B08_140P5123R0004_Attach_0005_Price_Sched_MALU_Install_Fire_Suppression_System.xls
XLS spreadsheet 46 KB Posted
- Attached to
- Install Fire Suppression System Federal contract opportunity
- Solicitation number
- 140P5123R0004
About this file
This document contains a price schedule and solicitation for the installation of a fire suppression system at two addresses within the Martin Luther King Jr. National Historical Park in Atlanta, Georgia. The solicitation requests pricing for the installation of a dry pipe sprinkler system throughout the buildings at 497 and 503 Auburn Avenue, including the attic, porch, and exterior areas. The dry pipe system is required to utilize a nitrogen generator system, with the nitrogen system and dry pipe valve to be installed in a cabinet assembly manufactured and supplied by the manufacturer of the dry pipe valve. Offerors must submit pricing for the base line item and all option line items, with lump sum pricing to include a detailed cost breakdown. Pricing terms require unit pricing along with extended totals, and calculations are to be rounded to whole dollars. The involved agency is the Department of the Interior National Park Service Southeast Region.
View the file
Other files for this federal contract opportunity
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Quote
| SOLICITATION PRICE SCHEDULE | ||||||
| SOLICITATION NUMBER: 140P5123R0004 PROJECT TITLE: Replace Fire Suppression System at 497 & 503 Auburn Avenue Martin Luther King, Jr. National Historic Park, Atlanta, GA | ||||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. | ||||||
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE | |
| 1 | Installation of a dry pipe sprinkler system through the building, including the attic, porch, and under exterior eaves and roof gables. Dry pipe system shall utilize a nitrogen generator system and both the N2 system and the dry pipe valve shall be installed in cabinet assembly | |||||
| manufactured/supplied by the manufacturer of the dry pipe valve. at Martin Luther King, Jr. National Historical Park 501 Auburn Avenue, NE, Atlanta, Georgia per the attached specifications, drawings, and other supporting documents. | 1 | LS | ||||
| TOTAL PROPOSED PRICE | ||||||
| NOTE: PLEASE PROVIDE A DETAILED COST BREAKOUT OF YOUR LUMP SUM PRICE PROPOSAL WITH ATTACHMENT 0004. ALL COSTS ASSOCIATED WITH YOUR PRICE PROPOSAL SHALL BE INCLUDED. PLEASE PROVIDE COST BREAKDOWN ON THE DETAILED COST BREAKDOWN TAB. |
&RPARK - PMIS
CPS - &P
Detailed Cost Breakdown
| SOLICITATION PRICE SCHEDULE | ||||||||||||||||
| SOLICITATION NUMBER: 140P5123R0004 PROJECT TITLE: Replace Fire Suppression System at 497 & 503 Auburn Avenue Martin Luther King, Jr. National Historic Park, Atlanta, GA | ||||||||||||||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. | ||||||||||||||||
| Bid Item No. | Bid Item Description | Total Material Cost | Total Labor Cost | Total Equipment Cost | Total Direct Construction Costs | Design Contingency | General Conditions | General Contractor Overhead | General Contractor Profit | Contracting Method Adjustment | Inflation Escalation | Insurance, Permits, Bond | Bid Item Total | |||
| APR | Months | |||||||||||||||
| Bid Item: 1 | 497 Auburn Avenue | TOTAL VALUE OF GOVERNMENT FURNISED PROPERTY if any : | $ - | |||||||||||||
| C30 | Interlor Flnlshes | $ | $ | $ | $ | |||||||||||
| D40 | Flre Protectlon | $ | $ | $ | $ | |||||||||||
| G10 | Slte Preparatlon | $ | $ | $ | $ | |||||||||||
| G20 | Slte mprovements | $ | $ | $ | $ | |||||||||||
| G30 | Slte Mechanlcal Utllltles | $ | $ | $ | $ | |||||||||||
| Total - Bid Item | 1 | 497 Auburn Avenue | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| Bid Item: 2 | 503 Auburn Avenue | TOTAL VALUE OF GOVERNMENT FURNISED PROPERTY if any : | $ - | |||||||||||||
| C30 | Interlor Flnlshes | $ | $ | $ | $ | |||||||||||
| D40 | Flre Protectlon | $ | $ | $ | $ | |||||||||||
| G10 | Slte Preparatlon | $ | $ | $ | $ | |||||||||||
| G20 | Slte mprovements | $ | $ | $ | $ | |||||||||||
| G30 | Slte Mechanlcal Utllltles | $ | $ | $ | $ | |||||||||||
| Total - Bid Item | 2 | 503 Auburn Avenue | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | $ | |
| Total Bid Items 1-2 | $ | $ | $ | $ | $ | $ | $ | $$ | $ | $ | $ |