B2 Attachment 2 Contractor Technical Certification.pdf

PDF 395 KB Posted

Attached to
Temporary Chill Water System Federal contract opportunity
Solicitation number
N4215823QS032
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document includes an attachment outlining technical requirements for a temporary chill water system rental and the corresponding federal contract opportunity on SAM.gov. The Navy is seeking to rent a complete chill water system for its Norfolk Naval Shipyard consisting of two 30-ton chillers, one 60-ton chiller, pumps to supply 30-350 GPM at 100 feet of head pressure, manifolds with supply and return connections, a 250-gallon reservoir, freeze protection, and monitoring equipment. The period of performance is April 2023 through April 2024 with an option to extend month-to-month for six months. Quotes are due by April 5, 2023 and will be evaluated using lowest price technically acceptable criteria. This is a 100% small business set-aside solicited through SAM.gov.

View the file

Other files for this federal contract opportunity

Other files attached to Temporary Chill Water System, newest first.
File Type Posted
N4215823QS032_Bidders Questions.docx DOCX document
B2 Combined Synopsis Solicitation.pdf PDF
B2 Attachment 1 FAR 52.212-1 Addendum.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment (2) Contractor Technical Certification

Vendor shall certify that equipment being quoted meets the capabilities listed below. Furthermore, vendor shall provide technical specification data in Tables A for the equipment that will be provided. In order to be considered for award, this must be completed and submitted with the vendor quote.

PURPOSE OF REQUEST: Service rental for one complete Chill Water System consisting of two 30 Ton chillers and one 60 Ton Chiller

LOCATION: Norfolk Naval Shipyard (NNSY), Portsmouth, VA 23709

PERIOD OF PERFORMANCE: 24 April 2023 to 23 April 2024 with clause to extend month to month for 6 months if needed.

Chiller

Chiller

P

P

P

Tank

Bypass Line

Chiller

Figure (1) – Line Diagram of Proposed System

Note 1: Final system may consist of different quantities of Chillers and Pumps (P) than shown in Figure (1) as long as the requirements above are met.

Note 2: Final system may change the order of components as long as the requirements above are met.

Note 3: Freeze protection is not shown in Figure (1). A Freeze protection method shall be included for the system in the event there is no cooling load on the system.

Table A

TECHNICAL CAPABILITIES STATEMENT

General Specification for One complete Chill Water System consisting of two 30 Ton chillers and one 60 Ton

Chiller

Shall be provided with the following capabilities, features and specifications: YES NO

Only fresh water will be circulated through the cooling system described below and shown in

Figure (1).

Chill Water System must consist of at least three chillers. System must be able to support varying capacity from 30 to 120 tons of cooling capacity. System shall consist of two 30 Ton chillers and one 60 Ton Chiller.

System shall be able to allow isolation of each chiller separately to support varying chill water loads shipboard.

Must be air cooled.

Shall be provided with the following capabilities, features and specifications: (Continued) YES NO

Must have a pumping system, consisting of at least two pumps. System must able to a provide a variable supply of 30 to 350 GPM. Each pumping apparatus must be capable of maintaining 100 feet of head supply pressure, all GPM ranges, at the contractor provided supply manifold. At a minimum, the pumping system shall have a minimum of 100 GPM at 100 feet of head pressure of redundant capacity. The expansion tank shall supply water directly to the pumps as shown in Figure

(1). Additional pumps downstream of the chiller unit(s) may be utilized to raise supply pressure to meet the required 100 feet of head pressure requirement at the contractor supplied supply manifold.

Must have suction and discharge manifolds with a quantity of four (4) 2-1/2” MNPT supply connection and a quantity of four (4) 2-1/2” MNPT discharge connections. All manifold connections shall have isolation globe valves installed.

Within the cooling loop there must be a reservoir capable of holding at least 250 gallons of cooling water or as required to support system design. Reservoir is required to account for small leaks and provide the system’s pumps a constant supply of water. Reservoir must be transparent in order to visibly verify the water level within the tank. Tank shall have a constant vent valve on the top or be open to the atmosphere to aid in bleeding air out of the chill water system.

System shall include a bypass line in order to flow water when no services are connected to the contractor supplied supply and discharge manifolds. This bypass line shall include globe valves so the flow can be throttled as required to suit ship’s demands and to keep the chiller units running under low flow/pressure conditions.

Desired output water temperature range is 55o - 65oF.

Must be operable on a single 460/480(V), 400 Amp Breaker (maximum).

Must be provided with a male 500 mcm Camlock electrical connection.

System must have necessary equipment to prevent freezing recirculating water with no cooling load at 0 O F.

CRITICAL SYSTEM SUPPORT: Unit must be capable of operating 24 Hours a day Seven

(7) Days a Week.

Must be operable at flow rates of as little as 30 GPM without needing to recirculate flow.

Contractor is to provide all equipment from the return manifold to the supply manifold. System shall be a complete unit. If pumps or tanks are separate, vendor will provide all piping/valves/fittings as required to couple pumps to the Chill Water Units. Vendor is to provide

Extra fittings and hoses to support installation. If the system requires assembly, the system shall be assembled in such a way that it does not cause tripping hazards by minimizing the lengths of hoses between components. If lengths of hoses are longer than needed, it should be able to be coiled and put somewhere out of the way of normal foot traffic. Hoses shall be routed in a way that does not cause the hose to kink and reduce flowrate.

Chiller Unit(s) must be capable of operating in an industrial environment where dust, dirt, and sea air are present.

YES NO

Chiller Unit(s) to be equipped with operational Inlet and Outlet Temperature Gages.

Chiller Unit(s) to be equipped with operational Outlet Pressure Gage.

System is to include operational pressure gages on the contractor provided supply and discharge manifold.

Unit shall have an electronic monitoring system that monitors inlet and outlet temperature, pressure, and flow rate. The system shall be able to notify NNSY personnel when the monitored parameters fall outside of a set range.

Shall be provided with the following capabilities, features and specifications: (Continued) YES NO

If chiller system holds 55 gallons or more of fuel or oil or similar fluid, provide an environmental catch capable of holding at least 110% of the capacity of the fuel, oil, and other fluids required to operate the rental unit.

Evaporator must be capable of delivering a leaving temp of less than 65O F.

Condenser must be capable of operating in a wide ambient temperature range (0-125 O F)

Unit must be affixed with a metal tag designating the supplying company, a POC responsible for repairs and maintenance, and a phone number of the POC who is responsible for repairs and maintenance.

Contractor to adhere to the rigging requirements as outlined in Attachment B for contractor equipment at Norfolk Naval Shipyard.

The gross weight of the unit shall be clearly marked on the outside of the unit as outlined in

Attachment B. If the unit is not a complete unit, the gross weight of each component shall be clearly marked on each component.

A Freeze protection method shall be included for the system in the event there is no cooling load on the system.

TECHNICAL CAPABILITY/CONTRACTOR RESPONSIBILITY CERTIFICATION

Vendor hereby certifies that vendor’s service meets or exceeds all specifications and contractor responsibilities stated in this solicitation, in their entirety, with no exceptions. ___________ (initials)

Signature Printed Name

Title Date

File details come from the government source that posted it. Updated .