Attch J-13_ECP-X Cost Analysis Format.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Undersea Warfare Combat Systems Product Support
Solicitation number
N0002421R5231
Issued by

About this file

This document contains a draft request for proposal for undersea warfare combat systems product support. The Navy seeks product support, integrated logistics support, and installation services for undersea warfare combat systems including AN/SQQ-89, AN/SQR-19, MK116, AN/SQQ-28, AN/SRQ-4, and AN/SQS-53C subsystems. Services include logistics product development and maintenance, training, installation, and lifecycle sustainment for U.S. and foreign military sales platforms supporting undersea warfare missions. Installation demand over the past four years totals approximately 155,180 hours for base year and 1,002,790 hours total for all option years. Interested parties may provide feedback on the draft RFP by February 3, 2021 after which the Navy will post responses and provide information on a virtual industry day for this requirement. The incumbent is Leidos under contract N00024-16-C-5202.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COST DATA FOR ECPs

ESTIMATED COSTECP-X
Non-recurringRecurring
FACTORTotal (a)Unit (b)Quantity (c)Total (d)Total (e)
a.PRODUCTION COSTS
(1) CONFIGURATION ITEM / CSCI$23,80023,8004$95,200$119,000
(2) FACTORY TEST EQUIPMENT$30,000$0$30,000
(3) SPECIAL FACTORY TOOLING$0$0
(4) SCRAP$0$0
(5) ENGINEERING, ENGINEERING DATA REVISION1,1202$2,240$2,240
(6) REVISION OF TEST PROCEDURES$16,80016,8004$67,200$84,000
(7) QUALIFICATION OF NEW ITEMS$15,7205,2404$20,960$36,680
(8) SUBTOTAL OF PROD COSTS / SAVINGS$86,320$185,600$271,920
b.RETROFIT COSTS$0$0
(1) ENGINEERING DATA REVISION$0$0
(2) PROTOTYPE TESTING$0$0
(3) KIT PROOF TESTING$0$0
(4) RETROFIT KITS FOR OPERATIONAL SYSTEMS10,00084$840,000$840,000
(5) PREP. OF MWO/TCTO/SC/ALT/TD$0$0
(6) SPECIAL TOOLING FOR RETROFIT$0$0
(7) INSTALLATION - CONTRACTOR PERSONNEL gov't$40,320
(8) INSTALLATION - GOVERNMENT PERSONNEL contr1,12060$67,200$67,200
(9) TESTING AFTER RETROFIT$13,440$0$13,440
(10) MODIFICATION OF GFE/GFP$0$0
(11) QUALIFICATION OF GFE/GFP$0$0
(12) SUBTOTAL OF RETROFIT COSTS/SAVINGS$53,760$907,200$920,640
$0
c.INTEGRATED LOGISTICS SUPPORT PRODUCT COST$0$0
(1) SPARES/REPAIR PARTS REWORK28042$11,760$11,760
(2) NEW SPARES AND REPAIR PARTS7040$2,800$2,800
(3) SUPPLY/PROVISIONING DATA7042$2,940$2,940
(4) SUPPORT EQUIPMENT$28080$22,400$22,400
(5) RETROFIT KITS FOR SPARES28080$22,400$22,400
(6) OPERATOR TRAINING COURSES$0$0
(7) MAINTENANCE TRAINING COURSES$0$0
(8) REVISION OF TECH MANUALS$0$0
(9) NEW TECH MANUALS$108,640$0$108,640
(10) TRAINING/TRAINERS$0$0
(11) INTERIM SUPPORT$0$0
(12) MAINTENANCE MANPOWER$9,0001,8006$10,800$19,800
(13) COMPUTER PROGRAMS/DOCUMENTATION$0$0
(14) SUBTOTAL OF ILS COSTS$117,640$73,100$190,740
d.SOFTWARE PRODUCTION COSTS
(1) SW DEVELOPMENT / DELIVERY TO INTEGRATION$10,000,000$0$10,000,000
(1) INTEGRATION / RECOMPILE / FINAL DELIVERY$10,000,000$0$10,000,000
(1) NEW/MODIFIED SHORE SITE HW COSTS (include SIM/STIM & maintenance)$4,023,000$168,966$4,191,966
(a) SITE: OEM$1,000,000140300$42,000$1,042,000
(b) SITE: Wallops$1,000,000140300$42,000$1,042,000
(c) SITE: CSEDS$1,000,000140300$42,000$1,042,000
(d) SITE: DEPOT$250,00014075$10,500$260,500
(e) SITE: REPRODUCTION FACILITY$23,0001407$966$23,966
(f) SITE: OTHER$750,000140225$31,500$781,500
(2) CERTIFICATION (ANALYSIS OR WALLOPS)$1,000,000$0$1,000,000
(3) SOFTWARE VERSION DOCUMENT$83,000$0$83,000
(3) IR DATABASE UPDATES$83,000$0$83,000
(4) SUBTOTAL OF SOFTWARE PRODUCTION COSTS$25,189,000$168,966$25,357,966
eSOFTWARE UPDATE COSTS (MOD TO EXISTING BASELINE)
(1) MODIFICATION OF EXISTING CODE
(2) NEW/MODIFIED SHORE SITE HW COSTS (include SIM/STIM & maintenance)
(3) INTEGRATION & INTEGRATION TESTING (DELTA ONLY)
(4) SOFTWARE VERSION DOCUMENT UPDATE
(5) SUBTOTAL OF SOFTWARE UPDATE COSTS$0$0$0
fSOFTWARE LCS COSTS / SAVINGS
(1) MAINTAIN ATO$150,0001,12052$58,240$208,240
(2) MAINTAIN CYBER / IA COMPLIANCE$150,0001,12052$58,240$208,240
(3) SUBTOTAL OF SOFTWARE LCS COSTS$300,000$116,480$416,480
gSW SUPPORT COSTS
(1) MAINTAIN SVD56052$29,120$29,120
(2) REPRODUCTION / DISTRIBUTION1,12022$24,640$24,640
(3) MAINTAIN IR db & WORKAROUNDS56052$29,120$29,120
(4) Subtotal of Software Support cost$0$82,880$82,880

i OTHER COSTS/SAVINGS (IMA/ISEA) $280,000 $103,800 j SUBTOTAL COSTS/SAVINGS $25,746,720 $1,814,226 $27,344,426 k COORDINATION OF CHANGES WITH OTHER CONTRACTORS l COORDINATION CHANGES BY GOVERNMENT m ESTIMATED NET TOTAL COSTS/SAVINGS $27,344,426

ESTIMATED COST SAVINGSNon-recurring (a)Unit (b)Quantity (c)Total (recurring) (d)Total (e)
aINTEGRATED LOGISTICS SUPPORT SAVINGS
(1) MATERIEL SUPPORT REDUCTIONS$35,0001,1008$8,800$43,800
(2) ILS PRODUCT RETIREMENT$17,5001,10012$13,200$30,700
(3) TRAINER AND TRAINING RETIREMENT$35,0001,1002$2,200$37,200
(4) SUPPORT EQUIPMENT ELIMINATION$35,0001,1008$8,800$43,800
(5) RETIREMENT OF INFRASTRUCTURE$35,0001,1008$8,800$43,800
(6) SW BASELINE RETIREMENT (LABS, CYBER, CERT)10,000,0002,24052$116,480$10,116,480
(6) DEPOT ELIMINATION$35,0001,1008$8,800$43,800

TOTAL ESTIMATED COST SAVINGS $10,359,580

ESTIMATED NET TOTAL COST / SAVINGS $16,984,846

Sheet2