This document contains a past performance questionnaire for a federal solicitation. The National Park Service is seeking to install a dry pipe sprinkler system at the Martin Luther King Jr. National Historical Park in Atlanta, Georgia. The installation must include running piping through the building, attic, porch, and exterior areas, and utilize both a nitrogen generator system and a dry pipe valve installed in an equipment cabinet. Offerors are to provide references from previous relevant contracts, who will receive this questionnaire to evaluate the offeror's past performance. The questionnaire asks for contract details, ratings on criteria such as meeting requirements, timeliness, and quality of work, as well as an overall rating and comments. Responses are due before the closing date for solicitation number 140P5123R0004.
View the file
Other files for this federal contract opportunity
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP #140P5123R0004 - Attachment 0006
PAST PERFORMANCE QUESTIONNAIRE
Solicitation#140P5123R0004
Please complete this Questionnaire and Submit with your Quote
We are currently in the process of preparing our proposal for the National Park Service, Interior Region 2
South Atlantic Gulf, Solicitation Number: 140P5123R0004 for the Installation of a dry pipe sprinkler system through the building, including the attic, porch, and under exterior eaves and roof gables. Dry pipe system shall utilize a nitrogen generator system and both the N2 system and the dry pipe valve shall be installed in cabinet assembly Manufactured and supplied by the manufacturer of the dry pipe valve for
497 and 503 Auburn Avenue Martin Luther King, Jr. National Historical Park Atlanta, Georgia per the specification, drawings, and other supporting documents. As part of our proposal, we have listed you as a reference on our performance for this type of service with your agency under the previous/current contract listed below. Your input on our performance is therefore requested.
Please complete this Questionnaire and submit with your quote
Questionnaire is due to prior to the closing of RFP #140P5123R0004.
Alternate POC name:
Alternate POC phone number:
Alternate POC e-mail address:
Thank you.
NAME OF OFFEROR:
Phone: ________________________ Fax: _____________________
E-Mail: _______________________
I. Current or Historical Contract Information
CONTRACT REFERENCED:
1. Contract or Identifying Number:
2. Contract Value:
3. Period of Performance:
4. Brief description of items provided:
5. Name of Person Completing Questionnaire:
Agency/Company:
Title: Phone:
E-mail:
mailto:Please%20complete%20this%20Questionnaire%20and%20e-mail%20to%20edward_dingle@nps.gov mailto:Please%20complete%20this%20Questionnaire%20and%20e-mail%20to%20Contracting%20Officer,%20e-mail:%20edward_dingle@nps.gov
II. EVALUATION. Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed.
Evaluation Definitions –
The following definitions should be used in the assessment of Contractor performance.
EXCEPTIONAL
Performance EXCEEDS MOST contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns.
VERY GOOD
Performance EXCEEDS SOME contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns, for which the Contractor’s corrective actions were highly effective.
SATISFACTORY
Performance MEETS contractual requirements. The performance of the areas being assessed contains minor issues or concerns, for which corrective actions taken by the Contractor were effective.
MARGINAL
Performance MEETS SOME contractual requirements. The performance of the areas being assessed includes significant problems, issues, or concerns for which corrective actions taken by the Contractor were only somewhat effective.
UNSATISFACTORY
Performance DOES NOT MEET contractual requirement. The performance of the areas being assessed includes serious problems, issues, or concerns for which the Contractor’s corrective actions were ineffective.
NOT APPLICABLE (N/A)
Performance information not recent or relevant as defined in the Solicitation. Unable to provide assessment.
Past Performance Evaluation
Question 1. Performance
What is your assessment of the Contractor’s ability to meet your requirements?
Exceptional Very Good Satisfactory Marginal Unsatisfactory N/A
Performance
Comments, if any.
Questions 2 and 3. Timeliness
What is your assessment of the Contractor’s ability to provide products in a timely manner?
Timeliness
Ability to
Resolve
Timeliness
Problems
Question 4. Quality of Work
What is your assessment of the Contractor’s ability to meet requirements of tasks and the overall quality of the work?
Quality of
Shipments
Question 5. Overall Rating of Contractor’s performance
What is your overall rating of Contractor’s performance (requirements, schedule, and price) on contract being assessed?
Exceptional Very Good Satisfactory Marginal Unsatisfactory