Awarded_Pricing_11.09.21.pdf
PDF 226 KB Posted
- Attached to
- Master Agreement AZ|CTR057927
- Contract number
- CTR057927
- Issued by
- Arizona
About this file
This document is an Annual Cathodic Protection Service Agreement for Water Storage Corrosion Control between Corrpro Waterworks (service provider) and the Arizona Department of Corrections (subscriber). The agreement covers multiple facilities within the Arizona Department of Corrections system, including locations at Florence, Globe, Douglas, Safford, Fort Grant, Lewis, Perryville, Yuma, Eyman, Tucson, Winslow, and Apache. The service provider is Corrpro Waterworks, operating under the AEGION brand.
The contract provides annual cathodic protection inspection and maintenance services for water storage tanks across the identified facilities, with each service classified as Plan "C" and priced at $725.00 per tank per year. Services include tank-to-water potential profiling, electrical measurements of anode and reference cells, inspection and cleaning of rectifiers and controls, system adjustment for optimum corrosion control, and comprehensive reporting with recommendations. The agreement covers 30 individual tanks with capacities ranging from 16,000 to 600,000 gallons, generating a total annual contract value of $21,750.00. The agreement period runs from November 1, 2021 through October 31, 2022, with payment due at the start of the contract period. Additional maintenance or replacement work beyond the standard scope requires subscriber approval and is billed separately.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Product Code Name Price Currency UOM CTR057927-12 ASPC - Winslow / Apache Annual Tank Cathodic Protection Service Plan C 7250000 USD Year CTR057927-11 ASPC - Winslow Annual Tank Cathodic Protection Service Plan C 725.0000 USD Year CTR057927-10 ASPC - Tucson Annual Tank Cathodic Protection Service Plan C 7250000 USD Year CTR057927-9 ASPC - Eyman Annual Tank Cathodic Protection Service Plan C 725.0000 USD Year CTR057927-S ASPC - Yuma Annual Tank Cathodic Protection Service Plan C 725.0000 USO Year CTR057927-7 ASPC - Perryille Annual Tank Cathodic Protection Service Plan C 725.0000 USD Year CTR057927-6 ASPC - Lewis Annual Tank Cathodic Protection Service Plan C 725.0000 USD Year CTR057927-5 ASPC - Safford I Fort Grant Annual Tank Cathodic Protection Service Plan C 725.0000 USD Year CTR057927-4 ASPC - Safford Annual Tank Cathodic Protection Service Plan C 725.0000 USD Year CTR057927-3 ASPC - Douglas Annual Tank Cathodic Protection Service Plan C 725.0000 USD Year CTR057927-2 ASPC - Florence / Globe Annual Tank Cathodic Protection Service Plan C 725.0000 USD Year CTR057927-1 ASPC - Florence Annual Tank Cathodic Protection Service Plan C 725.0000 USD Year
4AEGION®
Stronqer. Safer. Infrastructure.
coFrpFn
Arizona Department of Corrections
1055 West Smith Medina, Ohio 44256 Phone: (330) 725-6681 Fax: (330) 723-6065
I Annual Cathodic Protection Service Agreement for Water Storage Corrosion Control per AWWA D104
Our minimum standard scope of work for each system includes:
1. Tank-to-water potential profile within tank to monitor effectiveness of system on submerged metal surface of tank.
2. Electrical measurements to test anode and reference cells.
3. Inspect, test and clean rectifier, controls, meters, contacts, connections. Replace fuses as required.
4. Adjust system for optimum corrosion controL on submerged metal surface of tank.
5. Submit report with all data obtained, evaluation of data and recommendations for continued performance.
If required, additional work or maintenance coverage may also be covered in “Type of Service” as indicated.
TANK LOCATION TANK CAPACITY SYSTEM # TYPE OF SERVICE ANNUAL RATE
ASPC FLORENCE
ASPC FLORENCE
ASPC FLORENCE GLOBE
ASPC DOUGLAS
ASPC SAFFORD
ASPC SAFFORD
PLAN “C”
PLAN “C”
PLAN “C”
PLAN “C”
PLAN “C”
PLAN “C”
$725.00
$725.00
$725.00
$725.00
$725.00
$725.00
TOTAL PRICE $21,750.00
THIS AGREEMENT PROVIDES FOR ONE ANNUAL STANDARD [NSPECTION AS DESCRIBED ABOVE OF THE
CATHODIC PROTECTION CORROSION CONTROL EQUIPMENT LISTED.
Payment is due at the start of the contract period. Additional replacements not included in the service price would be subject to the subscribers approval. The subscriber agrees to hoLd harmless Corrpro Waterworks for damages not covered by Public
Liability, Property Damage and Workman’s Compensation Insurance.
Agreement period: 11/1/2021 THROUGH 10/31/2022
Please return on or before: N/A
ACCEPTED BY CORRPRO WATERWORKS
By:
SUBSCRIBER’S ACCEPTANCE
By:
Title: Assistant Contracts Administrator
Date: November 2,2021
Title:
Date:
250,000
500,000 120,000
60,000 250,000
40,000
TBD
TBD
TBD
TBD
TBD
TBD
Submifted in Duplicate — Please return one signed copy to the above address.
r
!I
AEGION®
Stronger. Safer. Infrastructure:
1055 West Smith Medina, Ohio 44256
Arizona Department of Corrections Phone: (330) 725-6681 Fax: (330) 723-6065
I Annual Cathodic Protection Service Agreement for Water Storage Corrosion Control per AWWA D104 I
Our minimum standard scope of work for each system includes:
1. Tank-to-water potential profile within tank to monitor effectiveness of system on submerged metal surface of tank.
2. Electrical measurements to test anode and reference cells.
3. Inspect, test and clean rectifier, controls, meters, contacts, connections. Replace fuses as required.
4. Adjust system for optimum corrosion control on submerged metal surface of tank.
5. Submit report with all data obtained, evaluation of data and recommendations for continued performance.
If required, additional work or maintenance coverage may also be covered in “Type of Service” as indicated.
TANK LOCATION TANK CAPACITY SYSTEM # TYPE OF SERVICE ANNUAL RATE
ASPC SAFFORD 16,000 TBD PLAN “C” $725.00
ASPC SAFFORD 16,000 TBD PLAN “C” S725.00
SAFFORD/FORT GRANT 500,000 TBD PLAN “C” $725.00
SAFFORD/FORT GRANT 500,000 TBD PLAN “C” $725.00
ASPC LEWIS 500,000 TBD PLAN “C” $725.00
ASPC LEWIS 500,000 TBD PLAN “C” $725.00
PACE 2 OF 5
THIS AGREEMENT PROVIDES FOR ONE ANNUAL STANDARD INSPECTION AS DESCRIBED ABOVE OF THE
CATHODIC PROTECTION CORROSION CONTROL EQUIPMENT LISTED.
Payment is due at the start of the contract period. Additional replacements not included in the service price would be subject to the subscribers approval. The subscriber agrees to hold harmless Corrpro Waterworks for damages not covered by Public Liability, Property Damage and Workman’s Compensation Insurance.
Agreement period: 11/1/2021 THROUGH 10/31/2022
Please return on or before: N/A
ACCEPTED BY CORRPRO WATERWORK$ SUBSCRIBER’S ACCEPTANCE
By:
jU&’t”’7’ By:
Title: Assistant Contracts Administrator Title:
Date: November 2, 2021 Date:__________________________
Submitted in Duplicate — Please return one signed copy to the above address,
r. AEGION® Stronger._Safer._Infrastructure:
1055 West Smith Medina, Ohio 44256
MIKEL SEELY, CIV Phone: (330) 725-6681
DFAS — COLUMBUS CENTER BMDSUP Fax: (330) 723-6065
CONTRACTING DIVISION
P.O. BOX 8368
CAMP LEJEUNE, NC 28547
Annual Cathodic Protection Service Agreement for Water Storage Corrosion Control per AWWA D104 I
Our minimum standard scope of work for each system includes:
1. Tank-to-water potential profile within tank to monitor effectiveness of system on submerged metal surface of tank.
2. Electrical measurements to test anode and reference cells.
3. Inspect, test and clean rectifier, controls, meters, contacts, connections. Replace fuses as required.
4. Adjust system for optimum corrosion control on submerged metal surface of tank.
5. Submit report with all data obtained, evaluation of data and recommendations for continued performance.
If required, additional work or maintenance coverage may also be covered in “Type of Service” as indicated.
TANK LOCATION TANK CAPACITY SYSTEM # TYPE OF SERVICE ANNUAL RATE
ASPC LEWIS 100,000 TBD PLAN “C” $725.00
ASPC LEWIS 100,000 TBD PLAN “C” $725.00
ASPC LEWIS 50,000 TBD PLAN “C” $725.00
ASPC LEWIS 50,000 TBD PLAN “C” $725.00
ASPC PERRYVILLE 500,000 TBD PLAN “C” $725.00
ASPC PERRYVILLE 500,000 TBD PLAN “C” $725.00
THIS AGREEMENT PROVIDES FOR ONE ANNUAL STANDARD INSPECTION AS DESCRIBED ABOVE OF THE
CATHODIC PROTECTION CORROSION CONTROL EQUIPMENT LISTED.
Payment is due at the start of the contract period. Additional replacements not included in the service price would be subject to the subscribers approval. The subscriber agrees to hold harmless Corrpro Waterworks for damages not covered by Public Liability, Property Damage and Workman’s Compensation Insurance.
Agreement period: 11/1/2021 THROUGH 10/31/2022
Please return on or before: N/A
ACCEPTED BY CORRPRO WATERWORKS SUBSCRIBER’S ACCEPTANCE
By:
By:
Title: Assistant Contracts Administrator Title:
Date: November 2, 2021 Date:___________________________________________
Submitted in Duplicate — Please return one signed copy to the above address.
— AEGION cnrrprn
Stronger. Safer. Infrastructure:
1055 West Smith Medina, Ohio 44256
Arizona Department of Corrections Phone: (330) 725-6681 Fax: (330) 723-6065
I Annual Cathodic Protection Service Agreement for Water Storage Corrosion Control per AWWA 0104 1 Our minimum standard scope of work for each system includes:
1. Tank-to-water potential profile within tank to monitor effectiveness of system on submerged metal surface of tank.
2. Electrical measurements to test anode and reference cells.
3. Inspect, test and clean rectifier, controls, meters, contacts, connections. Replace fuses as required.
4. Adjust system for optimum corrosion control on submerged metal surface of tank.
5. Submit report with all data obtained, evaluation of data and recommendations for continued performance.
If required, additional work or maintenance coverage may also be covered in “Type of Service” as indicated.
TANK LOCATION TANK CAPACITY SYSTEM # TYPE OF SERVICE ANNUAL RATE
ASPC VUMA 300,000 TBD PLAN “C” $725.00
ASPC VUMA 300,000 TBD PLAN “C” $725.00
ASPC VUMA 600,000 TBD PLAN “C” $725.00
ASPC YIJMA 275,000 TBD PLAN “C” $725.00
ASPC EYMAN 500,000 TBD PLAN “C” $725.00
ASPC FYMAN 500,000 TBD PLAN “C” $725.00
THIS AGREEMENT PROVIDES FOR ONE ANNUAL STANDARD INSPECTION AS DESCRIBED ABOVE OF THE
CATHODIC PROTECTION CORROSION CONTROL EQUIPMENT LISTED.
Payment is due at the start of the contract period. Additional replacements not included in the service price would be subject to the subscribers approval. The subscriber agrees to hold harmless Corrpro Waterworks for damages not covered by Public Liability, Property Damage and Workman’s Compensation Insurance.
Agreement period: 11/1/2021 THROUGH 10/31/2022
Please return on or before: N/A
ACCEPTED BY CORRPRO WATERWORKS SUBSCRIBER’S ACCEPTANCE
By:
By:
Title: Assistant Contracts Administrator Title:
Date: November 2, 2021 Date:_______________________ jAEGION® rnrrpro Stronger. Safer. Infrastructure?
1055 West Smith Medina, Ohio 44256
Arizona Department of Corrections Phone: (330) 725-6681 Fax: (330) 723-6065
I Annual Cathodic Protection Service Agreement for Water Storage Corrosion Control per AWWA 0104
Our minimum standard scope of work for each system includes:
1. Tank-to-water potential profile within tank to monitor effectiveness of system on submerged metal surface of tank.
2. Electrical measurements to test anode and reference cells.
3. Inspect, test and clean rectifier, controls, meters, contacts, connections. Replace fines as required.
4. Adjust system for optimum corrosion control on submerged metal surface of tank.
5. Submit report with all data obtained, evaluation of data and recommendations for continued performance.
If required, additional work or maintenance coverage may also be covered in “Type of Service” as indicated.
TANK LOCATION TANK CAPACITY SYSTEM # TYPE OF SERVICE ANNUAL RATE
ASPC EYMAN 100,000 TBD PLAN “C” $725.00
ASPC TUCSON 250,000 TBD PLAN “C” $725.00
ASPC TUCSON 500,000 TBD PLAN “C” $725.00
ASPC TUCSON 600,000 TBD PLAN “C” $725.00
ASPC WINSLOW 400,000 TBD PLAN “C” $725.00
ASPC WINSLOW APACHE 250,000 TBD PLAN “C” $725.00
PAGES OF 5
THIS AGREEMENT PROVIDES FOR ONE ANNUAL STANDARD ThJSPECTION AS DESCRIBED ABOVE OF THE
CATHODIC PROTECTION CORROSION CONTROL EQUIPMENT LISTED.
Payment is due at the start of the contract period. Additional replacements not included in the service price would be subject to the subscribers approval. The subscriber agrees to hold harmless Corrpro Waterworks for damages not covered by Public Liability, Property Damage and Workman’s Compensation Insurance.
Agreement period: 11/1/2021 THROUGH 10/31/2022
Please return on or before: N/A
ACCEPTED BY CORRPRO WATERWORKS SUBSCRIBER’S ACCEPTANCE
By:
L4zt&t.UT By:
Title: Assistant Contracts Administrator Title:
Date: November 2,2021 Date:___________________________________________
File details come from the government source that posted it. Updated .