This statement of work outlines requirements for establishing a communications site lease at Fremont Peak to support the Central Coast resource area for the Bureau of Land Management California State Office Telecommunications program. Key requirements include providing a secure facility to house BLM equipment including two repeaters, duplexers, amplifiers, and mounting the equipment in a 6'x19" rack. The site must provide 24/7/365 access and meet or exceed current coverage needs as shown in the attached plot. Additional needs involve tower access for two antennas according to Motorola R56 standards, independent power via solar or other means, cable routing, and providing the BLM ongoing access to the site and gates leading to it. The related federal contract opportunity is for a base year plus four option years for the Fremont Peak communications site lease through the Department of the Interior Bureau of Land Management California Region under solicitation 140L1223Q0103.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Attachment_2_JOFOC_1.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Fremont Peak Repeater Coverage Improvement
Introduction:
The Bureau of Land Management (BLM) California State Office Telecommunications program proposes to temporarily continue to provide service for the Central Coast office.
The Admin and Law Enforcement (LE) staff support Central Coast resource area. This repeater will provide additional coverage improvements for all BLM staff supporting Central Coast resource area.
Objective:
The BLM staff needs to establish a communications site lease at Fremont Peak to support the Central Coast resource area. This will improve safety of BLM employees that have the need to use radios while working in the field.
Statement of Work:
1. The BLM staff needs to establish a communications site lease at Fremont Peak to support the California Desert District two way radio infrastructure.
2. The vendor will provide a secure place for the BLM owned equipment
3. Site must be in an enclosed facility away from the outside elements
4. Site must have lights and power receptacles in it
5. Site must meet or exceed Motorola R56 standards.
6. The site must be capable storing two BLM Codan Model MT4E repeaters, two Sinclair duplexers Model Q2220E, Astron 50M –BB power supply, Low voltage disconnect, Battery tray, Two gel cell batteries, Band Pass Cavities, Pre Amplifier, hybrid combiner, two Crescend Amplifiers, and the equipment needs to be mounted into a 6’ 0” H / 19” W equipment rack.
7. The site must meet or exceed current coverage plot areas. Current coverage plot attached.
8. The site must be secure and have 24-7 / 365 access.
9. Site must have a tower capable of having two Celewave PD-220‘s or equivalent mounted to it with the appropriate mounting brackets.
10. Site must not cause interference to any of the BLM’s equipment.
11. The site must have the ability to expand to an additional 6’ 0” H / 19” W 19” rack for equipment in the future.
12. Site must have a cable runway to neatly run coax up and down the tower.
13. Cable run way must have cushions, snap in’s, or industry standard hangers to neatly route coax
14. The tower and all tower components must meet or exceed Motorola R56 standards.
15. The tower must be able to be climbed by BLM or BLM contracted personnel
16. Site must have an ICE bridge or equivalent to run coax / heliax from the tower to the facility / vault.
17. Site must be able to be accessed with a vehicle
18. Site must have the a cable entry port to run LDF4-50 or LDF5-50
19. Site must have power connected to it (Power company or Solar)
20. Site must have an internal cable runway
21. Site must have a keyed or combination access
22. If the site has alarm access the BLM must be given the access code
23. Equipment rack needs to have a receptacle above the rack to plug in 110VAC power supply
24. Equipment rack receptacle needs to have an independent circuit breaker (15 or 20 amp)
25. The BLM needs to have 24-7 / 365 access to all gates that lead to the communication site.
26. If site goes across private land the BLM needs to have the ability to receive a right away from the site to access site at no additional cost to the BLM.