B.084 CBPS - 26RA001 MADF Renovations.xlsx
XLSX spreadsheet 29 KB Posted
- Solicitation number
- W912ER26RA001
About this file
This file is a Proposal Schedule and Cost Breakdown spreadsheet for the Kuwait Missile Assembly/Disassembly Facility (MADF) Renovations project, solicitation number W912ER26RA001. The project, located at Subhan Air Defense Base in Kuwait, involves comprehensive facility renovation with 14 primary line items including mobilization, geotechnical investigation, design, demolition, fire protection system upgrades, HVAC system replacement, electrical system upgrades, paintbooth replacement, building renovation, canopy construction, site improvements, compressed air system expansion, security system upgrades, and new asphalt installation.
The U.S. Army Corps of Engineers Middle East District is seeking a contractor for this Firm-Fixed Price, Two-Phase Design-Build contract with a total project value estimated between $10-25 million. The project has a 409-calendar day performance period, utilizing NAICS code 236220 for Commercial and Industrial Building Construction, with a small business size standard of $45,000,000. The renovation will be constructed according to Kuwaiti and U.S. building codes, safety, and security standards, requiring comprehensive management, labor, equipment, and materials to complete the full scope of work.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposal Schedule
| PROPOSAL SCHEDULE | |||
| RFP: | W912ER26RA001 | P2 # 505270 | |
| PROJECT: | Kuwait Missile Assembly / Disassembly Facility (MADF) Renovations | ||
| LOCATION: | Subhan Air Defense Base, Kuwait | 12-Aug-08 |
| ITEM NO. | DESCRIPTION | QTY | UNIT | AMOUNT | TOTAL | TOTAL | ||
| Base Bid Items | ||||||||
| 0001 | Mobilization and Demobilization in accordance with the contract documents | 1 | JA | |||||
| 0002 | Geotechnical Investigation and Report in accordance with the contract documents | 1 | JA | |||||
| 0003 | Design in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0004 | Demolition in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0005 | Construct Fire Protection in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0006 | HVAC System Replacement in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0007 | Electrical System Upgrade in accordance with the contract documents | 1 | JA | |||||
| 0008 | Remove and Replace In-Kind Paintbooth in accordance with the contract documents | 1 | JA | |||||
| 0009 | Repair Settled Slab and Fully Renovate Entire Building in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0010 | Construct Exterior Enclosure and Complete Interior Finish of the MADF Canopy in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0011 | Construct Site Civil / Exterior Improvements and Drainage in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0012 | Compressed Air System Expansion in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0013 | Security System Upgrade in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| 0014 | New Asphalt in accordance with the contract documents | 1 | JA | $ | $ | $ | ||
| Total Base Bid Price (ITEMS 0001 - 0014) | $805,900 |
*OUSD has mandated that the "dollars" or "lump sum" units of measure no longer be used on DoD contracts. "JA" will be used for "LS" $805,900
$8,611,972
$805,900
$805,900
$805,900
$8,611,972
$8,611,972
$8,611,972
&9&P of &N
Cost Breakdown Sheet
| COST BREAKDOWN | ||||||||||||||
| RFP: | W912ER26RA001 | P2 # 505270 | ||||||||||||
| PROJECT: | Kuwait Missile Assembly / Disassembly Facility (MADF) Renovations | PROPOSER: | ||||||||||||
| LOCATION: | Subhan Air Defense Base, Kuwait | DATE: | 21-Aug-25 | |||||||||||
| ITEM | DESCRIPTION | UOM | Quantity | DIRECT LABOR COST | DIRECT EQUIPMENT COST | DIRECT MATERIALS COST | SUB CONTRACTOR COST | TOTAL DIRECT COST | INDIRECT COST JOOH | INDIRECT COST HOOH | BOND | TOTAL OVERHEAD/ INDIRECT COST | PROFIT | TOTAL PROPOSED COST |
| % Used | % Used |
| - | - |
| 0001 | Mobilization and Demobilization in accordance with the contract documents |
| 0001AA | Mobilization |
0001AB Demobilization
| Total Price (Items 0001AA - 0001AB) | |
| 0002 | Geotechnical Investigation and Report in accordance with the contract documents |
| 0002AA | Geotechnical Investigation and Report |
| Total Price (Items 0002AA) | |
| 0003 | Design in accordance with the contract documents |
| 0003AA | Design |
| Total Price (Items 0003AA) | |
| 0004 | Demolition in accordance with the contract documents |
| 0004AA | Demolition |
| Total Price (Items 0004AA) | |||
| 0005 | Construct Fire Protection in accordance with the contract documents | ||
| 0005AA | Fire Water Tank | Liters/Gallons | Volume of Tank |
0005AB Reconstruct Fire Protection System
0005AC New Prefabricated - Packaged Fire Pump House
| Total Price (Items 0005AA-0005AC) | |
| 0006 | HVAC System Replacement in accordance with the contract documents |
tc={D8CB1CB9-EC57-475F-91ED-646A5B8C2C82}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Question Sabrina on why she wants this as a separate CLIN 0006AA HVAC - Non Canopy Area Vonarnswaldt, Ernst C (Max) CIV USARMY CETAM (USA): Vonarnswaldt, Ernst C (Max) CIV USARMY CETAM (USA):
Need to phrase this differently KC.2 - Sitework and Utilities UOM KC.2 - Sitework and Utilities Quantity
0006AB HVAC - Canopy Area tc={A7C6CBF0-6C78-448A-BAB9-CA1A76D67775}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Max predicts that there will be a third similar HVAC unit installation to provide a/c for the Canopy area KC.2 - Sitework and Utilities UOM KC.2 - Sitework and Utilities Quantity
| Total Price (Items 0006AA-0006AB) | |
| 0007 | Electrical System Upgrade in accordance with the contract documents |
| 0007AA | Reinstall - Reconstruct Electrical in Non-Canopy Area |
0007AB New Interior Electrical in Canopy Area KC.2 - Sitework and Utilities UOM KC.2 - Sitework and Utilities Quantity
0007AC Reinstall - Reconstruct Telecommunications and Electronic Safety and Security KC.2 - Sitework and Utilities UOM KC.2 - Sitework and Utilities Quantity
| Total Price (Items 0007AA-0007AC) | |
| 0008 | Remove and Replace In-Kind Paintbooth in accordance with the contract documents |
| 0008AA | Remove Paintbooth |
0008AB Replace In-Kind Paintbooth KC.2 - Sitework and Utilities UOM KC.2 - Sitework and Utilities Quantity
| Total Price (Items 0008AA-0008AB) | |
| 0009 | Repair Settled Slab and Fully Renovate Entire Building in accordance with the contract documents |
| 0009AA | Earthwork (Interior) |
0009AB Install New Slab M2
0009AC Reconstruct Interior of Building M2
0009AD Reinstall - Reconstruct Plumbing
0009AE Specialized Facility/Ordinance grounding systems
0009AF Repair / Replace Cracked Bricks and/or other Exterior Finishes
| Total Price (Items 0009AA - 0009AF) | |
| 0010 | Construct Exterior Enclosure and Complete Interior Finish of the MADF Canopy in accordance with the contract documents |
| 0010AA | Construct Exterior Enclosure, PEMB for Canopy Area, Exterior Finishes & Doors |
0010AB Complete "Interior Finish" of the MADF Canopy Area
| Total Price (Items 0010AA - 0010AB) | |||
| 0011 | Construct Site Civil / Exterior Improvements and Drainage in accordance with the contract documents | ||
| 0011AA | Install Stormwater Management System | KC.7 - Sitework and Utilities UOM | KC.7 - Sitework and Utilities Quantity |
| LS | |||
| 0011AB | Install piping to carry water from gutter downspouts away from building |
0011AC Site work to include but not limited to protecting trees
0011AD Exterior Site lighting pole replacement EA
0011AE Replace Sidewalk - Apron around exterior of Building
0011AF Slope Stabilization M2 (Square Meters) Area of Slope Stabilization
0011AG Domestic Water Tank and Booster Pump
| Total Price (Items 0011AA - 0011AG) | |||
| 0012 | Construct Compressed Air System Expansion in accordance with the contract documents | ||
| 0012AA | Compressed Air System Expansion | Square Meters | |
| Total Price (Items 0012AA) | |||
| 0013 | Construct Security System Upgrade in accordance with the contract documents | ||
| 0013AA | Install Security | KC.2 - Sitework and Utilities UOM | KC.2 - Sitework and Utilities Quantity |
| Total Price (Items 0013AA) | |||
| 0014 | New Asphalt in accordance with the contract documents | ||
| 0014AA | Replace Asphalt | M2 |
| Total Price (Items 0014AA) | |
| Total Base Bid Price (ITEMS 0001 - 0014) |
Question Sabrina on why she wants this as a separate CLIN
Max predicts that there will be a third similar HVAC unit installation to provide a/c for the Canopy area
&"Arial,Bold"&12EXHIBIT 1 Page &P of &N