: Firm experienced in installation or application of systems similar in complexity to those required for this project, plus the following:

1. Acceptable to or licensed by manufacturer, state, or local authority where applicable.

2. At least 2 years’ experience with systems.

3. Successfully completed at least 5 projects of comparable scale, using these systems.

C. Local and state regulatory requirements: Obtain acceptance for proposed assemblies not conforming to specific rating agency classifications or rated assemblies.

D. Materials shall have been tested to provide fire rating at least equal to that of the construction in which they are to be installed.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Packing and shipping:

1. Deliver products in original unopened packaging with legible manufacturer’s identification.

2. Coordinate delivery with scheduled installation date, allow minimum storage at site.

B. Storage and protection: Store materials in a clean, dry, ventilated location. Protect from soiling, abuse, moisture and freezing when required. Follow manufacturer’s instructions.

©2026 James Posey Associates, Inc. 8213-25 26 0507 - 3

1.9 PROJECT CONDITIONS

A. Existing conditions:

1. Verify existing conditions and substrates before starting work. Correct unsatisfactory conditions before proceeding.

2. Proceed with installation only after penetrations of the substrate and supporting brackets have been installed.

B. Environmental requirements:

1. Furnish adequate ventilation if using solvent.

2. Furnish forced-air ventilation during installation if required by manufacturer.

3. Keep flammable materials away from sparks or flame.

4. Provide masking and drop cloths to prevent contamination of adjacent surfaces by firestopping materials.

5. Comply with manufacturing recommendations for temperature and humidity conditions before, during and after installation of firestopping.

1.10 WARRANTY

A. General project warranty and correction period, as required in general conditions and Division 01, requires repair or replacement of materials or systems which fail in joint adhesion, co-adhesion, abrasion resistance, weather resistance, extrusion resistance, migration resistance, stain resistance, or general durability or appear to deteriorate in any other manner not clearly specified by submitted manufacturer’s data as an inherent quality of the material for the exposure indicated.

2.1 ACCEPTABLE MANUFACTURERS

A. Acceptable manufacturers and…