B08_Contract_Price_Schedule.pdf

PDF 144 KB Posted

Attached to
Water Source Test Well Drilling, Independence, Cal Federal contract opportunity
Solicitation number
140P8122R0002
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document is a contract price schedule for a water source test well drilling project at Manzanar National Historic Site. The schedule outlines 15 line items for the base contract work including mobilization, drilling and setting a temporary conductor casing, drilling the test well to 260 feet, furnishing and installing 8-inch well casing and screen, gravel packing, formation stabilization, grouting the surface seal, well development, pumping and recovery testing, well disinfection, and video inspection logging. Unit prices are required for the line items along with extended totals. The schedule also specifies that award will be made based on the lowest total price for items 1 through 15. The National Park Service is the contracting agency and the work must be completed in accordance with the included specifications sections.

View the file

Other files for this federal contract opportunity

Other files attached to Water Source Test Well Drilling, Independence, Cal, newest first.
File Type Posted
Sol_140P8122R0002_Amd_0001.pdf PDF
B09_Questions_and_Answers_01_0001.pdf PDF
B08_Invoice_Payment_Request.docx DOCX document
B08_Transmittal.pdf PDF
B03_General_Decision_CA20220020.pdf PDF
Sol_140P8122R0002.pdf PDF
B08_Release_of_Claims.pdf PDF
A04_Construction_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANZ 216059 Test Well CPS - 1

CONTRACT PRICE SCHEDULE

Manzanar National Historic Site

PMIS NO. 216059

Test Well

Offerors are required to submit an offer that conforms to the Solicitation with pricing for Contract Price Schedule’s Base Line Items and all Option line items - failure to do so may render the offer non-responsive.

On lump-sum price items, provide total cost only; on unit price items, provide the unit price and the extended amount of total price for the item. If no price item exists for a portion of the work, include the costs in a related price item. In case of error in extension of prices, unit price governs. In case of error in summation, the total of the corrected price item amount governs. Round totals and extend prices to whole dollars. The Government reserves the right to award any or no options at or after the time of the award as detailed in the Solicitation. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgement of the Contracting Officer to offer the best value to the Government.

Price award will be made based upon the following equation.

Equation 1: Base Price

Base Price: Price Items 1 through 15.

MANZ 216059 Test Well CPS-2

CONTRACT CONTRACT

LINE ITEM LINE ITEM TITLE

NUMBER

(CLIN)

QUANTITY AND

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

BASE LINE ITEMS

012700

Mobilization/Demobilization 1 LS @$________ =$_________

Drill & Set Temporary Conductor Casing

1 LS @$________ =$_________

Drill Test Well 260 LF *NTE @$________ =$_________

Furnish 8-Inch Well Casing 210 LF *NTE @$________ =$_________

Install 8-Inch Well Casing 210 LF *NTE @$________ =$_________

Furnish 8-Inch Well Screen 40 LF *NTE @$________ =$_________

Install 8-Inch Well Screen 40 LF *NTE @$________ =$_________

Gravel Pack Material 90 LF *NTE @$________ =$_________

Formation Stabilizer Material 160 LF *NTE @$________ =$_________

Grout Surface Seal 60 LF *NTE @$________ =$_________

Well Development 1 LS @$________ =$_________

Pumping Test 1 LS @$________ =$_________

Recovery Test 1 LS @$________ =$_________

Disinfection of Well 1 LS @$________ =$_________

Video Inspection Logging of Completed Test Well

1 LS @$________ =$_________

MANZ 216059 Test Well CPS-3

TOTAL BASE PRICE – (Items 1 to 15) ------------------------------------------------------------------- =$_________

Quantities for unit price items are estimated, but payment will be made only for actual quantities of work completed up to the Not-To-Exceed quantity.

Award will be made to one Offeror in accordance with the Solicitation.

The low offeror will be determined by the offeror’s Base Price. Available funds will be announced as indicated in the Solicitation.

All measurement and payment information is included in the project specifications Section 01 27 00 Definition of Contract Price Schedule Line Items.

*NTE: Not-To-Exceed quantity

END OF SECTION

1
1 .1 DESCRIPTION
A. The work of this contract consists of, in general, the construction of a test well. The work related to this test well will be comprised of drilling for and setting temporary conductor casing; drilling a borehole to an anticipated depth of approxi...
B. The description of the work of this contract in 1.1.A above is a summary of the work and is not intended to provide a detailed and exhaustive description of all aspects of the entirety of the work. For the complete and comprehensive description of ...
C. All work will be performed under a single contract.
1 .2 LOCATION
A. The test well will be constructed on BLM land at a location approximately 1,000 lineal feet west of the northwest boundary of Manzanar National Historic Site located in Inyo County, California. Manzanar National Historic Site is located on the wes...
B. Access to the project coming off of HWY 395 will be on unimproved road surfaces on BLM land. At the exit from HWY 395 to the paved frontage road to the west side of HWY 395 the access route follows this paved frontage road to the northwest approxi...
1 .3 CONTRACTOR'S USE OF PREMISES
A. Construction Camp: Establishment of a camp within the park will not be permitted.
B. Contractor must at all times conduct their operations to ensure the least inconvenience to the public.
C. Confine storage of materials and equipment to areas designated by the Contracting Officer within the limits of the designated area for materials and equipment storage within the project site.
D. Preservation of Natural Features: Confine all work operations to within the work limits of the project that consist of previously disturbed areas that the government will delineate. Prevent damage to natural surroundings of the BLM designated Are...
1. Provide temporary barriers to protect existing plants and undisturbed terrain pertaining to the BLM’s ACEC bordering the designated work limits of the project.
2. Do not remove, injure, or destroy plants outside of the delineated work limits. The contractor must limit their movement to only those previously disturbed areas within the delineated work limits of the project.
3. Contain all work materials to prevent their release onto the ground. Contain all fuel and lubricants to prevent their release onto the ground. The contractor will be responsible for restoring any ground where work materials (drilling mud, surfact...
E. Existing Utilities: There are no active existing utilities (neither above ground or below ground) located within the work site.
F. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on BLM and NPS (aka Park) roads are identical to the state load restrictions with such additional regulations as may be imposed by the BL...
1 .4 SPECIAL CONSTRUCTION REQUIREMENTS
A. Because the test well work site (aka project site or work site) is situated within a BLM designated Area of Critical Environmental Concern (ACEC) the following are not available at the project site: water service, sewer service, electrical service,...
B. Holiday Work Restrictions: No on-site work will be performed during weekends (Saturday and Sunday) and federal holidays unless otherwise approved by the Contracting Officer. The contractor must submit a written request to the Contracting Office a...
1 .5 FIELD VERIFICATION
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
1 .6 CONSTRUCTION MATERIALS
A. The Government will furnish:
1. Water level transducer for use during the pumping test
2. Data logger and associated connectors for use during the pumping test

B. All other materials will be Contractor-furnished and installed.

2
3
4
4 .1 SUMMARY OF WORK
A. Payment will be included in the price schedule item to which this work relates.
1.1 DESCRIPTION
A. General:
1. The intent of this section is to explain, in general, what is and what is not included in a Contract Price Schedule Line Items, and the limits where one Contract Price schedule Line Item ends and another begins.
2. The total contract price must cover all work required by the Contract Documents. All costs in connection with the proper and successful completion of the work, including furnishing all materials, equipment, supplies, and appurtenances; providing al...
3. If no Contract Price Schedule Line Item exists for a portion of the work, include the costs in a related Contract Price Schedule Line Item.
4. The description of the work of this section constitutes a summary of the work for the purpose of defining the Base Contract Price Schedule Line Items and Contract Price Schedule Option Items and is not intended to provide a detailed and exhaustive ...
B. Estimated Quantities:
1. All estimated quantities stipulated in the Contract Price Schedule or other Contact Documents are approximate and are to be used only:
a. As a basis for estimating the probable cost of the work.
b. For the purpose of comparing the Contract Price Schedules submitted for the work.
2. The basis of payment for unit price work and materials will be the actual amount of work done and materials furnished up to the not-to-exceed quantity.
3. Except where otherwise specified the unit or lump sum price for each item of work that involves boring, drilling, excavation or trenching, backfilling, drilling mud containment and removal, borehole cuttings containment and removal must include all...
1.2 BASE CONTRACT PRICE SCHEDULE LINE ITEMS
A. Contract Line Item Number (CLIN) 1 – MOBILIZATION AND DEMOBILIZATION - This line item consists of mobilizing and demobilizing all required equipment and construction materials to the site along with preparation of the site in order to initiate work...
B. CLIN 2 – DRILL AND SET TEMPORARY CONDUCTOR CASING – This line item consists of furnishing all material, equipment, and labor for the completion of a bore hole to a sufficient depth to then install a temporary conductor casing to facilitate drilling...
C. CLIN 3 – DRILL TEST WELL - This line item consists of furnishing all materials, equipment, and labor for the completion of a borehole for a test water well to a depth of 260 feet below land surface (BLS.) The work also includes any reaming, under-...
D. CLIN 4 – FURNISH 8-INCH WELL CASING – This bid item consists of furnishing all materials, equipment, and labor necessary to furnish well casing and associated appurtenances for connecting it together at the project site. This line item will be pai...
E. CLIN 5 – INSTALL 8- INCH WELL CASING - This line item consists of furnishing all materials, equipment, and labor necessary to make a complete installation of the well casing into the test well borehole to allow for an operational well. The work als...
F. CLIN 6 – FURNISH 8-INCH WELL SCREEN- This line item consists of furnishing all materials, equipment, and labor necessary to furnish well screen and associated appurtenances for connecting it together at the project site. This line item will be pai...
G. CLIN 7 – INSTALL 8- INCH WELL SCREEN - This line item consists of furnishing all materials, equipment, and labor necessary to make a complete installation of the well screen into the test well borehole for an operational well. The work also include...
H. CLIN 8 – GRAVEL PACK MATERIAL - This line item consists of furnishing all materials, equipment, and labor necessary to make a complete installation of the gravel pack material, including but not limited to under-reaming, gravel pack material, forma...
I. CLIN 9 – FORMATION STABILIZER MATERIAL- This line item consists of furnishing all materials, equipment, and labor necessary to make a complete installation of the formation stabilizer material, including but not limited to under-reaming, formation ...
J. CLIN 10 – GROUT SURFACE SEAL - This line item consists of furnishing all materials, equipment, and labor necessary to construct the surface (aka sanitary) seal by placement of impervious material in the annular space between the exterior of the per...
K. CLIN 11 – WELL DEVELOPMENT - This line item consists of furnishing all materials, equipment, and labor necessary to develop the test well to achieve sand-free water at an acceptable specific capacity. This includes but is not limited to the time r...
L. CLIN 12 – PUMPING TEST- This line item consists of furnishing all necessary labor, equipment, tools, materials, and pumping equipment capable of pumping at the various discharge rates specified. This line item also includes all setup and disassemb...
M. CLIN 13 – RECOVERY TEST - This line item consists of furnishing all necessary labor, equipment, and tools to enable the NPS geologist to record test well water levels during the recovery period. This line item will be paid on a lump sum item basis.
N. CLIN 14 – DISINFECTION OF TEST WELL - This line item consists of furnishing all materials, equipment, and labor necessary to disinfect and keep disinfected the test well up through and including Final Inspection. This line item will be paid on a lu...
O. CLIN 15 – VIDEO INSPECTION LOGGING OF COMPLETED TEST WELL - This line item consists of furnishing all materials, equipment, and labor necessary to carry out the video inspection logging of the completed test well. This line item will be paid on a l...
SECTION 01 31 00
1
1 .1 PRECONSTRUCTION CONFERENCE
A. Before start of construction, Contracting Officer will arrange a preconstruction conference with Contractor. The meeting agenda will include the following as a minimum:
1. Park rules and regulations
2. Authorized Representatives
3. Correspondence procedures
4. Labor standards provisions
5. Payroll reports
6. Modifications
7. Payments to Contractor
8. Acceptance/rejection
9. Construction meetings
10. Subcontractors
11. Documents required under the contract to include proof of C57 licensure
12. Submittal of shop drawings, project data, samples, and approved equals
13. Submittal of a copy of the approved Well Completion Report filed with Inyo County
14. Saturday, Sunday, holiday and night work
15. Reference materials
16. Contractor quality control
17. Value engineering
18. Liquidated damages
19. Notice to proceed
20. Tentative construction schedule
21. Recycling Program
1 .2 PROGRESS MEETINGS
A. The Contracting Officer will schedule weekly meetings with the Contractor and subcontractors.
B. Subcontractors will not be allowed to work until they have attended a meeting.
C. Additional meetings will be held as needed or for new subcontractors.
D. The meeting agenda will include the following as a minimum:
1. Approval of minutes of previous meetings
2. Review of work progress
3. Field observations, problems, and decisions
4. Identification of problems which impede planned progress
5. Review of Contractor’s Quality Control Program and activities
6. Review of submittals schedule and status of submittals
7. Review of off-site fabrication and delivery schedules
8. Status of project record drawings (monthly)
9. Status of operation and maintenance data manuals (monthly)
10. Maintenance of progress schedule
11. Corrective measures to regain projected schedules
12. Planned progress during succeeding work period
13. Coordination of projected progress
14. Maintenance of quality and work standards
15. Effect of proposed changes on progress schedule and coordination
16. Other business relating to work
2
3
4
4 .1 PROJECT MEETINGS
A. Payment will be included in the Contract Price Line Item to which this work relates.
1
1 .1 DESCRIPTION
A. The work of this section consists of schedule requirements before and during construction.
1 .2 SCHEDULES
A. After issuance of the Notice of Award and before the Preconstruction Conference, submit the Project Schedule and Schedule of Values as a package. The Contracting Officer will review the Project Schedule and the Schedule of Values for format and co...
a. Project Schedule: Submit the Project Schedule in Gantt format. Show each bid item as a milestone and use activities to for the breakdown of work elements related to each milestone. The schedule must identify the critical path of the project.
b. Updates to Project Schedule: As requested by the Contracting Officer provide updated project schedules.
2. Schedule of Values:
a. Submit a schedule of dollar values based on the Contract Price Schedule. Include bond costs, mobilization, general condition costs, overhead, and profit in the total dollar value of unit price items and in the component parts of work for each lump...
b. Break down each lump-sum Price Schedule Line Item into component parts of work for which progress payments may be requested. The total costs for the component parts of work must equal the bid amount for that lump-sum item. The Contracting Officer...
c. Do not break down unit price Contract Price Schedule Line Items. Use only the Contract Price Schedule Line Item amount for unit price items.
d. The total cost of all items must equal the total contract price. The Schedule of Values will form the basis for progress payments as provided for in the terms of the contract.
2
3
4
4 .1 SCHEDULES AND MONTHLY INSPECTIONS
A. Payment will be included in the Contract Price Schedule Line Item to which this work relates.
1
1 .1 DESCRIPTION
A. The work of this section consists of submittal requirements before and during construction.
1 .2 RELATED REQUIREMENTS
A. TEST WELLS - Section 33 11 11.
1 .3 SUBMITTAL AND APPROVAL PROCEDURES
A. All submittals must be transmitted using National Park Service form DSC-1(CS), most recent version. (A copy of the form is included at the end of this section.) No action will be taken on a submittal item unless accompanied by the transmittal for...
B. As specified in the individual sections, forward submittals to Contracting Officer at least 30 days before need for approval. Unless a different number is specified, submit transmittal form with required submittal information electronically in PDF ...
1. Shop Drawings: Include the following information with each copy of shop drawings:
a. Date.
b. Date of revisions (when applicable).
c. Contractor's certification that shop drawing has been checked for compliance with contract documents.
d. Details of fabrication, assembly and erection including connections and engagement to contiguous work.
e. Materials used.
f. All required dimensions.
g. The term "by others" must not be used. All work to be performed by others must be identified by Contractor or subcontractor name, discipline, or trade.
2. Samples: Samples must be large enough to illustrate clearly the functional characteristics and full range of color, texture, or pattern.
3. Manufacturers' Catalog Sheets: Submit only pertinent pages; mark each copy of standard printed data to identify specific products proposed for use.
4. Manufacturer's Installation Instructions: When contract documents require compliance with manufacturer's printed instructions, provide one complete set of instructions for Contracting Officer and keep another complete set of instructions at the p...
C. Contracting Officer reserves the right to require submittals in addition to those called for in individual sections.
D. Approved Equals:
1. For each item proposed as an "approved equal," submit supporting data, including:
a. Drawings and samples as appropriate.
b. Comparison of the characteristics of the proposed item with that specified.
c. Changes required in other elements of the work because of the substitution.
d. Name, address, and telephone number of vendor.
e. Manufacturer's literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of r...
2. A request for approval constitutes a representation that Contractor:
a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
b. Will provide the same warranties for the proposed item as for the item specified.
c. Has determined that the proposed item is compatible with interfacing items.
d. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
e. Waives all claims for additional expenses that may be incurred as a result of the substitution.

3. Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material. Every effort will be made by the National Park Service to approve these materials.

E. Coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward submittals that are related to or affect one another as a package to facilitate coordinated review. Each transmit...
F. Submittal Identification:
1. Contractor must provide required information called for on the NPS Transmittal form.
2. All sets of shop drawings, manufacturer's catalog sheets, samples, and other documents submitted to the Contracting Officer must include the NPS Transmittal form.
G. Submittal Numbering:
1. Number each submittal consecutively as called for on the NPS Transmittal form.
2. For re-submittals use the original submittal number, plus a letter suffix beginning with A.
3. Additional re-submittals of the same item must contain the original number with the next consecutive letter.
H. Contracting Officer's Review:
1. Submittals will be returned disapproved without technical review if identification information is missing, not filled in, or if placed on the back of the submittal; an incorrect number or format of submittals is provided; the transmittal form is in...
2. Any work done or orders for materials or services placed before approval will be at the Contractor's own risk.
3. After reviewing submittals, the Contracting Officer will return an electronic PDF copy of form DSC-1(CS) along with the submittal sheets to the Contractor. Shop drawing review notations will be returned on a PDF of original shop drawing. All othe...
4. The returned submittal will be marked in one of three ways as defined below:
a. APPROVED: Acceptable with no corrections.
b. APPROVED WITH NOTATIONS: Minor corrections or clarifications required. All comments are clear and no further review is required. The Contractor must address all review comments when proceeding with the work.
c. DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. The Contracting Officer will identify the reasons for disapproval. The Contractor must revise and resubmit with changes ...
2
3
4
4 .1 SUBMITTALS
A. Payment will be included in the Contract Price Schedule Line Item to which this work relates.
SECTION 01 35 00
1
1
1 .1 DESCRIPTION
1 .1 DESCRIPTION
A. The work of this section consists of protecting archeological resources contained in soil deposits in the first twenty feet of the test well.
1 .2 DEFINITIONS
A. Resources: Prehistoric, historic, and early 20th century artifacts, including charcoal, human bones, ash, fire rocks, and building materials that indicate the presence of past human occupation.
B. Archeologically Sensitive Areas: Areas that have been determined to have a probability of buried archeological materials.
C. Nonsensitive Areas: Areas that have a low likelihood of containing significant in-the-ground archeological resources. The test well project site is considered a nonsensitive area.
D. Archeological Monitor: Representative of the Government designated to record and collect cultural resources for compliance with Government regulations to protect in-the-ground resources.
2
3
3 .1 COORDINATION
A. Contractor will coordinate with the Archaeological Monitor.
4
4 .1 ARCHEOLOGICAL PROTECTION
A. Payment will be included in the Contract Price Schedule Line Item to which this work relates.
1
1 .1 DESCRIPTION
A. The work of this section consists of establishing an effective safety program and providing a safe environment for all personnel and visitors.
1 .2 SUBMITTALS
A. Safety Program: Before on-site work begins, submit for approval a safety program. The Contracting Officer will review the proposed program for appropriate content relative to OSHA and project requirements. If the program requires any revisions o...
1. Name of responsible supervisor to carry out the program.
2. Daily, Weekly and monthly safety meetings.
3. First aid procedures.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work includ...
5. Training, both initial and continuing.
6. Planning for possible emergency situations, such as floods, fires, cave-ins, slides, explosions, power outages, and wind storms. Such planning must take into consideration the nature of construction, site conditions, and degree of exposure of pers...
7. Housekeeping procedures.
8. Fire Protection procedures and protocols.
9. Additional subjects the Contractor deems necessary for a safe work site.
B. Certificates: Provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.
C. Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.
D. Submit a report of safety meetings and of inspections.
E. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.
1 .3 QUALITY ASSURANCE
A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the contract. In case of conflicts between Federal, state, and local safety and health requirements, the most stringent will apply. Equipment or tools not meeting OSHA r...
B. Qualifications of Employees:
1. Ensure that employees are physically qualified to perform their assigned duties in a safe manner.
2. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
3. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all e...
1 .4 ACCIDENT REPORTING
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Notify Contracting Officer immediately in the event of a...
B. All Other Accidents: The Contractor must report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
2
2 .1 FIRST AID FACILITIES
A. Provide adequate facilities for the number of employees and the type of construction at the site.
2 .2 PERSONNEL PROTECTIVE EQUIPMENT
A. Meet requirements of NIOSH and MSHA.
2 .3 BARRIERS
A. Section 01 57 00.
3
3 .1 EMERGENCY INSTRUCTIONS
A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
3 .2 EGRESS
A. Provide and maintain adequate egress at all times in accordance with the Life Safety Code (NFPA 101). No corridor, aisle, stairway, door, or exit can be obstructed or used in a manner that interferes with egress.
3 .3 PROTECTIVE EQUIPMENT
A. Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.
B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
3 .4 SAFETY MEETINGS
A. As a minimum, conduct Daily 15-minute "toolbox" safety meetings. These meetings will be conducted by a foreman and attended by all construction personnel at the worksite.
B. Conduct weekly safety meetings for all levels of supervision. Notify the Contracting Officer of meeting dates and times. These meetings will be used to review the effectiveness of the Contractor's safety effort, to resolve current health and safe...
3 .5 PERSONAL PROTECTIVE EQUIPMENT (PPE) AREAS
A. The PPE area will be designated by the Contracting Officer. The PPE area must be posted by the Contractor in a manner satisfactory to the Contracting Officer.
B. It is the Contractor's responsibility to require all those working on or visiting the site to wear PPE and other necessary protective equipment at all times. As a minimum, provide 3 sets of PPE for use by visitors. Thoroughly sanitize all PPE to ...
3 .6 TRAINING
A. First Aid: Provide adequate training to ensure prompt and efficient first aid.
B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or othe...
4
4 .1 SAFETY REQUIREMENTS
A. Payment will be included in the bid item to which this work relates.

SECTION 01 43 00

1
1 .1 DESCRIPTION
A. The work of this section consists of preparing and executing a quality control program. Also included is the requirements for Requests for Information (RFI.).
1 .2 RELATED REQUIREMENTS
A. "Inspection of Construction" clause of the contract.
1 .3 SUBMITTALS
A. As specified in section 01 33 00.
B. Quality Control Plan:
1. At the time of the preconstruction conference, submit for approval a written Contractor Quality Control (CQC) plan.
2. If the plan requires any revisions or corrections, the Contractor must resubmit the plan within 10 days.
3. The Government reserves the right to require changes in the plan during the contract period as necessary to obtain the quality specified.
4. No change in the approved plan may be made without written concurrence by the Contracting Officer.
5. The plan must include:
a. A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.
b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.
c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.
d. Methods of performing, documenting, and enforcing quality control of all work.
e. Methods of monitoring and controlling environmental pollution and contamination as required by regulations and laws.
C. Contractor's Quality Control Daily Reports: Submit a digital PDF copy of CQCDR showing all inspections and tests on the first workday following the date covered by the report.
D. Test Reports:
1. Submit Daily Test Information Sheets with Quality Control Daily Reports.
2. Submit digital PDF copy of failing test results and proposed remedial actions within four hours of noted deficiency.
3. Submit digital PDF copy of original complete test results not later than three calendar days after the test was performed.
E. Off-Site Inspection Reports: Submit prior to shipment.
F. If the CQC plan and Quality Control Daily Reports are not submitted as specified, the Contracting Officer may retain all payments until such time a plan is approved and implemented.
1 .4 QUALITY ASSURANCE
A. General:
1. The quality of all work is the responsibility of the Contractor. Testing will be the responsibility of an independent testing laboratory
2. Inspect and test all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with the Construction Documents.
3. Quality Control Daily Reports must be completed by the Quality Control Supervisor.
4. Test reports must be completed by the person performing the test.
5. The Contracting Officer may designate the locations of tests.
B. Quality Control Staff:
1. The Contractor's Quality Control Supervisor may also perform the duties of Project Superintendent.
2. The Contractor's job supervisory staff may be used to assist the Quality Control Supervisor, supplemented as necessary by additional certified testing technicians.
C. Testing Laboratory and Equipment:
1. Employ certified independent laboratories to perform sampling and testing. The testing laboratory organization must be certified for the type of testing and sampling work to be done.
2. All measuring devices, laboratory equipment, and instruments must be calibrated at established intervals against certified standards in accordance with NBS requirements. Upon request, measuring and testing devices must be made available for use by...
2
3
3 .1 OFF-SITE CONTROL
A. Items that are fabricated or assembled off-site must be inspected for quality control at the place of fabrication.
3 .2 ON-SITE CONTROL
A. Notification:
1. Notify the Contracting Officer at least 48 hours in advance of the preparatory phase meeting.
2. Notify the Contracting Officer at least 24 hours in advance of the initial and follow-up phases.
B. Preparatory Phase: Perform before beginning each feature of work.
1. Review control submittal requirements with personnel directly responsible for the quality control work. As a minimum, the Contractor's Quality Control Supervisor and the foreman responsible for the feature of work must be in attendance.
2. Review all applicable specification sections related to the feature of work.
3. Ensure that copies of all referenced standards related to sampling, testing, and execution for the feature of work are available on site.
4. Ensure that provisions have been made for field control testing.
5. Examine the work area to ensure that all preliminary work has been completed.
6. Verify all field dimensions and advise the Contracting Officer of discrepancies with contract documents.
7. Ensure that necessary equipment and materials are at the project site and that they comply with approved shop drawings and submittals.
8. Prepare a report on all preparatory phase activities and discussions. Attach report to Contractor's Quality Control Daily Report.
C. Initial Phase:
1. As soon as work begins, inspect and test a representative portion of a particular feature of work for quality of workmanship.
2. Review control testing procedures to ensure compliance with contract requirements.
3. Prepare a report on all initial phase activities and discussions. Attach report to Contractor's Quality Control Daily Report. Exact location of initial phase must be indicated for future reference and comparison with follow-up phases.
D. Follow-Up Phase: Inspect and test as work progresses to ensure compliance with contract requirements until completion of work.
E. Additional Preparatory and Initial Phases: Additional preparatory and initial phases may be required on the same feature of work for the following reasons:
1. Quality of on-going work is unacceptable.
2. Changes occur in the applicable quality control staff, on-site production supervision, or work crew.
3. Work on a particular feature of work is resumed after a substantial period of inactivity.
3 .3 DOCUMENTATION
A. Maintain Quality Control Daily Reports and Daily Test Report Information Sheets (samples attached) of quality control activities and tests.
B. For work documented on the DAILY DRILLER’S REPORT it will not be required to be recorded a second time on the report cited in 3.3.A above.
C. Quality Control Daily Reports may not be substituted for other written reports required under clauses of the contract, such as Disputes, Differing Site Conditions, or Changes.
3 .4 ENFORCEMENT
A. The Contractor must stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff or the Contracting Officer.
4
4 .1 CONTRACTOR QUALITY CONTROL
A. Payment will be included in the Contract Price Schedule Line Item to which this work relates.
1
1 .1 DESCRIPTION
A. The work of this section consists of providing temporary services required for Contractor's performance of the work of this contract. It also covers field offices and sheds.
1 .2 RELATED REQUIREMENTS
A. Section 01 36 00 – Safety Requirements
B. Section 01 57 00 - Temporary Controls.
1 .3 FIELD OFFICES AND SHEDS
A. Temporary or permanent structures for use as a field office and/or sheds will not be allowed on the BLM ACEC nor on the property of Manzanar National Historic Site.
2
2 .1 GENERAL
A. Temporary materials may be new or used, but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.
2 .2 SANITARY FACILITIES
A. Provide and maintain temporary toilet facilities in accordance with State Health Department and National Park Service requirements.
B. Sufficiently lighted and ventilated toilet facilities in weatherproof, sightproof, sturdy enclosures with privacy locks.
2 .3 FIRE PROTECTION EQUIPMENT
A. Extinguisher must have a minimum UL rating of 2-A:10-B:C.
3
3 .1 ELECTRICITY AND LIGHTING
A. The contractor will not have commercial electrical power available at the test well project site. Contractor must provide an electrical power source for their electrical power needs at the test well project site.
B. Temporary Electrical: Temporary electrical work must meet requirements of NFPA 70 (NEC).
C. Contractor to provide temporary lighting at the test well project site for any work done outside of daylight hours of the day. Temporary lighting must sufficiently illuminate the work site to allow for safe working conditions.
3 .2 TELEPHONE
A. No land line telephone service is available at the test well project site for Contractor's use. Availability of cellular phone service at the test well project site is unknown. Contractor must make arrangements for having communications access at...
3 .3 WATER
A. Drinking water and construction water are not available at the test well project site. Contractor must make arrangements to have drinking water and construction water at the test well project site and pay all costs.
B. Limited construction water is available at Manzanar National Historic Site. The Contractor must make specific arrangements with Chief of Maintenance on the frequency and quantity of water that can be taken for use on the test well project. In gen...
C. Furnish cool, potable water for construction personnel in locations convenient to work stations.
3 .4 SANITARY FACILITIES
A. Furnish and place in approved locations secluded from public observation and convenient to work stations. Provide sanitary facilities representatively for genders of workers. Relocate as work progress requires.
B. Maintain and clean toilet facilities at least weekly.
C. Completely remove sanitary facilities on completion of work.
3 .5 FIRE PREVENTION AND PROTECTION
A. Responsible Person: A capable and qualified person must be placed in charge of fire protection. The responsibilities must include locating and maintaining fire protective equipment and establishing and maintaining safe torch cutting and welding p...
B. Hazard Control: Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
C. Spark Arresters:
1. The BLM ACEC is an areas of potential fire hazard.
2. Equip all gasoline or diesel powered equipment used at the test well project site with spark arresters approved by the USDA Forest Service.
D. Service and Refueling Areas: The well drilling rig may be refueled where it is while it is set up over the test well. Shut down equipment before refueling.
E. Smoking: Smoking within test well project site is prohibited.
F. Welding: Cutting by torch or welding must be performed only when adequate fire protection is provided per the HOT PERMIT issued by the NPS.
3 .6 PROTECTION EQUIPMENT REQUIRED
A. Buildings:
1. Furnish a minimum of one extinguisher for each 1,500 square feet of area or major fraction thereof.
2. Travel distance from any work station to the nearest extinguisher must not exceed 75 feet.

B. Vehicles and Equipment: Provide one extinguisher on each vehicle or piece of equipment.

4
4 .1 TEMPORARY SERVICES
A. Payment will be included in the Contract Price Schedule Line Item to which this work relates.
1
1 .1 DESCRIPTION
A. The work of this section consists of providing temporary controls.
1 .2 SUBMITTALS
A. As specified in Section 01 33 00.
B. Containment plan for drilling mud if mud rotary technology is utilized.
2
3
3 .1 HOUSEKEEPING
A. Keep project neat, orderly, and in a safe condition at all times.
B. Provide enough containers for collecting construction debris and construction materials to be recycled.
C. Wet down dry soils in the test well project area to prevent blowing dust.
D. Keep volatile wastes in covered containers.
E. Keep cuttings from the bore hole contained so they can be removed from the test well project site and legally disposed of off of federal land.
3 .2 DISPOSAL
A. Dispose of borehole cuttings and drilling mud (if mud rotary is used) legally off of the project site and federal land.
B. Unless otherwise specified, all removed material becomes the property of the Contractor and must be disposed legally off of the project site and federal land.
C. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas off of the project site and fede...
3 .3 AIR, WATER, AND SOIL POLLUTION CONTROL
A. Take all necessary reasonable measures to reduce air, water and soil pollution by any material or equipment used during construction.
B. Do not dispose of volatile wastes or oils on the BLM ACEC or Manzanar National Historic Site.
C. Do not allow waste materials to be washed or blown away from the test well project site into the adjacent BLM ACEC and Manzanar National Historic Site.
D. Upon discovery or notification, the Contractor must immediately repair or replace any piece of equipment or tool that develops leaks. All leaked material and associated soil must be removed from the BLM ACEC and properly disposed of in a legal man...
A. Equipment for use on the project site must be inspected by the NPS prior to it being brought onto the BLM ACEC and the test well project site. Equipment that is unclean with dirt and plant residue will not be allowed onto the BLM ACEC. Also, equi...
4
4 .1 TEMPORARY CONTROLS
A. Payment will be included in the Contract Price Schedule Line Items to which this work relates.
1
1 .1 DESCRIPTION
A. The work of this section consists of the general procedures for handling, storing, and protecting material and equipment.
1 .2 TRANSPORTATION AND HANDLING
A. Arrange deliveries of materials in accordance with construction schedules; coordinate to avoid conflict with work and conditions at the site. Deliver materials in undamaged condition, in manufacturer's original containers or packaging, with identi...
1 .3 STORAGE AND PROTECTION
A. Store materials in accordance with manufacturer's instructions, with seals and labels accessible for inspection.
B. Interior Storage: Maintain temperature and humidity within the ranges required by manufacturer's instructions.
C. Exterior Storage:
1. Store products subject to damage by the elements in weathertight enclosures.
2. Store fabricated products above the ground, on blocking or skids; prevent soiling or staining. Cover products subject to damage or deterioration with impervious sheet coverings; provide adequate ventilation to avoid condensation.
3. Store loose granular materials in a well-drained area on solid surfaces to prevent mixing with foreign matter.

D. Protection After Installation: Provide adequate coverings as necessary to protect installed materials from damage resulting from natural elements, traffic, and subsequent construction. Remove when no longer needed.

2
3
4
4 .1 MATERIAL AND EQUIPMENT
A. Payment will be included in the Contract Price Schedule Line Item to which this work relates.
1
1 .1 DESCRIPTION
A. The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.
2
2 .1 CLEANING MATERIALS
A. As recommended by the manufacturer of surface to be cleaned.
2 .2 POSTED OPERATING INSTRUCTIONS
A. Frame instructions under nonglare glass or approved laminated plastic. In areas where operating instructions are subject to sunlight or moisture, provide weather-resisting materials.
3
3 .1 POSTED OPERATING INSTRUCTIONS
A. As specified in the individual sections. Furnish operating instructions attached to or posted adjacent to equipment. Include wiring diagrams, control diagrams, control sequence, start-up, adjustment, operation, lubrication, shut-down, safety prec...
3 .2 CLEANING
A. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials,...
3 .3 CLOSEOUT SUBMITTALS
A. Submit before final inspection request.
1. Copy of Inyo County Approved Well Completion Report.
3 .4 SUBSTANTIAL COMPLETION AND FINAL INSPECTION
A. When project is substantially complete request in writing a final inspection. Upon receipt of written request that project is substantially complete, the Contracting Officer will proceed with inspection within 10 days of receipt of request or will ...
B. If, following final inspection, the work is determined to be substantially complete, Contracting Officer will prepare a list of deficiencies to be corrected before final acceptance and issue a Letter of Substantial Completion. Contractor must comp...
C. If, following final inspection, the work is not determined to be substantially complete, Contracting Officer will notify Contractor in writing. After completing work, Contractor must request a new final inspection. All reinspection costs may be ch...
3 .5 FINAL ACCEPTANCE OF THE WORK
A. After all deficiencies have been corrected, a Letter of Final Acceptance will be issued.
4
4 .1 PROJECT CLOSEOUT
A. Payment will be included in the bid item to which this work relates.
SECTION 31 23 33.20
RESTORATION OF SURFACES
PART 1 - GENERAL
PART 2 - PRODUCTS - NOT USED.
PART 3 - EXECUTION
4.1 TEST WELL