Bid_#2025-35_Bid_Set_Pepper_Ridge_Sidewalk_-_Route_66_Path_Improvements.pdf

PDF 14 MB Posted

Attached to
Pepper Ridge Sidewalk - Route 66 Path Improvements
Solicitation number
Bid #2025-35
Issued by
Mclean County, Illinois

About this file

This is a comprehensive set of engineering design and construction documents for the Pepper Ridge Sidewalk and Route 66 Shared-Use Path Improvements project, prepared by Fehr Graham Engineering & Environmental for the City of Bloomington, Illinois. The project involves constructing new sidewalks and a shared-use path, with detailed plans including typical sections, traffic signal installations, lighting improvements, utility relocations, and grading details across multiple intersections including Veterans Parkway, Danbury Drive, and Greenwood Avenue. The project includes specific quantities for various construction elements such as tree removal (80 units), earth excavation (99 cubic yards), topsoil excavation and placement (123 cubic yards), and sidewalk construction (712 square feet for 4-inch and 620 square feet for 6-inch concrete sidewalks).

The project documents indicate compliance with Illinois Department of Transportation standards and include comprehensive details for ADA ramp configurations, traffic signal modifications, and utility infrastructure adjustments. The bid set suggests this is a public infrastructure improvement project with precise engineering specifications, including provisions for erosion control, seeding, fertilization, and detailed material requirements. While specific budget details are not explicitly stated in the documents, the project appears to be funded through municipal infrastructure improvement funds, with careful attention to prevailing wage requirements and potential project labor agreement considerations as outlined in the City of Bloomington's municipal code for public works projects exceeding $50,000.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Know what's below.

Call before you dig.

OR CALL (800) 892-0123

J.U.L.I.E. ENGINEERING & ENVIRONMENTAL

Ó

ENGINEERING & ENVIRONMENTAL

LOCATION(S):

MIXTURE USE(S):

PG:

DESIGN AIR VOIDS:

MIXTURE COMPOSITION:

(MIXTURE GRADATION)

FRICTION AGGREGATE:

QUALITY MANAGEMENT PROGRAM:

SUBLOT SIZE:

MIXTURE WEIGHT (LBS/SQ YD/IN):

ALL STREETS

HMA MIXTURE REQUIREMENT TABLE

MIX C

SURFACE

PG 64-22

N/A

QC/QA

4.0% @ NDESIGN=50

IL-9.5

Sheets and Views
1 COVER SHEET
2 GENERAL NOTES (1 OF 2)
3 GENERAL NOTES (2 OF 2)
4 SUMMARY OF QUANTITIES
5 TYPICAL SECTIONS
6 REMOVALS
7 PEPPER RIDGE SIDEWALK IMPROVEMENTS
8 ROUTE 66 SHARED-USE PATH IMPROVEMENTS
9 ADA RAMP DETAILS
10 HANDHOLE AND SIGNAL RELOCATION
11 AS-BUILT SUMMARY OF QUANTITIES
12 AS-BUILT LIGHTING
13 AS-BUILT SIGNAL INSTALLATION
14 AS-BUILT CABLE PLAN
15 AS-BUILT INTERCONNECT

File details come from the government source that posted it. Updated .