B08_140FGA24R0008_Att_18_Proposal_Pricing_Schedule.pdf
PDF 66 KB Posted
- Attached to
- Pahranagat NWR Upper Dam Design/Build Project
- Solicitation number
- 140FGA24R0008
About this file
This document is a Proposal Pricing Schedule related to a Design-Build Services solicitation for the Repair and Maintenance of Upper Lake Dam, Ditch, and Associated Water Control Structures at the Pahranagat National Wildlife Refuge.
The solicitation, issued by the U.S. Fish and Wildlife Service, requires the contractor to provide a detailed breakdown of their proposal pricing, including a base bid for design and construction tasks for the Upper Lake Dam, Ditch, and Drain Inlet, as well as optional bid tasks for permits and additional construction work. Pricing is required for all line items, and failure to provide pricing may result in the bid not being considered for award. The document organizes the pricing into base tasks and optional tasks, with the contractor required to provide unit prices and total line item prices. The overall grand totals for the base tasks and base plus optional tasks are to be provided.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAHRANAGAT NATIONAL WILDLIFE REFUGE
DESIGN-BUILD SERVICES FOR THE:
Repair and Maintenance of Upper Lake Dam, Ditch, and Associated Water Control Structures
PPR PROPOSAL SCHEDULE
INSTRUCTIONS:
The Offeror shall edit this Proposal Schedule and provide a detailed breakdown of their Proposal (including support documentation) and all associated line item pricing. It is the responsibility of the Offeror to ensure all requirements are met and all support documentation is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks and Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Contractor shall show pricing for items. Failure to provide pricing for all items may result in bid not being considered for award.
Line Item Number Description Quantity Unit Price Unit Total Line Item Price
10 Base Tasks 1 - 12. Design and Construction.
Upper Lake Dam Rehabilitaiton and Restoration.
20 Base Tasks 1 - 9. Design.
Upper Lake Ditch
30 Base Tasks 1 - 9. Design.
Drain Inlet.
40 Option Tasks A - C. Permits.
Upper Lake Dam Rehabilitation and Restoration.
50 Option Tasks A - C. Permits.
Upper Lake Ditch.
60 Option Tasks A - C. Permits.
Drain Inlet.
70 Option Task D, E - E.g . Construction.
Drain Inlet. New SWFL Diversion Structure, Monitoring Structure, Diversion Channel, Box Culvert, and Stream Channel Restoration.
80 Option Tasks F, G - G.e, H - H.c, and I . Construction.
Upper Lake Ditch. Habitat Restoration, Upper Supply Ditch Restoration, New Monitoring Structure, Flume Monitoring Structure, Culverts, Screw Gates, Below Grade Pipeline.
Grand Total (Base Tasks, Base Items 10 - 30) $0.00 Grand Total (Base Tasks and Option Tasks, Base and Option Items 10 - 80) $0.00
File details come from the government source that posted it. Updated .