BAA 10-016 Amendment 0001.pdf

PDF 20 KB Posted

Attached to
Advanced Mooring System (AMS)
Solicitation number
BAA10-016
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
Proposal Checklist 1.pdf PDF
BAA 10-016 FINAL.pdf PDF
Cost Proposal Spreadsheet.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BAA 10-016

Amendment 0001

Broad Agency Announcement 10-016 "Advanced Mooring System"

Amendment Number 0001

The purpose of Amendment Number 0001 is to revise:

1. Section I, entitled “General Information”, paragraph 5, entitled “Research Opportunity

Description”, sub-paragraph 5.2, entitled “Program Plan”, part 5.2.1 , entitled “AMS System Performance Specifications and Requirements”, bullet 1, entitled “Performance Specifications”, sub-bullet 2, entitled “Environmental”, minor bullet 5 is hereby revised as follows:

Vessel Data: AMS will be required for a variety of vessels, with the following ranges of motions operating independently: - threshold Large Vessels Connectors INLS / MCS RRDF

Length (m) (LOA) 185 m to 290 m 41 m to 103 m 73 m to 122 m Beam (m) (Max) 23 m to 50 m 9 m to 28.5 m 22 m Draft (m) (Full Load) 7 m to 12 m 2 m to 4 m 0.75 m to 2.4 m Full Load Displacement (MT) up to 104,500 MT up to 2,400 MT 712 MT to 1400 MT

Range of Operating Freeboard (m) up to 17 m (note mission deck of MLP may submerge) up to 6.0 m 0.3 m to 2 m Maximum Roll (SS3/SS4) 1 degree to 12 degrees up to 5 degrees up to 9 degrees (SS3) Maximum Pitch (SS3/SS4) 1 degree to 3 degrees up to 1.3 degrees up to 12 degrees (SS3) Maximum Heave (SS3/SS4) 1 to 2 meters up to 1.1 meters up to 2.11m (SS3) Maximum Surge (SS3/SS4) up to 1.2 meters N/A up to .45 m (SS3) Maximum Sway (SS3/SS4) up to 1 meter N/A up to 1.5 m (SS3) Maximum Yaw (SS3/SS4) up to 1 degree up to 0.35 degrees up to 1.2 degrees (SS3) Vertical Accelerations (G's) up to 0.2 G's up to 0.20 G's xx Transverse Accelerations (G's) up to 0.2 G's up to 0.20 G's xx Longitudinal Accelerations (G's) up to 0.2 G's up to 0.20 G's xx

Vertical acceleration load factors associated with motions in the above chart are

1.2 G’s. Assume any “up to” amplitudes are maximum amplitudes.

2. Section I, entitled “General Information”, paragraph 5, entitled “Research Opportunity

Description”, sub-paragraph 5.2, entitled “Program Plan”, part 5.2.1 , entitled “AMS System Performance Specifications and Requirements”, bullet 1, entitled “Performance Specifications”, sub-bullet 3, entitled “Operational”, minor bullet 10, “Reliability, Maintainability, and Availability – threshold”, sub-minor bullet 4 is hereby revised as follows:

The maximum mean-time-to-repair (MTTR) shall be eight hours for all sub-systems. The system shall be designed to minimize scheduled preventive maintenance man-hours. The system maintenance shall not require use of proprietary tools.

3. Section I, entitled “General Information”, paragraph 5, entitled “Research Opportunity

Description”, sub-paragraph 5.2, entitled “Program Plan”, part 5.2.1 , entitled “AMS System Performance Specifications and Requirements”, bullet 1, entitled “Performance

BAA 10-016

Amendment 0001

Specifications”, sub-bullet 3, entitled “Operational”, minor bullet 12 is hereby revised as follows:

The amount of special test equipment required for maintenance shall be minimized. The amount of tools not normally carried aboard ship required for maintenance shall be minimized. – threshold

4. Section IV, entitled “Application and Submission Information”, paragraph 1, entitled

“Application and Submission Process”, is hereby revised as follows:

“1. Application and Submission Process -

This solicitation is for full proposals only. Full proposals are due before the date and time listed in Section I.4. Full Proposal shall be mailed or hand delivered to the technical point of contact listed in Section I.6.

5. Attachment entitled “Proposal Checklist” is hereby incorporated.

File details come from the government source that posted it. Updated .