B08_Transmittal.pdf

PDF 175 KB Posted

Attached to
Phase 2 Boundary Fence, NPS, Nevada Federal contract opportunity
Solicitation number
140P8122R0006
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This transmittal document outlines submittal requirements for a boundary fence project at Tule Springs Fossil Beds National Monument in Nevada. The contractor must submit items such as lagoon liners, geomembrane specifications, and closeout/operations and maintenance documentation to the National Park Service for review. Submittals will follow the transmittal process defined herein, with the contractor submitting items to the reviewer by the specified dates and the reviewer returning feedback to the contractor. The related federal contract opportunity is for Phase 2 of the boundary fence project at Tule Springs Fossil Beds National Monument, to be awarded by the National Park Service Pacific West Region.

View the file

Other files for this federal contract opportunity

Other files attached to Phase 2 Boundary Fence, NPS, Nevada, newest first.
File Type Posted
B11_Site_Visit_Sign_In_Sheet-Notes_0001.pdf PDF
B09_Questions_and_Answers_0001.pdf PDF
Sol_140P8122R0006_Amd_0001.pdf PDF
A04_Project_Specifications.pdf PDF
B03_General_Decision_NV20220001.pdf PDF
Sol_140P8122R0006.pdf PDF
B08_Past_Performance_Questionnaire.pdf PDF
B08_Contract_Price_Schedule.pdf PDF
B08_Site_Visit_map.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL - NATIONAL PARK SERVICE Transmittal No.:

Sheet: 1 of:

Park: Project: Contract No.: Pkg. No.: Date:

Contractor: Subcontractor/Supplier:

NPS ACTION

Ite m

N o.

Specification Section No. P ar ag ra ph

Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

Contractor Signature Recommended By

Title Date Title Date I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Review Comments Action By Date Contracting Officer's Representative

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.

SUBMITTAL LOG DATES: From Contractor [__________], To Reviewer [__________], From Reviewer [__________], To Contractor [__________] Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim

CM-16Rev. 4/00 (Formerly DSC-1)

TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE Transmittal No.:

Sheet: 2 of:

Park: Project: Contract No.: Pkg. No.: Date:

Contractor: Subcontractor/Supplier:

NPS ACTION

Ite m

Specification Section No. P ar ag ra ph

Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

Review Comments

CM-16Rev. 4/00 (Formerly DSC-1)

BB Lagoon Liners - Geomembrane Specs.pdf
Closeout and O&M Requirements.pdf
Template

File details come from the government source that posted it. Updated .