This is a Statement of Work for a Request for Quotation (RFQ) to supply and deliver 600 tons of Untreated Base Course (UBC) material to Natural Bridges National Monument near Blanding, Utah. The contractor must supply material that meets UDOT specification 02721 (dated January 1, 2008), with a maximum water content of approximately 2%. The delivery period runs from May 26, 2026 through June 26, 2026, with deliveries restricted to 7:00 AM to 5:00 PM, Monday through Thursday only. Daily deliveries must be approximately 200 tons per day. The contractor is prohibited from using double belly dump trucks (trains) or end dump trucks with two pups (triples) due to limited stockpile space at the delivery location (the bone yard). Contractors must submit a signed letter of certification with their quote confirming material compliance, and after contract award, must submit job mix gradation documentation as required by UDOT specification Table 2. The contractor is responsible for coordinating offloading procedures with the park Point of Contact and for arranging their own site visit by contacting the Contracting Officer's Representative.

Payment is measured by the ton based on certified weigh tickets provided with each delivery and processed according to the price schedule in Part B of the RFQ solicitation. Payment requests must be submitted electronically through the U.S. Department of the Treasury's Invoice Processing Platform (IPP) with required documentation including a PDF vendor invoice showing pricing breakdown and contract number. Contractors must register for IPP access through their Government Business Point of Contact, with enrollment instructions provided by the Federal Reserve Bank of St. Louis within 3-5 business days of contract award. The delivered UBC must meet aggregate quality standards including dry rodded unit weight, plasticity index, aggregate wear resistance, gradation limits per Table 2, and California Bearing Ratio requirements (70% minimum for Class A only), with Class C aggregate preferred by the park.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ P1226Q0013

STATEMENT OF WORK

SUPPLY AND DELIVER UNTREATED BASE COURSE (UBC)

Park: Natural Bridges National Monument

PART 1 GENERAL

1.1 DESCRIPTION & REQUIREMENTS

A. General. Natural Bridges National Monument requires supply and delivery of 600 tons of Untreated Base Course (UBC). The UBC shall not contain over approximately 2% water.

B. Location. Natural Bridges National Monument is approximately 102 miles from Moab, Utah. From Moab head south on highway 191, to Blanding, Utah. Turn right (west) on Highway 95 and go 27 miles and turn right on Route 275. Material will be off-loaded at the bone yard.

C. Period of Performance. The Contractor shall be available to supply UBC

May 26, 2026 – June 26, 2026.

D. Warranty. The product shall be warranted to meet the requirements of this specification upon delivery.

E. Submittals. The supplier shall submit a signed letter of certification stating that materials supplied will meet the requirements of part 2 products. This letter of certification must be included with the quote. After award the Contractor shall submit their job mix gradation as required in table two of the referenced UDOT spec 02721.

1.2 REQUIREMENTS

A. Site Tour. A formal Site Tour will not be conducted. The Contractor should visit the site on their own, after contacting the Contracting Officer’s Representative (COR) Todd McDougall at 435.719.2160 to schedule their visit.

B. Delivery Times and Dates. Delivery to begin on May 26, 2026. Delivery will only be allowed between 7:00 AM to 5:00 PM Monday through Thursday. No Friday, Weekend or Federal Holiday deliveries will be allowed.

C. Delivery Coordination. Contact information for the park POC will be provided at award.

D. Truck Size. It is the Contractors responsibility to assess the delivery location and determine suitable delivery trucks. However, due to the size of the delivery locations and the limited amount of space to stockpile material, double belly dumps (trains) or end dump with two pups (triples) will not be allowed.

RFQ P1226Q0013

E. Delivery Quantities. Daily deliveries shall be approximately 200 tons per day to ensure that the Contractor does not overwhelm the Park’s capacity.

F. Offloading. The Contractor shall comply with the Park POC on offloading procedures and locations to facilitate the Park in pushing the material up into a pile or hauling the material to the jobsite.

PART 2 PRODUCTS

2.1 PRODUCT REQUIRMENTS

A. UBC. The UBC shall meet the requirements of UDOT spec 02721 part 2 Products (dated

January 1, 2008). The aggregate class designation for Table 1 may be A, B, or C, however the Park prefers class C. UDOT spec section 02721 is included in the statement of work as addendum 1.

PART 3 EXECUTION – N/A

PART 4 MEASUREMENT AND PAYMENT

4.1 UBC will be measured by the ton. The Contractor shall provide the Park POC with certified weigh tickets with each delivery. Payment will be made according to the price schedule (Part B on page 4 of the RFQ Solicitation).

4.2 Payment requests must be submitted electronically through the U.S. Department of the Treasury's Invoice Processing Platform System (IPP). "Payment request" means any request for contract financing payment or invoice payment by the Contractor.

A. Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

1. Copy of vendor invoice document in PDF format, which shows pricing breakdown for all items being invoiced for and must include the contract number, date(s) of service (if applicable), date of invoice, and the vendor’s standard invoice letterhead.

B. The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131. The IPP website address is: https://www.ipp.gov.

END OF SECTION

Addendum 1

SECTION 02721

UNTREATED BASE COURSE (UTBC)

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Supply of UTBC used for pavements, shoulders, and incidental construction.

1.2 RELATED SECTIONS

A. Not Used

1.3 REFERENCES

A. AASHTO T 11: Materials Finer than 75-µm (No. 200) Sieve in Mineral Aggregates by Washing

B. AASHTO T 19: Bulk Density (“Unit Weight”) and Voids in Aggregate

C. AASHTO T 27: Sieve Analysis of Fine and Coarse Aggregates

D. AASHTO T 89: Determining the Liquid Limit of Soils

E. AASHTO T 90: Determining the Plastic Limit and Plasticity Index of Soils

F. AASHTO T 96: Resistance to Degradation of Small-Sized Coarse

Aggregate by Abrasion and Impact in the Los Angeles Machine

G. AASHTO T 180: Moisture-Density Relations of Soils Using a 4.54 kg (10

lb) Rammer and 457 mm (18 in) Drop

H. AASHTO T 193: The California Bearing Ratio

I. AASHTO T 255: Total Evaporable Moisture Content of Aggregate by Drying

J. AASHTO TP 61: Determining the Percent of Fracture in Coarse Aggregate

K. UDOT Minimum Sampling and Testing Requirements

1.4 DEFINITIONS Not Used

Untreated Base Course (UTBC) 02721 – Page 2 of 3

January 1, 2008

1.5 SUBMITTALS

A. Submit a written report for approval for each aggregate class and source, a minimum of five working days prior to delivery. Include the following:

1. Aggregate suitability. Refer to this Section, Part 2, Products.

2. Name of supplier and location of source.

3. Maximum Dry Density and Optimum Moisture Content. Refer to

AASHTO T 180, Method D.

4. Job mix gradation including single values for each sieve size, No. 4 and finer, within the gradation limits of Table 2.

1.6 ACCEPTANCE

A. Acceptance sampling and testing of material is in accordance with UDOT Minimum Sampling and Testing Requirements.

PART 2 PRODUCTS

2.1 AGGREGATES

A. Contractor to provide well-graded, clean, hard, tough, durable and sound mineral aggregates consisting of crushed stone, crushed gravel or crushed slag; free of organic matter and contamination from chemical or petroleum products; meeting the requirements of Table 1.

Table 1

Aggregate Properties Aggregate Class A B C Dry Rodded Unit Weight Not less than 75 lb/ft3 AASHTO T 19

Liquid Limit/Plastic Index Non-plastic PI ≤ 6 AASHTO T 89

AASHTO 90

Aggregate Wear Not to exceed 50 percent. AASHTO T 96

Gradation Table 2 AASHTO T 11

AASHTO T 27

CBR with a 10 lb surcharge measured at

0.20 inch penetration

70% Minimum N/A AASHTO T 193

Two Fractured Faces 50 % Min N/A N/A AASHTO TP 61

Untreated Base Course (UTBC) 02721 – Page 3 of 3

January 1, 2008

B. Contractor shall establish the job mix (target) gradation for the 1½ inch sieve and finer within the gradation limits. The Job Mix Gradation Tolerance is the allowable deviation from the job mix (target) gradation on the applicable sieves. All other percents passing will be within the gradation limits. Refer to AASHTO T 11 and AASHTO T 27.

Table 2

Gradation Limits Sieve Size Job Mix Gradation

Target Band Job Mix Gradation

Tolerance

1½ inch 1 inch ¾ inch ½ inch ⅜ inch No. 4 No. 16 No. 200

90 - 100 70 - 85 65 - 80 55 - 75 40 - 65 25 - 40 7 - 11

±9.0 ±9.0 ±9.0 ±9.0 ±7.0 ±5.0 ±3.0

Percent passing based on total aggregate (dry weight), and fine and coarse aggregate having approximately the same bulk specific gravities.

A06_44033594_UBC Specs_NABR Supply UBC Gravel.pdf
SECTION 02721
UNTREATED BASE COURSE (UTBC)
PART 1 GENERAL
1.1 SECTION INCLUDES
1.2 RELATED SECTIONS
1.3 REFERENCES
1.4 DEFINITIONS Not Used
1.5 SUBMITTALS
1.6 ACCEPTANCE
PART 2 PRODUCTS
2.1 AGGREGATES

File details come from the government source that posted it. Updated .