This document provides specifications for mechanical, electrical, plumbing and fire suppression system rehabilitation work at the Rose Farmhouse within Gettysburg National Military Park in Gettysburg, Pennsylvania. The scope of work includes building systems such as mechanical, plumbing, electrical and fire suppression systems. Construction must take place during normal business hours between 7:00 a.m. and 4:30 p.m., Monday through Friday, excluding federal holidays. The contractor will be responsible for locating and preventing damage to known utilities, and for repairs to known or unknown utilities if damage occurs. Smoking is prohibited in all park structures. The contractor must coordinate construction operations between different trades and with the park to ensure efficient installation of work and avoid conflicts. The related federal contract opportunity is solicitation number 140P4223R0023 for the Rose Farmhouse mechanical, electrical and plumbing rehabilitation project issued by the National Park Service Northeast Region of the Department of the Interior.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gettysburg National Military Park Gettysburg, PA
Rose Farmhouse Mechanical, Electrical and Plumbing Rehabilitation
(PMIS 307356)
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 – GENERAL
1.1 SUMMARY
A. Project Location: Within the Gettysburg National Military Park approximately 3 miles southwest of the town of Gettysburg at 1300 Emmitsburg Road, Gettysburg, PA 17325.
B. The Work includes building systems:
i. Mechanical
ii. Plumbing
iii. Electrical
iv. Fire Suppression Systems
1.2 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:00 a.m. to 4:30 p.m., Monday through Friday. No Federal Holidays. On each occasion the Contractor intends to work during hours other than those indicated above, the Contractor shall obtain written permission from the Contracting Officer at least three business days in advance.
1.3 SUMMARY OF WORK
A. Existing Utilities
i. Existing Utilities: Notify COR and utility companies of proposed locations and times for Excavation.
ii. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
iii. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
iv. Nonsmoking Building: Smoking is not permitted within Park structures.
1.4 CONSTRUCTION COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of the
Specifications to ensure efficient and orderly installation of each part of the Work.
Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.
i. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
ii. Make adequate provisions to accommodate items scheduled for later installation.
B. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
i. Preparation of Contractor's Construction Schedule.
ii. Preparation of the Schedule of Values.
iii. Delivery and processing of submittals.
iv. Progress meetings.
v. Project closeout activities.
The park will complete all construction work utilizing the park’s own construction project management and work crews.
1.5 Work related to Building Systems will be performed by the contractor. This work includes
Mechanical, Electrical, Plumbing and fire suppression. Refer to Attachment 2 MEP specification and Attachment 3 Drawings for details.
1.6 Any work not related to the Mechanical, Electrical, Plumbing or fire suppression is not the responsibility of the contractor. However, the contractor is responsible for any final cutting and patching after the installation of the building systems.