B08_140FGA24R0008_Att_18_Proposal_Pricing_Schedule.pdf

PDF 66 KB Posted

Attached to
Pahranagat NWR Upper Dam Design/Build Project
Solicitation number
140FGA24R0008
Issued by

About this file

This document is a Proposal Pricing Schedule related to a Design-Build Services solicitation for the Repair and Maintenance of Upper Lake Dam, Ditch, and Associated Water Control Structures at the Pahranagat National Wildlife Refuge.

The solicitation, issued by the U.S. Fish and Wildlife Service, requires the contractor to provide a detailed breakdown of their proposal pricing, including a base bid for design and construction tasks for the Upper Lake Dam, Ditch, and Drain Inlet, as well as optional bid tasks for permits and additional construction work. Pricing is required for all line items, and failure to provide pricing may result in the bid not being considered for award. The document organizes the pricing into base tasks and optional tasks, with the contractor required to provide unit prices and total line item prices. The overall grand totals for the base tasks and base plus optional tasks are to be provided.

View the file

Other files

File Type Posted
Amendment_2_Q_A__08-02-2024_0002.pdf PDF
Sol_140FGA24R0008_Amd_0002.pdf PDF
PNWR__Upper_Lake_Dam__Project_Nomination_0002.pdf PDF
PNWR__Statement_of_Work__Upper_Lake_Dam__08-02-2024_0002.pdf PDF
PNWR__Draft_Environmental_Assesment_0001.pdf PDF
Sol_140FGA24R0008_Amd_0001.pdf PDF
Amendment_1_Q_A_0001.pdf PDF
B08_140FGA24R0008_Att_12_Construction_Management.pdf PDF
B08_140FGA24R0008_Att_19_Quick_Entry_Data_Form.pdf PDF
B08_140FGA24R0008_Att_7_Pahranagat__North_Unit_Cross_Dike_Rehabilitation.pdf PDF
B08_140FGA24R0008_Att_13_Project_Location_Map_1.pdf PDF
B08_140FGA24R0008_Att_11_360_FW1__Summary_of_Construction_Permits.pdf PDF
B08_140FGA24R0008_Att_5_Pahranagat__Islands_and_Water_Control_Structures.pdf PDF
B08_140FGA24R0008_Att_4_Pahranagat__North_Unit_Cross_Dike_and_Islands.pdf PDF
B08_140FGA24R0008_Att_6_Pahranagat_Water_Control_Replacement_Structure.pdf PDF
B08_140FGA24R0008_Att_8_-_Upper_Dam_Report.pdf PDF
B08_140FGA24R0008_Att_17_Wage_Rates.pdf PDF
B08_140FGA24R0008_Att_16_Project_Location_Map_4.pdf PDF
B08_140FGA24R0008_Att_3_Pahranagat__Outlet_Works__Record_Drawings.pdf PDF
B08_140FGA24R0008_Att_1_Statement_of_Work.pdf PDF
B08_140FGA24R0008_Att_2_Pipeline__Record_Drawings.pdf PDF
B08_140FGA24R0008_Att_20_Dam_Safety_Report.pdf PDF
B08_140FGA24R0008_Att_15_Project_Location_Map_3.pdf PDF
B08_140FGA24R0008_Att_9_Upper_Cross_Dike_Report.pdf PDF
B08_140FGA24R0008_Att_10_Safety_and_Design_Checklists.pdf PDF
B08_140FGA24R0008_Att_14_Project_Location_Map_2.pdf PDF
Sol_140FGA24R0008.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAHRANAGAT NATIONAL WILDLIFE REFUGE

DESIGN-BUILD SERVICES FOR THE:

Repair and Maintenance of Upper Lake Dam, Ditch, and Associated Water Control Structures

PPR PROPOSAL SCHEDULE

INSTRUCTIONS:

The Offeror shall edit this Proposal Schedule and provide a detailed breakdown of their Proposal (including support documentation) and all associated line item pricing. It is the responsibility of the Offeror to ensure all requirements are met and all support documentation is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks and Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Contractor shall show pricing for items. Failure to provide pricing for all items may result in bid not being considered for award.

Line Item Number Description Quantity Unit Price Unit Total Line Item Price

10 Base Tasks 1 - 12. Design and Construction.

Upper Lake Dam Rehabilitaiton and Restoration.

20 Base Tasks 1 - 9. Design.

Upper Lake Ditch

30 Base Tasks 1 - 9. Design.

Drain Inlet.

40 Option Tasks A - C. Permits.

Upper Lake Dam Rehabilitation and Restoration.

50 Option Tasks A - C. Permits.

Upper Lake Ditch.

60 Option Tasks A - C. Permits.

Drain Inlet.

70 Option Task D, E - E.g . Construction.

Drain Inlet. New SWFL Diversion Structure, Monitoring Structure, Diversion Channel, Box Culvert, and Stream Channel Restoration.

80 Option Tasks F, G - G.e, H - H.c, and I . Construction.

Upper Lake Ditch. Habitat Restoration, Upper Supply Ditch Restoration, New Monitoring Structure, Flume Monitoring Structure, Culverts, Screw Gates, Below Grade Pipeline.

Grand Total (Base Tasks, Base Items 10 - 30) $0.00 Grand Total (Base Tasks and Option Tasks, Base and Option Items 10 - 80) $0.00