SCOPE OF WORK:
This proposed work involves the removal of all asbestos containing material from Quarters 10 located at Sulivan Creek National Fish Hatchery, 21200 West Hatchery Road Brimley, Raco, MI 49715
Contractor shall remove and dispose of all ACM’s as indicated in the asbestos inspection reports and original building specifications.
1. Quarters 10:
• Remove and dispose of approximately 250 Linear Feet of trim caulk (Siding/Trim) on the Exterior of the building with 1.5% asbestos.
• Remove and dispose of approximately 50 Square Feet of White Mottled Linoleum with 2% asbestos in Bathroom.
• Remove and dispose of approximately 200 Square Feet. Tan 12X12 VFT ML floor tile in Dining, Kitchen, Garage Entry with between 1.25% and 1.75% asbestos.
• Remove and dispose of approximately 450 Square Feet. Of White 1x1 Ceiling Tiles with Glue Pod with 1.75% Asbestos in South Bedroom.
• Remove and dispose of approximatively 3,800 Square Feet of asbestos drywall and compound, entire interior, with 1.25% asbestos found in the Kitchen Ceiling.
• Remove and dispose of one (1) Light in Kitchen with 40% asbestos light black paper in the Kitchen.
• Remove and dispose of approximately 30 Linear Feet of Black Line Wrap with 25% asbestos in the basement.
• Remove and dispose of Two (2) windows in the garage, one 27”x36” and one 35”x36” with 1.25% asbestos window glaze.
2. Any presumed asbestos containing material found but not identified on the asbestos reports and not sampled shall also be removed and disposed of.
Note: This includes the removal of asbestos containing material where closet walls or other walls have been built over the material.
Project Location:
Sullivan National Fish Hatchery Quarters 10 13415 S Asher Row, Brimley, Raco, MI 49715.
Project Timeline:
Coordinate with Hatchery Manager Start approximately March 1, 2023 (or as soon as awarded) Final payment April 30, 2023.
Interested bidders can contact Pendills Creek National Fish Hatchery by emailing Denise Johnston at Denise_Johnston@fws.gov or by calling (906) 437-5231.
mailto:Denise_Johnston@fws.gov
CONSTRUCTION REQUIREMENTS
Project Manager: Robert McGinn or Denise Johnston
Project Location: Sullivan Creek NFH
Project Description: Quarters 10
GEOGRAPHICAL AREAS OF OPERATION:
Illinois __ Minnesota
Indiana Iowa Michigan (LP)
X Michigan (UP)
Missouri Ohio Wisconsin Other
County: Becker
DOLLAR VALUE OF CONSTRUCTION: (PRICE RANGE OF INVITATION FOR BID)
X _ Less than $25,000
$100,000-$250,000 $500,000-$1,000,000 $5,000,000-$10,000,000
$25,000-$100,000 $250,000-$500,000 $1,000,000-$5,000,000 More than $10,000,000
NATURE OF BUSINESS:
Bridge Builders Building Concrete & Masonry
Highway (Paving) Insulation Marine Construction
Dredging Mechanical Demolition & Salvage Services Painting Earthwork Plumbing Electrical Roofing & Siding Equipment Rental w/Operator Sewer & Wastewater Disposal General Water Supply Systems
_ Heating & Air Conditioning Supplier X
Well Drilling Other: Asbestos Abatement
MISCELLANEOUS:
Performance Time: 30 calendar days
Calculation Attached: Yes _ X _ No
STANDARD FORM 36, JULY 1966 REF NO OF DOC BEING CONT'D PAGE 1 OF 1
GENERAL SERVICES ADMINISTRATION
FED PROC. REG. (41 CFR) 1-16.101
NAME OF OFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Furnish all labor, tools, equipment, materials, superintendence and transportation necessary to construct the project described in Block 10 of Page A1, Solicitation, Offer, and Award, Standard Form 1442 in accordance with the Technical Specifications, Drawings, and terms and conditions contained herein as follows:
SCHEDULE I – Asbestos Removal
I - 1 Asbestos abatement ton include but is not limited to the removal 1 LS of asbestos containing material from Quarters 10
1) Abate approximately 250 Linear Feet of trim caulk
(Siding/Trim) on the Exterior of the building with 1.5% asbestos.
2) Abate approximately 50 Square Feet of White Mottled Linoleum with 2% asbestos in Bathroom.
3) Abate approximately 200 Square Feet. Tan 12X12 VFT ML floor tile in Dining, Kitchen, Garage Entry with between 1.25% and 1.75% asbestos.
4) Abate approximately 450 Square Feet. Of White 1x1 Ceiling Tiles with Glue Pod with 1.75% Asbestos in South Bedroom.
5) Abate approximatively 3,800 Square Feet of asbestos drywall and compound with 1.25% asbestos in the Kitchen Ceiling.
6) Abate one (1) Light in Kitchen with 40% asbestos light black paper in the Kitchen.
7) Abate approximately 30 Linear Feet of Black Line Wrap with 25% asbestos in the basement.
8) Abate 2 windows in the garageone 27”x36”, one 35”x36”) with 1.25% asbestos window glaze.
Note: Contractor is required to remove all asbestos containing material that is located under walls if walls were placed on top of tile or linoleum.
TOTAL SCHEDULE I
If estimated quantities are listed, Bidders must only bid on the estimated quantities listed. These quantities indicated are the Government's best estimate of actual quantities needed to complete the work. Payment will be made for the actual amount of work done on the basis of unit or lump sum prices bid.
PROJECT CONSISTS OF: The asbestos abatement work includes but is not limited to the removal of asbestos containing material from the Quarters 10, 13415 S Asher Row, Brimley, MI 49715 at Sullivan Creek NFH in Brimley, MI. The Quarters is schedule for demolition in the future. Contractor must coordinate work with Hatchery.
PROJECT LOCATION: Sullivan Creek National Fish Hatchery (NFH) 21200 West Hatchery Road Brimley, Raco, MI 49715
Contact Denise Johnston, Hatchery Manager for
Directions to project location: 906-437-5231
Page J - 1
PART III, SECTION J
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
INVITATION NO. xxxxxxxxx
INDEX
TECHNICAL PROVISIONS/SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01100 SUMMARY OF THE WORK
SECTION 01310 PROJECT COORDINATION
SECTION 01330 SUBMITTALS
SECTION 01420 DEFINITIONS AND STANDARDS
SECTION 01770 PROJECT CLOSEOUT
DIVISION 2 – SITE WORK
SECTION 02200 HAZARDOUS MATERIALS REMOVAL
ATTACHMENTS
1) Location of Work, Estimated Square Footage, Diagrams, and Photos
2) Red Cedar Consulting Asbestos Inspection Report – August 25, 2022
3) Michigan EGLE and Michigan Lara Notification of Asbestos Related Work
4) PRECONSTRUCTION SAFETY CHECKLIST
DIVISION 1
GENERAL REQUIREMENTS
SECTION 01100
SUMMARY OF THE WORK
01100-5
PART 1 - GENERAL
1.1 Project Title: Asbestos abatement at 13415 S Asher Row, Brimley, Raco, MI 49715.
1.2 Work Under These Specifications: The asbestos abatement work includes but is not limited to: the removal of asbestos containing material from 13415 S Asher Row, Brimley, MI including;
1) approximately 250 Linear Feet of trim caulk (Siding/Trim) on the Exterior of the building with 1.5% asbestos.
2) approximately 50 Square Feet of White Mottled Linoleum with 2% asbestos in Bathroom.
3) approximately 200 Square Feet. Tan 12X12 VFT ML floor tile in
Dining, Kitchen, Garage Entry with between 1.25% and 1.75% asbestos.
4) approximately 450 Square Feet. Of White 1x1 Ceiling Tiles with Glue Pod with 1.75% Asbestos in South Bedroom.
5) approximatively 3,800 Square Feet of asbestos drywall and compound, the entire interior, with 1.25% asbestos sampled in the Kitchen Ceiling.
6) one (1) Light in Kitchen with 40% asbestos light black paper in the Kitchen.
7) approximately 30 Linear Feet of Black Line Wrap with 25% asbestos in the basement.
8) Remove and dispose of Two (2) windows in the garage, one 27”x36” and one 35”x36” with 1.25% asbestos window glaze.
The building is scheduled for demolition. Contractor shall coordinate work with station manager.
This work will not be measured for payment and shall be performed on a lump sum basis.
8.1 Location and Inspection Of Site
A. The work site is located at 13415 S Asher Row, Brimley, Raco, MI 49715. The mailing address is shown on the Solicitation, Offer, and Award (Standard Forms 1442 or, 18 block 9) as attached to this Invitation. The Fisheries Manager may be contacted for further information at the Pendills Creek National Fish Hatchery in Brimley, MI, by telephone at (906) 437-5231, or by e-mail:
Denise_Johnston@fws.gov.
B. All prospective bidders/quoters, contractors, subcontractors, and related persons are encouraged to visit the site(s) of the proposed Work and to assess the location(s) and extent of the Work prior to submitting bids/quotes. Persons may inspect the site by
SECTION 01100
01100-6 contacting the Fisheries Manager.
8.2 Work Not Included In This Contract
A. Only work identified above is included in this contract.
8.3 Items Provided By The Government
A. No materials or equipment shall be furnished by the Government under this Contract.
8.4 Temporary Facilities
A. Temporary toilet facilities are not provided as part of this contract.
B. There are not electric and water utilities provided on the site.
C. Potable water is not available at the site.
D. Maintain and restore all government roads, service areas and utilities used to pre-construction conditions.
8.5 Site Access and Right of Way
A. The construction access limits on Government property will be established by the Government and the Contractor shall be responsible for complying with these limits and governing all work accordingly. The work site is in a restricted area that is not open to public access and there are no other ongoing activities adjacent the work site.
B. All bidders are reminded that they are responsible for contacting the local entity such as township, county, or state having jurisdiction in the project vicinity to ensure bidders/quoters are aware of any requirements of the local entity. These requirements are between the entity and the bidder. Load limits and other restrictions shall be obeyed. If the Contractor proposes to cross private property, permission must be obtained from the owner to use private property or roads in the conduct of the Work.
SECTION 01100
01100-7
C. Work scheduled on Saturdays, Sundays, Federal Holidays or other than normal working hours shall be approved in advance by the Government.
8.6 Safety - In addition to FAR 52.236-13 Accident Prevention
A. Contractor shall fill out and submit the “Preconstruction Safety Checklist” to the Contracting Officer (CO) prior to beginning construction.
B. The contractor shall designate a safety officer to ensure a safe work site. The safety officer shall perform daily work site inspections to assure compliance with all safety regulations and standards.
C. The Contractor’s Safety Plan shall be available on- site.
The Contractor shall provide Safety Data Sheets (SDS) for all hazardous materials brought on- site. SDS shall be made available in a conspicuous location and a copy shall be provided to the Refuge.
D. All equipment and work activities shall comply with
OSHA Regulations and all accidents incidental to work performed under this contract shall be reported in accordance with OSHA reporting requirements.
Additionally, a copy of the accident report shall be provided to the Contracting Officer.
E. The contractor shall provide and install barricades, signs, or other warning devices to delineate the construction area and restrict public access to the construction site. Follow Manual of Uniform Traffic Control Devices (MUTCD).
F. Provide at least one non-freezing-type fire extinguisher in each workshop and shed used for storage of materials on the premises. Place in location readily accessible to workers.
G. Provide at least one non-freezing-type fire extinguisher of the appropriate class for each group of workers performing flammable procedures.
SECTION 01100
01100-8
H. Provide and maintain a basic first aid kit for use of workers.
(a) Provide first aid supply commensurate with size of project with items necessary for first aid treatment of all injuries. The first aid supply shall include items identified on SDS (see paragraph B of this section) in applicable locations.
(b) Advise all workers of the location of first aid supplies.
(c) Post telephone numbers of nearest hospital or ambulance service and fire station in conspicuous location. Advise all workers of location of telephone numbers.
I. Provide necessary Personnel Protective Equipment (PPE) as identified by SDS and OSHA regulations. Provide documentation, workers have been trained in use of PPE prior to individual use.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
(END OF SECTION 01100)
SECTION 01310
PROJECT COORDINATION
01310-1
1.1 Jobsite Administration - Superintendence, Subcontract
administration and Quality Control, is the responsibility of the Contractor.
A. Final decisions relative to items in conflict shall be made by the Contracting Officer.
B. The Government shall have the authority to temporarily suspend the Work for such time as necessary because of the failure on the part of the Contractor to perform any of the provisions of the Contract. No extension of contract performance time will be permitted until the Government determines that the deficiencies in performance, which caused the temporary suspension, have been corrected.
C. The Contractor shall have responsible superintendence on site during all project operations. Contractor shall notify Government of any changes of superintendents.
D. The Contractor shall notify the COR at least ten (10) days prior to the anticipated date of completion of all Work specified herein. Upon completion of the Work, the COR shall proceed with the final inspection which shall be completed as promptly as practicable. The time required for such inspection and for performing any corrective Work shall be included in the contract performance time.
1.2 Modification/Change Order procedures
A. In the event of the need for a Change Order, the Contractor will receive a letter requesting a price quote for proposed changes to the Contract.
B. For evaluation purposes, the Contractor's quote shall be broken down to show the costs of labor and materials for each proposed category of Work included
SECTION 01310
01310-2 with the change, along with the total cost for Contractor's overhead, profit, and bond for the proposed changes.
C. All Contract time extensions required as a result of a proposed change must be justified and supported in detail at the time of the proposal.
1.3 Preconstruction Conference
A. Soon after award of the Contract and prior to commencing construction, the Contractor and any subcontractors shall attend a preconstruction conference with representatives of the Government. Timely notification of the meeting will be given to the Contractor. Time, date, and place of the conference will be determined by the Contracting Officer. Requirements pertaining to Contract administration, construction operations and the project schedule will be discussed. The project schedule shall be in accordance with Section 01330.
The Preconstruction Safety Checklist shall be submitted for review during this conference.
1.4 Progress Meetings
A. Periodic general project meetings will be conducted with a representative of the Contractor at the project site or by telephone by the Government's representative for the purpose of coordinating, expediting, and assessing the work progress.
B. The Contractor shall provide reports of progress on the project, discuss the work schedule for the coming period and present all conflicts, discrepancies, or other difficulties for resolution. A record of discussions and decisions will be prepared by the Government and distributed to those attending and others affected.
SECTION 01310
01310-3
PART 3 - EXECUTION (not Applicable)
(END OF SECTION 01310)
SECTION 01330
SUBMITTALS
01330-1
1.1 Submittal Register:
A. The Contractor shall provide all required submittals to the COR within 30 days of award except for items noted otherwise on the submittal register.
B. Furnish a minimum of three copies of all required submittals. Two copies will be retained by the Government. The remaining copies will be returned to the Contractor.
C. The approval of submittals shall not relieve the Contractor to comply with the terms and conditions of the Contract Drawings and Specifications. The Contractor shall be responsible to determine correct dimension, design, connection, detail and satisfactory construction of all Work.
1.2 Project Schedule: Contractor shall provide as required by Federal Acquisition Regulation (FAR) clauses. *
1.3 Price Breakdown - Lump Sum Items: Contractor shall provide as required by FAR clauses. *
1.4 Subcontractor's List
A. Submit a list of subcontractors who will be working on the project.
1.5 Submittal of Progress Payment Certificate: Contractor shall provide as required by FAR clauses. *
1.6 Guarantees, Warranties And Certificates: Refer to Section 01770
1.7 Waste Manifests
A. The Contractor shall submit copies of all waste manifests.
SECTION 01330
SUBMITTALS
01330-2
B. Manifests shall state type of waste (i.e., construction debris, hazardous asbestos, etc.), location of disposal, landfill designation, EPA registration of landfill, and EPA registration for transportation of any hazardous wastes.
* The applicable FAR clauses will be provided in full text to the resultant contractor at the pre-construction conference.
(END OF SECTION 01330)
SECTION 01420
DEFINITIONS AND STANDARDS
01420-1 pPART 1 - GENERAL
1.1 Regulatory Requirements
A. All Work shall be accomplished in strict accordance with the regulations, codes, and laws in effect at the time the Work is performed for the location where it is to be performed. All completed construction shall comply with OSHA, EPA, NFPA, and ADA regulations.
1.2 Means and Methods
A. Means and methods used in the performance of this
Contract must be in accordance with all applicable Federal Acquisition Regulations in addition to OSHA regulations, 29 Code of Federal Regulations, acceptable industry practices as recognized by societies, associations, building codes, manufacturers’ specifications and any applicable state safety and health requirements.
1.3 Permits
A. All permits required to support construction activities such as asbestos notification, road permits for oversize, overweight vehicles and equipment, bridge permits, and utility hookup permits, shall be obtained and paid for by the Contractor.
(END OF SECTION 01420)
SECTION 01770
PROJECT CLOSEOUT
01770-1
1.1 Final Inspection
A. The Contractor shall request a final inspection in writing at least ten (10) days prior to the anticipated date of completion.
B. Work will not be considered ready for final inspection until all the Work has been completed and the Contractor has certified that all items are properly operating and in strict compliance with all Contract terms and conditions.
C. The Contractor or the project supervisor shall be at the job site during the final inspection.
1.2 Test
A. Provide any regulatory acceptance documents in cases of cleanup.
1.3 Guarantees, Warranties and Certificates
A. The Contractor will submit all guarantees, warranties and certificates to the Government prior to final payment.
B. The Government requires a 100% warranty for a period of one full year after final acceptance. Items of Work found defective during the warranty period will be replaced at no cost to the Government and the warranty for that particular part of the Work shall automatically extend for one full year beyond the completion date of repairs.
(END OF SECTION 01770)
1.1 SUMMARY:
A. The requirements of this section shall govern all site preparation, hazardous material removal, and disposal operations.
B. The Contractor shall provide all labor, tools, equipment, and materials necessary to prepare the site for removal and disposal of hazardous materials.
C. All work shall be completed in accordance of all Federal, State and Local regulations.
D. All permits shall be acquired by the Contractor at the Contractors expense.
1.2 QUALITY ASSURANCE:
A. Removal of Asbestos Containing Building Material (ACM) shall be conducted in accordance with the following:
1. NESHAP - 40 CFR Part 61, Subpart M – National Emission
Standard for Asbestos
2. TSCA - 40 CFR Subpart D, Section 763 – Asbestos
3. 29 CFR 1910.1001: General Industry Occupational Safety and Health Standards
4. 29 CFR 1926.1101: Safety and Health Regulations for
Construction
5. Michigan Admin Code 336.1942, Emission Standards for
Asbestos
6. Michigan Asbestos Abatement Contractors Licensing Act
7. Michigan Asbestos Workers Accreditation Act 440 of 1988
8. MIOSHA Part 305: Asbestos in General Industry
9. MIOSHA Part 602: Asbestos in Construction
B. A licensed Michigan state certified asbestos removal service shall be obtained for asbestos removal and disposal operations.
C. Contractor shall ensure all employees are current on
NESHAP training prior to allowing employees on-site to conduct asbestos removal operations.
1.3 SUBMITTALS:
A. Submit the credentials certifying that the Asbestos
B. Abatement Company is currently certified to remove ACM’s C. Submit certificates of all personnel who are to work at the site are currently certified to remove ACM’s in the state of Michigan.
D. Submit the name and certification of the Waste Disposal
Site for which asbestos containing materials are to be disposed.
E. Submit the name and certification of the hazardous materials Transport Company used to haul ACM materials.
1.4 CONDITIONS
A. All structures at each site are scheduled for demolition.
PART 2 – PRODUCTS N/A
PART 3 - EXECUTION
3.1 GENERAL:
A. Contractor shall notify the Michigan EGLE and MIOSHA
Asbestos Program at least 10 days prior to beginning Asbestos Abatement work as defined in MICHIGAN DEPARTMENT
OF LICENSING AND REGULATORY AFFAIRS (LARA), ASBESTOS PROGRAM,
P.A. 135 OF 1986, AS AMENDED.
B. Contractor shall prepare for asbestos removal according to all Federal, State of Michigan, and OSHA rules and regulations including but not limited to, the following:
1. Build a decontamination chamber complete with shower and change room.
2. Seal area for asbestos removal and with polyethylene barrier.
3. Install HEPA air filtration system to create Negative air pressure inside the affected area.
4. Water is n o t available on-site for wetting and decontamination procedures (i.e. showers and hand washing).
C. Contractor shall remove and dispose of all ACM’s as indicated in the asbestos inspection reports and original building specifications.
1. Quarters 10:
A. Remove and dispose of approximately 250 Linear Feet of trim caulk (Siding/Trim) on the Exterior of the building with 1.5% asbestos.
B. Remove and dispose of approximately 50 Square Feet of White Mottled Linoleum with 2% asbestos in Bathroom.
C. Remove and dispose of approximately 200 Square Feet.
Tan 12X12 VFT ML floor tile in Dining, Kitchen, Garage Entry with between 1.25% and 1.75% asbestos.
D. Remove and dispose of approximately 450 Square Feet.
Of White 1x1 Ceiling Tiles with Glue Pod with 1.75% Asbestos in South Bedroom.
E. Remove and dispose of approximatively 3,800 Square
Feet of asbestos drywall and compound, the entire interior, with 1.25% asbestos found in the Kitchen Ceiling.
F. Remove and dispose of one (1) Light in Kitchen with
40% asbestos light black paper in the Kitchen.
G. Remove and dispose of approximately 30 Linear Feet of Black Line Wrap with 25% asbestos in the basement.
H. Remove and dispose of Two (2) windows in the garage, one 27”x36” and one 35”x36” with 1.25% asbestos window glaze.
2. Any presumed asbestos containing material found but not identified on the asbestos reports and not sampled shall also be removed and disposed of.
a) Asbestos materials found but not identified in asbestos inspection reports shall be reported to the Contracting Officer for a modification to the contract prior to removal.
C. ACM material shall be placed into containers for transportation to landfill. All containers shall be lined with two layers 6 mil polyethylene per EPA and MDH rules and regulations. All containers shall be properly labeled for transportation of hazardous materials.
1. All ACM’s shall be disposed of in a state certified landfill certified to accept ACM’s.
D. All ACM’s shall be transported per Michigan Department of Transportation (MIDOT) rules and regulations.
E. Provide the Hatchery manager and CO/COR written certification of compliance that all ACM’s have been removed.
Bid Form Sullivan NFH 2022 Quarters 10 Asbestos Abatement Project
This proposed work involves the removal of all asbestos containing material from Quarters 10 located at Sullivan Creek National Fish Hatchery, 21200 West Hatchery Road Brimley, Raco, MI 49715
Contractor shall remove and dispose of all ACM’s as indicated in the asbestos inspection reports and original building specifications.
Quarters 10
Remove and dispose of approximately 250 Linear Feet of trim caulk (Siding/Trim) on the Exterior of the building with 1.5% asbestos.
Remove and dispose of approximately 50 Square Feet of White Mottled Linoleum with 2% asbestos in Bathroom.
Remove and dispose of approximately 200 Square Feet. Tan 12X12 VFT ML floor tile in Dining, Kitchen, Garage Entry with between 1.25% and 1.75% asbestos.
Remove and dispose of approximately 450 Square Feet. Of White 1x1 Ceiling Tiles with Glue Pod with 1.75% Asbestos in South Bedroom.
Remove and dispose of approximatively 3,800 Square Feet of asbestos drywall and compound with 1.25% asbestos in the Kitchen Ceiling.
Remove and dispose of one (1) Light in Kitchen with 40% asbestos light black paper in the Kitchen.
Remove and dispose of approximately 30 Linear Feet of Black Line Wrap with 25% asbestos in the basement.
Remove and dispose of Two (2) windows in the garage, one 27”x36” and one 35”x36” with 1.25% asbestos window glaze.
Any presumed asbestos containing material found but not identified on the asbestos reports and not sampled shall also be removed and disposed of.
Note: This includes the removal of asbestos containing material where closet walls or other walls have been built over the material.
Base Bid: $________________
| 2. Sullivan Creek Quaters Asbestos Abatement Pre-bid Solicitation Notification (1) |
| 1. SOW - Asbestos Abatement - Sullivan Creek NFH |
| (END OF SECTION 01100) |
| (END OF SECTION 01310) |
| (END OF SECTION 01330) |
| (END OF SECTION 01420) |
| (END OF SECTION 01770) |
| 1.1 SUMMARY: |
| 1.2 QUALITY ASSURANCE: |
| 1.3 SUBMITTALS: |
| 1.4 CONDITIONS |
| PART 2 – PRODUCTS N/A |
| 3.1 GENERAL: |