This document outlines projected submittals for a renovation project at the DC Booth Historic National Fish Hatchery. The project involves installing a new electrical supply, panel, and circuits to a four-stall garage building.

The contractor must provide all material and equipment for trenching or boring to connect a new electrical line from an existing transformer to the garage. Submittals will include shop drawings, material cut sheets, test results, certifications, samples, and operation and maintenance manuals. The submittal schedule, waste management plan, erosion control plan, and closeout documentation are also included. Approval statuses of A through E are defined for the submittals.

The related federal contract opportunity is for the SD DC Booth HNFH 4-stall Garage Electrical Renovation project. The Department of the Interior Fish and Wildlife Service requires installation of the new electrical infrastructure at the four-stall garage to meet the facility's needs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET 1 OF 3

PROJECT NAME: 4 Stall Garage Electrical Renovation ENGR. PROJECT NO.: 24-005 LOCATION: DC Booth National Fish Hatchery CONTRACT NO.:

CONTRACTOR:

PWS

Section Number

Spec.

Paragraph No. Comments

012900 1.2.A.1 013100 1.3 013200 1.4 013233 1.2 013300 1.3 014000 1.4 015000 1.3 017419 1.3 017419 1.4 017700 1.3 017823 1.2 260500 1.3 262416 1.03

Waste records Closeout documents O&M Manual Maintenace Manuals Electrical Panel Product Data

Digital photos Submittal schedule Test agency information Erosion control plan Waste management plan

PROJECTED SUBMITTAL LIST

Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)

Schedule of Values Subcontract list and information Construction schedule

A - Approved as Submitted.

B - Approved, Except as Noted. No Resubmission Required.

C - Approved, Except as Noted. Resubmission Required.

D - No Action Taken. See Comments. Resubmission Required.

E - disapproved. See Comments. Resubmission Required.

SHEET 2 OF 3

LOCATION: DC Booth National Fish Hatchery CONTRACT NO.:

CONTRACTOR:

PWS

Section Number

Spec.

Paragraph No. Comments

PROJECTED SUBMITTAL LIST

Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)

A - Approved as Submitted.

B - Approved, Except as Noted. No Resubmission Required.

C - Approved, Except as Noted. Resubmission Required.

SHEET 3 OF 3

LOCATION: DC Booth National Fish Hatchery CONTRACT NO.:

CONTRACTOR:

PWS

Section Number

Spec.

Paragraph No. Comments

PROJECTED SUBMITTAL LIST

Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)

A - Approved as Submitted.

B - Approved, Except as Noted. No Resubmission Required.

C - Approved, Except as Noted. Resubmission Required.

Sheet1