B09_Bid_Schedule.pdf

PDF 65 KB Posted

Attached to
Demo, Foundation Repair, and Flooring Installation
Solicitation number
140FC224R0017
Issued by

About this file

This document is a Bid Schedule for the Demo, Foundation Repair, and Flooring Installation project at the San Bernardino & Leslie Canyon National Wildlife Refuge in Douglas, Arizona. The lump sum quote should include demo, installation, and foundation repair for luxury vinyl tile (LVT), quartz, and luxury vinyl plank (LVP) flooring. Vendors must provide pricing breakouts for the different flooring types, as well as for crack repairs over and under 1/2 inch wide. Pricing for foundation repair options, such as raising the floor, grinding/stitching, and laying epoxy, is also required. The opportunity is being solicited under Solicitation Number 140FC224R0017 by the Department of the Interior Fish and Wildlife Service.

View the file

Other files

File Type Posted
Sol_140FC224R0017_Amd_0001.pdf PDF
Sol_140FC224R0017.pdf PDF
B08_Past_Performance_Survey.doc DOC document
B03_Wages.pdf PDF
B08_SOW.pdf PDF
B08_Photos.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUOTE SCHEDULE

Demo and Installation of Flooring at San Bernardino & Leslie Canyon NWR

Douglas, AZ

BEFORE SUBMITTING QUOTES, quoters shall carefully read the Statement Of Work (SOW) and all applicable documents.

Quotes for construction under this Invitation will be considered on the following schedule.

QUOTE ITEM ESTIMATED TOTAL

NO. DESCRIPTION QUANTITY AMOUNT

Demo, Installation, and Foundation Repair Lump Sum $

(cove base in restrooms shall be 6" high (code) and in all other epoxy areas 4" high.

rubber base board is to be installed in laminate areas)

Proposal Breakout included in lump sum amount:

Flooring: LVT per (indicate quantity) $

Flooring: Quartz per(indicate quantity) $

Flooring: LVP per(indicate quantity) $

Crack repairs over ¼ inch wide linear foot $

Crack repairs under ¼ inch wide linear foot $

Pricing for foundation repair included in lump sum amount:

Raise the floor back to level $________________

Grind/stitch back to level $________________

Lay epoxy over unlevel surface $________________

If additional Materials/Services are needed after Award, the resulting Modification will calculate value using approved pricing breakout above.

Vendor Name:

BY: EMAIL: _________

(signature)

ADDRESS:

DATE: UEID NO. ________

File details come from the government source that posted it. Updated .