Contractor Furnished Property, Material, Equipment and Services The Contractor shall provide the following material:
Item Dimension Quantity Round concrete culvert 36” diameter x 8’ length 8 each Concrete catch basin 5’ wide x 5’ long 4 each Shipping container 40’ long x 8’ wide x 8’ tall 1 each 3” Crushed limestone 60’ long x 60’ wide x 4” deep 45 cu. yards 2” Crushed limestone 60’ long x 60’ wide x 2” deep 23 cu. yards Fabric weed barrier 360 square feet 1 each
W912NS22R0002
Statement of Work
Missouri National Guard Wappapello Training Site Structural Collapsible Venue Site
Background The Missouri National Guard is seeking a single vendor to build a Structural Collapsible Venue Site (SCVS), commonly referred to as a Rubble Pile at the Missouri National Guard Wappapello Training Site.
Period Of Performance The Period of Performance shall be 1 week starting as soon as possible.
Place and Performance of Services The contractor shall provide services between the hours of 0700-1500 Local Time on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at the Wappapello Training Site, 461 Co Rd 517, Wappapello, MO 63966: BIV Area C; Entry Control Point.
Recognized Holidays Recognized Federal Holidays can be viewed here, the contractor shall not perform services on any federal holiday: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
Security Requirements The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
Government Furnished Property, Material, Equipment and Services The Government will provide a latrine in Building 25. The Government will not provide any materials, equipment or services for this project.
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
• Remove 6” of topsoil in the marked area, measuring 60’ x 60’.
• Place fabric weed barrier in the marked area, measuring 60’ x 60’.
• Place approximately 6” of limestone aggregate (3 inch on bottom, 2 inch on top) in the marked area as indicated by the provided diagram (Appendix 1). Change of elevation not to exceed +/- 2”.
• Provide one 40 foot shipping container.
• Cut two holes in container to align with two adjoining culverts as depicted in diagram (Appendix 1). Ensure holes are large enough to allow safe entry into culvert (no rough, jagged, or protruding edges). Hole diameters not to exceed 40 inches an not less than 36 inches.
• Place the 40 foot shipping container at the southeast edge of the gravel pile, not less than 5 feet from the southeast edge of the gravel and centered between the northeast and southwest edges (see Appendix 1).
• Provide concrete items.
• Place the culverts and catch basins on the gravel as indicated by the diagram
(Appendix 1), ensuring there is not less than 6.5” at the narrowest point and not more than 7” at the widest point between each item (culvert, catch basin, container).
• Secure the culverts with blocks or gravel to make them securely stationary.
W912NS22R0002
Requirements The contractor shall furnish everything required to perform the following requirements:
Appendix 1 Region VII
2022 UNCLASSIFIED
5 BOUNDARY OF AREA OF WORK
2022 UNCLASSIFIED
10’
5’
D oors40’ Container
8’ T ub e
8’ T ub e
8’ Tube
8’ T ub e
8’ T ub e
North
60’ Limestone Base
’ L im es to ne
B as e
3 3 3 ALLOW NO LESS THAN 6 ½” AND NO MORE THAN 7”
BETWEEN CULVERTS AND CONNECTING ITEMS FOR
FUTURE PLACEMENT OF 4’ X 4’ X 6” CONCRETE SLABS.
4 3” under 2” CRUSHED STONE BASE OVER FABRIC WEED
BARRIER THROUGH OUT AREA WITHIN BOUNDARY OF
AREA OF WORK.
5 BOUNDARY OF AREA OF WORK
8’ Tube
8’ T ub e
8’ T ub e3
Appendix 1 Appendix 1
2022 UNCLASSIFIED
5’-0 LONG GALV. “U” CHANNEL POST (2 LBS PER FOOT). 4 PER CULVERT. TOP OF
POST 2” HIGHER THAN WIDEST POINT OF CULVERT, IN CONTACT WITH CULVERT TO
PREVENT MOVMENT OF CULVERT.
1 3’-0” DIAMETER X 8’-0” LONG CONCRETE CULVERT
3 ALLOW NO LESS THAN 6 ½” AND NO MORE THAN 7” BETWEEN CULVERTS AND
CONNECTING ITEMS FOR FUTURE PLACEMENT OF 4’ X 4’ X 6” CONCRETE SLABS.
7 THIN WALL KNOCK OUT FOR 36” RCP ALL WALLS KNOCKED OUT FOR JUNCTIONS,
UNALTERED FOR NON-JUNCTION SIDES OR PRECASTED OPENINGS ON ALL SIDES
4 4” CRUSHED STONE BASE OVER FABRIC WEED BARRIER
THROUGH OUT AREA WITHIN BOUNDARY OF AREA OF
WORK.
5 BOUNDARY OF AREA OF WORK
6 48” X 48” CATCH BASIN WITH 36” THIN WALL KNOCK OUTS ON ALL SIDES OR
PRECASTED OPENINGS.
Appendix 1 Appendix 1
2022 UNCLASSIFIED
Region 7 MO HRF Rubble Pile (Proposed)
• WTS site will look similar to this
| Rubble Pile WTS_Estep.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Statement of Work (SOW) - Rubble Pile.pdf |
| Background |
| Period Of Performance |
| Place and Performance of Services |
| Recognized Holidays |
| Security Requirements |
| Government Furnished Property, Material, Equipment and Services |
| Contractor Furnished Property, Material, Equipment and Services |
| Requirements |
| The contractor shall furnish everything required to perform the following requirements: |