B2504PriceForm.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Spec Martin Stadium Drainage Improvements State and local contract opportunity
- Solicitation number
- B-25-04
- Issued by
- Volusia County, Florida
About this file
The document is a Price Form (B2504PriceForm.xlsx) for a Spec Martin Stadium Drainage Improvements project in Florida, detailing a comprehensive civil and architectural infrastructure renovation. The project encompasses drainage system improvements for the North, West, and South buildings of the Spec Martin Stadium Memorial Complex, involving extensive demolition, excavation, and replacement of existing concrete slabs and subsurface drainage systems. The scope includes multiple construction categories such as general construction, erosion control, demolition, earthwork, pavement installation, storm drainage infrastructure, and miscellaneous architectural modifications. Key quantitative elements include 790 linear feet of sediment barrier, 966 square yards of concrete/sidewalk removal, 921 square yards of concrete pavement, 536 linear feet of concrete curb and gutter, and numerous drainage basin and piping installations.
The price form indicates a base bid structure with line items totaling $0.00, suggesting this is a preliminary or template document awaiting specific cost inputs. The project includes a 1.5% infrastructure/site improvement permit fee and a 10% contingency allocation. While no specific pricing is populated, the comprehensive itemization covers civil and architectural work, including detailed specifications for drainage system enhancements, downspout installations, gutter modifications, and structural alterations. The document suggests a structured approach to project costing with granular breakdown of expected construction activities, allowing for precise budgeting and cost tracking throughout the stadium improvement project.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| RCA.pdf | ||
| B2504Tabulation.pdf | ||
| B2504ADD1.pdf | ||
| B2504Plans.pdf | ||
| B2504Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPC
| BASE BID ITEMS | |||||
| ITEM NUMBER | ITEM DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL COST |
| CIVIL ITEMS | |||||
| 1 | GENERAL CONSTRUCTION | - | - | - | - |
| MOBILIZATION | LS | 1 | $0.00 | ||
| MAINTENANCE OF TRAFFIC | LS | 1 | $0.00 | ||
| ITEM TOTAL | $0.00 | ||||
| 2 | EROSION AND SEDIMENT CONTROL | - | - | - | - |
| SEDIMENT BARRIER | LF | 790 | $0.00 | ||
| INLET PROTECTION SYSTEM | EA | 24 | $0.00 | ||
| CONSTRUCTION EXIT/ENTRANCE | SY | 150 | $0.00 | ||
| PYRAMAT | LS | 1 | $0.00 | ||
| ITEM TOTAL | $0.00 | ||||
| 3 | DEMOLITION | - | - | - | - |
| REMOVAL OF EXISTING CONCRETE/SIDEWALK | SY | 966 | $0.00 | ||
| MILLING EXISTING ASPHALT (2" AVG DEPTH) | SY | 91 | $0.00 | ||
| REMOVE & REINSTALL EXISTING PAVERS | SY | 18 | $0.00 | ||
| REMOVAL OF EXISTIING CURB | LF | 16 | $0.00 | ||
| REMOVAL OF FENCING | LS | 1 | $0.00 | ||
| ITEM TOTAL | $0.00 | ||||
| 4 | EARTHWORK | - | - | - | - |
| CLEARING AND GRUBBING | AC | 1.14 | $0.00 | ||
| ITEM TOTAL | $0.00 | ||||
| 5 | PAVEMENT | - | - | - | - |
| STANDARD DUTY ASPHALT (INCLUDES 2" SP 12.5 ASPHALT, 8" BASE, AND 9" SUBBASE) | SY | 91 | $0.00 | ||
| 6" CONCRETE PAVEMENT (INCLUDES 4" BASE, AND 12" SUBBASE) | SY | 921 | $0.00 | ||
| SIDEWALK | SY | 45 | $0.00 | ||
| CONCRETE CURB & GUTTER, TYPE D | LF | 536 | $0.00 | ||
| ITEM TOTAL | $0.00 | ||||
| 6 | STORM DRAINAGE | - | - | - | - |
| 18" DRAIN BASIN | EA | 4 | $0.00 | ||
| 30" DRAIN BASIN | EA | 2 | $0.00 | ||
| 36" DRAIN BASIN | EA | 6 | $0.00 | ||
| Z883 TRENCH DRAIN | LF | 110 | $0.00 | ||
| ADS TRENCH DRAIN | LS | 1 | $0.00 | ||
| 15" HDPE | LF | 284 | $0.00 | ||
| 18" HDPE | LF | 31 | $0.00 | ||
| 4" PVC | LF | 294 | $0.00 | ||
| 6" PVC | LF | 479 | $0.00 | ||
| 8" PVC | LF | 169 | $0.00 | ||
| 4" CLEANOUT/WYE/TEE | EA | 9 | $0.00 | ||
| 6" CLEANOUT/WYE/TEE | EA | 8 | $0.00 | ||
| 8" CLEANOUT/WYE/TEE | EA | 7 | $0.00 | ||
| INSERT-A-TEE | EA | 6 | $0.00 | ||
| 4" PVC MES | EA | 1 | $0.00 | ||
| CONCRETE FLUME | EA | 2 | $0.00 | ||
| HEEL SAFE GRATE | EA | 1 | $0.00 | ||
| ITEM TOTAL | $0.00 | ||||
| 9 | MISCELLANEOUS | - | - | - | - |
| CHAIN LINK FENCING | LF | 536 | $0.00 | ||
| DETECTIBLE WARNING MATT | EA | 1 | $0.00 | ||
| ITEM TOTAL | $0.00 | ||||
| ARCHITECTURAL ITEMS | |||||
| 1 | DEMOLITION | - | - | - | - |
| NEW OPENINGS THRU WALL FOR DOWNSPOUTS ELBOWS | EA | 2 | $0.00 | ||
| OPENING THRU CONCRETE SLAB FOR DOWNSPOUT SLEEVE | EA | 12 | $ - 0 | $0.00 | |
| EXISTING SCUPPER REMOVAL IN WEST BUILDING | EA | 2 | $0.00 | ||
| ITEM TOTAL | $0.00 | ||||
| 2 | PAVEMENT | - | - | - | - |
| FILLER MATERIAL AND SEALANT FOR EXPANSION JOINT | LF | 289 | $0.00 | ||
| SAWCUT 1/2" X 1/2" IN CONCRETE SLAB ( CONTROL JOINT) | LF | 742 | $0.00 | ||
| ITEM TOTAL | $0.00 | ||||
| 3 | STORM DRAINAGE | - | - | - | - |
| PLASTIC SLEEVE THRU CONCRETE SLAB FOR DOWNSPOUTS TO STORM DRAINAGE | EA | 12 | $0.00 | ||
| ALUMINUM SQUARED DOWNSPOUT 4"X4" WITH BRACKETS TO WALL (PAINTED) | LF | 213 | $0.00 | ||
| ALUMINUM SQUARED DOWNSPOUT 5"X5" WITH BRACKETS TO WALL (PAINTED) | LF | 26 | $0.00 | ||
| ALUMINUM SQUARED PROFILE 6"X6" GUTTER (PAINTED) | LF | 593 | $0.00 | ||
| LAP TYPE GUTTER EXPANSION JOINT (6" X 6") PAINTED | EA | 6 | $0.00 | ||
| ALUMINUM GUTTER OUTLET 4" X 4" | EA | 17 | $0.00 | ||
| ALUMINUM GUTTER OUTLET 5" X 5" | EA | 2 | $0.00 | ||
| ALUMINUM WIRE STRAINER 5"X5" | EA | 2 | $0.00 | ||
| ALUMINUM WIRE STRAINER 4"X4" | EA | 17 | $0.00 | ||
| 4"DIA. DOWNSPOUT ELBOW THRU WALL ( PARAPET WEST BUILDING) | EA | 2 | $0.00 | ||
| 4" PVC PIPE - WEST BUILDING DOWNSPOUT | LF | 161 | $0.00 | ||
| ALUMINUM PERFORATED COVER 12'X6"(SEE SPECS)-INCLUDES SUPPORTING | LF | 80 | $0.00 | ||
| ITEM TOTAL | $0.00 | ||||
| 4 | MISCELLANEOUS | - | - | - | - |
| FW20 MCBI ALUMINUM PANEL ENCLOSURE ( FIELD VERIFY-SEE DWGS) | SF | 97 | $0.00 | ||
| OPENING CLOSURE (EXISTING SCUPPER REMOVED) | EA | 2 | $0.00 | ||
| ITEM TOTAL | $0.00 |
| Subtotal | $0.00 |
| Infrastructure/Site Improvement Permit Fee (1.5%) | $0.00 |
| Contingency (10%) | $0.00 |
| Base Bid Total | $0.00 |
File details come from the government source that posted it. Updated .