B08_Attachment_1_-_Statement_of_Work_date_12_Jul_23.pdf

PDF 7 MB Posted

Attached to
Replace Exterior Siding Canyon Rim Visitor Center
Solicitation number
140P4223R0015
Issued by

About this file

This statement of work describes exterior siding replacement services required at the Canyon Rim Visitor Center in New River Gorge National Park and Preserve. The contractor will remove existing wooden siding and replace it with a longer lasting alternative material approved by the National Park Service. Additional requirements include removing and replacing gutters and downspouts, relocating some recessed lights, and completing minor electrical work. The project must be completed within 90 days of the notice to proceed. The contractor will be responsible for safety plans, schedules, quality control, submittals, coordination, and closeout documentation.

View the file

Other files

File Type Posted
Sol_140P4223R0015_Amd_0001.pdf PDF
Q_A_Document_-_FINAL_0001.xlsx XLSX spreadsheet
B08_Attachment_2_-_Q_A_Document.xlsx XLSX spreadsheet
Sol_140P4223R0015.pdf PDF
B08_Attachment_3_-_Wage_Determination.pdf PDF
B08_-_Combined_Synopsis___Solicitation.docx DOCX document
B08_Attachment_4_-_Subcontracting_Percentage_Worksheet.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P a g e | 1

Exterior Siding Replacement at Canyon Rim Visitor Center

Statement of Work

Lansing, WV

New River Gorge National Park & Preserve

PMIS #191181

P a g e | 2

TABLE OF CONTENTS

Overview…3 Background …3 Objectives…3 Scope of Work…3 Project Location…4 Period of Performance…4 Work Restrictions…4 Construction Staging Area…4 Safety Concerns…5 Products…5 Execution…6 General Requirements…6 Special Construction Notes…7 Contract Modifications, Changes, Delays and Contractor Requests…8 Quality Control Plan (QCP)…8 Design, Product, and Other Project Management Submittals…8 Post Award Conference/Periodic Progress Meetings…9 Construction Schedule…9 Contracting Officer Representative (COR)…9 Key Personnel…9 Site Superintendent…10 Government Furnished Items and Services…10 Performance Objectives and Measures…10 Attachment A: Submittal Procedures and List of Required Submittals…14 Attachment B Work Site Location and Headquarters Location…19 Attachment C: Staging Areas for CRVC Siding Project…20 Attachment D: Photos of Siding and Soffit Locations…21 Attachment E: List of Siding/Soffit/Gutters Boards Needed per Location & Site Drawings…35 Attachment F: Estimated siding measurements & Quantities of Boards…40 Attachment G: Special construction photos…45 Contractor Site Specific Safety Plan…56

P a g e | 3

Statement of Work:

Exterior Siding Replacement at Canyon Rim Visitor Center

New River Gorge National Park & Preserve

PMIS #191181

1) Overview:

• This document is a Statement of Work (SOW) for the National Park Service (NPS). The purpose of the SOW is to describe services associated with the removal of old exterior siding of Canyon Rim Visitor Center and replacement with new materials for long lasting exterior protection to the most popular visitor center in New River Gorge National Park & Preserve (NERI).

• The contractor shall exercise management and operational control over and retain full responsibility for performance requirements as set forth in this SOW. The Government shall not exercise any supervision or control over sub-contractor(s) performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

• Offerors are encouraged to propose process improvements and industry best practices in their proposals.

2) Background:

• The Canyon Rim Visitor Center is located at 162 Visitor Center Road in Lansing, West Virginia and is the park’s most visited site and the flagship visitor center. The building’s wooden siding has exceeded its life expectancy and this project will provide new exterior siding to ensure the continued lifecycle of the building

3) Objectives:

• Removing the old wooden tongue and groove siding completely and disposing of properly.

• Repairing any underlying damage to sheathing.

• Installing new material tongue and groove siding.

• Remove & dispose of existing gutter and downspouts at three locations and replace with new, in-kind replacement. Installing three new sections of gutters/short downspouts to rear of visitor center.

• The project will require removing flashing in the course of siding removal/replacement and contractor shall attempt to not damage existing flashing but should be prepared to replace in kind to match existing appearance and flashing capabilities/color/materials.

• Contractor is solely responsible for verifying all dimensions and quantities. Quantities and measurements listed in this SOW are estimates only.

• Protect landscaping and adjacent areas from damage while the work is being executed. Monitor excavation activities for unknown archeological resources.

• Site is to be left clean and orderly at the end of each day.

• All work will be performed in a safe, professional manner according to accepted industry standards.

• Prepare and submit all required quality assurance reporting documentation in a timely manner.

• Accomplish all demolition and construction activities within the established construction time limits.

• Demobilize from the site. Remove all construction associated debris and equipment from the worksite.

Rehabilitate all areas affected by the work to match existing conditions.

• Close Project. Complete all administrative requirements necessary to close project within 2 weeks of final acceptance of site work.

4) Scope of Work:

a. The current wood siding and soffits will be removed and disposed properly of and replaced with an alternative material board for longer lasting lifecycle. Contractor shall be responsible for presenting examples of new material for approval prior to installation. Color of new siding material must be a close match to existing color on visitor center and the park has identified an industry standard of Cobblestone, a

P a g e | 4 gray-yellow color with an imitation wood texture. The siding and soffit area to be covered is being calculated in total board length in 12’ lengths (with an added 10%) for a total of 587 12’ Boards. The NPS requires that commercial grade products with a service life of no less than 20 years be used for products that are not mentioned specifically by name.

b. The contractors are strongly encouraged to conduct site visits prior to submitting proposal to be fully aware of steep slope on southern (rear) side of visitor center. If visiting, please contact Project Manager for access issues and questions that arise.

5) Project Location:

Canyon Rim Visitor Center 162 Visitor Center Road Lansing, WV 25862

6) Period of Performance:

• The period of performance shall be 90 days from the issuance of a notice to proceed by the NPS Contracting Officer.

7) Work Restrictions:

On-Site Work Execution Hours:

a. Limit Work on Park grounds in existing structure to normal Park hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, unless otherwise authorized by Park.

b. Weekend Hours: Do not perform Work, unless authorized by Government. Request authorization 72 hours in advance, minimum, in writing.

c. Holiday Hours: Do not perform Work, unless authorized by Government. Request authorization 72 hours in advance, minimum, in writing.

Existing Utility Interruptions:

d. Do not interrupt utilities serving facilities occupied by Government or others unless permitted by Government and those authorities having jurisdiction, and then only after providing temporary utilities per requirements indicated.

e. Three hours is the maximum time allowed for planned utility disruptions unless otherwise approved by Government in writing.

f. An interruption beyond four hours shall require temporary services.

i. Notify Government not less than four days in advance of proposed utility interruptions.

ii. Obtain Government written permission before proceeding.

iii. Cite periods on construction schedule.

iv. Locate and prevent damage to known utilities.

g. If any damage occurs, take relative action and repair utility at no additional expense to Government.

h. Repairs shall commence immediately and be carried out expeditiously and in a professional manner pursuant to and compliant with all federal, state and local codes and regulations as applicable.

i. No additional time shall be added to Contract for repairs from damages to utilities.

j. If damage occurs to an unknown utility, repair and reconnect utility immediately.

i. An equitable adjustment shall be made in accordance with the Changes clause of the Contract.

ii. Repairs shall be executed as cited above.

8) Construction Staging Area:

• The construction staging area will be designated by the NERI Project Manager/COR in the parking lot in front of the visitor center. Connex boxes are permitted. The site is not secured by NPS and contractor is responsible for security of materials and tools. The construction staging area will be maintained in a neat and

P a g e | 5 orderly condition at all times. An area closer to building/work site next to visitor center on eastern and western sides of Visitor Center for cutting materials will be designated by the NERI Project Manager/COR.

This cut area will be maintained in a neat and orderly condition at all times and will be cleaned/cleared at end of each workday before contractors depart site. Contractor is responsible for leaving area at conclusion of project in same condition as presented at start of project. Please see Attachment C for map of staging/cut areas.

9) Safety Concerns:

• Canyon Rim Visitor Center (CRVC) is open throughout the year, closed only on Thanksgiving Day, Christmas, and New Year’s Day. The Government will require occupancy and use of CRVC seven (7) days a week save for those designated holidays. Please note that park staff will be in the building prior to opening to the visitors each day and after closing hours, along with park visitors who may be in area both early and late in the day. Contractors must be aware of the staff and visitors and all safety concerns at all times.

• The public and NPS Staff utilize the grounds near CRVC throughout the year. Contractors will need to work with park staff to properly designate a parking location for all contractor vehicles. The interior of the building will be used by the Government for visitor and office functions throughout the year.

• Contractor shall provide barricades to separate ongoing work from Government employees and members of the public accessing the building or its surroundings. Contractor shall make every effort to limit noise and contain dust and debris that may adversely affect those in or near the building.

• The height of the exterior walls and precipitous slopes around the visitor center warrant the contractor’s on-site inspection prior to work beginning and filing a full Safety Plan for approval to demonstrate the methods crews will safely access all sites around the building for all stages of the project. No work will begin without an approved Safety Plan in place.

• Keep driveways, parking lots, loading areas, corridors, and entrances serving premises clear and available to Government, Government employees, and first responders, for access and egress, emergency or otherwise, on foot and in vehicles, at all times. Do not use areas for parking, staging, or storage of materials, unless authorized by Government. Schedule deliveries to minimize use of driveways and entrances by construction operations. Deliveries shall utilize specified route as defined by Government.

• Conduct all operations and procedures in a manner to ensure the safety for all and to minimize inconveniences. Methods shall be compliant with OSHA and other applicable regulations, including State and local bodies having jurisdiction.

Deliver to Government:

1. Schedule for safety meetings.

2. Project specific emergency response plan.

3. Project specific accident prevention plan.

4. Possess first aid equipment on site, and other areas as required.

5. Provide necessary safety equipment on site to perform the construction activities as required by regulation.

• The Government will provide access to water and electricity. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish appropriate work tasks. Toilet facilities will not be provided to the Contractor who will be expected to have a porta john for employees in the staging area. This porta john must be locked after business hours and all weekends when contractors are not present.

10) Products:

• Where an item, equipment or material, is designated by reference of a particular brand-name, manufacturer or trade name, in the Drawings or Specifications, it is understood by all entities participating in Project that citing is to establish minimum acceptable standard of quality and performance allowed by the Government

P a g e | 6 and it is not intended to preclude manufacturers of similar products that possess the same or better salient characteristics and properties of the product(s) cited.

• Where a product is submitted based upon salient characteristics and properties, it is required to demonstrate to Government that the proposed product intended to be incorporated in the Work matches or exceeds the quality and durability of product referenced.

• Product must receive approval from the Government prior to incorporation into Work of Project.

11) Execution:

• Mobilization, preparation, and construction activities may not commence without written receipt of Notice to Proceed from the Government.

12) General Requirements:

• IMPORTANT: Contractor shall be responsible for all site survey measurements and calculations. Drawings, photos, and maps provided are often not to scale and should be field verified by contractor prior to Bid Submittal. The total area (board length) given is an estimate upon best measurements and inflated by 10% for coverage/spoils.

• Contractor shall provide and deliver all labor, material, tools, supervision, equipment, supplies, services, and cost needed to complete the tasks identified in the scope of work.

• Contractor shall supply and erect any necessary scaffolding/safety measures needed to access the exterior siding, soffits and gutters/downspouts.

• Contractor shall remove and properly dispose of the existing tongue and groove horizontal siding, repair damage to sheathing discovered in old siding removal and replace with new tongue and groove style siding, removing and replacing gutters and downspouts, and any flashing damaged in process.

• The new siding material will not be a replacement of pressure treated wood. After market research and analysis of siding, the park requires that the material/style/usability found in Nichiha Architectural Wall Panel or an equal product. The color samples shall be provided on site by contractor post award for National Park Service approval prior to any installation. The new material requires a minimum lifespan/warranty of 20 years, shall have a wooden grain texture/appearance, have a tongue and groove style appearance (not lap) and installed to manufacturer’s specifications. IMPORTANT: The approximate number of boards given in this SOW is given upon the estimate of using 12’ Double 4’s of siding for an approximate 8” coverage in width per board. (See Attachment F – Estimated Measurements & Quantities of Siding) Additionally, there is approximately 107 linear feet of commercial dark brown, K Style, 6” gutter and 60 linear feet of commercial 4” wide downspout that will be removed to access siding that will need to be replaced with new gutters and downspouts. Three additional new runs of gutters and downspouts will be installed (See Section 13). Existing flashing is to be maintained and shall be in fully operational condition and matching existing style upon completion should any need replacement or repairs due to damage during siding project.

• The park would request that any scrap siding over four feet and full lengths of uncut siding over four feet be returned to the park for the use of any siding replacement in the future beyond the date of warranty replacements. Contractor shall work with park Project Manager to designate nearby location for materials to be stored.

• If working on or around gutters/downspouts, take precautions to prevent drains from clogging during the siding application. Remove debris at the completion of each day's work and clean drains, if required. At completion, test drains to ensure the system is free running and drains are watertight. Remove strainers and plug drains in areas where work is in progress. Install flags or other telltales on plugs. Remove plugs each night and screen drain.

• The contractor shall adequately protect building, paved areas, service drives, lawn, shrubs, trees, etc. from damage while performing the required work. Provide canvas, boards and sheet metal (properly secured) as necessary for protection and remove protection material at completion. The contractor shall repair or be responsible for costs to repair all property damaged during the siding project.

P a g e | 7

• During the siding contractor's performance of the work, the building owner will continue to occupy the existing building. The contractor shall take precautions to prevent the spread of dust and debris, particularly where such material may sift into the building. The contractor shall provide labor and materials to construct, maintain and remove necessary, temporary enclosures to prevent dust or debris in the construction area(s) from entering the remainder of the building. The contractor is required to cut all materials on the ground and raise to roof/walls for installs to prevent any damage or debris on membrane or other roofs. Any damage to roofs, gutters, or downspouts shall be the responsibility of the contractor to repair to satisfaction of the park and COR at contractor’s expense.

• Do not overload any portion of the building or roof, by either use of or placement of equipment, storage of debris, or storage of materials. Protect against fire and flame spread. Maintain proper and adequate fire extinguishers. Store moisture susceptible materials above ground and protect with waterproof coverings.

• At the completion of each work week, scaffolding and safety lines may remain in place, but remainder of work areas, staging/lie-down areas and material storage sites should be clean and orderly and secured for the weekend. Contractor will dispose of all waste properly and shall be the responsibility of the contractor to haul away materials and trash.

• At the successful completion of project, all scaffolding and safety measures must be removed by contractor in three business days and all sites restored to previous conditions. Remove all traces of piled bulk material and return the job site to its original condition upon completion of the work. All work areas, staging/lie-down areas and material storage sites should be cleared out, trash hauled away, cleaned and returned to conditions prior to start of work. Sites will be inspected and must be cleared by COR and CO Approval prior to final payment to contractor.

13) Special Construction Notes:

• Lights & Recessed Lighting: Several soffits have recessed lighting, some of which will be replaced with new lights in same location and others will be completely removed and locations covered by new siding. See notes below for more detail. Contractor will be responsible for removing large halogen light over North Back Door that is on exterior siding (as per 1st photo in Attachment G, page 45) and disposing of properly.

• The two in the front (North Side – North Front Door & North Front Window) will retain their fixtures in exact same places in new siding.

• The recessed lighting on the rear (south side) of the building (South1, South2, South3) will need to have their lighting removed and not reinstalled.

• The South Walkway (rear of building) currently has four lights recessed into soffit. Only one light will remain, the one in the end of the walkway closest to shelter/back door of Auditorium and be reinstalled in exact same place.

• Along the western side of building (next to loading dock), the two lights atop the stairs over the two back glass doors will be reinstalled in new siding in exact same place. The three over the stairwell (closest to rear (South) of building) will not be reinstalled. The one atop the stairwell and above the landing by back doors will be moved slightly. See Attachment G, page 45, for photo of old location and proposed new location for light. If understructure precludes moving light to park desired location, contractor will make CO and park aware, and an alternative location will be determined on site.

• Contractor will be responsible for providing specs/photos of new light fixtures in proper submittal procedure for Approval prior to full purchase/installation. The park requires fixtures to match previous fixtures (currently 8 ¼” diameter and 7” deep) and use energy efficient light bulbs. For sites where lights are completely removed, the contractor will have those wires properly disconnected and terminated.

• Other Electrical Concerns – Two security cameras and air monitor near employee entrance/back door (North Back Door Soffit) will be temporarily removed during siding installation and replaced in good working order in exact same places.

• Gutters notes – Three runs of commercial-grade gutters to be installed along southern (rear) of building.

Gutters will match the run along South Walkway (above rear viewing platform overlooking river) except to add a gutter guard for each three runs. Gutters will be aluminum K Style, Dark Brown, and 6” wide. The

P a g e | 8 gutters approximate lengths are listed below. The downspouts will match the style of the Southern Walkway downspout – Dark Brown, aluminum, 4” wide and short with length to not go below bottom of siding for each section. See Attachment G for gutter photo of South Walkway for example. New downspouts will bend away from building, not extend beneath siding and end no farther than 12” from building (shooting water away from building/siding and not obstructing view). Gutters will run east to west, and downspouts will be on western ends.

• South1 Approximately 21’4” long

• South2 Approximately 11’ long

• South3 Approximately 13’ long

• Four runs of existing gutters and downspouts will be removed and replaced with new gutter/downspouts with same materials to match other existing and the items in previous bullet. Below are the four locations and approximate measurements:

• North Front Door – Gutter 11’ Downspout 15’

• North Front Window – Gutter 12’ Downspout 12’

• West Stairwell – Gutter 42’ Downspout 30’

• South Walkway – Gutter 42’ Downspout 3’’

• Loading Dock Storage Shed – Park is replacing doors on Shed. Contractor is not responsible for doors to Shed. Park is pursuing a garage door opener system for Shed and contractor will be solely responsible for replacing exterior walls of Shed. Contractor should measure building without doors in their estimate. At time of Notice to Proceed, CO/Park will make contractor aware of garage door status.

• Seven soffits have 2” wide vents that will need full replacement in kind.

• The contractor’s warranty with respect to work repaired or replaced will run for one year from the date of repair or replacement.

14) Contract Modifications, Changes, Delays and Contractor Requests:

• Modifications: When contract modifications, amendments or changes are initiated, delays are experienced, or the Contractor desires to revise the contract completion date, the Contractor shall submit to the Contracting Officer a written request that includes a “Time Impact Analysis” illustrating the influence of each modification, amendment, change, delay, or Contractor Request on the contract completion date.

• Time Extensions: Delays shall not automatically mean that an extension of the contract completion date is warranted or due the Contractor. It is possible that a modification, amendment, change, or delay will not affect existing critical path activities or cause non-critical activities to become critical. A modification, amendment, change, or delay may result in only absorbing a part of the available Project Schedule, thereby not causing any effect on the contract completion date. Time extensions will be granted in accordance with the terms of the Contract.

15) Quality Control Plan (QCP):

• The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.

• The QCP is to be delivered to the COR in accordance with the submittal register provided in Attachment B.

After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system. A revised copy of the QCP shall be submitted to the COR within 5 working days when changes are made thereafter.

16) Design, Product, and Other Project Management Submittals:

• Design, product, and other submittals required by the COR to effectively manage the project are indicated in the submittal list provided in SOW Attachment B. A submittal register will be provided under separate cover

P a g e | 9 after the contract is awarded. The Contractor will provide the required submittals to the NPS in accordance with the procedures described in SOW Attachment B.

17) Post Award Conference/Periodic Progress Meetings:

• The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

18) Construction Schedule:

• As per Submittal Register

19) Contracting Officer Representative (COR):

• The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

20) Key Personnel:

The following personnel are considered key personnel by the government:

Contracting Officer: Cole Johnson

Contracting Officer Representative (COR) / Project Manager Neil Hakel New River Gorge National Park &Preserve 104 Main Street Glen Jean, WV 25846 Office: 304-465-6547 Cell: 304-640-0925 neil_hakel@nps.gov

NERI Facility Manager Michael Hartsog New River Gorge National Park &Preserve

P a g e | 10

104 Main Street Glen Jean, WV 25846 Office: 304-465-6514 Cell: 304-640-8742 michael_hartsog@nps.gov

21) Site Superintendent:

• The contractor shall provide a site superintendent who shall be responsible for the performance of the work. The site superintendent shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The site superintendent or alternate shall be present on site at all times when the contractor’s employees are working.

22) Government Furnished Items and Services:

a. Services

i. The Government shall supply no service to the contractor.

b. Facilities

i. The Government will provide no facilities to the Contractor. A staging area will be designated for the contractors use.

c. Utilities

i. The Government will provide access to water and electricity. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish appropriate work tasks. Toilet facilities will not be provided to the Contractor.

d. Equipment

i. The Government will provide no equipment to the Contractor.

e. Materials

i. The Government will provide no materials to the Contractor.

24. Performance Objectives and Measures

24.1. Confirm the Functional Requirements of the Work:

24.2. Task Description:

The contractor will be familiar with the requirements stated in this scope of work and meet with the park staff and CO to gain a clear understanding of the design and functional requirements of work desired.

24.3. Acceptable Quality Level:

P a g e | 11

The CO/COR will organize and conduct a pre-construction meeting with the contractor, park superintendent and staff within three weeks of Contract Award. The objective of the meeting is to discuss and coordinate the Contractor’s proposed approach to accomplishing the work, establish clear lines of communication and authority, and confirm specific details of the timeline for completion. The contractor will prepare and submit a narrative summary or meeting minutes as a submittal. The summary is intended to be an internal document and is typically 2 to 5 written pages in length. The summary document need not contain sophisticated graphics or images.

24.4. Confirm Existing Conditions, and Provide Design/Product Submittals/Samples:

24.5. Task Description:

The contractor will confirm existing site conditions and measurements. Shop drawings, material samples and product submittals related to the proposed work will be prepared and submitted to the NPS. NPS approval will be obtained prior to ordering materials. Work will be executed as described in the approved drawings and submittals.

24.6. Acceptable Quality Level:

Drawings will be scaled and contain detail sufficient to communicate the intent of the designer and permit a thorough and detailed on-site inspection of the work by NPS inspectors. Product submittals that do not indicate the specific item to be approved will be rejected without review.

24.7. Protect Existing Resources from Damage:

24.8. Task Description:

Protective material and barriers will be installed as necessary to ensure that the building, walkways, and landscape are reasonably protected from impact damage during the work.

24.9. Acceptable Quality Level:

100% compliance

24.10. Demolition and Disposal of Debris:

24.11. Task Description:

Remove existing siding and set aside gutters/downspouts appropriately. Any area where work is occurring each day must be fully covered each evening if work is unfinished. Gutters and downspouts should be temporarily replaced each evening, if possible, to prevent damage to structure/construction. All open work sites must have proper waterproof covering every evening and weekend. All gutter/downspout/flashing work has to be completed ahead of any weekend or long absence by contractors (more than two days).

All construction debris will be removed from the site regularly and disposed of off-site. The work site will be cleaned of construction debris daily. All construction debris will be contained within the immediate work area or staging area at all times. Full waste containers will be removed within 1 day of reaching capacity. All construction debris stored at the park overnight and on weekends will be contained and protected from dispersal by wind. All construction debris will be disposed of off-site at an approved waste disposal facility. The NPS encourages the contractor to seek out alternative uses for debris rather than landfill. At the conclusion of the project, the NPS requests that the Contractor will have recorded and tracked all construction debris haulage amounts and will

P a g e | 12 provide data to NPS for park’s data tracking on trash disposal. The Contractor will work with the COR/Project Manager to develop criteria of information requested.

24.12. Acceptable Quality Level:

24.13. Repair underlying damage:

24.14. Task Description:

Damaged sheathing discovered below existing siding will be removed and disposed of properly.

New sheathing will be properly attached, as per industry standards, prior to installing new siding.

24.15. Acceptable Quality Level:

100% of damaged sheathing is replaced properly.

24.16. Install new siding:

24.17. Task Description:

New siding (of new material as discussed previously) will be installed atop sheathing to match in style/appearance of prior siding without nails or screws visible.

24.18. Acceptable Quality Level:

24.19. Install new gutters:

24.20. Task Description:

Three runs of fully new commercial grade, six-inch-wide brown aluminum gutters with leaf guards are to be installed along southern (rear) side of visitor center. Gutters to be attached appropriately and have short L-shaped downspouts in same fashion as example pictured in Attachment G. See Section 13 for more details.

Four runs of gutter will have been removed to install siding and will need new gutter/downspout installed. See Section 13 for more details.

24.21. Acceptable Quality Level:

24.22. Reattaching flashing & Check for Leaks:

24.23. Task Description:

After siding has been installed and new gutter/downspouts, contractor will return flashing back to original location and attached properly. In the event that any of these materials were damaged, the contractor shall assume responsibility and replace in kind. The contractor shall also test gutters/downspouts/flashing/siding for any leaks and repair/replace accordingly at contractor’s expense.

24.24. Acceptable Quality Level:

P a g e | 13

24.25. Quality Assurance Reporting:

24.26. Task Description:

Daily reports will be consolidated and submitted to the COR weekly. Project management submittals will be submitted and approved as indicated on the Transmittal Register. Product submittals will be approved in advance of procurement and installation.

24.27. Acceptable Quality Level:

90% of daily reports will be received complete and on time. 100% of pre-construction project management submittals will be received and approved prior to procurement and installation.

24.28. Demobilize Project:

24.29. Task Description:

Remove all construction associated debris and equipment from the worksite. Repair any damage to adjacent structures and reseed damaged lawn areas affected by departure.

24.30. Acceptable Quality Level:

24.31. Project Closure:

24.32. Task Description:

Complete all administrative requirements needed to close the project within 2 weeks of final acceptance of site work.

24.33. Acceptable Quality Level:

P a g e | 14

Attachment A Submittal Procedures and List of Required Submittals

SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Government’s responsive action.

B. Informational Submittals: Written information that does not require Government’s responsive action. Submittals may be rejected for not complying with the requirements.

1.3 GENERAL SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. Review them for legibility, accuracy, completeness, and compliance with Contract Documents.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Contracting Officer reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

B. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.

C. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on Contracting Officer’s receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including re-submittals.

1. Action Submittals

a. Initial Review: Allow 10 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.

b. Re-submittal Review: Allow 10 days for review of each re-submittal.

2. Informational Submittals

a. Review: Allow 10 days for review of each submittal.

D. Approved Equals:

1. For each item proposed as an “approved equal,” submit supporting data, including:

a. Drawings and samples as appropriate.

b. Comparison of the characteristics of the proposed item with that specified.

c. Changes required in other elements of the work because of the substitution.

d. Name, address, and telephone number of vendor.

P a g e | 15

e. Manufacturer’s literature regarding installation, operation, and maintenance and parts lists. Describe availability of maintenance service, and state source of replacement materials.

2. A request for approval constitutes a representation that Contractor:

a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

b. Will provide the same warranties for the proposed item as for the item specified.

c. Has determined that the proposed item is compatible with interfacing items.

d. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

e. Waives all claims for additional expenses that may be incurred as a result of the substitution.

E. Additional Copies: Unless additional copies are required for final submittal, and unless Contracting Officer observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

1. Additional copies submitted for maintenance manuals will not be marked with action taken and will be returned.

F. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Contracting Officer will discard submittals received from sources other than Contractor.

1. CM-16 Transmittal Form: All material submittals shall be transmitted using National Park Service form CM-16.

(This form can be downloaded from the Workflows website at http://www.nps.gov/dscw/con_subreview21.htm.)

No action will be taken on a material submittal item unless accompanied by the transmittal form.

G. Identification:

1. Include the following information on each transmittal sheet:

a. Project name, Park, PMIS number, Contract number.

b. Date.

c. Submittal number or other unique identifier, including revision identifier.

i. Submittal number shall be a sequential number (e.g., 001). Re-submittals shall include an alphabetic suffix after another decimal point (e.g., 001.A).

H. Re-submittals: Make re-submittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in label or title block and clearly indicate extent of revision.

3. Re-submit submittals until they are marked “Approved” or “Approved with notations”.

I. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

J. Use for Construction: Use only final submittals with mark indicating “Approved” or “Approved with notations.”

1.4 CONTRACTOR’S USE OF CAD FILES

A. General: NPS has no CAD files associated with the project.

PART 2 – PRODUCTS

2.1 ACTION SUBMITTALS

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Contracting Officer reserves the right to require submittals in addition to those called for in individual sections.

P a g e | 16

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer’s written recommendations.

b. Manufacturer’s product specifications.

c. Manufacturer’s installation instructions: When Contract Documents require compliance with manufacturer’s printed instructions, provide one complete set of instructions to Contracting Officer and keep another complete set of instructions at the project site until substantial completion.

4. Number of Copies: Submit four copies of Product Data, unless otherwise indicated. Contracting officer will return one copy. Retain copy as a Project Record Document.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Dimensions.

b. Identification of products.

c. Fabrication and installation drawings.

d. Roughing-in and setting diagrams.

j. Notation of dimensions established by field measurement.

k. Relationship to adjoining construction clearly indicated.

l. Seal and signature of professional engineer if specified.

2. Sheet Size: Submit shop drawings electronically in .pdf format. When requested specifically, submit paper copies of shop drawings on sheets at least 8.5 by 11 inches but no larger than 30 by 40 inches.

3. Number of Copies: Submit four copies of each submittal. Contracting Officer will return one copy.

D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.

2. Identification: Attach label on unexposed side of Samples that includes the following:

a. Generic description of Sample.

b. Product name and name of manufacturer.

c. Sample source.

d. Submittal Number and title of appropriate Specification Section.

3. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

4. Samples for Initial Selection: Submit manufacturer’s color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

P a g e | 17

a. Number of Samples: Submit two full set(s) of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer’s product line. Contracting Officer will return submittal with options selected.

5. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.

a. Number of Samples: Submit four sets of Samples. Contracting Officer will retain three Sample sets;

remainder will be returned. Retain Sample set as a Project Record Sample.

E. Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material. Every effort will be made by the National Park Service to approve these materials.

2.2 INFORMATIONAL SUBMITTALS

A. General: Prepare and submit Informational Submittals as required in this SOW or as requested by the CO.

1. Number of Copies: Submit Informational Submittals electronically whenever possible. When submitting on paper, provide three copies of each submittal, unless otherwise indicated. Contracting Officer will not return copies.

2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Informational submittals that do not comply with the requirements specified in the Contract Documents will be rejected and one copy will be returned.

PART 3 - EXECUTION

3.1 CONTRACTOR’S REVIEW

A. Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions.

3.2 CONTRACTING OFFICER’S ACTION

A. General: Submittals will be returned disapproved without technical review if identification information is missing, not filled in, or if placed on the back of the submittal; an incorrect number or format of submittals is provided; the transmittal form is incorrectly filled out; submittals are not coordinated; or submittals do not show evidence of Contractor’s approval.

1. Any work done or orders for materials or services placed before approval shall be at the Contractor’s own risk.

B. Action Submittals: Contracting Officer will review each submittal, make marks to indicate corrections or modifications required, and return one copy. Contracting Officer will annotate the CM-16 Transmittal Form indicating the action taken, as follows:

1. The returned submittal will be marked in one of three ways as defined below:

a. APPROVED: Acceptable with no corrections.

b. APPROVED WITH NOTATIONS: Minor corrections or clarifications required. All comments are clear and no further review is required. The Contractor shall address all review comments when proceeding with the work.

c. DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. The Contracting Officer will identify the reasons for disapproval. The Contractor shall revise and resubmit with changes clearly identified.

P a g e | 18

C. Informational Submittals: Contracting Officer will review each submittal and will not return it, or will reject and return one copy if it does not comply with the requirements. Contracting Officer will forward each submittal to appropriate party.

D. Partial submittals are not acceptable, will be considered non-responsive, and will be returned without review.

END OF SECTION

LIST OF REQUIRED SUBMITTALS

1.0 Submittals Due Prior to Issuance of Notice to Proceed

1.1 Contracting General Conditions - includes bond, insurance, list of subcontractors, and all other legal documents and certifications required by the CO to execute the contract. Submittals should be sent directly to CO for approval. No transmittal slip required.

2.0 Submittals Due After Issuance of Notice to Proceed and Prior to Start of Work On Site

2.1 Designation letter and description of qualifications of Superintendent.

2.2 Quality Control Plan

2.3 Accident Prevention / Safety Plan

2.4 Construction Schedule

2.5 Coordination Meeting Summary Report

2.6 Product Data – Exterior Siding

2.7 Product Data – Gutter & Downspout & Flashing Materials (for new section on rear of building and to replace any damaged items

3.0 Submittals Due During Project Execution and Prior to Final Inspection Request

3.1 Construction Schedule Updates, Construction Schedule Revisions & Time Impact Analysis.

3.2 Contractor Quality Control Daily Reports

4.0 Submittals Due at Close Out Meeting

4.1 As-built drawings

4.2 Product and Workmanship Warranties

P a g e | 19

Attachment B – Work Site Location and Headquarters Location

CANYON RIM SIDING PROJECT

Canyon Rim Visitor Center is located at 162 Visitor Center Road in Lansing, WV which is just due north of Fayetteville, WV. It is right off Route 19 and is approximately 11 miles north of the NPS Headquarters, which is located at 104 Main Street in Glen Jean, WV.

HQ

CRVC

P a g e | 20

Attachment C – Staging Areas for CRVC Siding Project

Red Square – Main Staging Area

Yellow Stars – Cut Areas

P a g e | 21

ATTACHMENT D – PHOTOS OF SIDING AND SOFFIT LOCATIONS

1 – NORTH BACK DOOR SIDING (Line demarcates ALCOVE from STAIRWELL)

1 – NORTH BACK DOOR (SOFFIT TOWARDS EMPLOYEES DOOR)

1 – NORTH BACK DOOR (SOFFIT OVER RESTROOM DOOR)

P a g e | 22

1 – NORTH BACK DOOR & 14 – WEST STAIRWELL SOFFITS

2 NORTH ROOF SIDING

3 – NORTH FRONT DOOR SIDING & SOFFIT

P a g e | 23

3 – NORTH FRONT DOOR SOFFIT (CORNER OF 6 EAST PITCHED SIDING)

4 – NORTH FRONT WINDOW

4 – NORTH FRONT WINDOW SIDING & SOFFIT

P a g e | 24

4 – NORTH FRONT WINDOW SOFFIT & 5 – EAST WINDOW “THIN” SOFFIT

5 – EAST FRONT WINDOW & 4 – NORTH FRONT WINDOW & 6 – EAST PITCHED SIDING

6 – EAST PITCHED SIDING

P a g e | 25

P a g e | 26

7 – EAST AUDITORIUM SIDING & 6 – EAST PITCHED SIDING

7 – EAST AUDITORIUM SIDING & 6 – EAST PITCHED SIDING

7 – EAST AUDITORIUM SIDING

P a g e | 27

7 – EAST AUDITORIUM SIDING & 18 SOUTH WALKWAY SIDING

7 – EAST AUDITORIUM SIDING & 17 SOUTH3 SIDING SOFFIT

8 – EAST BACK WALKWAY SIDING & 18 – EDGE OF SOUTH WALKWAY SOFFIT

P a g e | 28

9 – EAST AUDITORIUM CORNER SIDING

10 – WEST EXHIBIT SIDING & 17 – SOUTH3 SOFFIT

11 – WEST PITCHED SIDING

P a g e | 29

P a g e | 30

11 – WEST PITCHED SIDING &…