Hot_Foil_Questions_and_Answers.docx

DOCX document 34 KB Posted

Attached to
Hot Foil Die Cutting Press Federal contract opportunity
Solicitation number
BEP-RFP-17-0502
Issued by
Department of the Treasury Bureau of Engraving and Printing

About this file

Hot Foil Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Hot Foil Die Cutting Press, newest first.
File Type Posted
Revised_Solicitation_12-22-16.pdf PDF
119_edited_for_release_PSB_(2).tiff TIFF file
128_edited_for_release_PSB_(2).tiff TIFF file
117_edited_for_release_PSB_(2).tif TIF image
Structural_Study_2-5.pdf PDF
Structural_Study_6-3.pdf PDF
Structural_Study_2-4.pdf PDF
Attachment_N_Past_Performance_Questionnaire.docx DOCX document
Attachment_D.pdf PDF
Attachment_B[1].0-04_EHS_Contractor_Requirements_11-1-16 —
Attachment_I.pdf PDF
Attachment_G.pdf PDF
Attachment_G_Spec_C.pdf PDF
Revised-Solicitation_Hot_Foil_Press_BEP-RFP-17-0502_1__12-12-16.docx DOCX document
Attachment_E.pdf PDF
Attachment_A-Non-Disclosure_Form_12-12-16.docx DOCX document
Attachment_H_.pdf PDF
Attachment_O_Subcontracting_Plan_Large_Business_in_the_USA.doc DOC document
Attachment_C.pdf PDF
Page_1_SF_Form_1449.pdf PDF
Attachment_J.pdf PDF
Attachment_F.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP

Section

Paragraph

Page

Question or Issue

Answer or Resolution

C.4.8

5
Measurement is provided in imperial system, i.e. 260-300 short tons (=260-300 tn). Machine provides 275 tn – 250 metric tons of cutting pressure

The reference is for U.S. ton is the short ton which is 2000 pounds.

C.5.1.4

8
We believe that you refer to “PR”6 instead of “PR”4?

Yes the Contractor is correct; should read PR 4 and PR 6 for C.5.1.4 B. and C.

C.5.1.6

9
Is this with reference to an inline laminating option?
Yes, this is in reference to an in-line or standalone laminating option.
C.7.2
last
13
Please confirm which jobs you want to be run for FIT and BEP: is it all jobs that are described in Attachments C through J? We will provide tooling and foils and laminate if applicable. We assume that the tooling from the FIT can be re-used for the BEP. Jobs PR 7 and PR8 are currently under review.

Proposal should include testing all PR attachments. Final test plans for FIT and BAT will be provided after contract award.

E.2

21
Please confirm which jobs you want to be run for FIT and BEP: is it all jobs that are described in Attachments C through J? We will provide tooling and foils and laminate if applicable. We assume that the tooling from the FIT can be re-used for the BEP. Jobs PR 7 and PR8 are currently under review.

Proposal should include testing all PR attachments. Final test plans for FIT and BAT will be provided after contract award

L.1
Request for Clarifications
79
1. Are there any construction documents available on site or online?

2. Provide column, primary and secondary framing member sizes and member connections.

3. Provide the supporting slab thickness, steel deck for (steel form deck or composite steel deck) and weight of concrete (NW or LW).

4. Framing bay plan dimensions.

5. Is there a drawing available showing any other equipment weights and locations on other floors above and below within the bays where the new machine will be placed?

6. Has a survey been prepared of the equipment to make sure that the cumulative demand loadings to columns and foundations are within safe capacity loads.

1. Yes, please see attached documents.

2. See attached documents.

3. See attached documents.

4. See attached documents.

5. Yes, please see attached documents.

6. The structural survey data relative to the info in question is in the attached documents.

BEP‐RFP‐17‐0489

Questions and Answers

RFP

Section

Paragraph

Page

Question or Issue

Answer or Resolution

7. Will we have access to view the underside of the supporting floor? Is it exposed to view?

8. Confirm that there will be no recesses for trays or guide rails we will need to cut into the slab

7. Yes, there is a drop ceiling below the space. Some tiles would have to be removed to view the underside.

8. Please use all means necessary to provide a solution that does not involve the cutting of the slab.

L
L.1.5
79
The Bid states a form SF1449 is required with our proposal, but I didn’t see an SF1449 included in the bid documents or attachments.
Normally the Solicitation is prepared using a SF Form 1449; however, this Solicitation was prepared using a regular Microsoft Word format. You are required to fill out and submit with your proposals page three (3) of the RFP with “Unit Price” and “Amount.”
L
L.2.3
81
Explain the difference between the “Cross Reference Matrix” and the “Table of Contents”. It is stated that “Each Volume shall contain a Table of Contents..” and “Each Volume shall contain a cross-reference matrix relating the proposal information to Sections L and M of the RFP”.

There is no difference between the “Cross Reference Matrix” and the “Table of Contents.”