This document is a Preconstruction Risk Assessment and Exposure Control Checklist for a federal contract opportunity to modernize existing A wing and D wing elevators at a Department of Veterans Affairs (VA) facility. The key details are:
The scope of work includes modernizing the control systems, electrical wiring, door equipment, operating fixtures, elevator hoisting machines, and complete replacement of the blood work dumbwaiter elevator. Potential hazards and mitigation measures are addressed, such as asbestos, lead-based paint, confined spaces, dust, fire and smoke, moisture/water leaks/mold, vapors/fumes, noise, vibration, air pressure relationships, electrical modifications, crane operations, traffic flow, and proximity to immune-suppressed patients. An ICRA assessment designated the work as Class II/IV, and ILSM requirements were identified. The contract opportunity number is 36C25025B0003, with a project number of 583-22-101 and an expected completion date of 01/02/2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25025B0003 0004.docx | DOCX document | |
| 36C25025B0003 0003.docx | DOCX document | |
| Sign in Sheet.pdf | ||
| Bid Schedule.docx | DOCX document | |
| 36C25025B0003 0002.docx | DOCX document | |
| 36C25025B0003 0001.docx | DOCX document | |
| Attachment X - Sole Sources-Motion Control.pdf | ||
| Attachment IX - Sole Sources-Imperial Electric.pdf | ||
| Attachment VI - Specifications.pdf | ||
| Attachment IV - VHA Directive 1192-01.pdf | ||
| Attachment VII - NEPA Documentation.pdf | ||
| Attachment III - EMR.docx | DOCX document | |
| Attachment II - RFI Template.doc | DOC document | |
| 36C25025B0003.docx | DOCX document | |
| Attachment V - Drawings.pdf | ||
| Attachment I - Wage Determination.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Preconstruction Risk Assessment and Exposure Control Checklist
Project Name/Project No.: __________________________________________ Date: ______________
Scope of Work Overview:
Other Requirements for above project:
Preliminary Analysis – Project Engineer
Hazard Concern?
(Y/N) Remarks
Asbestos
Lead Base Paint
Confined Space
Dust
Fire & Smoke Walls
Moisture/Water Leaks/Mold
Vapors/Fumes
Noise
Vibration
Air Pressure Relationships
Electrical Modifications
Revised 8/31/22
583-22-101 01/02/2024
Modernize existing A and D wing Elevators which are suffering from control related issues and modify the elevators to meet current criteria and surpass expected life range. The extent of the elevator modernization includes but not limited to the following Control Systems, Electrical Wiring, Door Equipment, Operating Fixtures, Elevator Hoisting Machines with required Deflector Sheaves, Governors and Tail Sheaves, Roller Guides, Elevator Cabs on S11 and S12, Hoistway Door Panels on Elevators P8, P9, P10 and S7, Complete Replacement of the Blood Work DW elevator.
Y Y Y Y Y N N Y Some of the work in blood draw may have to be done after hours
Y Y
Crane Operation
Traffic Flow
Open Outside Walls
Impact to Levels Above and Below
Proximity of Air Intakes
Pest Control Within Construction Area
Proximity of Immune Suppressed Patients
Security Issues/Concerns
ICRA Assessment
ILSM Assessment
Hot Work Permit
TB Risk Assessment
Radiation Safety
National Environmental Policy Act (NEPA) Evaluation – GEMS Coordinator, Jeff Abshire Note: All construction projects shall have a NEPA evaluation conducted per the requirements of Engineering Policy Memorandum 138-48.
NEPA Evaluation Evaluation Completed (Y/N)
Date NEPA Submitted Remarks
NEPA Evaluation submitted to the facility GEMS Manager?
Revised 8/31/22
Y N N
Y N N
Y
N
Y
Y
Y
Y
N
Yes 1/16/2024 Follow guidance in NEPA Document.
Specific Control Measures
Asbestos – Industrial Hygiene (Laura Totten)
Yes/No Measure
Contractor to hire an asbestos abatement contractor for control and cleanup.
VA to hire independent Industrial Hygienist to inspect and clear area for re-occupancy based on monitoring and/or professional judgment.
Published asbestos protocol to be followed for work through ceilings.
Published asbestos protocol to be followed for work above ceilings.
Perimeter barrier to be constructed in the interstitial space to isolate the construction area with other areas in the interstitial.
Project area to be encased with spray-applied hard surface encasement material.
Provide mini containments under negative air in public areas.
Sealed gypsum board barrier to be constructed to isolate the construction area from the public.
Transit panels to be removed, which is considered Class B removal.
Comments:
Lead Base Paint – Safety/IH (Dan Woody or Laura Totten)
Yes/No Measure
LBP reports available for testing results?
If none are available, hire environmental company for testing.
LBP is present, hire a lead remediation contractor to remove paint according to OSHA’s lead safe work.
Comments:
Revised 8/31/22 n/a n/a n/a n/a n/a n/a n/a n/a n/a
LMT 1/30/2024 - Only if the known ACM will be impacted during this project, requires abatement prior.
Y n/a
LMT 1/30/2024 - Only if the known LBP will be impacted during this project, requires abatement prior or workers trained for OSHA Lead Safe Work Practices.
Confined Space – Safety (Dan Woody)
Yes/No Measure
Obtain an “Entry Permit” from Safety Services prior to entering the confined space.
The Entry Team must be trained as an Entry Supervisor, Attendant, or Entrant.
A specific confined space entry plan and rescue plan must be approved prior to entry into a permit-required confined space.
Safe entry conditions must be achieved before and during confined space entry.
Comments:
Dust – Infection Prevention (Diana Greathouse, Jennifer Buchs, and or Kevin Kniery)
Yes/No Measure
Sealed gypsum board barrier to be constructed to isolate the construction area from the public.
Trash carts will be covered when transported through the building.
Provide negative air machine exhausted too outside.
Provide mini containments under negative air in public areas.
Provide negative air machine in space as air scrubber.
Provide walk off mats at entrances to work area.
Perimeter barrier will be constructed in the interstitial space to isolate the construction area with other areas in the interstitial.
Mist area to decrease dust (outside work)
Provide anteroom under negative pressure at entrance to project zone.
Comments:
Revised 8/31/22
Y Y
Y
Y
LMT 1/30/2024 - See Dan Woody for Entry Permit
Yes Yes
Yes
NA
NA
Yes
NA
NA
Yes
For the dumbwaiter in the blood draw area, negative airflow will be required, but there is no way to exhaust to an outside window.
DLG 2/16/24
Fire & Smoke Walls – Engineering Supervisor and Safety (James Wallace and Bryant Garibay)
Yes/No Measure
Review latest LSC drawings to determine if existing fire and/or smoke walls will be affected.
Risk to be mitigated with ILSM.
2-hour gypsum barrier to be constructed.
Comments:
Moisture/Water Leaks/Mold – IH (Laura Totten)
Yes/No Measure
Contain any water from core drilling activities.
Dike any floor penetrations to minimize risk of leaks from construction zone.
Request assessment for IAC ICRA from Safety. Follow VHA M3P.
Comments:
Vapors/Fumes – Safety/IH (Dan Woody or Laura Totten)
Yes/No Measure
Use of products with low Volatile Organic Compounds (VOCs).
Provide negative air in construction zone exhausted to outside, away from intakes.
Seal work area airtight barrier.
Cut all metal outside the building.
Seal any floor penetrations to minimize risk of fumes through construction zone.
Shut down air handler to minimize infiltration of fumes from outside.
Use carbon or activated charcoal filters on air scrubbers or negative air machines.
Comments:
Revised 8/31/22
Y Y n/a
LMT 1/30/2024 - Elevator Shaft JPW 13FEB24 - Must have plan to maintain 2 hr fire protection if elevator shaft is open n/a n/a n/a
LMT 1/30/2024
n/a n/a n/a n/a n/a n/a n/a
LMT 1/30/2024
Noise – Safety/IH (Dan Woody or Laura Totten)
Yes/No Measure
Schedule demolition work after normal work hours.
Cut all metal outside the building.
Comments:
Vibration – Safety/IH (Dan Woody or Laura Totten)
Yes/No Measure
Schedule demolition work after normal work hours.
Coordinate with occupants in surrounding areas to explain the work occurring.
Comments:
Air Pressure Relationships – Infection Prevention and HVAC Supervisor (Diana Greathouse & Nate Fair)
Yes/No Measure
Provide negative air during asbestos abatement.
Provide negative air during construction.
Seal off supply and exhaust Heating, Ventilation, and Air Conditioning (HVAC) registers.
Comments:
Revised 8/31/22
N Y
LMT 1/30/2024
N Y
LMT 1/30/2024
Y Y
SMR 2/16/24 in basement areas where coring will take place for sump installation
Electrical Modifications – Electric Shop Supervisor (Steve Poynts)
Yes/No Measure
Additional circuits added.
Outlets or lighting moved.
Follow VA Project Electrical Inspection Checklist.
Comments:
Crane Operation – Safety (Dan Woody)
Yes/No Measure
Contact Safety Services for review for any project crane operations.
Comments:
Traffic Control – Engineering Supervisor (James Wallace)
Yes/No Measure
Access construction area via exterior door.
Schedule delivery of large quantities of material and demolition haul out after hours.
Comments:
Open Outside Walls – Engineering Supervisor (James Wallace)
Yes/No Measure
Construct temporary outside wall to limit the infiltration of wind, air, and temperature differences into the project site.
Comments:
Revised 8/31/22
N N Y
None
Y
LMT 1/30/2024 - See Dan Woody - Require Lift Plan for Dan to review prior.
Y Y
Must minimize disruption in elevator lobbies and egress routes. Significant service disruptions must take place outside of core business hours.
NA
JPW
Impact to Levels Above and Below – Safety/IH (Dan Woody or Laura Totten)
Yes/No Measure
Coordinate with occupants in surrounding areas to explain the work occurring.
Follow asbestos protocol when doing under floor work.
Vacate areas when doing below floor work off of the catwalk.
Comments:
Proximity of Air Intakes – HVAC Shop Supervisor and Safety (Nate Fair and Laura Totten)
Yes/No Measure
Shut down air handlers to reduce infiltration of fumes from exterior activities such as painting, gasoline powered engines, roofing operations, equipment, etc.
Comments:
Pest Control Within Construction Area – EMS Supervisor (Robert Franklin)
Yes/No Measure
Provide barriers to any open outside walls.
Contact pest controller if any evidence of pests is found during the course of the work.
Comments:
Proximity of Immune Suppressed Patients – IP (Diana Greathouse, Jennifer Buchs, or Kevin Kniery)
Yes/No Measure
Relocate patients away from construction zone for entire project.
Relocate patients away from construction zone during demolition operations.
Revised 8/31/22
Y N n/a
LMT 1/30/2024 - See Asbestos Comments above.
n/a
LMT 1/30/2024
N/A Y
NO ISSUES FOR EMS -2/13/24
Yes Yes
Work will be done after hours to decrease risk
Comments:
ICRA Assessment – Infection Prevention (Diana Greathouse, Jennifer Buchs, and or Kevin Kniery)
Yes/No Measure
Meet with Infection Prevention to complete ICRA assessment.
Class Assigned – I, II, III, IV, V
Comments:
ILSM Assessment – Engineering Supervisor and Safety (James Wallace and Bryant Garibay)
Yes/No Measure
Meet with VA resident LSC expert to complete ILSM assessment.
ILSM Required
Comments:
Hot Work Permit – Engineering Supervisor (James Wallace)
Yes/No Measure
A Hot Work Permit is required to be issued by the Project COR/Safety prior to completing any welding or brazing on site.
Comments:
Revised 8/31/22
There will be work on the Awing elevators. The infusion clinic is in close proximity to this work.
Yes
II/IV
Elevator shaft and Mechanical spaces will be a class II The lab and the blood draw areas will be a class IV
DLG 2/16/24
Y Y
LMT 1/30/2024
JPW
JPW - Hot Work Permit is required
TB Risk Assessment – IP (Diana Greathouse, Jennifer Buchs and or Kevin Kniery)
Yes/No Measure
The contractor must provide written certification that all contract employees assigned to the work site have had a pre-placement tuberculin screening within 90 days prior to assignment of the worksite and been found to be negative TB screening reactions. (This can be CDC two-step skin testing or an FDA approved blood test). If a positive screen identified, please defer to VHA directive 7715.
Contractors will be required to show documentation of negative TB screening reactions for any additional workers who are added after the 90-day requirement before they will be allowed to work on the site.
Comments:
Radiation Safety – Radiation Safety Officer (Jeff Mason or Mary Ann Spilker)
Yes/No Measure
Radiation shielding and testing will be required during this project.
Comments:
Approval Signatures:
Project Engineer or COR:
GEMS Coordinator:
Industrial Hygiene:
Safety Officer:
Infection Prevention:
Supervisory Engineer or Chief Engineer:
HVAC Supervisor:
Electric Supervisor:
EMS Supervisor:
Radiation Safety Officer:
Revised 8/31/22
No
No
Risk for TB is low, due to work locations and barriers will be in place to separate patients from the work area.
DLG 2/16/24
No
No radiation safety concerns.
LAURA TOTTEN Digitally signed by LAURA TOTTEN Date: 2024.01.31 12:05:43 -05'00'
LAURA TOTTEN Digitally signed by LAURA TOTTEN Date: 2024.01.31 12:06:01 -05'00'
STEPHEN POYNTS
Digitally signed by STEPHEN
POYNTS
Date: 2024.02.13 11:25:10 -05'00'
MARY SPILKER Digitally signed by MARY SPILKER Date: 2024.02.13 11:51:07 -05'00'
ROBERT FRANKLIN Digitally signed by ROBERT FRANKLIN Date: 2024.02.13 12:16:56 -05'00'
JEFFREY ABSHIRE Digitally signed by JEFFREY ABSHIRE Date: 2024.02.13 13:28:45 -05'00'
MALAK K IBRAHIM 3595684
Digitally signed by MALAK K IBRAHIM 3595684 Date: 2024.02.13 13:46:48 -05'00'
JAMES WALLACE Digitally signed by JAMES WALLACE Date: 2024.02.13 15:31:43 -05'00'
SEAN ROSENFELD Digitally signed by SEAN ROSENFELD Date: 2024.02.16 14:53:51 -05'00'
DIANA GREATHOUSE
Digitally signed by DIANA
GREATHOUSE
Date: 2024.03.05 13:15:52 -05'00'
File details come from the government source that posted it. Updated .