B08c_Drawings_-_Specifications.pdf

PDF 816 KB Posted

Attached to
RESTORE ELEC. POWER TO COAL CREEK CAMP
Solicitation number
140P9725R0005
Issued by

About this file

These are electrical site plan and power riser engineering drawings for a microgrid upgrade project at Coal Creek Camp in Alaska Parks (Yukon-Charley Rivers National Preserve). The documents detail electrical infrastructure modifications including demolition of existing electrical systems and installation of new components such as solar arrays, battery storage, inverters, charge controllers, and generator inlets. Specific work includes replacing existing electrical infrastructure with new Outback Power Systems components, installing ground rods, connecting solar panel arrays, and upgrading power distribution systems across multiple buildings including a generator building, mess hall, recreation building, laundry/shower facility, and storage building. The drawings provide technical specifications for electrical trenching, cable routing, power distribution, and system interconnections, with a focus on creating a more robust and flexible electrical microgrid system for the remote park facility.

View the file

Other files

File Type Posted
Sol_140P9725R0005_Amd_0004.pdf PDF
UPDATED_SOW_0004.docx DOCX document
Sol_140P9725R0005_Amd_0003.pdf PDF
Sol_140P9725R0005_Amd_0002.pdf PDF
Sol_140P9725R0005_Amd_0001.pdf PDF
Sol_140P9725R0005.pdf PDF
B08d_Wage_Determination.pdf PDF
B08b_Statement_of_Work.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TO YUKON RIVER

TO COAL CREEK AND AIRSTRIP

TO

W

O O

D C

H O

PP

ER

C R

EE

K

BEATON PUP (C

REEK)

UGE

UGE

UGE

U G

E U

G E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

O

HE

O

HE

O

HE

O

HE

BATTERY STORAGE BUILDING

SOLAR ARRAY #2

SOLAR ARRAY #1

GENERATOR BUILDING

INCINERATOR

MESS HALLLAUNDRY/SHOWER

BUILDING

STORAGE BUILDING

RECREATION BUILDING

(E) POLE P5

(E) POLE P4

UGE

UGE

UGE

POLE P6

(E) (3) #2 AL

O H

E

MESS HALL

SERVICE DROP

WITH SPLICE

LAUNDRY/SHOWER

SERVICE DROP

RECREATION BUILDING

SERVICE DROP WITH

SPLICE

STORAGE BUILDING

SERVICE DROP

(E) (3) #2 AWG AL

ABANDON GENERATOR FEED

TO INVERTERS IN PLACE

3/C #2 W/ (3)#10 GND

TYPE MC-HL CABLE

PORTABLE

GENERATOR

INLET

LINETYPE LEGEND

OHE

UGE

OVERHEAD ELECTRIC

UNDERGROUND ELECTRIC

3/C #10 W/ (3)#14 GND

TYPE MC-HL CABLE

PORTABLE

GENERATOR

INLET

CABLES, TYPE SIZE

AND NUMBER AS

SHOWN ON DRAWINGS

(TYP)

BACKFILL WITH

EXCAVATED MATERIAL.

REMOVE ORGANICS.

CLEAR TRENCH BOTTOM

OF ANY ORGANIC

MATERIAL THAT COULD

DAMAGE CONDUCTORS.

POWER CABLES

SURFACE FINISH TO MATCH

ADJACENT FINISH

MARKER TAPE

(TYP)

FINISH GRADE

MIN 24"

6/21/2021 11:41 AM 402001 - E101 - ELECTRICAL SITE PLAN (REVISED).DWG

402001

1 OCT 2020

COMM. NUMBER

ISSUE DATE

DESIGNED BY

DRAWN BY

1"0" SCALE

601 College Road Fairbanks AK 99701 907.452.1241

Architects SurveyorsEngineers

AECC511 designalaska.com

MICROGRID

UPGRADES IN

ALASKA PARKS

COAL CREEK

(YUCH)

REG IS T ER ED P R O F E S S IO NA L ENGINEER

Robert S. Gras

No. EE7352 24-Jun-2021

E101

JCC

RSG

ELECTRICAL SITE

PLAN

ELECTRICAL SITE PLAN1

E101 1" = 80'

TYPICAL TRENCH DETAIL2

E101 NO SCALE

SPECIFIC NOTES

PROVIDE PLACARD AT INLET THAT READS: "GENERATOR INLET RECEPTACLES LOCATED

AT GENERATOR BUILDING AND UTILITY POLE NEAR MESS HALL. ENSURE GENERATOR IS

NOT CONNECTED AT SECOND LOCATION PRIOR TO CONNECTING AT THIS LOCATION."

REVISION 23 JUN 20211

REVISED FINAL

lminski Cloud lminski Callout Approximate Limit of Work lminski Cloud lminski Text Box (destroyed by fire) lminski Text Box (destroyed by fire) lminski Text Box Staging Area lminski Text Box Work consists of:

Demolition: Demolish the remains of the overhead electrical distribution line from Pole P4 to Pole P5.

New Construction:

· The contractor shall trace the original 120/240V underground electric line from the old Power Pole P4 location back to where the electric line can be determined to be unimpacted by the Mess Hall fire and install a new in-ground junction box.

· A new guyed Power Pole P4a shall be installed in the original location of Power Pole 4.

· A new underground distribution cable in 2” metal conduit shall be installed from the junction box to a 1-phase service box with disconnect mounted on Pole P4a. The service box shall include 1) access to temporary service at Pole P4a, 2) a circuit for the incinerator, 3) a portable generator inlet, and 4) A service disconnect switch permitting isolation between P4 and the photovoltaic system permitting use of a portable generator to supply power to the storage building and recreation building at Pole P5. The service box shall be equipped with surge protection and new panel ground rods shall also be installed into the earth per NEC requirements.

· A new overhead distribution line shall be installed from a service riser in 2” rigid conduit with a weather head at Pole P4a approximately 175 linear feet to the existing service weather head on the Recreation Building.

(E) DC ENCLOSURE

PV ARRAY #1 (1650 W)

48V DC

4500 AMP HOURS

(8 HOUR DISCHARGE)

GENERATOR

BUILDING

BATTERY STORAGE BUILDING

165 W

165 W

165 W

165 W

165 W

165 W

165 W

165 W

165 W

165 W

GENERATOR

BUILDING

60A MCB

120/240 V

1 PH, 3 W

(E) (3) #2 AL

(E) POLE P4

120/240 V PORTABLE

GENERATOR

INLET

NEMA L14-30R

(E) TO INCINERATOR

GUY WIRE

PANEL 'MDP'

100A MCB

120/240 V

1 PH, 3 W

100/2

30/1

20/1

60/2

55 W

55 W

55 W

55 W

PV ARRAY #2 (220 W)

(E) POLE P5

125A LOAD

CENTER

120/240 V

GUY WIRE

LAUNDRY/SHOWER

BUILDING

125A LOAD

CENTER

120/240 V

MESS HALL

INVERTER #2

60/2

3/C #2 W/ (3)#10 GND

TYPE MC-HL CABLE

(E) (3) #2 AWG AL

(E) AC ENCLOSURE

INVERTER #1

125A LOAD CENTER

120/240 V

(E) 60A

DISCONNECT

SWITCH

(E) 60A

DISCONNECT

SWITCH

125A LOAD CENTER

120/240 V

STORAGE BUILDING

RECREATION BUILDING

60/2

CHARGE

CONTROLLERS

SYSTEM CONTROL

PANEL

(E) BATTERY BANK

TO WATER

TREATMENT

EQUIPMENT

20/1

(E) GROUND

ROD

5/8"X8'

GROUND ROD

(E) GROUND

ROD

5/8"X8'

GROUND ROD

(E) GROUND

ROD

5/8"X8'

GROUND ROD

(E) GROUND

ROD

5/8"X8'

GROUND ROD

(E) GROUND

ROD

5/8"X8'

GROUND ROD

(TYP OF BOTH

BUILDINGS)

(TYP OF BOTH

BUILDINGS)

3/C #10 W/ (3)#14 GND

TYPE MC-HL CABLE

ARRAY COMBINER

(E) (E)

(E)

(E)(E)

(E) (E)

TO EXISTING

GENERATOR

BUILDING

OUTLET AND

LIGHT

20/1

(E) (3) #4

AWG CU

(E) (3) #4

AWG CU

120/240 V PORTABLE

GENERATOR

INLET

NEMA L14-30R

30/1

6/24/2021 8:39 AM 402001 - E300 - POWER RISER.DWG

402001

1 OCT 2020

COMM. NUMBER

ISSUE DATE

DESIGNED BY

DRAWN BY

1"0" SCALE

601 College Road Fairbanks AK 99701 907.452.1241

Architects SurveyorsEngineers

AECC511 designalaska.com

MICROGRID

UPGRADES IN

ALASKA PARKS

COAL CREEK

(YUCH)

REG IS T ER ED PR O F E S S IO NA L ENGINEER

Robert S. Gras

No. EE7352 24-Jun-2021

E301

JCC

RSG

POWER RISER AND

DETAILS

POWER ONE-LINE1

E301 NOT TO SCALE

SOLAR CONTROLLER DETAILS2

E301 NO SCALE

50/2 50/2 50/2 25/2 15/1 20/1

TO

A

C O

U

TP

U T

FR

O

M G

E N

E R

A

TO

R

TO

A

C O

U P

U T

FR

O

M

IN

V E

R

TE

R

TO

IN

V E

R

TE

R

FR

O M

G E

N E

R A

TO

R

TO

A

C O

U

TP

U T

FR

O

M

V

X

FR

M R

TO

IN

TE

G

R A

L O

U

TL

E T

FR

O

M A

C O

U

TP

U T

TO

E

X

TE

R N

A L

LO

A

D

FR

O M

A C

O U

TP

U

T

S P

A C

E

S P

A C

E

S P

A C

E

S P

A C

E

S P

A C

E

S P

A C

E

60/1 60/1 100/1 100/1

S P

A C

E

S P

A C

E

S P

A C

E

S P

A C

E

S P

A C

E

FR

O

M B

A

TT

E R

IE

S

FR

O

M B

A

TT

E R

IE

S

TO

IN

V E

R

TE

R

TO

IN

V E

R

TE

R

FR

O

M S

O

LA

R P

A N

E

LS

TO

B

A

TT

E R

IE

S

TO

C

H A

R G

E C

O N

TR

O

LL

E

R

FR

O

M C

H A

R G

E C

O N

TR

O

LL

E

R

AC ENCLOSURE DC ENCLOSURE

SPECIFIC NOTES

PROVIDE NEW INVERTERS COMPATIBLE WITH EXISTING OUTBACK POWER SYSTEMS PS2

AC AND DC ENCLOSURES AND NEW SYSTEM CONTROL PANEL AND CHARGE

CONTROLLERS. INVERTERS TO HAVE A CONTINUOUS POWER RATING OF 3,000 VAC @

25°C AND CAPABLE OF PRODUCING A 120/240 VAC SINGLE PHASE SYSTEM. BASIS OF

DESIGN: OUTBACK POWER SYSTEMS FXR3048A

PROVIDE NEW CHARGE CONTROLLERS COMPATIBLE WITH EXISTING OUTBACK POWER

SYSTEMS PS2 AC AND DC ENCLOSURES AND NEW INVERTERS AND SYSTEM CONTROL

PANEL. CHARGE CONTROLLER TO FEATURE MAXIMUM POWER POINT TRACKING. BASIS

OF DESIGN: OUTBACK POWER SYSTEMS FLEXMAX 60.

PROVIDE NEW SYSTEM CONTROL PANEL COMPATIBLE WITH EXISTING OUTBACK POWER

SYSTEMS PS2 AC AND DC ENCLOSURES AND NEW INVERTERS AND CHARGE

CONTROLLERS. SYSTEM CONTROLLER TO HAVE ABILITY TO BE MONITORED REMOTELY.

BASIS OF DESIGN: OUTBACK POWER SYSTEMS MATE3 WITH OPTICS RE MONITORING.

PROVIDE NEW PV ARRAY COMBINER BOX AND CONNECT EXISTING 4 PANEL ARRAY IN

COMBINER BOX. PV COMBINER BOX TO BE RATED TO HANDLE EXISTING SOLAR PANELS.

BASIS OF DESIGN: OUTBACK POWER SYSTEMS FLEXWARE FWPV-8.

CONNECT NEW 5/8"X8' GROUND ROD TO EXISTING GROUND ROD WITH #8 BARE CU WIRE.

LOCATE NEW GROUND ROD A MINIMUM OF 25 FEET FROM EXISTING GROUND ROD.

PROVIDE PLACARD AT INLET THAT READS: "GENERATOR INLET RECEPTACLES LOCATED

AT GENERATOR BUILDING AND UTILITY POLE NEAR MESS HALL. ENSURE GENERATOR IS

NOT CONNECTED AT SECOND LOCATION PRIOR TO CONNECTING AT THIS LOCATION."

GENERAL NOTES

1. (E) DENOTES "EXISTING TO REMAIN"

5 5 5 5

REVISION 23 JUN 20211

REVISED FINAL

lminski Line lminski Line lminski Line lminski Line lminski Line lminski Line lminski Line lminski Line lminski Cloud lminski Text Box (destroyed by fire) lminski Text Box (destroyed by fire) lminski Text Box Work consists of:

Demolition: Demolish the remains of the overhead electrical distribution line from Pole P4 to Pole P5.

New Construction:

· The contractor shall trace the original 120/240V underground electric line from the old Power Pole P4 location back to where the electric line can be determined to be unimpacted by the Mess Hall fire and install a new in-ground junction box.

· A new guyed Power Pole P4a shall be installed in the original location of Power Pole 4.

· A new underground distribution cable in 2” metal conduit shall be installed from the junction box to a 1-phase service box with disconnect mounted on Pole P4a. The service box shall include 1) access to temporary service at Pole P4a, 2) a circuit for the incinerator, 3) a portable generator inlet, and 4) A service disconnect switch permitting isolation between P4 and the photovoltaic system permitting use of a portable generator to supply power to the storage building and recreation building at Pole P5. The service box shall be equipped with surge protection and new panel ground rods shall also be installed into the earth per NEC requirements.

· A new overhead distribution line shall be installed from a service riser in 2” rigid conduit with a weather head at Pole P4a approximately 175 linear feet to the existing service weather head on the Recreation Building.

G001
E100 - Electrical Site Plan (Existing)
E101 - Electrical Site Plan (Revised)
E300 - Power Riser
E301 - Power Riser-E301

File details come from the government source that posted it. Updated .