About this file

This is a maintenance specifications document issued by the Montana Department of Transportation (MDT) for caretaker management services at the Bad Route Rest Area located in Dawson County on Interstate 94 at milepost 192.3, approximately 23 miles west of Glendive, Montana. The scope of work encompasses comprehensive maintenance and operation of all rest area facilities including restrooms, grounds, parking areas, picnic shelters, and associated infrastructure. Services must be provided three times daily, seven days per week, with specific service windows: first cleaning no later than 6:00 a.m., second cleaning between 11:00 a.m. and 12:00 p.m., and third cleaning between 6:00 p.m. and 7:00 p.m. The contract term runs from October 1, 2026 through September 30, 2027, with potential extensions for up to four additional one-year periods for a maximum total contract duration of five years. A pre-bid conference and site inspection will be held on September 1, 2026 at 10:00 a.m. at the rest area, with sealed bids due September 14, 2026 at 2:00 p.m. MDT through the eMACS system. The facility inventory includes four picnic shelters, twelve picnic tables, four hand dryers, four mirrors, four sinks, one furnace/air conditioner unit, one hot water heater, one men's restroom and two women's restrooms, two kiosks, two pet areas, and various other amenities.

The contractor must furnish all labor, equipment, tools, materials, and supplies except for items specifically provided by MDT, including paper products, garbage bags and containers, light bulbs, paint, cleaning chemicals, deicer materials, graffiti removal chemicals, Kavik cleaner, and sprinkler heads. Payment terms are Net 30 days, and compensation will be calculated on a monthly basis with prorations applied for partial months or periods of facility closure exceeding two weeks. The contractor is prohibited from operating any commercial enterprise on the premises and must maintain 24-hour emergency contact availability with department personnel. All mechanical, electrical, and plumbing work must comply with applicable codes and be performed by appropriately licensed tradespeople. The contractor is responsible for maintaining daily checklists and logs documenting all activities, unusual incidents, lost and found items, and traffic counts, with records submitted to MDT twice monthly. The department reserves the right to terminate the purchase order for failure to comply with service requirements, with a 24-hour cure period for deficiencies before immediate termination becomes effective. Contractor employees must wear visible identification badges and safety vests, maintain professional appearance standards, and are prohibited from possessing firearms, illegal drugs, or non-prescribed medications while on site.

View the file

Other files

File Type Posted
1435001-event.pdf PDF
Prevailing Wage Rates Non-Construction 2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BAD REST AREA MAINTENANCE

PRE-BID CONFERENCE AND SITE INSPECTION

Contractors can attend a pre-bid conference and site inspection. The time and date of the pre-bid conference and site inspection will be held on September 1st, at 10:00 a.m. at the Bad Route Rest Area located on I-94 at milepost 192.3 WB. The purpose of the conference is to answer questions related to this bid and to provide a site inspection of the rest area complex.

SCOPE OF WORK

1.1. DESCRIPTION OF WORK

The Montana Department of Transportation (Department) is seeking bids from caretaker management firms or individuals for the maintenance of the Bad Route Rest Area located in Dawson County on I-94 milepost 192.3. (Refer to Location Maps) [These maps show specific work requirements. Copies of these maps will be distributed at the site inspection.]

The work shall include, but not limited to, furnishing labor, equipment, supplies not provided by the Department, tools and materials required to effectively maintain and operate the rest area including the rest rooms, grounds, parking lots and all other facilities within the rest area proper.

The scope of the work does not include the maintenance, repair, or removal of snow from the parking lots including entrances and exits to the parking lots of the rest area.

In addition to the routine work outlined in this document, the resulting purchase order requires a Contractor or Contractor’s representative capable and authorized to confer on a daily basis with the Department’s representative concerning situations and problems that arise and to be on call for emergencies.

Prior to commencement of work, the Department will arrange a meeting with the Contractor to discuss the resulting purchase order terms and work performance requirements. At this time, an inspection of the rest area will be conducted jointly to document conditions that exist. The Department is responsible for corrections of any identified substandard items listed as a result of the inspection.

All mechanical, electrical, plumbing, etc. work must be within codes and performed by appropriate licensed tradesperson.

1.2. WORK LOCATIONS AND SCHEDULES

The Rest Area is located at 23 miles west of Glendive, MT. on I-94 milepost 192.3 West Bound.

The following schedules will apply:

Three Times a Day Schedule

The Contractor shall provide appropriate personnel to service and clean the restrooms a minimum of three times a day, seven days per week.

The first service and cleaning for each site shall commence no later than 6:00 am, and the second service and cleaning shall commence no later than 12:00 pm, but no earlier than 11:00 am, and the third service and cleaning shall commence no later than 7:00 pm, but no earlier than 6:00 pm.

The cleaning requirements are based on minimum service levels required to keep the site refreshed throughout the day. The Contractor shall provide additional cleanup and care during periods of high use and, if necessary, through temporary closures, holidays and weekends.

In addition to routine janitorial services the Contractor will be responsible for, but not limited to, the following typical maintenance duties:

Toilet, Urinal, and Sink

1. Unclog toilet, urinals, and sinks.

Doors – Repair and/or Replace

1.Touch up paint to maintain appearance.
2.Replace push plates, kick plates and door pulls.

Fixtures – Repair and/or Maintain

1. Soap and paper dispensers.

2. Mirrors.

3. Electrical lighting bulbs (except high-level parking lot lights).

4. Information signs.

Painting – touch up to maintain appearance of:

1. Rest room walls/stalls.

2. Woodwork on arbors and buildings.

3. Information signs.

4. Doors.

5. Arbors and picnic tables.

Sprinkler Systems

1. Replace heads.

2. Maintain sprinkler-watering zones timing.

1.3. INVENTORY OF REST AREA AND PORT-OF-ENTRY FEATURES

Picnic shelters
Four (4)
Picnic tables
Twelve (12)
Outside garbage cans
Twelve (12)
Dumpster site
One (1)
Furnace/air conditioner
One (1)
Hot water heater
One (1)
Toilets
One (1) men, Two (2) women
Urinals
One (1)
Hand dryers
Four (4)
Sinks
Four (4)
Mirrors
Four (4)
Drinking faucets
Two (2)
Inside garbage cans
Two (2)
Baby changing stations
Two (2)
Baby seats
Zero (0)
Inside benches
Zero (0)
Outside benches
Two (2)
Kiosk
One (1)
Phone booths
Zero (0)
Outside historic signs
Three (3)
Soap dispensers
Two (2)
Air fresheners
Zero (0)
Storage shed
Two (2)
Air compressor
Zero (0)
Weather radio
One (1)
Trailer pad
Zero (0)
Pet areas
Two (2)

1.4. GENERAL REQUIREMENTS

Under the terms of the resulting purchase order, the Contractor and employees are prohibited from operating or advertising any commercial enterprise or activity on any premises that are the subject of the resulting purchase order.

The Contractor shall provide all labor, equipment, tools, materials and supplies (except as specified below) necessary to provide minor maintenance services associated with the facilities, landscaping, water supply, and heating systems to effectively maintain and operate the rest areas.

The Department agrees to furnish only the following:

a)
Paper Products
f)
Cleaning Chemicals
b)
Garbage Bags & Containers
g)
Deicer Materials for Sidewalks
c)
Light Bulbs
h)
Graffiti Removal Chemicals
d)
Touch-up and other Paint
i)
Sprinkler Heads
e)
Kavik Cleaner
j)
Filters

The Contractor shall provide the appropriate personnel to maintain the rest area facilities in a safe, sanitary, clean and attractive manner in accordance with the terms and conditions of the resulting purchase order.

The Department will post a phone number and address for complaints. The Contractor shall provide a 24-hour phone number for emergency repair notification that will be posted with the complaint number. Any complaints received by the Department will be shared with the Contractor.

The Contractor agrees to have a phone during the duration of the resulting purchase order and shall provide the Department with the name(s) and telephone number(s) of all on-call personnel.

Contractor personnel may assist the Department's appointed representative in making random on-site facility inspections and in coordinating other operational requirements. All site inspection deficiencies and recommended corrective actions will be shared with the Contractor.

The Contractor shall promptly notify appropriate authorities of emergencies that occur in the rest area. In the event of illness or injury to visitors or others while in the rest area, the Contractor's personnel shall call for professional help as requested or deemed appropriate.

The Contractor shall immediately report to the Department any suspected hazardous material spills. The Contractor shall barricade the area. The Contractor shall not attempt cleanup and will keep people away until qualified authorities decide on proper action.

The Contractor shall report all incidents such as vandalism, excessive occupancy, camping, etc., to the Department daily. The Contractor must document pertinent details when possible, such as identity of responsible party, or license plate numbers. The Department shall receive notification of any incidents relative to public health or safety immediately and incidents of a lesser nature during the next normal workday.

The Contractor shall monitor the activities of organizations granted special use permits for serving refreshments and report any noncompliance with the permit terms. The permit terms require that the rest area grounds, or area used by the organization, be cleaned by the organization at termination of their use period so that no additional work will result for the Contractor.

The Contractor and their employees shall not accept tips or other gratuities for any service performed in the rest area.

The Contractor or its’ employees cannot have pets; or children requiring the supervision of the Contractor or its’ employee, on site while performing work on the rest area.

In the event questions concerning areas of responsibility and duties arise, the Department shall have final authority.

1.5. WORK DETAIL - CLEANING/SERVICING REQUIREMENTS

Restrooms Floors, toilet partitions, doors, toilets, urinals, baby changing tables, hand dryers, wash basins, soap dispensers and mirrors shall be scrubbed thoroughly, with additional cleaning as necessary.

After being washed, fixtures shall be wiped dry with a clean rag and floors shall be dried by either forced air or dry mopping.

Garbage containers shall be emptied, cleaned, and lids washed during the morning cleaning, or more often if necessary.

Soap and paper goods dispensers shall be replenished as necessary. At least one-half roll of toilet paper should be in evidence in each stall. Odor-suppressant materials such as urinal blocks and air deodorant shall be used and replenished as determined suitable to control odors.

Windows, walls, ceilings and light fixtures shall be scrubbed weekly with soap and water, or appropriate cleaner, and wiped dry to maintain a clean, smear-free appearance. Daily spot cleaning is to be done as needed.

The entire inside of the restrooms shall be deep cleaned at least weekly, or more often if required to maintain in original condition. The Department will provide the necessary equipment and chemicals to accomplish the deep cleaning. Lighting fixture covers shall be clean and free of insects.

The heating or cooling system shall be operated and maintained as necessary with desired temperature (60 F to 70 F) winter; (75 F to 80 F) summer, to assure proper air circulation/exchange is taking place inside the restrooms.

The Department shall provide soap, paper goods, garbage bags, mechanical or electrical odor control and cleaning supplies. Material Safety Data Sheets (MSDS) must be present for all appropriate products.

The Contractor shall immediately remove any graffiti or markings of any kind on any surface inside the restrooms.

Plaza Areas (outside the restrooms) Walkways, doors, water fountains, benches and display areas shall be thoroughly cleaned each day, with additional cleaning as necessary. Smooth walls and overhead surfaces shall be scrubbed monthly with soap and water and wiped dry to maintain a clean, smear-free appearance.

Rough surfaces shall be brushed and/or swept clean as necessary and shall be pressure washed a minimum of once monthly except during winter weather conditions.

Grounds and Parking Lots All trash, paper, other litter and pet waste shall be removed from the grounds, (core area around restrooms), ramps and parking areas once per shift, or more often if necessary. (See Exhibit I showing core area.) All types of litter shall be removed from the surrounding areas daily. All garbage containers shall be emptied, cleaned and lids washed if dirty, and fitted with new bags as often as necessary to avoid overflow.

The Contractor should use his judgment to determine whether an almost empty garbage bag actually needs to be replaced. The Contractor shall notify the Department when garbage containers need replaced due to damage, normal wear and tear, etc.

The Contractor will be responsible for collecting and transporting all litter, debris and garbage to a site designated by the Department. The designated site is located at the site location.

Garbage bags placed in garbage storage containers must be tightly secured in order to reduce the risk of creating unsanitary conditions.

Parking areas, sidewalks and walkways shall be inspected and debris removed at least once per workday or as needed.

The Contractor shall be responsible for removing snow and ice from the pedestrian walkways to provide bare walkways for safe access. The pedestrian walkway applies only to the walkways in front of the rest area from the parking lot to the restrooms themselves. This does not apply to the walkways to the picnic shelters and picnic tables. Pick-up trucks or heavy tractors with snowplows or blades are not allowed on the pedestrian walkways in the rest area.

The Department will be responsible for snow removal from the parking lots area.

The Contractor shall immediately remove any graffiti or markings of any kind on any surface in the rest area. If the graffiti problem persists, or is of a violent or obscene nature, the problem shall be reported to the Department immediately.

Public telephone(s) shall be cleaned and sanitized once daily; any operational problems are to be reported to the telephone company and to the Department.

Arbors and Tables Picnic tables, benches and floors shall be cleaned according to Exhibit II, Rest Area Maintenance Checklist , or more often if necessary, with biodegradable soap and water, using brushes, rags, sponges or other power-cleaning equipment that will clean and sanitize.

Arbors and Tables will be cleaned and sanitized during each rest area cleaning.

Brushes, cloths or sponges, which have been used for cleaning in restrooms, shall not be used to clean tables or benches. Do not apply insecticide or disinfectant to the table or bench tops unless the surface can be rinsed off immediately with clean water.

Ceilings, walls and posts shall be pressure washed once per month on 30-day intervals or more often if necessary.

Water Supply – from the point it enters the building.

The Contractor shall perform all routine maintenance and servicing necessary for proper operation of the water supply and irrigation systems. Take samples and provide to the Department to perform water tests if required.

Sewage System – from the point it enters the building.

The Contractor is responsible for unclogging toilets, urinals, and sinks. The Department is responsible for sewage system main drains.

Irrigation System The Contractor shall operate and perform all maintenance and routine servicing of the irrigation system in accordance with good practice.

1. Check program controllers each week.

2. Visually check each week for proper coverage while in operation through each zone.

3. The Department will be responsible for winterizing and spring startup.

1.6. WORK DETAIL - MAINTENANCE REQUIREMENTS

The Contractor shall:

Maintain in good working condition all fixtures in the rest rooms including, but not limited to, soap dispensers, hand dryers, mirrors, urinals, toilets, wash basins, water fountains, toilet partitions and all doors, hinges, latches and supports.

Maintain in good working order the plumbing fixtures, which shall include cleaning, unstopping clogged toilets, urinals, sinks, traps or grates.

Be responsible for cleaning or replacement of new filter pads for the heating and cooling system once a month or sooner as needed.

Install all replacement light bulbs to light fixtures that are attached to the building and the replacement and information kiosk. The high-level parking area lights will be maintained by the Department.

Be responsible for pruning and trimming (dead branches and any limbs or branches obstructing the walk ways) trees and shrubs.

Be responsible for controlling or removing weeds in the lawns, flower/wild flowerbeds, gravel, blanketed areas (bare ground) and landscaped areas (shrub beds).

Be responsible for mowing lawns to maintain a height of not less than 2 inches nor more than 4 inches. Pet areas to maintain a height of not less than 4 inches nor more than 6 inches. The natural areas will be maintained by the Department.

Be responsible for edging and trimming along all curbs and sidewalks and pet areas.

Be responsible for removing lawn clippings, needles and leaves from the lawns, buildings and arbors.

Be responsible for irrigating all areas including lawns/shrub beds designed for irrigation and in accordance with good irrigation practices and schedules established by the Department. Sprinkler system shall be set to come on and off at a time to be determined by the Department and the Contractor to ensure proper watering of the lawn, shrubs, and trees.

1.7. WORK DETAIL - REPAIR AND REPLACEMENT REQUIREMENTS

The Contractor shall:

Be responsible for replacing unserviceable or broken fixtures, including toilet seats, partitions, doors, soap dispensers, toilet paper dispensers, mirrors and other related fixtures with Department provided fixtures. The Department will make the final determination if a fixture needs replaced.

The Department will:

Be responsible for major repairs to the sewage system and related facilities, the water system including the well, major plumbing and pump; primary valves and controls for the irrigation system, the heating and cooling system and electrical repairs. Major repairs shall be defined as any repair or replacement that requires a licensed tradesperson. The Department will coordinate these repairs.

Be responsible for providing replacement fixtures for the rest rooms and rest area proper, including, but not limited to: urinals, toilets, toilet seats, water fountains, sinks, valves, partitions, doors, soap dispensers, toilet paper dispensers, mirrors, benches, arbors, picnic tables and garbage containers.

Reserve the right to make any repairs, remove or add fixtures, facilities, landscaping or any other improvements or maintenance activity it deems necessary.

1.8. SAFETY REQUIREMENTS

The Department will furnish signs and barricades for emergency closure of the rest area. The Contractor shall furnish pedestrian signs deemed necessary to adequately warn or protect the public from possible hazardous conditions. Special precautions must be used when power equipment is operated.

The public shall be permitted use of rest rooms during cleaning if they so request.

The Contractor shall comply with applicable laws and regulations governing safety, health and sanitation.

The Department will provide a first aid kit. The Contractor shall keep the first aid supplies stocked at all times. The resident caretaker may attend a first aid course (conducted by the Department) if he or she so desire.

The Contractor and/or employees are not security personnel. All security or safety issues are to be reported to appropriate law enforcement entity and the Department immediately.

The Department will maintain security cameras if equipped.

1.9. CONTRACTOR'S EMPLOYEES

Each employee shall wear a visible easily read identification badge that contains the Contractor's and the employee's names. Additionally, employees shall wear a safety vest provided by the Department at all times. Because work performed on the rest area reflects directly on the Department, especially in the eyes of the traveling public, Contractor’s employees must dress in a professional and appropriate manner (i.e., clothing that appears clean, no shabby or ragged clothing, no halter/tank tops, no very short cutoffs, etc.)

Employees are prohibited from having firearms in their possession while on site. They also may not be in possession of any non-prescription or illegal drugs, or prescription drugs that are not currently prescribed to them. They may not be under the influence of any alcohol or drugs, prescription or otherwise that may impair the employee, while on-site or performing work under the purchase order.

Employees shall treat the public in a friendly, courteous manner.

The facility has an informational Kiosk to answer questions and provide general traveler information. The Department will train Contractor's employees in the use of the Kiosk.

Contractor employees should be well informed on local road conditions, detours, and tourist attractions.

The Department reserves the right to require the Contractor to remove employees performing any duties associated with the resulting purchase order who endanger persons or property, who are in violation of any of these requirements, or whose continued employment does not serve the best interest of the Department.

1.10. RECORDS

The Contractor shall keep a daily checklist and log which will be kept on site and available to the Department at any time. The checklist and log shall contain time and details of unusual activity (accidents, vandalism, etc.), lost and found articles, traffic counter reading, etc. A sample Daily Checklist and Log is attached as Exhibit I. The checklist and log shall be kept in the storage or mechanical room and be available for inspection by Department personnel.

Copies of the Daily Logs will be mailed or delivered to the Department no less than twice a month to the location listed below:

Montana Department of Transportation
PO Box 890

503 N. River Ave Glendive, MT 59330-0890

1.11. DEPARTMENT'S RESPONSIBILITIES

Utilities

The Department will provide all utilities, including electrical, water and sewer for the rest area proper.

Grounds, Parking Lot and Roadway

The Department will be responsible for all repairs to pavement, walks, curbs and high-level parking lights. If the Department determines that any damage is the result of a negligent act by the Contractor, the cost of repairs shall be the responsibility of the Contractor.

Signs and Symbols

The Department will provide all necessary permanent signs and pavement markings.

No additional signs shall be installed or erected by the Contractor except those required on a temporary basis to designate rest room cleaning. The Contractor shall do emergency closure of the rest area by use of the signs, barricades, and deployment plan provided by the Department. The Department must approve closures. The Contractor shall remove closure signs and barricades when the emergency is over and the rest area is to be reopened. The Department shall be notified immediately of any emergency.

Tourist Information

The Department will approve all maps and brochures to be displayed in the rest areas.

Fire Extinguishers

The Department will furnish fire extinguishers for emergency use by Contractor personnel. Monthly inspection (30 day intervals) of fire extinguishers shall be the responsibility of the Contractor and should be noted in the daily log. The Contractor shall be responsible for notifying the Department each time an extinguisher is used or requires servicing or recharging. The Department will replace and/or recharge extinguishers.

Special Use Permits

Permits may be issued by the Department, for use of the rest area by private non-profit organizations, for such activities as providing free refreshments to travelers during a specific time period. Inquiries about such permits shall be directed to the Department. The Department will provide the Contractor a copy of any such permits issued.

Complaints

All letters of complaint directed to the Contractor from the public shall be forwarded to the Department for reply. Copies of any complaints received, or responses issued by the Department will be provided to the Contractor.

Acts of Nature

The Department will be responsible for all damage and other problems caused by acts of nature.

Inspection

The Department will perform inspection(s) to ascertain the Contractor's compliance with requirements. The Contractor's designated supervisor may accompany the Department representative when inspections are made, but no advance notice of inspection time will be given. Refer to Inspection Sheets for the Department checklist and scoring criteria for each item.

The Department will allow adjustment only for the following reasons:

· Acts beyond the control of the Contractor

· Inspections performed during a large influx of visitors, such as a bus tour

· The Contractor demonstrates that broken or malfunctioning items noted were repaired within 5 working days of the inspection

1.12. REST AREA CLOSURE

In the event that the rest area or one of the rest areas specified in this IFB is to be closed for a period of more than two weeks for any reason (such as fire, vandalism, sewage or water system problems, highway construction, rest area renovation, reduction of funding, etc.) it is agreed by the parties that, upon written notification by email from the DEPARTMENT to the CONTRACTOR, payments provided for in the resulting purchase order, will be discontinued starting two weeks after the date of postmark.

If the notification of closure falls between monthly payment periods the amount due will be prorated based upon the monthly rate and the number of days worked prior to the date payment will be discontinued.

When the rest area becomes operational, payment will commence from the first day the services are rendered. If services are provided for less than one full month, payment will be for the number of days worked based on the monthly rate.

If this IFB is for maintenance services on a dual rest area and only one facility is taken out of service, payments will be reduced by 1/3, based upon the monthly rate.

The DEPARTMENT may terminate the resulting Purchase Order for any of the closure causes listed above.

1.13. PURCHASE ORDER EXTENSION

The resulting purchase order may, upon mutual agreement, be extended in one (1) year increments for a period not to exceed a total of five (5) years, [four (4) additional years]. This extension is contingent upon legislative appropriations and in no case may the resulting purchase order run longer than seven (5) years. Extension of the resulting purchase order will be possible only by way of duplication of the terms and conditions of the original existing purchase order.

Any intention to extend the resulting purchase order must be initiated in writing prior to the termination date of the existing purchase order or termination date of the purchase order, which has been previously extended.

The resulting purchase order term is for the period October 1, 2026 through September 30, 2026.

1.14. CLAIMS FOR ADJUSTMENT AND DISPUTES

If the Contractor believes that additional compensation is due them for work or material not clearly covered in the contract, or not ordered as extra work, as defined herein, they shall prosecute their claim in the following manner.

Prior to doing the work on which they believe additional compensation is due them, the Contractor shall notify the Division Maintenance Chief in writing of their intent to file a claim. If such notification is not given, and the Division Maintenance Chief is not afforded the opportunity by the Contractor for keeping strict account of actual costs, as required, then the Contractor shall thereby waive their right to any claim for such additional compensation.

At a minimum, the detailed letter shall include a narration of events, citing of entitlement, and a showing of the amount of compensation and/or adjustment of time believed due. Full documentation for all elements in the letter shall be included. The claim will be considered and a determination made by the Division Maintenance Chief who will notify the Contractor of the decision in writing.

The Division Maintenance Chief's decision will be final and conclusive unless, within 30 days from receipt of the Division Maintenance Chief's letter, the Contractor appeals in writing to the Chief of the Procurement Services Section in Helena. All pertinent information, references, arguments and data to support the claim shall be included. The Procurement Services Section Supervisor, along with the Maintenance Division Administrator, will review the claim and notify the Contractor by certified mail of the decision. This decision will be final and conclusive upon the State and the Contractor, unless subsequently changed by a court of competent jurisdiction. The Contractor shall exhaust their administrative remedies in the manner provided herein prior to the further pursuing their claim as prescribed by law.

In connection with any appeal proceeding under this subsection, the Contractor will be afforded an opportunity to be heard and offer evidence in support of their claim at any level of review. Pending final decision of a dispute hereunder the Contractor shall proceed diligently with performance of the resulting purchase order and in accordance with the Division Maintenance Chief's decision.

1.15. COMPLIANCE

If the Department registers a formal and written complaint with the Contractor in respect to undesirable or unsanitary conditions in this rest area, the Contractor will have 24 hours in which to respond in person to the complaint, at the Miles City Maintenance Division office to remedy the problems. Failure to respond in the prescribed time to the complaint or to remedy the problem may result in termination of the resulting purchase order as provided in Section 1.16 TERMINATION.

If the Department is not satisfied with the results and remediation of the complaint, the Department may require periodic and joint inspections of the rest area with the Contractor to discuss and point out Contractor violations. Failure of the Contractor to attend these inspections may result in termination of the resulting purchase order.

1.16. TERMINATION

The resulting Purchase Order may be terminated for failure to provide the services or accomplish work enumerated herein. Upon receiving written notice from the DEPARTMENT, the CONTRACTOR has 24 hours to cure the failure; the CONTRACTOR'S failure to cure the failure within the time allowed will be grounds for the immediate termination of the resulting Purchase Order.

The resulting purchase order may be terminated by the DEPARTMENT without cause; the party DEPARTMENT must give written notice of intention to do so to the CONTRACTOR at least thirty (30) days prior to effective day of termination, unless immediate termination is necessary.

If the Contractor fails to provide services required by the resulting purchase order or such services within the time specified herein or any extension thereof, the Department may, by written notice of default to the Contractor, cancel the whole or any part of the resulting purchase order upon written notice.

The Department may, upon finding that the Contractor is not in compliance with any law or regulation, or applicable licensure and certification requirement, cancel the resulting purchase order upon written notice to the Contractor.

The above remedies are in addition to any other remedies provided by law or the terms on the resulting purchase order.

Due to requirements of Federal labor laws, individuals who are presently a Montana State employee will not be considered for potential award of the resulting Purchase Order. A successful bidder who, during the post-bid period or during the term of the resulting Purchase Order, becomes a Montana State employee, must immediately notify in writing the DEPARTMENT'S Procurement Services Section. CONTRACTOR agrees that, if it becomes a Montana State employee during those periods, or if it hires anyone to perform more than 50% of the work under the resulting Purchase Order who is a Montana State employee, the resulting Purchase Order is subject to immediate termination.

Should the Contractor neglect to prosecute the work properly, or fail to perform any provision of the resulting purchase order, the Department, after seven days' written notice to the Contractor, may, without prejudice to any other remedy they may have, make good the deficiencies and may deduct the cost thereof from the payment then or thereafter due to the Contractor or, at its option, may terminate the resulting purchase order and take possession of all materials, tools, fixtures, and finish the work by such means as the Department sees fit, and if the unpaid balance of the resulting purchase order price exceeds the expense of finishing the work, such excess shall be paid to the Contractor, but if such expense exceeds such unpaid balance, the Contractor or their surety shall pay the difference to the Department.

1.17. PAYMENT REQUIREMENTS

The making and acceptance of payment for work, or material replacement, performed by the Contractor shall constitute a waiver of all claims by the Contractor, other than those arising from faulty work and of all or any claims by the Contractor previously made and unsettled.

REST AREA MAINTENANCE EXHIBIT I

DAILY CHECK LIST

Rest Area Name and Location: Bad Route / Glendive MT

Activity Check List – Check Items Completed
Time Completed
1
Women's Restroom

am pm

Clean Toilets, Check Operations, and Wash Partitions

Clean Sinks, Counters, Mirrors, and Baby Changers

Clean Hand Dryers and Check Operations

Clean and Fill Soap Dispenser

Clean and Mop Floors

Empty Garbage Containers

Remove or Cover Graffiti

2
Men's Restroom

am pm

Clean Toilets, Urinals, and Check Operations and Wash Partitions

Clean Sinks, Counters, Mirrors, and Baby Changers

Clean Hand Dryers and Check Operations

Clean and Fill Soap Dispenser

Clean and Mop Floors

Empty Garbage Containers

Remove or Cover Graffiti

3
Unisex Restroom
N/A
am pm
Clean Toilet and Wash Partitions
N/A
Clean Sink, Counters, Mirror and Hand Dryers
N/A
Clean and Fill Soap Dispenser
N/A
Clean and Mop Floors
N/A
Empty Garbage Container
N/A
Remove or Cover Graffiti
N/A
4
Lobby and Hallways
N/A
am pm
Sweep and/or Mop Lobby and Hallway Floors
N/A
Clean Lobby Windows
N/A
Clean Counters and Kiosk
N/A
Clean Benches and Seating Areas
N/A
5
Sidewalks, Parking Lot and Arbors

am pm

Clean Sidewalks and Plaza Area

Empty Garbage Containers

Pick Up Litter and Trash Outside

Clean Picnic Tables and Arbors

6
Mow Lawn/Pet Area As Needed – REMOVE CLIPPINGS

am pm

7
Replace Security System Tape
N/A
am pm

Comments: (Lost and Found, Repairs, Vandalism, etc.)

Date Time (am pm) (Signed) Contractor's Representative Records must be maintained on site and turned into the appointed contract compliance officer two times a month. (White copy to Department, Yellow retained by Contractor)

REST AREA MAINTENANCE CHECK LIST_________________________ EXHIBIT II_______
Frequency Key:Low Use Period(s)Spring, Fall, Winter
High Use Period(s)Summer & Holidays
Fall:September 15th to December 15th
Winter:December 15th to March 15th
Spring:March 15th to Memorial Day Weekend
Summer:Memorial Day Weekend to September 15th
D = dailyW = weeklyM = monthlyY = yearly
D2 = 2 x dayW2 = 2 x weekM2 = 2 x monthY2 = 2 x year
D3 = 3 X dayW3 = 3 x weekA = as neededNA = not applicable
Example: Clean Sinks D2/A translates to twice per day or more as neededFrequency
Task – Facilities
Minimum Results Expected
Low Use
High Use

1. Driveways - Parking Lots Pickup and dispose of all litter. Sweep and clean curbs and gutters.

Parking lots and driveways shall be clean of all debris and litter. Curbs and gutters must be clean.
D/A
D3/A

2. Side Walks Sweep and clean sidewalks. Wash off spilled food, drinks, dirt, sand. Remove snow and ice.

Sidewalks shall be clean of all spills, dust, dirt, sand and of all snow or ice.
D/A
D3/A

3. Garbage Containers Check and replace garbage bags to prevent overflow or unsanitary conditions. Check and clean garbage container and lids.

All garbage containers shall be maintained clean and free of dirt and grime. All garbage bags shall be replaced as often as necessary to prevent overflow.
D2/A
D3/A

4. Lawn –Trees - Shrubs Mow and edge the grassy area. Maintain lawn between 2 and 4 inches in height. Fertilize lawns and trees/shrubs as scheduled. Control undesirable weeds in lawns and/or other areas as required. Prune trees and shrubs as required. Edge lawns, curbs and sidewalks as required. Ensure irrigation system is functioning and timed appropriately to maintain lawn, shrubs, and trees.

All lawns, trees/shrubs and landscaped areas shall have a neat, healthy and well-maintained appearance. All debris, trash and litter in these areas will be picked up at all times and disposed of. All trees and shrubs shall be healthy and well maintained and not suffer from insect and disease damage.
W/A
W/A

5. Natural Areas Clean up and remove all litter and trash and dispose.

Native characteristics shall be preserved and enhanced. Area must be litter and trash free. Wild flower beds and area shall be preserved and maintained to enhance the rest area.
A
A

6. Pet Areas Pick up and dispose of all pet litter and trash. Trim excessive growth as required.

Pet areas shall be neat and clean and be free of excessive vegetative growth and free of any litter and trash.
D/A
D2/A

7. Building Exterior Clean walls, doors, entryway, and windows. Sweep down cobwebs. Remove graffiti. Keep gutters free of debris, leaves and needles.

Clean and neat appearing building exterior free of cobwebs, dirt and grime.
M/A
M/A

8. Picnic Tables – Arbors Clean and scrub all tabletops and benches with soap and water that will clean and sanitize. Wash walls and post as required. Wipe dry. Remove or paint over all graffiti immediately.

All picnic tables, arbors and floors shall be neat, clean and the area free of trash and litter. Cobwebs shall be removed. No graffiti will be visible.
D/A
D2/A

9. Information Signs/Kiosk Wipe clean Kiosk and Counters. Pick up and dispose of all trash and litter. Clean wooden benches with soap and water. Rinse and wipe them dry.

Information signs and Kiosk must be clean and free of cobwebs, litter and graffiti. All frames and displays must be in good shape. Report if displays need attention or repair.
D2/A
D2/A

10. Building Interior/ Foyer Sweep and mop area. Wash and scrub with soap and water or appropriate cleaner. Sweep down all cobwebs. Remove or paint all graffiti immediately. Clean entire drinking fountain with antibacterial disinfectant. Rinse and wipe dry. Check faucet for leaks and proper operation.

Foyer area is clean for public use. Clean and sanitary drinking fountain that operates properly. Walls and ceilings, especially in the corners, shall be free of cobwebs, dirt, grime and graffiti. All lights are clean and operational.
D/A
D2/A
Task – Facilities
Minimum Results Expected
Low Use
High Use

11. Restrooms Floors, and. Partitions Mop floor with a high strength detergent. Clean all partition walls with a disinfectant cleaner and wipe dry. Remove and/or paint over all graffiti. Make sure doors operate and lock properly. Make sure had dryer are operational. Check to make sure partitions are sturdy and not damaged. Remove graffiti.

Restroom floors are clean and sanitized. Clean and well-maintained partitions that are free of dirt, grime and graffiti with doors and all fixtures operate properly.
D2/A
D3/A

12. Urinals/ Toilet Stools Clean and thoroughly scrub with high-strength detergent containing a deodorant and anti-bacterial agent. Rinse with clean water and wipe dry. Check to see if urinals and toilets flush properly. Check and replace odor blocks. Check to make sure adequate supplies of toilet paper and toilet seat covers are present in the dispensers. At least one-half roll of toilet paper shall be in evidence in each stall.

All surfaces, including exterior of urinal, toilet stool and exposed plumbing, are free of dust, grime, stains, and fingerprints. Toilet paper and toilet seat covers shall be available at all times should never run out. Toilets and Urinals operate properly.
D2/A
D3/A

13. Sinks, Counters and Baby Changers Clean and thoroughly scrub with a high-strength detergent containing a deodorant and anti-bacterial agent. Rinse with clean water and wipe dry. Check to see if faucets and drain operates properly.

All surfaces, including counters surrounding the exterior of sink, shall be free of dust, grime, stains and fingerprints. Baby changers are clean and operational. Faucets and drains shall operate properly.
D2/A
D3/A

14. Mirrors Clean and thoroughly scrub with a high strength detergent containing a deodorant and anti-bacterial agent. Rinse and wipe dry. Remove all graffiti.

All surfaces of the mirror shall be clean, and functional, and free of dust, dirt, stain, grime and fingerprints. No graffiti will be present or visible.
D2/A
D3/A

15. Hand Dryers/Soap Dispenser Clean and thoroughly scrub with a high strength detergent containing a deodorant and anti-bacterial agent. Rinse and wipe dry. Check to see if hand dryer operates safely and properly. Check to see if soap dispenser has adequate supply of soap and operates properly.

All surfaces of the hand dryer and soap dispenser shall be clean and free of all dust, dirt, grime, stains and fingerprints. Hand dryer and soap dispenser shall operate safely and properly at all times. Soap dispenser shall have adequate supply of soap at all times.
D2/A
D3/A
Task – Facilities
Minimum Results Expected
Low Use
High Use

16. Restroom Deep Cleaning Clean and thoroughly scrub with high pressure washer or appropriate cleaning system to deep clean and disinfect restroom interior. A high strength cleaning detergent containing a deodorant and anti-bacterial agent will be used. Rinse and dry. Check to make sure floor drains operate properly and disinfect traps.

Deep cleaning is necessary to sanitize, disinfect and thoroughly clean the rest room to prevent buildup of dirt and grime on the floors, floorboards, corners, and walls. This cleaning shall be done at low-use periods as scheduled.
M/A
M/A

17. Heating -Air Exchange Check all filters, ducts, grills, and vents to insure heating and air conditioning systems are operating properly. Oil all bearings and other moving parts as required.

Desired temperatures are 50 to 65 degrees in the winter and 65 to 80 degrees in the summer. The air exchange capacity shall meet code requirements of every 15 minutes.
W/A
W/A

18. Rest Room - Exterior - Kiosk Lighting and Sky Lights Clean all light fixtures with a damp cloth. Replace bulbs immediately when burnt out. Remove all cobwebs and dead insects, and clean lens.

All lights shall be clean, free of cobwebs and operating properly at all times. Skylights shall be free of cobwebs and dust.
W/A
W/A

19.Cigarette Butt Receptacles Clean cigarette butt receptacles. Remove and dispose of all cigarette butts and trash. Replace sand as required.

Neat and clean cigarette butt receptacles.
D/A
D2/A

20. Mechanical/Storage Room Keep mechanical/storage room clean, organized and free of litter. Keep up-to-date MSDS sheets on all cleaning products in a visible place and easily accessible in case of emergency. Check fire extinguishers. Check first aid kit.

All mechanical/storage rooms shall be free of clutter, dirt and cobwebs. Fire extinguisher and first aid kits shall be full and ready in case of emergency.
W
W

21. Caretaker Appearance The caretaker shall wear an I.D. badge, which contains Contractor and employee's name.

Caretaker and Contractor employees shall be neat and clean at all times. Employees shall be friendly and courteous to rest area users. Employees shall wear I.D. badges at all times while working within rest area complex.
D
D
Task – Facilities
Minimum Results Expected
Low Use
High Use

22. Record Keeping/ Daily Log Keep a daily log listing activity completed. Enter unusual or required information (i.e. traffic counts, lost and found articles, accidents, vandalism). Keep the daily log in the mechanical room.

Daily logs and records shall be maintained every time cleaning activities occur. Logs will be maintained on site and be available for Department inspection. Daily sheet, logs and records shall be delivered twice a month to the Department.
D2
D3

23. Public Telephones Clean and sanitize public phones/booths once per day. Report operational problems to telephone company and Department.

All public telephones shall be neat, clean and free of stains and fingerprints. Report trouble to telephone company and Department.
D/A
D/A

24. Irrigation System Monitor and service irrigation system controllers to assure that timely and proper coverage of irrigation water is taking place. Replace and/or repair sprinkler heads and broken lines as required.

The lawn shall appear green, healthy, well-kept and be irrigated on a regular basis.
W/A
W/A

- 2 -

- 1 –

REVISED: 12/08/08

File details come from the government source that posted it. Updated .