Avalon Boulevard Improvements Martin Luther King Jr Boulevard to 56th Street (Vision Zero Program).pdf
PDF 12 MB Posted
- Attached to
- Avalon Boulevard Improvements Martin Luther King Jr Boulevard to 56th Street (Vision Zero Program)
- Solicitation number
- ECS0132D
- Issued by
- Los Angeles County, California
About this file
This bid proposal is issued by the City of Los Angeles Department of Public Works Bureau of Engineering for the Avalon Boulevard Improvements project from Martin Luther King Jr Boulevard to 56th Street under the Vision Zero Program (Work Order ECS0132D). The project encompasses street and pedestrian safety improvements including upgraded crosswalk markings, traffic signal upgrades, signage, curb extensions, bicycle lane striping, sidewalk repairs, ADA curb ramps, and concrete bus pads. The scope of work includes 195 line items covering general mobilization, traffic control, stormwater pollution prevention planning, clearing and grubbing, pavement removal and installation, drainage improvements, traffic signal modifications, street lighting elements, and striping work. The pre-bid meeting is scheduled for October 6, 2026 at 10:00 a.m. via Google Meet. Bids must be received no later than 10:00 a.m. on November 4, 2026 at Los Angeles City Hall, Room 355. The contract completion time is 547 calendar days with liquidated damages of $3,000 per calendar day. Technical questions must be submitted in writing by October 14, 2026 to Armando Medina in the Street Improvement Division.
The contract is a cash proposal with a fixed cost component for items 5 through 10 totaling $1,220,410.00. The bidder must possess a valid California Contractor's License Classification "A" at the time of bid submission. The project requires a minimum 25 percent subcontracting of the total bid amount (excluding fixed cost items), with the prime contractor required to perform at least 50 percent of the contract price with its own forces. The City's anticipated participation levels are 4 percent MBE, 2 percent WBE, 25 percent SBE, 8 percent EBE, and 3 percent DVBE. A ten percent bid bond is required, and all contractors and subcontractors must be registered with the California Department of Industrial Relations pursuant to Senate Bill 854. The project is subject to the Local Business Preference Program, offering bid reductions of up to 10 percent for certified Local Business Enterprises. All bidders must complete BIP outreach documentation on the Regional Alliance Marketplace for Procurement (RAMP) by 4:30 p.m. the calendar day following bid receipt, or their bid will be deemed non-responsive. The contract is also subject to Project Labor Agreement requirements, prevailing wage standards, and California's Buy Clean California Act for eligible materials.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID PROPOSAL
In and for the
City of Los Angeles, California Department of Public Works
Bureau of Engineering
AVALON BOULEVARD
IMPROVEMENTS MARTIN LUTHER
KING JR BOULEVARD TO 56TH
STREET (VISION ZERO PROGRAM)
W. O. ECS0132D
Rev. 9/13/2017 i
TABLE OF CONTENTS
PAGE
Table of Contents…………………………………..……………..………… 2 pages
Important Notice……………………………………………………………. 5 pages
PART I
Bid Proposal ………………………………………………………………… 1-1
Schedule of Work and Prices……………………………………………… 1-2a thru 1-2h
Responsibility Questionnaire……………………………………………… 1-3a thru 1-3m
Bidder Certification Form 50………………………………..……………… 1-3n
Signature Sheet and Affidavit…………………………………………… 1-4
Bid Bond……………………………………………………………………… 1-5
List of Subcontractors………………………………………………………. 1-6 and 1-7
Vendor and/or Supplier and Broker Participation Recognition………… 1-8
Certification of Compliance with Child Support Obligations…………… 1-9
Equal Benefits Ordinance/First Source Hiring Ordinance …………… 1-10
Iran Contracting Act of 2010 Compliance Affidavit ……………………. 1-11a Thru 1-11c
PART II
City of Los Angeles Non-Discrimination, Equal Employment Practices, Affirmative Action Requirements for Construction Contractors………… 2-1 and 2-2
PART III
Board of Public Works Business Inclusion Program (BIP) Outreach… 3-1 thru 3-22
PART IV
General Instructions and Information for Bidders……..………….…… 4-1 thru 4-7
Senate Bill 854…………………………………………………………… 1 page
Required Insurance and Minimum Limits………………………….…… 1 page
Summary of First-Notice Replies………………………………………… 2 pages
Department of Water & Power Standard Drawing……………………… 6 pages
Holiday Season Street Closure Restrictions…………………………… 11 pages
AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET
(VISION ZERO PROGRAM) - W.O. ECS0132D
Rev. 9/13/2017 ii
PART IV (Cont.)
Board of Public Works Mandatory Subcontracting Minimum………… 2 pages
Board of Public Works “Zero Sanitary Sewer Overflows” Policy…….… 3 pages
City of Los Angeles Labor Compliance Manual………………………… 13 pages
Important Notice Section…………………………………………………… 1 page
Equal Benefits Ordinance………………………………………………… 4 pages
Municipal Lobbying Ordinance……………………………………..……… 24 pages
Disclosure Ordinances Affidavit…………………………………….…… 1 page
Local Business Preference Program……………………………………… 7 pages
Construction & Demolition Waste Recycling Ordinance Compliance Packet (supersedes General Conditions, Article 00221 and General Requirements, Section 01572) …………………………………………… 12 pages
Contractors' Use of Criminal History for Consideration of Employment Applications Ordinance…………………….…………………………….. 1 page
Contractor Evaluation Program…………….. …………………….……… 1 page
Contractor Special Recognition Program.. …………………….………
1 page
Project Labor Agreement (PLA)……………………………………… 68 pages
Public Works Infrastructure Stabilization Policy…………………… 15 pages
Buy Clean California Act Implementation……………………………… 2 pages
Executive Directive 35 Equitable Access to Contracting Opportunities...1 page
ATTACHMENTS
1. Plan Drawings, Index No. P-39629 (74 sheets)
2. Specifications
a. General Conditions
b. General Requirements
c. Technical Specifications
d. Special Provisions
e. Supplemental Information
Rev. 02/22/2022 Page 1 of 5
IMPORTANT NOTICE
A. BIDDER’S SUBMITTALS
Part I - Must be properly completed and submitted to the Board of Public Works no later than the time and date designated on Page 1-1 of the Proposal at Los Angeles City Hall, 200 N. Spring Street, Room 355, Los Angeles, California 90012, Attention: Contract Section.
Changes have been made to the documentation and submittal procedures for the Equal Benefits Ordinance. Refer to the Ordinance in the Table of Contents for additional information.
Part II - Bidders are required to complete and upload the Non-Discrimination/Equal Employment Practices Certification and Affirmative Action Plan Affidavit on the City’s Regional Alliance Marketplace for Procurement (RAMP) at the time of registration on RAMP, but no later than the bid date designated on Page 1-1 of the Proposal. However, Bidders with current OCC approval for their Non- Discrimination/Equal Employment Practices Certification and Affirmative Action Plan Affidavit do not need to re-submit unless the approval is 30 days or less from expiration. In lieu of the Los Angeles City Affirmative Action Plan, the bidder may submit its own Affirmative Action Plan by uploading it onto the City’s RAMP. A bidder’s compliance with the aforementioned Non- Discrimination/Equal Employment Practices and Affirmative Action filing requirements will be a factor in determining the responsiveness of their bid/proposal.
The Non-Discrimination/Equal Employment Practices Certification and the City of Los Angeles Affirmative Action Plan Affidavit shall be effective for a period of twelve months from the date it was approved by the Office of Contract Compliance (OCC) or when it was uploaded onto the City’s RAMP.
Note that significant changes have been made to the documentation and submittal procedures for the Non-Discrimination/Equal Employment Practices and Affirmative Action Plan. Refer to the appropriate Ordinances in the Table of Contents for the instructions and forms. For questions regarding the documents and/or submission procedures, call (213) 847-2625. For technical questions regarding RAMP, use the support link located at the bottom of the web page.
Part III - Submission of the Business Inclusion Program (BIP) Outreach Documentation is mandatory. All bidders must perform their BIP Outreach Documentation on the City’s Regional Alliance Marketplace for Procurement (RAMP) as described in Part III of the Bid Proposal. All bidders must submit this documentation on the City’s RAMP. All BIP outreach documentation including the summary sheet must be submitted on the RAMP’s BIP Outreach Reports System and must be submitted by 4:30 p.m. of the following City working day from the date bids are received by the Board of Public Works.
Rev. 02/22/2022 Page 2 of 5
NOTE: THE BIDDER’S FAILURE TO PASS THE BIP OUTREACH
DOCUMENTATION PROCESS WILL RENDER THE BID NON-
RESPONSIVE.
B. PRE-BID MEETING - BUSINESS INCLUSION PROGRAM (BIP) OUTREACH
(See Part III of the Proposal)
A pre-bid meeting has been scheduled for October 6, 2026 at 10:00am via Google Meet. Join by Phone: (US) +1 260-676-0005 PIN: 377 105 624# or via Video Link:
meet.google.com/dmf-utdo-yor
The City highly recommends all bidders to attend the pre-bid meeting. The purposes of this meeting are to inform prospective bidders of the scope of work, discuss the submittal requirements, answer any related technical and non-technical questions, explain the provisions relative to the utilization of MBEs, WBEs, OBEs, Small Business Enterprises (SBE), Emerging Business Enterprises (EBE), and Disabled Veteran Business Enterprises (DVBE) and describe how to submit the BIP Outreach Documentation using the City’s RAMP and explain how to obtain a complete set of bid documents, including all addenda, for this project through the City’s RAMP.
The Board of Public Works anticipated level of MBE participation is 4%, WBE participation is 2%, SBE participation is 25%, EBE participation is 8%, and DVBE participation is 3% (See Part III of the Proposal).
C. BIDDER INFORMATION AND ASSISTANCE
Requests for clarification of conflicts and omissions from the contract documents shall be addressed in writing to:
Armando Medina Street Improvement Division (SID) 1149 South Broadway Public Works Building, 8th Floor Los Angeles, CA 90015 E-MAIL: Armando.Medina@lacity.org
The deadline for receipt of written technical questions is October 14, 2026.
D. MANDATORY SUBCONTRACTING MINIMUM (MSM) REQUIREMENT
(See Part IV of the Proposal)
To be eligible for award of this project, the Board of Public Works requires the bidder to subcontract a minimum of 25% of the Total Bid Amount (excluding the Fixed Cost Items designated in the Schedule of Work and Prices) to any qualified, available subcontractor. FAILURE BY THE BIDDER TO SUBCONTRACT THE MINIMUM
PERCENTAGE SPECIFIED HEREIN MAY RESULT IN THE BOARD OF PUBLIC
WORKS DECLARING THE BID NON-RESPONSIVE.
Rev. 02/22/2022 Page 3 of 5
E. CONTRACTOR PARTICIPATION
The Prime Contractor shall perform, with its own organization, contract work amounting to at least 50% of the contract price. Any items designated as specialty items by the City and performed by Subcontractors shall be deducted from the contract price before computing the amount of the work required to be performed by the Prime Contractor with its own forces. This percentage shall be based upon the original contract price, exclusive of specialty items performed by Subcontractors, but include the cost of materials and manufactured products purchased or produced by the Prime Contractor.
F. CONTRACTOR’S LICENSE CLASSIFICATION REQUIRED TO BID
At the time of bid the contractor must possess a valid State of California Contractor's License Classification of "A.”
G. CALIFORNIA STATE SENATE BILL 854:
I. Contractors are advised of the following changes made by California State
Senate Bill 854 to the State of California Department of Industrial Relations:
1. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the California Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
2. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the DIR pursuant to Labor Code section 1725.5.
3. DIR maintains a current list of registered contractors.
https://efiling.dir.ca.gov/PWCR/Search.action
II. Please see the one-page section, “Senate Bill 854” in Part IV of the Bid
Proposal for more information about Senate Bill 854.
H. PLANHOLDERS LIST
The Planholders List is available 24 hours a day and can be obtained via the Bureau of Engineering’s web site at http://eng.lacity.org. Click on Contractors tab; and then click on PLANHOLDERS LIST link.
I. ESCROW BID DOCUMENTS
All Bidders must abide by the requirements listed in the General Requirements, Section 01351 “Escrow Bid Documents,” including the timely submittal of the Escrow Bid Documents by the three low Bidders.
The Escrow Bid Documents shall be submitted to the Board of Public Works Office, by the three (3) low Bidders, in sealed containers, within forty-eight (48) hours after the
AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET
(VISION ZERO PROGRAM) - W.O. ECS0132D
https://efiling.dir.ca.gov/PWCR/Search.action http://eng.lacity.org/
Rev. 02/22/2022 Page 4 of 5 time for receipt of Bids. The containers shall be clearly marked on the outside with the Bidder's name, date of submittal, project name and the words "Escrow Bid Documents."
J. PROJECT LABOR AGREEMENT INFORMATION
The contractor needs to abide by the Project Labor Agreement Information contained in Part IV of this Bid Proposal.
K. LOCAL BUSINESS PREFERENCE PROGRAM
This project is subject to the provisions of the City’s Local Business Preference Program. Los Angeles Administrative Code Division 10, Chapter 1, Article 4, Section
10.25 adopted the Local Business Preference (LBP) Program which was designed to increase local employment and expenditures in the local private sector. All Bidders are eligible to participate in the LBP Program. The City shall grant a six percent (6%) bid reduction of their Bid amount solely for Bid evaluation purposes to those bidders who are certified as a Local Business Enterprise (LBE) firm. If the LBE is also a Local Small Business (LSB) and/or Local Transitional Employer (LTE), they may be granted an additional two percent (2%) reduction for each of those certifications, up to a total of ten percent (10%). The City shall grant a ten percent (10%) bid reduction of their Bid amount solely for Bid evaluation purposes to those Bidders who are certified as a City Business Enterprise (CBE) firm. If the CBE is also a LSB and/or LTE, they may be granted an additional two percent (2%) reduction for each of those certifications, up to a maximum of twelve percent (12%). Additionally, all non-LBE/CBE Bidders may be granted a one percent (1%) bid reduction of their Bid amount solely for Bid evaluation purposes, up to a maximum of five percent (5%), for every ten percent (10%) of their bid that is to be performed by a LBE, CBE, LSB and/or LTE subcontractor.
L. IRAN CONTRACTING ACT OF 2010
In accordance with California Public Contract Code Sections 2200-2208, all bidders submitting proposals for entering into or renewing contracts with the City of Los Angeles for goods and services estimated at $1,000,000 or more are required to complete, sign and submit the “Iran Contracting Act of 2010 Compliance Affidavit.”
M. ELECTRONIC SIGNATURE POLICY
(Types of Documents Permitted for Electronic and Scanned Signature)
This Policy is intended to broadly support the use of electronic signatures.
Departments are encouraged to consult with the City Attorney’s Office if Departments are uncertain if the electronic/scanned signature is acceptable for a document.
However, below are examples of the types of documents where electronic/scanned signatures are allowed:
1. Memos, forms, board letters and other correspondence Electronic/Scanned
2. Contracts Electronic/Scanned
3. Certificates and Permits Electronic/Scanned
4. Notarized Document Scanned
Rev. 02/22/2022 Page 5 of 5
Please note that Ethics Form 50 and 55 must be signed via a software that is accepted by the Ethics Commission (i.e. DocuSign, Adobe). (Issued March 19, 2020)
N. BUY CLEAN CALIFORNIA ACT (BCCA)
I. For projects with a bid due date on or after July 1, 2021 that include eligible materials as part of the permanent work, the successful bidder shall be required to provide current facility-specific Environmental Product Declaration (EPD) for the materials and meet the State of California maximum limits for Global Warming Potential as listed by California's Department of General Services with the applicable submittal.
https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division- Resources-List-Folder/Buy-Clean-California-Act
II. Please see the two-page section, “Buy Clean California Act Implementation” in Part IV of the Bid Proposal for more information about Buy Clean California Act.
THE DOCUMENTS CONTAINED HEREIN HAVE BEEN APPROVED BY:
Arsen Voskerchyan, P.E.
Division Engineer Project Award and Control Division Bureau of Engineering https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-%20%20%20%20%20%20%20%20%20%20%20Resources-List-Folder/Buy-Clean-California-Act https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-%20%20%20%20%20%20%20%20%20%20%20Resources-List-Folder/Buy-Clean-California-Act
PART I
Print and submit with your bid Part I single-sided only except for the “Equal Benefits Ordinance Affidavit” which will be submitted on RAMP.
1-1 Rev. 9/20/2017
PART I OF IV
AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR
BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)
W.O. ECS0132D
In and for the City of Los Angeles
California
TYPE OF CONTRACT CASH
PROPOSAL ATTACHMENTS Plan Drawings: Index No. P-39629 (74 sheets)
SPECIFICATIONS General Conditions, General Requirements, Technical Specifications, Standard Specifications for Public Works Construction (Greenbook) 2012, 2014, 2017, and 2021 Edition* as amended by the City's Brown Book, May 4, 2022 Edition*.
PROJECT LOCATION See Plan Drawings
COMPLETION TIME 547 Calendar Days
LIQUIDATED DAMAGES $3,000 per Calendar Day
BID DATE
Bids must be received no later than 10:00 a.m. on November 4, 2026, at Los Angeles City Hall, 200 North Spring Street, Room 355; Los Angeles, California 90012. Call the Board Office at (213) 978-0262 if you have difficulties gaining access to City Hall.
Firm Name:
Address:
Telephone Number: ( ) Fax Number: ( )
Email Address:
Contractor's License Number: Classification: Expiration Date:
Business Tax Registration Certificate (BTRC) No.:
* Part 1 of the Greenbook and Brown Book are not a part of the Specifications.
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
1 General Mobilization LS
Traffic Control including but not limited to Traffic Mitigation plan, plan preparation and implementation, LADOT permitting and fees.
LS
Prepare and Implement Stormwater Pollution Prevention Plan
(SWPPP)
LS
4 Clearing And Grubbing LS
5 Allowance for Differing Site Conditions, Section 01253 $150,000.00
6 Allowance for Payment for Permits, Section 01292 $10,000.00
Allowance for Relocating Transit Furniture Including
Coordination $18,000.00
8 Allowance for Additional Transit Shelter Work $78,100.00
Allowance for DWP Fire Hydrant Relocations Including
Coordination $460,723.00
Allowance for DWP Water Service Relocations Including
Coordination $513,587.00
11 Unclassified Excavation CY 811
12 Remove Concrete Pavement SF 1,893
13 Remove AC Pavement SF 20,910
14 Remove AC Pavement by Cold-Milling. (2" Min) SF 31,076
15 Remove Concrete Sidewalk, Curb Ramp, Driveway SF 31,641
16 Remove Concrete Integral Curb & Gutter LF 2,225
17 Remove Concrete Curb LF 466
18 Remove Payphone EA 1
19 Remove Tree and Stump EA 1
20 Remove Catch Basin (Drainage) EA 7
21 Crushed Miscellaneous Base CY 1,009
22 Asphalt Concrete Pavement TON 724
23 Concrete Driveway and Alley Intersection (t=6") SF 5,363
24 Concrete Bus Pad (t=8") SF 7,360
Allowance
Street and Sidewalk Removals
Street and Sidewalk Construction
AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR
BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)
W.O. ECS0132D
SCHEDULE OF WORK AND PRICES
City of Los Angeles - Department of Public Works - Bureau of Engineering
General
1-2a
BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)
W.O. ECS0132D
SCHEDULE OF WORK AND PRICES
City of Los Angeles - Department of Public Works - Bureau of Engineering
General25 Concrete Sidewalk (t=4") SF 23,912
26 Concrete Curb Ramp (Including Detectable Warning Surface) EA 49
27 Integral Curb and Concrete Pavement CY 4
28 Type "C" Concrete Integral Curb and Gutter (a= 2 ft., b= 8 in.) LF 2,662
29 Type "A" Concrete Curb LF 483
30 Type A1 Pedestrian Pipe Handrail LF 17
31 Remove and Construct Water Meter Box EA 19
32 Adjust Maintenance Hole to Grade EA 6
33 Adjust Water Valve Cover to Grade EA 10
34 Reconnect Water Service EA 1
35 Adjust Pull Box to Grade EA 4
36 Adjust Communication Pull Box to Grade EA 2
37 Adjust Trash Can to Grade EA 2
38 Reset Sign and Post EA 9
39 Relocate Sign and Post EA 2
40 Tree Well EA 5
41 Root Prune and Trim Tree EA 1
42 Maintenance Hole "EZ" S-381-0 (Drainage) EA 8
43 Junction structure "B" S-302-1 (Drainage) EA 1
44 18" Reinforced Concrete Pipe (RCP) (Drainage) LF 660
45 Concrete Collar S-333-0 (Drainage) EA 1
46 Remodel Curb Drain EA 9
47 Curb Opening Catch Basin (Side Opening Catch Basin) EA 11
48 Remodel Catch Basin S-343-1 EA 1
49 ARS (Automatic Retractable Screen) EA 11
50 REMOVE F-1 OR F-8 FOUNDATION EA 5
51 REMOVE F-2 FOUNDATION EA 17
52 REMOVE F-7 FOUNDATION EA 1
53 REMOVE F-5, 6, OR 14 FOUNDATION (BSL Concrete Poles) EA 3
54 REMOVE CIDH PILE FOUNDATION FOR TYPE 16-26 EA 1
FOUNDATIONS (Traffic Signals)
1-2b
BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)
W.O. ECS0132D
SCHEDULE OF WORK AND PRICES
City of Los Angeles - Department of Public Works - Bureau of Engineering
General55 REMOVE CIDH PILE FOUNDATION FOR TYPE 27-29 EA 1
56 INSTALL F-1 FOUNDATION EA 8
57 INSTALL F-7 FOUNDATION EA 3
58 INSTALL CD953 FOUNDATION EA 12
59 INSTALL F-332 FOUNDATION EA 1
60 INSTALL CIDH PILE FOUNDATION FOR TYPE 16-29 EA 9
61 INSTALL C-1 / C-2 FOUNDATION EA 1
62 REMOVE MAST ARM ONLY EA 4
63 REMOVE TYPE 1, 9 (excluding heads) EA 5
64 REMOVE TYPE 7, 8 (excluding pushbutton/cabinet) EA 1
65 REMOVE CD953 EA 13
66 REMOVE TYPE 2, 3, 5, CD954 (w/ mast arm only) EA 6
67 REMOVE TYPE 24 (w/ mast arm only) EA 1
68 INSTALL MAST ARM ONLY EA 3
69 INSTALL TYPE 1, 9 EA 8
70 INSTALL TYPE 7, 8, 8A EA 3
71 INSTALL CD953 EA 11
72 INSTALL TYPE 16 (w/ mast arm) EA 1
INSTALL TYPE 17 (w/ mast arm, luminaire arm, luminaire & lamp)
EA 2
INSTALL TYPE 19 (w/ mast arm, luminaire arm, luminaire & lamp)
EA 4
INSTALL TYPE 24 (w/ mast arm, luminaire arm, luminaire & lamp)
EA 2
76 REMOVE EXISTING CONTROLLER CABINET EA 1
INSTALL 2070 CONTROLLER / 356 CABINET (w/ wire, Complete Assembly)
EA 1
INSTALL 2070 CONTROLLER / 351 CABINET (w/ wire, Complete Assembly)
EA 1
79 REMOVE TRAFFIC SIGNAL HEAD (Vehicle/Ped/Bike) EA 62
80 REMOVE PEDESTRIAN PUSHBUTTON EA 13
81 INSTALL 3-SECTION 8-in. (R,Y,G) EA 4
STANDARDS (Traffic Signals)
CONTROLLER (Traffic Signals)
HEADS, APS / PPB
1-2c
BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)
W.O. ECS0132D
SCHEDULE OF WORK AND PRICES
City of Los Angeles - Department of Public Works - Bureau of Engineering
General82 INSTALL 3-SECTION 12-in. (R,Y,G) EA 29
83 INSTALL 3-SECTION 12-in. (mast arm) (R,Y,G) EA 12
84 INSTALL 3-SECTION 12-in. (mast arm) (RA,YA,GA) EA 4
85 INSTALL 4-SECTION 12-in. (R,Y,G,GA) EA 4
86 INSTALL ANGLED VISORS EA 1
87 INSTALL PEDESTRIAN HEAD EA 26
88 INSTALL ACCESSIBLE PEDESTRIAN SIGNAL (APS) EA 18
89 INSTALL PEDESTRIAN PUSHBUTTON EA 2
90 REMOVE PULLBOX ONLY, SIDEWALK RESTORATION EA 1
RELOCATE PB-2 UP TO 10' AT INTERSECTION (Extend conduits)
EA 3
RELOCATE PB-3 UP TO 10' AT INTERSECTION (Extend up to 4 conduits)
EA 5
93 ADJUST PULLBOX TO GRADE EA 2
94 INSTALL PB-2 (Composite) EA 11
95 INSTALL PB-3 (Composite) EA 25
96 TRENCH EXCAVATION (concrete) (up to 2 conduits) EA 145
T-TRENCH AND PAVEMENT RESTORATION FOR A/C
STREETS
EA 72
98 INSTALL 2-in. PVC CONDUIT IN OPEN TRENCH EA 167
99 INSTALL 3-in. PVC CONDUIT IN OPEN TRENCH EA 8
PREPARE / EXCAVATE JACKPIT AND RESTORATION (for 25-ft to 150-ft runs)
EA 6
INSTALL 2-in. GALVANIZED CONDUIT, JACKING (SIDEWALK
& STREET)
EA 80
102 INSTALL 3-in. GALVANIZED CONDUIT, JACKING (CROSSING) EA 155
INSTALL 2-in. PVC CONDUIT, DIRECTIONAL BORING
(SIDEWALK & STREET)
EA 136
INSTALL 3-in. PVC CONDUIT, DIRECTIONAL BORING
(CROSSING)
EA 118
JUMPERS BETWEEN TWO PULLBOXES (Any size conduit, up to 10')
EA 8
JOIN & EXTEND CONDUIT WITH PB-3 W/O SWEEPS (includes new PB-3)
EA 3
JOIN & EXTEND CONDUIT WITH PB-3 W/ SWEEPS (includes new PB-3)
EA 3
PULLBOXES
CONDUIT
1-2d
BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)
W.O. ECS0132D
SCHEDULE OF WORK AND PRICES
City of Los Angeles - Department of Public Works - Bureau of Engineering
General
INSTALL 12-PR. INTERCONNECT CABLE (exist. conduit w/ cables) (+10' slack per PB)
EA 299
INSTALL 2-PR. DETECTOR LEAD-IN CABLE (DLC) (new conduit)
EA 836
INSTALL 2-PR. DETECTOR LEAD-IN CABLE (DLC) (existing conduit w/ cables)
EA 362
111 INSTALL 3-CONDUCTOR CABLE (3 x #14) (new conduit) EA 456
112 INSTALL 5-CONDUCTOR CABLE (5 x #14) (new conduit) EA 1,323
INSTALL 5-CONDUCTOR CABLE (5 x #14) (existing conduit w/ cables)
EA 91
114 INSTALL APS 5-CONDUCTOR CABLE (5 x #14) (new conduit) EA 221
INSTALL APS 5-CONDUCTOR CABLE (5 x #14) (existing conduit w/ cables)
EA 858
INSTALL 9-CONDUCTOR CABLE (8 x #14, 1 x #10) (new conduit)
EA 80
INSTALL 13-CONDUCTOR CABLE (12 x #14, 1 x #10) (new conduit)
EA 25
INSTALL 13-CONDUCTOR CABLE (12 x #14, 1 x #10) (existing conduit w/ cables)
EA 105
INSTALL 28-CONDUCTOR CABLE (27 x #18, 1 x #16) (new conduit)
EA 307
120 INSTALL #6 SERVICE WIRES (3 wires) (new conduit) EA 781
INSTALL #6 SERVICE WIRES (3 wires) (existing conduit w/ cables)
EA 281
INSTALL DETECTOR + BICYCLE LOOP WITH UP TO 50-ft.
HOME RUN (6-ft dia.)
EA 25
123 INSTALL DETECTOR LOOP STUB-OUT (curb & gutter) EA 4
124 INSTALL DETECTOR LOOP STUB-OUT (up to 48-in.) EA 4
125 ADDITIONAL STUB-OUT LENGTH LF 6
126 STRIPING SETUP (include for any striping work) EA 1
127 REMOVE 4-in. SOLID SINGLE LINE, PLASTIC LF 1,597
128 REMOVE 8-in. SOLID BARRIER LINE, PLASTIC LF 386
129 REMOVE 12-in. LIMIT LINE, PLASTIC LF 128
130 REMOVE CURB MARKINGS LF 224
131 REMOVE BIKE LANE SYMBOL EA 7
LOOPS
STRIPING
CONDUCTORS
1-2e
BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)
W.O. ECS0132D
SCHEDULE OF WORK AND PRICES
City of Los Angeles - Department of Public Works - Bureau of Engineering
General132 INSTALL GREEN BIKE LANES, MMAX SF 3,317
133 INSTALL 4-in. SOLID SINGLE LINE, PLASTIC LF 271
134 INSTALL 6-in. SOLID SINGLE LINE, PLASTIC LF 25
135 INSTALL 6-in. BROKEN SINGLE LINE, PLASTIC LF 635
136 INSTALL 8-in. SOLID BARRIER LINE, PLASTIC LF 358
137 INSTALL 12-in. LIMIT LINE, PLASTIC LF 69
138 INSTALL CURB MARKINGS LF 1,841
139 INSTALL BIKE LANE SYMBOL EA 4
140 REMOVE SIGN EA 6
141 REMOVE SIGN & POST EA 8
142 RELOCATE STREET NAME SIGN EA 20
143 INSTALL STREET NAME SIGN -- LABOR ONLY EA 4
144 INSTALL SIGN -- LABOR ONLY EA 14
145 LOW-LEVEL STREET NAME SIGN -- MATERIAL ONLY EA 2
146 HIGH-LEVEL STREET NAME SIGN -- MATERIAL ONLY EA 14
147 INSTALL POST EA 1
148 INSTALL SERVICE RISER (down to service pullbox) EA 1
149 INSTALL GROUND ROD / CLAMP EA 1
150 INSTALL FUSE HOLDER AND FUSE (60 amp) EA 1
TEMP. STANDARD INCLUDING SIGNAL HEADS & OVERHEAD
WIRES EA
TEMP. STANDARD INCLUDING SIGNAL HEADS, MAST ARM &
OVERHEAD WIRES EA 1
153 REGULATORY SIGNS -- MATERIAL ONLY EA 10
154 INSTALL 20 ft MAST ARM EA 2
RELOCATE M.A. SIGN / LARGE STREET NAME SIGN (LABOR
ONLY) EA
156 RELOCATE SIGN EA 4
157 INSTALL SPECIAL FOUNDATION EA 2
SIGNS / PARKING METER
MISC (Traffic Signals)
ADDITIONAL ITEMS (Traffic Signals)
1-2f
BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)
W.O. ECS0132D
SCHEDULE OF WORK AND PRICES
City of Los Angeles - Department of Public Works - Bureau of Engineering
General158
RETROFIT EXISTING SIGNAL HEADS (YELLOW
RETROREFLECTIVE BACKPLATES)
EA 43
INSTALL RETROREFELCTIVE BACKPLATES ONTO NEW
HEADS (*excludes new head cost*)
EA 53
160 Remove existing wire per plan LS
Remove & dispose complete foundation, pole, and luminaire per plan
EA 23
162 Remove & dispose of luminaire per plan EA 9
1" galv. cond. (Parkway) incl. excavations and restoring surface to match adjacent surface
EA 24
164 #10 AWG stranded wire per plan LS
165 #8 AWG stranded wire (600v) LS
Pullbox, type 2 Armorcast incl. lid, bends, excavating, & restoring surface to match adj. surface. (buried per plan)
EA 23
167 10 amp fuse kit (includes cartridge fuse) EA 23
Foundation ((CD953,B-3685) incl.cap, excavation all bends & restoring surface to match adj. surf.
EA 13
169 CD953C pole with 4' luminaire arm EA 2
170 CD953C pole with 6' luminaire arm EA 9
171 CD953C pole with 8' luminaire arm EA 2
172 15' luminaire arm for Cal Type pole EA 1
173 12' luminaire arm for Cal Type pole EA 1
174 8' lum arm for Cal Type pole EA 8
175 6' luminaire arm for Cal Type pole EA 1
176 LED luminaire (200W HPS replacement) per plan EA 18
177 LED luminaire (250W HPS replacement) per plan EA 10
178 LED luminaire (310W HPS replacement) per plan EA 11
179 Remote Monitoring Unit EA 39
180 Remove Pullbox LS
181 Remove led luminaire and salvage LS
182 Remove existing wire per plan LS
1" galv. cond. (Parkway) incl. excavations and restoring surface to match adjacent surface
LS
Traffic Signal (Street Lighting Elements)
Street Lighting for Plan Sheets 67-70
1-2g
BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)
W.O. ECS0132D
SCHEDULE OF WORK AND PRICES
City of Los Angeles - Department of Public Works - Bureau of Engineering
General184 #10 AWG stranded wire per plan LS
185 #8 AWG stranded wire (600v) LS
Pullbox relocation including bends, excavating, & restoring surface. To match adj. surface (existing type 2 to be adjusted or relocated per plan)
LS
Pullbox, type 2 Armorcast incl. lid, bends, excavating, & restoring surface to match adj. surface.
LS
188 10 amp fuse kit (includes cartridge fuse) LS
Foundation (CD953, B-3685) incl. cap, excavation all bends & restoring surface to match adj. surf.
LS
190 Foundation per plan (for 15' security lighting) LS
Remove and reinstall pole per plan (arms and luminaires included)
LS
192 LED luminaire (200W HPS Replacement) per plan LS
193 Philips City Touch Lum Controller LS
194 POLE CAP KIT RMU LS
195 PE Cell LS
Unit abbreviation:LF=linear foot, TON=ton, SF=square foot, CY=cubic yard, EA=each, and LS=lump sum
NOTES
TOTAL BID AMOUNT:
C. SPECIALTY ITEMS: Bid Items Nos. 2, 3, 19, 40, 41, 50-139, and 148-195. are designated as "Specialty Items."
A. MOBILIZATION: If the successful bidder shows an amount in excess of $244,700.00 for Mobilization (Bid Item No. 1), the bidder will be paid $244,700.00 per Specification Section 01292 of the General Requirements. The difference between the
Contractor’s bid amount for Bid Item No. 1 and $244,700.00 will be paid after the Statement of Completion has been issued.
B. FIXED COST ITEMS: Bid Item Nos. 5 through 10 are considered Fixed Cost Items at the time of bid. The pre-printed dollar amounts in figures listed in the SCHEDULE OF WORK AND PRICES shall not be changed or deleted.
1-2h
C O N S T R U C T I O N
Responsibility Questionnaire (rev 1/23/2020) 1
CITY OF LOS ANGELES
CONTRACTOR RESPONSIBILITY ORDINANCE (CRO) QUESTIONNAIRE
Unless otherwise exempt from the Contractor Responsibility Ordinance (Los Angeles Administrative Code Section 10.40, et. seq.), a Company/Firm bidding with the City of Los Angeles must complete this Questionnaire. If no bid is required, the prospective contractor still must submit a Questionnaire.
The signatory for this Questionnaire must be authorized to respond to these questions on behalf of the Company/Firm. Any false or misleading statement(s), the failure to answer any of the required questions, or the failure to submit the completed Questionnaire with its bid may render the bid/proposal non-responsive. If a response does not fit in the space provided, then you may submit an attachment with your questionnaire.
The Company is responsible for keeping the Questionnaire responses current. If any changes have occurred that would render any of the responses inaccurate in any way, this document must be updated within thirty
(30) days of the change(s).
A. BIDDER / PROPOSER / PROSPECTIVE CONTRACTOR CONTACT INFORMATION
Business Name Contractor’s License Number
Street Address City State Zip
Contact Person, Title Phone Fax
TYPE OF SUBMISSION:
The Questionnaire being submitted is:
An initial submission of a completed Questionnaire.
An update of a prior Questionnaire dated ______/______/______.
No change. I certify under penalty of perjury under the laws of the State of California that there has been no change to any of the responses since the last Questionnaire dated ____/______/____ was submitted by the firm.
B. BUSINESS ORGANIZATION / STRUCTURE
Indicate the organizational structure of your firm. “Firm” includes a sole proprietorship, corporation, joint venture, consortium, association, or any combination thereof.
Corporation: Date incorporated: _____/_____/_____ State of incorporation:
List the corporation’s current officers.
President: __________________________________________________________________________ Vice President: ______________________________________________________________________ Secretary: __________________________________________________________________________ Treasurer:
1-3a
Responsibility Questionnaire (rev 1/23/2020) 2
List all the stock owners who own 5% or more of the corporation’s stock. Publicly traded corporations do not need to list its stock owners.
(Use this space. If you need additional space, you can attach a document)
Partnership: Date formed: _____/_____/_____ State of formation: ____________ List all partners in your firm.
(Use this space. If you need additional space, you can attach a document)
Sole Proprietorship: Date started: _____/_____/_____ List any firm(s) that you have been associated with as an owner, partner, or officer for the last five years. Do not include ownership of stock in a publicly traded company in your response to this question.
(Use this space. If you need additional space, you can attach a document)
Joint Venture: Date formed: _____/_____/_____
(1) List each firm that is a member of the joint venture and (2) List the percentage of ownership the firm will have in the joint venture. NOTE: Each member of the Joint Venture must complete a separate Questionnaire for the Joint Venture’s submission to be considered a responsive bid.
(Use this space. If you need additional space, you can attach a document)
C. OWNERSHIP AND NAME CHANGES
1. Is your firm a subsidiary, parent, holding company, or affiliate of another firm?
Yes No
If Yes, explain the relationship between your firm and the associated firm(s). Include information about an affiliated firm only if one firm owns 50% or more of another firm, or if an owner, partner or officer of your firm holds a similar position in another firm.
(Use this space. If you need additional space, you can attach a document)
1-3b
Responsibility Questionnaire (rev 1/23/2020) 3
2. Have any of your firm’s owners, partners, or officers operated a similar business in the past five years?
Yes No
If Yes, list the names and addresses of all such businesses, and the person who operated the business. Include information about a similar business only if an owner, partner or officer of your firm holds a similar position in another firm.
(Use this space. If you need additional space, you can attach a document)
3. Has your firm changed names in the past five years?
Yes No
If Yes, list all prior names, addresses, and the dates they were used. Explain the reason for each name change in the last five years.
(Use this space. If you need additional space, you can attach a document)
4. Are any of your firm’s contractor licenses held in the name of a corporation or partnership?
Yes No
If Yes, list the name of the corporation or partnership that actually holds the license.
(Use this space. If you need additional space, you can attach a document)
D. FINANCIAL RESOURCES AND RESPONSIBILITY
5. In the past five years, has your firm ever been denied construction bonding?
Yes No
If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
1-3c
Responsibility Questionnaire (rev 1/23/2020) 4
6. Is your firm now, or has it been at any time in the last five years, the debtor in a bankruptcy case?
Yes No
If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
7. Is your firm in the process of, or in negotiations toward, being sold or dissolved?
Yes No
If Yes, explain the circumstances.
(Use this space. If you need additional space, you can attach a document)
E. INSURANCE
8. In the past five years, has any bonding company made any payments to satisfy any claims made against a bond issued on your firm’s behalf?
Yes No If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
9. Indicate the status of your firm’s current workers’ compensation insurance policy (check one):
Workers’ Compensation Insurance Policy Currently in Effect Legally Self-Insured No Workers’ Compensation Policy Currently in Effect*
*If you do not have a worker’s compensation insurance policy currently in effect, and you are not legally self-insured, provide an explanation.
(Use this space. If you need additional space, you can attach a document)
1-3d
Responsibility Questionnaire (rev 1/23/2020) 5
10. List the Experience Modification Rate (EMR) issued to your firm annually by your workers’ compensation insurance carrier for the last three years. Begin with the most recent year (YR 1) that an EMR rate was issued (EMR -1). If any of the rates for the three years is or was 1.00 or higher, provide an explanation below.
YR. 1: EMR-1: YR 2: EMR-2: YR. 3: EMR-3:
(Use this space. If you need additional space, you can attach a document)
11. Within the past five years, has your firm employed workers that were not covered under workers’ compensation insurance or state approved self-insurance?
Yes No
If Yes, explain each instance. If No, attach a statement from your workers’ compensation insurance provider that you have been continuously insured for the past five years.
(Use this space. If you need additional space, you can attach a document)
F. PERFORMANCE HISTORY
12. How many years has your firm been in operation? _______ Years.
13. Has your firm ever entered into any contract with the City of Los Angeles or any of its departments?
Yes No
If, Yes, list all contracts your firm has had with the City of Los Angeles for the last five (5) years. If your firm has had more than 10 contracts with the City of Los Angeles, then use the 10 most recent (and most similar) contracts. For each contract listed in response to this question, include: (a) entity name; (b) name of a contact and phone number; (c) purpose of contract; (d) total cost; (e) starting date; and (f) ending date.
(Use this space. If you need additional space, you can attach a document)
14. List all contracts that require similar work as the current bid/proposal in which your firm has had with any private or governmental entity (other than the City of Los Angeles) over the last five years. If your firm has had more than 10 contracts with similar work with any private or other governmental entities, then use the 10 more recent (and most similar) contracts. For each contract listed in response to this question, 1-3e
Responsibility Questionnaire (rev 1/23/2020) 6 include: (a) entity name; (b) name of a contact and phone number; (c) purpose of contract; (d) total cost;
(e) starting date; and (f) ending date.
(Use this space. If you need additional space, you can attach a document)
15. In the past five years, has a governmental or private entity or individual terminated your firm’s contract prior to its completion?
Yes No If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
16. In the past five years, has your firm previously hired a debarred subcontractor to perform work on a government contract?
Yes No If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
17A. In the past five years, has your firm been debarred or determined to be a non-responsible bidder or contractor?
Yes No
If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
17B.. Has your firm ever received a Notice of Unsatisfactory Performance by the Bureau of Contract Administration pursuant to the City Contractor’s Performance Evaluation Ordinance (LAAC Section 10.39)?
Yes No
If Yes, please enter the date of the Notice(s).
1-3f
Responsibility Questionnaire (rev 1/23/2020) 7
G. DISPUTES
18A. In the past five years, has your firm been a defendant in a court case or other legal proceeding on a matter related to any of the following issues? For parts (a) and (b) below, check Yes even if the matter only proceeded to arbitration, mediation or other dispute resolution process. For part (c), check Yes only if the matter proceeded to court litigation, even if the case was later settled or dismissed.
(a) Payment to subcontractors?
Yes No
(b) Work performance on a contract?
Yes No
(c) Employment-related litigation brought by an employee?
Yes No
18B. If you answer Yes to any of the questions below, explain the circumstances surrounding each instance.
For each instance, you must include the following in your response: the name of the plaintiff(s), the specific cause(s) of action or claim(s), the original date of filing; and the disposition/current status.
(Use this space. If you need additional space, you can attach a document)
19. Does your firm have any outstanding judgments pending against it?
Yes No
If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
20. In the past five years, has your firm been assessed liquidated damages on a contract?
Yes No
If Yes, explain the circumstances surrounding each instance and identify all the projects for which liquidated damages were assessed, the amount of liquidated damages assessed and paid, and the name and address of the project owner.
(Use this space. If you need additional space, you can attach a document)
1-3g
Responsibility Questionnaire (rev 1/23/2020) 8
H. COMPLIANCE
For the following questions, the term “owners” does not include stock owners in your firm if your firm is a publicly traded corporation.
21A. In the past five years, has your firm or any of its owners, partners or officers, ever been investigated, cited, assessed any penalties, or been found to have violated any laws, rules, or regulations enforced or administered, by any of the governmental entities listed on page 12:
Yes No
21B. If Yes, explain the circumstances surrounding each instance, including the governmental entity or entities that were involved, the dates of such instances, and the outcome.
(Use this space. If you need additional space, you can attach a document)
22. Within the past five years, has your firm, or any person employed by your firm, been investigated, found to have violated, cited, assessed any penalty, or been subject to any disciplinary action by a licensing agency for violation of any licensing law, rule or regulation?
Yes No
If Yes, explain the circumstances surrounding each instance in the last five years.
(Use this space. If you need additional space, you can attach a document)
23. In the past five years, has your firm, any of its owners, partners, or officers, been penalized or given a letter of warning by the City of Los Angeles for failing to obtain authorization from the City for the substitution of a Minority-owned (MBE), Women-owned (WBE), or Other (OBE) business enterprise?
Yes No If Yes, explain the circumstances surrounding each instance in the last five years.
(Use this space. If you need additional space, you can attach a document)
1-3h
Responsibility Questionnaire (rev 1/23/2020) 9
24A. Provide the name(s), address(s) and telephone number(s) of the apprenticeship program sponsor(s) approved by the California Division of Apprenticeship Standards that will provide apprentices to your company for use on any public works projects that you are awarded by the City of Los Angeles.
(Use this space. If you need additional space, you can attach a document)
Provide the name(s), address(s) and telephone number(s) of the apprenticeship program sponsor(s) approved by the California Division of Apprenticeship Standards that have provided apprentices to your company on any public works project on which your firm has participated within the last 3 years.
(Use this space. If you need additional space, you can attach a document)
I. BUSINESS INTEGRITY
For the following questions, the term “firm” includes any owner, partner, or officer in the firm. If your firm is a publicly traded corporation, the term “owner(s)” does not include its stock owners.
25A. For questions (a), (b), and (c) below, check Yes if the situation applies to your firm.
(a) Is a governmental entity or public utility currently investigating your firm for making a false claim or material misrepresentation?
Yes No
(b) In the past five years, has a governmental entity or public utility alleged or determined that your firm made a false claim or material misrepresentation?
Yes No
(c) In the past five years, has your firm been convicted of, or found liable in a civil suit for, making a false claim or material misrepresentation to any governmental entity or public utility?
Yes No
25B. If you check Yes to any of the three questions above, explain the circumstances surrounding each instance of a false claim or material misrepresentation.
(Use this space. If you need additional space, you can attach a document)
26. In the past five years, has your firm or any of its owners or officers been convicted of a crime involving the
24B.
1-3i
Responsibility Questionnaire (rev 1/23/2020) 10 bidding of a government contract, the awarding of a government contract, the performance of a government contract, or the crime of theft, fraud, embezzlement, perjury, or bribery?
Yes No
If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
1-3j
Responsibility Questionnaire (rev 01/23/2020) 11
TERMS OF ACCEPTANCE AND SIGNATURE:
I certify under penalty of perjury under the laws of the State of California that I read and understand the questions contained in this questionnaire and the responses contained herein and on all Attachments. I further certify that I have provided full and complete answers to each question, and that all information provided in response to this Questionnaire is true and accurate to the best of my knowledge and belief.
Electronic Signature:
Signature Date
I understand that checking this box constitutes a legal signature confirming that I acknowledge and agree to the above Terms of Acceptance.
Execution of document by E-signature. By clicking on the check box, it indicates an electronic signature.
This is considered to be the legal equivalent of a manual or “wet” signature. Once signed electronically, this document is considered original and legally binding.
1-3k
Responsibility Questionnaire (rev 01/23/2020) 12
ATTACHMENT A: GOVERNMENTAL ENTITIES FOR QUESTION NO. 21A
Check Yes in response to Question No. 21A if your firm or any of its owners, partners or officers, have ever been investigated, cited, assessed any penalties, or found to have violated any laws, rules, or regulations enforced or administered, by any of the governmental entities listed below (or any of its subdivisions), including but not limited to those examples specified below. The term “owner” does not include owners of stock in your firm if your firm is a publicly traded corporation. If you answered Yes, provide an explanation of the circumstances surrounding each instance, including the entity involved, the dates of such instances, and the outcome.
FEDERAL ENTITIES
Federal Department of Labor
• American with Disabilities Act
• Immigration Reform and Control Act
• Family Medical Leave Act
• Fair Labor Standards Act
• Davis-Bacon and laws covering wage requirements for federal government contract workers
• Migrant and Seasonal Agricultural Workers
Protection Act
• Immigration and Naturalization Act
• Occupational Safety and Health Act
• anti-discrimination provisions applicable to government contractors and subcontractors
• whistleblower protection laws
Federal Department of Justice
• Civil Rights Act
• American with Disabilities Act
• Immigration Reform and Control Act of 1986
• bankruptcy fraud and abuse
Federal Department of Housing and Urban Development (HUD)
• anti-discrimination provisions in federally subsidized/assisted/sponsored housing programs
• prevailing wage requirements applicable to HUD related programs
Federal Environmental Protection Agency
• Environmental Protection Act
National Labor Relations Board
• National Labor Relations Act
Federal Equal Employment Opportunity Commission
• Civil Rights Act
• Equal Pay Act
• Age Discrimination in Employment Act
• Rehabilitation Act
• Americans with Disabilities Act
STATE ENTITIES
California’s Department of Industrial Relations
• wage and labor standards, and licensing and registration
• occupational safety and health standards
• workers’ compensation self insurance plans
• Workers’ Compensation Act
• wage, hour, and working standards for apprentices
• any provision of the California Labor Code
California’s Department of Fair Employment and Housing
• California Fair Employment and Housing Act
• Unruh Civil Rights Act
• Ralph Civil Rights Act
California Department of Consumer Affairs
• licensing, registration, and certification requirements
• occupational licensing requirements administered and/or enforced by any of the Department’s boards, including the Contractor’s State Licensing Board
California’s Department of Justice
LOCAL ENTITIES
City of Los Angeles or any of its subdivisions for violations of any law, ordinance, code, rule, or regulation administered and/or enforced by the City, including any letters of warning or sanctions issued by the City of Los Angeles for an unauthorized substitution of subcontractors, or unauthorized reductions in dollar amounts subcontracted.
OTHERS
Any other federal, state, local governmental entity for violation of any other federal, state, or local law or regulation relating to wages, labor, or other terms and conditions of employment.
1-3l
CITY OF LOS ANGELES
PLEDGE OF COMPLIANCE WITH CONTRACTOR RESPONSIBILITY ORDINANCE
Los Angeles Administrative Code (LAAC) Section 10.40 et seq. (Contractor Responsibility Ordinance) provides that, unless specifically exempt, City contractors working under service contracts of at least $25,000 and three months, contracts for services and for purchasing goods and products that involve a value in excess of twenty-five thousand dollars ($25,000) and a term in excess of three months are covered by this Article; and construction contracts of any amount; public lessees; public licensees; and certain recipients of City financial assistance or City grant funds, shall comply with all applicable provisions of the Ordinance. Upon award of a City contract, public lease, public license, financial assistance or grant, the contractor, public lessee, public licensee, City financial assistance recipient, or grant recipient, and any its subcontractor(s), shall submit this Pledge of Compliance to the awarding authority.
The contractor agrees to comply with the Contractor Responsibility Ordinance and the following provisions:
(a) To comply with all federal, state, and local laws in the performance of the contract, including but not limited to laws regarding health and safety, labor and employment, wage and hours, and licensing laws, which affect employees.
(b) To notify the awarding authority within 30 calendar days after receiving notification that any governmental agency has initiated an investigation which may result in a finding that the contractor did not comply with any federal, state, or local law in the performance of the contract, including but not limited to laws regarding health and safety, labor and employment, wage and hours, and licensing laws, which affect employees.
(c) To notify the awarding authority within 30 calendar days of all findings by a governmental agency or court of competent jurisdiction that the contractor has violated any federal, state, or local law in the performance of the contract, including but not limited to laws regarding health and safety, labor and employment, wage and hours, and licensing laws which affect employees.
(d) If applicable, to provide the…
This is the start of the file's text. The full file is on GovTribe.