Attachment V - Drawings.pdf

PDF 23 MB Posted

Attached to
Y1DA--CON - Upgrade A Wing & D Wing Elevators - 583-22-101 Federal contract opportunity
Solicitation number
36C25025B0003
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

The provided document is Attachment V - Drawings, which appears to be related to the federal contract opportunity with Solicitation Number 36C25025B0003 for the Upgrade A Wing & D Wing Elevators - 583-22-101 project. The contract is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. This attachment likely contains technical drawings or schematics relevant to the elevator upgrade requirements outlined in the solicitation. As this document is solely a set of drawings and does not provide details on the required products, services, response dates, pricing, or other key information, a detailed summary is not possible. The document appears to be a supporting attachment to the main solicitation, which would contain the comprehensive details about the contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--CON - Upgrade A Wing & D Wing Elevators - 583-22-101, newest first.
File Type Posted
36C25025B0003 0004.docx DOCX document
36C25025B0003 0003.docx DOCX document
Sign in Sheet.pdf PDF
36C25025B0003 0002.docx DOCX document
Bid Schedule.docx DOCX document
36C25025B0003 0001.docx DOCX document
Attachment X - Sole Sources-Motion Control.pdf PDF
Attachment IX - Sole Sources-Imperial Electric.pdf PDF
Attachment VIII - PCRA - Elevator Modification.pdf PDF
Attachment VI - Specifications.pdf PDF
Attachment IV - VHA Directive 1192-01.pdf PDF
Attachment I - Wage Determination.pdf PDF
36C25025B0003.docx DOCX document
Attachment VII - NEPA Documentation.pdf PDF
Attachment III - EMR.docx DOCX document
Attachment II - RFI Template.doc DOC document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t

00 00

11 11 o n e in c h o n e fo o t o n e in c h o n e fo o t o n e in c h o n e fo o t o n e in c h o n e fo o t

00 00

22 22 th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t

00 00 22 22 o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t

00 00 44 44 th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t

00 00 44 44 o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

00 00 44 44

88 88 o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t

00 00 44 44

88 88

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

DRAWING TITLE PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

PROJECT NUMBERCONSULTANTS:

DRAWING #

U.S. DEPARTMENT OF VETERANS AFFAIRS

VA HEALTH CARE SYSTEM APPROVAL:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. AR12100034 EXP. 12/31/2025

MECH ENGR REG. NO. PE12100220 EXP. 07/31/2024

ELEC ENGR REG. NO. PE12300478 EXP. 07/31/2024

STRUCTURAL ENGINEER

STAND

8234 ROBINSON ST

OVERLAND PARK, KS 66204

(913) 214-2169

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FULLY SPRINKLERED

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

11140 SOUTH TOWNE SQUARE, SUITE 100

ST. LOUIS, MO 63123

(314) 917-0148

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

DRAWING NUMBER

BUILDING NUMBER

MECHANICAL / ELECTRICAL /

VERTICAL TRANSPORTATION

SPUR DESIGN

2519 MADISON AVE, SUITE 100

KANSAS CITY, MO 64108

(913) 369-7200

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

/2

/2

:1 :2

P

M

COVER SHEET

EFB 01 OF 91AJS

FINAL BID SET

UPGRADE A WING AND D WING

ELEVATORS

VA PROJECT NUMBER: 583-22-101

UPGRADE A WING AND D

WING ELEVATORS

08/22/2024

583-22-101

RICHARD L. ROUDEBUSH VAMC

1481 WEST 10TH STREET

INDIANAPOLIS, IN 46202

RICHARD L. ROUDEBUSH VETERANS AFFAIRS MEDICAL CENTER

1481 WEST 10TH STREET

INDIANAPOLIS, IN 46202

FINAL BID SET

GI000

SPUR #: 2303

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

[01] GENERAL

01 GI000 COVER SHEET

02 GI001 GENERAL INFORMATION

03 GI002 ICRA CONSTRUCTION DETAILS

04 GI010 PHASING PLANS - TYPICAL

05 GI011 PHASING PLAN & CONTRACTOR ACCESS - BASEMENT

06 GI012 PHASING PLAN & CONTRACTOR ACCESS - LEVEL 1

07 GI013 PHASING PLAN & CONTRACTOR ACCESS - LEVEL 2

08 GI014 PHASING PLAN & CONTRACTOR ACCESS - LEVEL 7

09 GI015 PHASING PLAN & CONTRACTOR ACCESS - LEVEL 8 & 9

10 GI016 PHASING PLAN & CONTRACTOR ACCESS - DUMBWAITER LEVEL 1 & 2

11 GI017 PHASING PLAN & CONTRACTOR ACCESS - ENLARGED VIEWS

[02] ENVIRONMENTAL HAZARDS

12 HA000 GENERAL ENVIRONMENTAL NOTES

13 HA001 BASEMENT

14 HA100 LEVEL ONE

15 HA200 LEVEL TWO

16 HA300 LEVEL THREE

17 HA400 LEVEL FOUR

18 HA500 LEVEL FIVE

19 HA600 LEVEL SIX

20 HA700 LEVEL SEVEN

21 HA800 LEVEL EIGHT

22 HA900 LEVEL NINE

[03] STRUCTURAL

23 SS 001 STRUCTURAL GENERAL NOTES

24 SS 030 TYPICAL DETAILS - CONCRETE

25 SS 100 ELEVATOR PIT PLANS

26 SS 101 PENT HOUSE FLOORS

27 SS 102 PENT HOUSE ROOF AND CEILING

[04] ARCHITECTURAL

28 AS001 ARCHITECTURAL SITE PLAN

29 AE101 DIMENSION & DEMO PLANS - SUB-BASEMENT - WING D

30 AE102 DIMENSION & DEMO PLANS - TYPICAL WING A & D

31 AE103 DIMENSION & DEMO PLANS - TYPICAL WING A & D

32 AE111 DIMENSION & DEMO PLANS - PENTHOUSE

33 AE121 DIMENSION & DEMO ROOF PLANS

34 AE122 ELEVATOR CAB ENLARGEMENT

35 AE301 VERTICAL TRANSPORTATION SECTIONS

[05] FIRE PROTECTION

36 FA001 FIRE ALARM GENERAL NOTES & LEGEND

37 FA101 FIRE ALARM FLOOR PLANS - SUB-BASEMENT

38 FA102 FIRE ALARM FLOOR PLANS - BASEMENT

39 FA103 FIRE ALARM FLOOR PLANS - LEVEL 1

40 FA104 FIRE ALARM FLOOR PLANS - LEVEL 2

41 FA105 FIRE ALARM FLOOR PLANS - LEVEL 3

42 FA106 FIRE ALARM FLOOR PLANS - LEVEL 4

43 FA107 FIRE ALARM FLOOR PLANS - LEVEL 5

44 FA108 FIRE ALARM FLOOR PLANS - LEVEL 6

45 FA109 FIRE ALARM FLOOR PLANS - LEVEL 7

46 FA110 FIRE ALARM FLOOR PLANS - LEVEL 8

47 FA111 FIRE ALARM FLOOR PLANS - LEVEL 9

48 FX001 FIRE SUPPRESSION GENERAL NOTES & LEGEND

LOCATION

PLAN

AREA

PLAN

N N

PROJECT LOCATION PROJECT LOCATION

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

49 FX101 FIRE SUPPRESSION FLOOR PLAN - SUB-BASEMENT

50 FX102 FIRE SUPPRESSION FLOOR PLAN - BASEMENT

51 FX103 FIRE SUPPRESSION FLOOR PLAN - LEVEL 1

52 FX104 FIRE SUPPRESSION FLOOR PLAN - LEVEL 2

53 FX105 FIRE SUPPRESSION FLOOR PLAN - LEVEL 3

54 FX106 FIRE SUPPRESSION FLOOR PLAN - LEVEL 4

55 FX107 FIRE SUPPRESSION FLOOR PLAN - LEVEL 5

56 FX108 FIRE SUPPRESSION FLOOR PLAN - LEVEL 6

57 FX109 FIRE SUPPRESSION FLOOR PLAN - LEVEL 7

58 FX110 FIRE SUPPRESSION FLOOR PLAN - LEVEL 8

59 FX111 FIRE SUPPRESSION FLOOR PLAN - LEVEL 9

[06] PLUMBING

60 P-000 PLUMBING LEGEND

61 PL100 PLUMBING PLANS

62 P-500 PLUMBING PLAN DETAILS

63 P-600 PLUMBING PLAN SCHEDULES

[07] MECHANICAL

64 M-000 LEGEND AND ABBREVIATIONS

65 MD100 MECHANICAL DUCT DEMO PLAN WING D

66 MH100 MECHANICAL DUCT PLAN WING D

67 MP100 MECHANICAL PIPING PLANS - TYPICAL WING D

68 M-501 MECHANICAL SCHEDULES AND DETAILS

69 M-701 MECHANICAL CONTROLS

[08] ELECTRICAL

70 E-000 LEGEND AND ABBREVIATIONS

71 E-100 ELECTRICAL REFERENCE PLANS - A-WING

72 E-101 ELECTRICAL REFERENCE PLANS - D-WING

73 E-102 ELECTRICAL ENLARGED PLANS - A-WING & D-WING

74 ED-101 ELECTRICAL DEMOLITION POWER PLAN - A-WING BASEMENT, LEVEL 1 & D-WING

75 ED-102 ELECTRICAL DEMOLITION POWER PLAN - A-WING - LEVEL 9 & D-WING LEVEL 8

76 ED-103 ELECTRICAL DEMOLITION LIGHTING PLAN - A-WING -BASEMENT & LEVEL 1, 2, 3, 4, & 5

77 ED-104 ELECTRICAL DEMOLITION LIGHTING PLAN - A-WING - LEVEL 6, 7, 8 & 9

78 ED-105 ELECTRICAL DEMOLITION LIGHTING PLAN - D-WING - BASEMENT & LEVEL 1, 2, 3, 4, & 5

79 ED-106 ELECTRICAL DEMOLITION LIGHTING PLAN - D-WING - LEVEL 6, 7,& 8

80 E-200 ELECTRICAL POWER PLAN - A-WING BASMENT & LEVEL 1 & 9

81 E-201 ELECTRICAL POWER PLAN - D-WING - BASEMENT & LEVEL 8

82 E-202 ELECTRICAL POWER PLAN - A-WING & D-WING SUB BASEMENT

83 E-203 ELECTRICAL LIGHTING PLAN - A-WING BASEMENT & LEVEL 1, 2, 3, 4, & 5

84 E-204 ELECTRICAL LIGHTING PLAN - A-WING LEVEL 6, 7, 8 & 9

85 E-205 ELECTRICAL LIGHTING PLAN - D-WING BASEMENT & LEVEL 1, 2, 3, 4 & 5

86 E-206 ELECTRICAL LIGHTING PLAN - D-WING - LEVEL 6, 7 & 8

87 E-501 ELECTRICAL DETAILS

88 E-601 A-WING ONE-LINE DIAGRAM

89 E-602 D-WING ONE-LINE DIAGRAM

90 E-701 A-WING PANEL SCHEDULES

91 E-702 D-WING PANEL SCHEDULES

TOTAL SHEETS: 91

No. REVISION DESCRIPTION DATE

BID ALTERNATES:

BID ALTERNATE NO. 1:

1. BASE BID EXCEPT DELETE D-WING HYDRAULIC ELEVATOR S7 FROM SCOPE OF WORK. THE PROJECT DURATION IS REDUCED BY 0 CALENDAR DAYS AFTER THE NOTICE TO PROCEED.

BID ALTERNATE NO. 2:

1. BASE BID AND BID ALTERNATE NO.1, CONTRACTOR TO PERFORM LIMITED SCOPE FOR D-WING ELEVATORS P8-P10. THE SCOPE IS LIMITED TO REPLACING GEARED HOIST MACHINES WITH NEW HOIST ROPES, ROPE GRIPPERS, COUNTERWEIGHT FRAMES, AND WEIGHTS WITH NEW COUNTERWEIGHT ROLLER GUIDES. AS INDICATED IN THE DRAWINGS AND SPECIFICATIONS, HVAC MODIFICATIONS TO THE MACHINE ROOM WILL ALSO BE INCLUDED IN THE SCOPE. THE PROJECT DURATION IS REDUCED BY 210 CALENDAR DAYS AFTER THE NOTICE TO PROCEED.

BASE BID:

1. WORK INCLUDES GENERAL CONSTRUCTION, ALTERATIONS, NECESSARY REMOVAL OF EXISTING ITEMS AND CONSTRUCTION AND CERTAIN OTHER ITEMS NECESSARY TO PREPARE THE EXISTING SPACE FOR THE INSTALLATION AND OPERATION OF THE NEW ELEVATORS. ALL PHASES OF WORK SHALL BE COMPLETE WITHIN 690 CALENDAR DAYS AFTER NOTICE TO PROCEED.

ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS

4' -0 M A X

4' -0 M A X

2' -1 0" M A X

2' -3 M

IN

1'-6" MIN

1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT

BLOCKING FOR ALL WALL MOUNTED ACCESSORIES,

FIXTURES, AND EQUIPMENT.

2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN

COUNTERTOPS @ 36"-48" MAX ON CENTER.

3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER

FINISHED FLOOR TO THE OPERABLE PART OF THE FIXTURE.

4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL

FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR

FIXTURE TYPES USED IN THIS PROJECT.

5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,

BACKING TO BE PROVIDED AS SHIM FOR FLUSH

APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.

6" MAX

9" M

IN

SHOWER

VA TOILET ROOM

TURNING RADIUS

DRINKING

FOUNTAIN

PAPER TOWEL

DISPENSER

SANITARY

NAPKIN

DISPENSER

4' -0 "M

A X

WASTE

RECEPTACLE

LAVATORY

WITH MIRROR

ON CENTER

WALL

4' -0 M A X

SOAP

DISPENSER

2' -1 0" M A X

T O B .O . R

E F

LE

C T

IV

E S U R F A C E

3' -4 "M

A X

17 MIN

2' -3 M

IN

3' -0 M A X

1'-6" MIN

WALL

2' -9 3' -0

3' -2 4' -0

2'-0" MIN

8" MIN

WALL

LAVATORY

WITH APRON

1' -5 M A X

1'-6" MIN

URINAL

WALL

1'-5" - 1'-7" (AMBULATORY)

1'-4" - 1'-6" (WHEELCHAIR)

CLEAR FLOOR

5'-6"

CLEAR FLOOR

6'-0"

3'-0" MIN

2' -9 3' -0

1'-0" MIN

3'-6" MIN 1'-0"MAX

4'-6" MIN

1' -5 '-7

1' -6 M

IN

A N S I I C C A 7.

1)

1' -3 M

IN

A D A /A B A

2' -9 3' -0

WALL

WALL

4' -0 M A X

WALL HOOK

7' -0

CLOCK

WALL

FINISHED FLOOR

FIRE EXTINGUISHER

CABINET

WEIGHT > 40LBS

FIRE EXTINGUISHER

CABINET

WEIGHT < 40LBS

4' -0 "M

A X

4' -0 M A X

TOILET SEAT

COVER

DISPENSER

BABY

CHANGING

STATION

CLEAR FLOOR SPACE

@ WATER CLOSET

5'-6"

2'-6"

4' -0

2'-6"

4' -0

HANDRAILS AND

BUMPER GUARDS

FIXTURE MOUNTING HEIGHTS AND CLEARANCES

18" MIN

M

IN

FRONT APPROACH,

PULL SIDE

36" MIN

M

IN

HINGE APPROACH,

PULL SIDE

HINGE APPROACH,

PULL SIDE

*12" MIN48

M

IN

FRONT APPROACH,

PUSH SIDE

M

IN

HINGE APPROACH,

PUSH SIDE

22" MIN 24" MIN

*4 8" M

IN

LATCH APPROACH,

PULL SIDE

24" MIN*4

2" M

IN

LATCH APPROACH,

PUSH SIDE

*IF BOTH CLOSER

AND LATCH ARE

PROVIDED

*54" MIN IF CLOSER

IS PROVIDED

*48" IF CLOSER IS

PROVIDED

FRONT APPROACH,

PUSH SIDE

M

IN

42" MIN

DOOR AND FIXTURE CLEARANCES

MATERIALS LEGEND

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN

VOLUNTARY STANDARD BODIES.

GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS. REFERENCE RELEVANT ADDNEDA FOR EACH OF THE ADOPTED CODES AND STANDARDS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• 2024 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)

• 2024 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)

• 2024 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)

• 2024 NATIONAL FIRE CODES (NFPA)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• 2023 VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2024 INTERNATIONAL MECHANICAL CODE

• 2023 NATIONAL ELECTRICAL CODE (NEC), NFPA 70

• 2024 INTERNATIONAL PLUMBING CODE (IPC)

• 2022 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.

• 2022 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)

• 2022 ANSI ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES

• 2022 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)

• 2023 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND

NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS

• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

• 2022 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1

• 2022 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15

• 2023 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL

• 2022 GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS (FGI)

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT

NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.

DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES

EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

ASHRAE 90.1 - 2019 EDITION

BUILDING LOCATION: INDIANAPOLIS, IN

CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 4A

INTERIOR DESIGN CONDITIONS:

THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM

AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.

BUILDING ENVELOPE REQUIREMENTS (5.5 )

BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)

ROOFS REQUIRED DESIGNED

INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls N/A

ATTIC AND OTHER: R-49 N/A

WALLS, ABOVE GRADE

MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. N/A STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 N/A

WALL, BELOW GRADE

BELOW-GRADE WALL: R-7.5 c.i. EXISTING

FLOORS

MASS: R-14.6 c.i. EXISTING

STEEL-FRAMED: R-30 EXISTING

WOOD-FRAMED AND OTHER: R-30 N/A

SLAB-ON-GRADE FLOORS

UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. EXISTING

OPAQUE DOORS

SWINGING: U-0.370 EXISTING

NONSWINGING: U-0.310 N/A

FENESTRATION (TABLE 5.5-4):

VERTICAL FENESTRATION, U-FACTOR

FIXED: U-0.36 EXISTING

OPERABLE: U-0.45 EXISTING

ENTRANCE DOOR: U-0.63 EXISTING

DEFINITIONS

c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM

NR = NO (INSULATION) REQUIREMENT

ENERGY REQUIREMENTS

N

1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL CONFIRM

ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE ENTIRE

DOCUMENT SET.

2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY WORK,

TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY DISCREPANCIES TO

THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND

EXISTING STRUCTURAL CONDITIONS.

3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT

CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.

4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE

CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK

AREAS FROM THE EXISTING FACILITIES.

5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.

6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN

PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND REPAIR

ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.

7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR

REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.

8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT

PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.

9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE

ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.

10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER

DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A

WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE AND

OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND

ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS, BUT

DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL DRAWINGS.

CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE OTHER SHEETS

AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION DOCUMENTS THAT REFLECT

WORK REQUIRED TO ACHIEVE A COMPLETE AND OPERATIONAL GOAL. LACK OF

COORDINATION AND REVIEW OF DRAWINGS AND SPECIFICATIONS AS AN ENTIRE

DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS, BEING OBVIOUS AND

TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE DRAWINGS AND SPECIFICATIONS, SHALL

NOT BE IN ANY WAY AN ADDITIONAL COST TO THE GOVERNMENT.

11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH SERVICES

TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN ADVANCE OF

PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND

APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS OF ANY

SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60 CALENDAR DAYS PRIOR TO THE

DESIRED TIME AND SHALL BE PERFORMED AS DIRECTED BY THE COR. MAJOR

INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS AND MAY

NOT BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL

CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING AND APPROVED BY THE COR.

CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH

OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE

TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE

MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING

HOURS. SCHEDULE INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT

BE AN ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT

MAY AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING

THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.

12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING BUILDING MATERIALS

(ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE DESIGNED/SPECIFIED AS BUILDING

MATERIAL IN ANY OF THE CONSTRUCTION DOCUMENTS.

13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.

GENERAL NOTES

AREA NAME

150 SF

A101

A101

SIM

A

00.0

A101

1 1

A101

LEVEL NAME

00'-00"

00'-00" 4B

3A

FIBERGLASS BATT

INSULATION

RIGID INSULATION

CONCRETE / PRECAST

CONCRETE

EARTH / SOIL

SAND, EIFS FINISH, OR

PLASTER FINISH

GYPSUM BOARD FINISH

BRICK

CONCRETE MASONRY

UNIT

STONE / CAST STONE

GYPSUM BOARD SECTION

EXTERIOR SHEATHING

BOARD SECTION

PLYWOOD SECTION

CLEAN UTILITY

000A

150 SF

/1 A101

X0000

6"2' -1 0" '-2

ROOM TAG

AREA TAG

SPECIALTY EQUIPMENT TAG

DOOR TAG

KEYED NOTE TAG

WALL TAG

WINDOW TAG

A101

SIM

A101

SIM

A

ACB ACOUSTIC CEILING BAFFLE

ACP ACOUSTIC CEILING PANEL

ACST ACOUSTIC

ADA AMERICANS WITH DISABILITIES ACT

ACT ACOUSTICAL CEILING TILE

ADDL ADDITIONAL

ADDN ADDITION

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

AE ARCHITECT/ENGINEER

AF ACCESS FLOORING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINIUM (TRIM)

AMT AMOUNT

APPROX APPROXIMATE

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

AT ACOUSTIC CEILING TILE

AVG AVERAGE

B

BD BOARD

BG BUMPER GUARD

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BOS BOTTOM OF STEEL

BOT BOTTOM

BRKT BRACKET

BTWN BETWEEN

C

CAB CABINET

CAV CAVITY

CBB CONCRETE BACKER BOARD

CC CONTRACTOR PROVIDED /

CONTRACTOR INSTALLED

CD CONSTRUCTION DOCUMENTS

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CH BD CHALKBOARD

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CONTRACTING OFFICER

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CP CONTRACTOR PROVIDED

CPT CARPET/CARPET TILE

CS CONCRETE SEALED

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTR CENTER

CU FT CUBIC FEET

D

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

DWG DRAWING

DWP DIMENSIONAL WALL PANEL

E

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPY EPOXY FLOORING

EQ EQUAL

ETR EXISTING TO REMAIN

EX EXISTING

EXP EXPOSED

EXT EXTERIOR

F

FAB FABRIC

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FP FIRE PROTECTION

FR FIRE RESISTANT

FT FEET

FTG FOOTING

FV FIELD VERIFY

FWC FABRIC WALL COVERING

G

GDR GUARDRAIL

GL GLASS/GLAZING

GRAN GRANITE

GR FL GROUND FLOOR

GT GROUT

GSM GALVANIZED SHEET METAL

GYP BD GYPSUM BOARD

H

HDW HARDWARE

HEPA HIGH EFFICIENCY

PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

I

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J

J-BOX JUNCTION BOX

L

LAV LAVATORY

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIN LINEAR

LN LINOLEUM

LOC LOCATION

LT LIGHT

LVR LOUVER

LVT LUXURY VINYL TILE

M

MAT CARPET MAT / WALK-OFF MAT

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MOD MODIFY

MTG MOUNTING

MTL METAL

MVBL MOVABLE

N

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P

P PAINT

PA PUBLIC ADDRESS

PBD PARTICLE BOARD

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PNL PANEL

PR PAIR

PRB PROFILE BASE

PRKG PARKING

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PORCELAIN TILE

PWR POWER

Q

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QTY QUANTITY

REFERENCE SYMBOLS IDENTIFICATION TAGS

NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.

GRID HEAD AND

LINE

LEVEL INDICATOR

MATCH LINE AND

VIEW REFERENCE

NORTH ARROW W/

PROJECT NORTH

SPOT ELEVATION

DETAIL

SECTION

**48" MIN IF BOTH CLOSER

AND LATCH PROVIDED

WALL

SECTION

BUILDING

SECTION

DETAIL

ELEVATION

INTERIOR

ELEVATION

BUILDING

ELEVATION

1 1

6'- 0"

5'- 6"

BARIATRIC TOILET ROOM

TURNING RADIUS

CLEAR FLOOR SPACE

@ ADA LAVATORY

CLEAR FLOOR SPACE @ ADA

DRINKING FOUNTAIN

4"

6"

3"

1' -6

6" MAX

7" - 9" 11" MIN

17" - 25"

M

IN

6' -0

(ANSI ICC A117.1)

39"- 41"

(A N S I I C C A 7.

1)

M

IN

(A N S I I C C A 7.

1)

1"

3' -6 M A X

5' -0 M A X

R

RAF RESILIENT ATHLETIC FLOORING

RB RUBBER BASE/RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RES RESINOUS FLOORING

RES-W RESINOUS / EPOXY WALL / CEILING

RF RUBBER FLOORING

RFG ROOFING

RM ROOM

RO ROUGH OPENING

RP RESIN PANEL

RSF RESILIENT SHEET FLOORING

RV ROOF VENT

RWC RIGID VINYL WALLCOVERING

S

SC SPECIALTY COATING

SD STATIC DISSIPATIVE FLOORING/TILE

SCHED SCHEDULE

SECT SECTION

SF SQUARE FOOT (FEET)

SGL SINGLE

SIM SIMILAR

SJ SCORED JOINT

SLNT SEALANT

SM SHEET METAL

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SOLID SURFACE

ST STONE

STD STANDARD

STOR STORAGE

SV SHEET VINYL (ROLLED OR TILE)

T

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TOF TOP OF FOOTING/ FOUNDATION

TOM TOP OF MASONRY

TOS TOP OF SLAB/ STEEL

U

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

V

VAR VARIES

VC VA PROVIDED / CONTRACTOR

INSTALLED

VCT VINYL COMPOSITION TILE

VFAT VINYL-FACED ACOUSTICAL TILE

VP VENEERED PLASTER

VT VINYL TILE

VV VA PROVIDED / VA INSTALLED

VWC VINYL WALLCOVERING

VWF VINYL WALL FABRIC

W

W/ WITH

W/O WITHOUT

W/C WATER CLOSET

WC WHEELCHAIR

WD WOOD

WFAB WALL FABRIC

WPM WATERPROOF MEMBRANE

WSF WELDED SHEET FLOOR

X

X BRACE CROSS BRACE

TRUE

NORTH

BID DEDUCTS

th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t

00 00

11 11 o n e in c h o n e fo o t o n e in c h o n e fo o t o n e in c h o n e fo o t o n e in c h o n e fo o t

00 00

22 22 th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t

00 00 22 22 o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t

00 00 44 44 th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t

00 00 44 44 o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

00 00 44 44

88 88 o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t

00 00 44 44

88 88

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

DRAWING TITLE PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

PROJECT NUMBERCONSULTANTS:

DRAWING #

VA HEALTH CARE SYSTEM APPROVAL:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. AR12100034 EXP. 12/31/2025

MECH ENGR REG. NO. PE12100220 EXP. 07/31/2024

ELEC ENGR REG. NO. PE12300478 EXP. 07/31/2024

STRUCTURAL ENGINEER

STAND

8234 ROBINSON ST

OVERLAND PARK, KS 66204

(913) 214-2169

MECHANICAL / ELECTRICAL /

VERTICAL TRANSPORTATION

SPUR DESIGN

2519 MADISON AVE, SUITE 100

KANSAS CITY, MO 64108

(913) 369-7200

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

11140 SOUTH TOWNE SQUARE, SUITE 100

ST. LOUIS, MO 63123

(314) 917-0148

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

DRAWING NUMBER

BUILDING NUMBER

/2

/2

:1 :2

P

M

GENERAL INFORMATION

EFB 02 OF 91AJS

FINAL BID SET

UPGRADE A WING AND D

WING ELEVATORS

08/22/2024

583-22-101

RICHARD L. ROUDEBUSH VAMC

1481 WEST 10TH STREET

INDIANAPOLIS, IN 46202

GI001

SPUR #: 2303No. REVISION DESCRIPTION DATE

CONTROLS DEFINED BELOW FOR THE LEVEL OF PRECAUTIONS IDENTIFIED FOR THE ACTIVITY MUST BE IN PLACE BEFORE THE ACTIVITY BEGINS AND MAINTAINED UNTIL WORK ISCOMPLETED AND THE AREA IS ACTIVATED. CONTROL MEASURES FOR EACH PRECAUTION LEVEL MUST ALSO INCLUDE THE CONTROL MEASURES IN THE PRECEDING LEVEL(S). AS THE ACTIVITY PROGRESSES, A FULL RE-

EVALUATION OF REMAINING ACTIVITY TYPE AND PATIENT RISK IS REQUIRED PRIOR TO

DOWNGRADING THE LEVEL OF PRECAUTIONS.

LEVEL I:

1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.

2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC.,UPON COMPLETION OF

WORK.

3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUSTBE FREE OF

CONTAMINANTS AND LOOSE MATERIAL.

LEVEL II:

ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:

1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED

AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT

CART OR SOME OTHER SYSTEM).

2. IF WORK SITE CONTAINED, MUST BE NEUTRAL OR NEGATIVELY PRESSURIZED.

3. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK

AREA.

4. REMOVE/ISOLATE/TAPE OFF AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC

SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS

DIFFUSER ISOLATION.

5. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING STAGNATION

DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR ISOLATED FROM

THE MAIN SYSTEM.

6. SEAL/CLOSE DOORS TO PREVENT DUST MIGRATION. MAY PUT ZIPPER PLASTIC BARRIER OVER

DOOR.

7. CONSIDER HEPA CART USE.

8. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND DISPOSAL

OF TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.

9. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN SEALED

CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE AREA.

10. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUSTBE USED TO

TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS MUST

BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE

CONTAINED WORK AREA.

11. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY SOILED.

12. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR HEPA

VACUUMING SURFACES AT LEAST DAILY.

LEVEL III:

ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:

1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.

2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS. BARRIERS

MUST EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THEDECK ABOVE.

3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A

MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELYAFFIXED TO

FLOOR AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND SECURE FROM MOVEMENT OR

DAMAGE.

4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING, USING

APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).

5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE

BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A WORK SPECIFIC

WAIVER IS APPROVED BY VHA’S OFFICE OF HEALTHCARE ENGINEERING); THIS MUST BE

MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. EXHAUST DISCHARGED

DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES

AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED. EXHAUSTING DISCHARGED AIR INTO

SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G.,

BATHROOM EXHAUST) IS PROHIBITED.

6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR

DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR AND

DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL”OR SIMILAR APPARATUS ARE

NOT ACCEPTABLE.

LEVEL IV:

ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:

1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINALBARRIER.

2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL.ANTEROOM

MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’PPE AND

CLEANING.

3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST

BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF

COVER SUITS IS ACCEPTABLE.

4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES INANTEROOM.

SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THEOCCUPIED SPACE

(NON-WORK AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.

GENERAL ICRA NOTES - LEVEL OF PRECAUTIONS & CONTROL MEASURES

MINIMUM INFECTION PREVENTION AND CONTROL MEASURES REQUIRED

UPON COMPLETION OF THE ACTIVITY

CONTROLS DEFINED BELOW SHALL BE COMPLETED UPON COMPLETION OF THEACTIVITY AND

INSPECTED PRIOR TO TERMINATING MEASURES DEFINED IN TABLE 5.

LEVELS I -II:

CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

HVAC SYSTEMS:

1. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

2. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN

SPECIFICATIONS.

WATER SYSTEMS:

1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL

CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

LEVELS III - IV:

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND

ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL

ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL

MEASURES.

WORK AREA CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

REMOVAL OF CRITICAL BARRIERS:

1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVINGDRYWALL

REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE

BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED.

ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.

2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER

THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING

HARD BARRIERS:

1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA

VACUUM.

3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD

BARRIER.

5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.

NEGATIVE AIR REQUIREMENTS:

1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE WORK

AREA.

2. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT)

MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION

OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND

BEFORE REMOVAL OF CRITICAL BARRIERS.

HVAC SYSTEMS:

1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS

WHERE WORK IS BEING PERFORMED.

2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND

AIR EXCHANGE DESIGN SPECIFICATIONS.

WATER SYSTEMS:

UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT

LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

*STATION REQUIRES ALL ICRA BARRIERS TO BE 1 HOUR FIRE RATED MINIMUM.

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION

CATEGORY C

INCLUDES BUT NOT LIMITED TO:

• WORK REQUIRING LONGER THAN A SINGLE WEEK TO COMPLETE BUT NOT EXCEEDING 6 MONTHS.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.

• DEMOLITION/REMOVAL OF PREEXISTING FLOOR COVERING, CASEWORK, LAY-IN CEILING, OR OTHER

ARCHITECTURAL ELEMENTS.

• DEMOLITION/REMOVAL OF MORE THAN 32 SF OF DRYWALL/FRAMING, HARD CEILINGS, AND

DOORS/FRAMING AND MINIMAL INFRASTRUCTURE SUCH AS ELECTRICAL CIRCUITS AND BRANCH PIPING.

• INSTALLATION OF NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING,DRYWALL/PLASTER AND

ASSOCIATED WORK.

• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW SINKS, SHOWERS ANDTOILETS AND ASSOCIATED

PLUMBING.

• SHUT DOWN OF SECTIONS OF POTABLE WATER SYSTEMS.

• ELECTRICAL WORK SUCH AS INSTALLATION OF CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND

SWITCHES FOR AN AREA, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS

TERMINAL UNITS, FANS ETC.

• MODIFICATION OF EXISTING FIRE ALARM AND SUPPRESSION SYSTEMS.

• MECHANICAL WORK SUCH AS THE INSTALLATION OF DUCTWORK, DIFFUSERS,AND TERMINAL UNITS FOR

AN AREA

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATES MINIMAL DUSTCATEGOTY B

INCLUDES BUT NOT LIMITED TO:

• PROLONGED INSPECTION AND WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT BUT NOT

EXCEEDING A WEEK.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.

• WORK THAT CREATES MINIMAL DUST AND DEBRIS.

• INTERIOR FINISH OR SURFACE REPAIRS, UPDATES, OR MODIFICATIONS SUCH AS REPAIR OF

FIREWALLS AND BARRIERS, AND NEW FLOORING THAT PRODUCESMINIMAL DUST AND DEBRIS.

CONTROLLED SANDING ACTIVITIES (E.G., WET OR DRYSANDING) THAT PRODUCE MINIMAL DUST

AND DEBRIS.

• PLUMBING WORK SUCH AS INSTALLATION OR REPLACEMENT OF A SINGLE FIXTURE OR PIPING

FOR A SINGLE FIXTURE. ANY WORK ON SANITARY PLUMBING INCLUDING SNAKING OF DRAINS.

• ELECTRICAL WORK SUCH AS INSTALLATION OF CABLING/WIRING/CONDUIT FOR A SINGLE DEVICE, INSTALLATION OF NEW DEVICE SUCH AS A LIGHT FIXTURE THAT PRODUCES MINIMAL DUST AND

DEBRIS.

• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS REPLACEMENT OF A

SINGLE DIFFUSER, SINGLE TERMINAL UNIT OR A SINGLE DEVICE THAT PRODUCES MINIMAL DUST

AND DEBRIS.

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES

DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES

CATEGORY D

INCLUDES BUT NOT LIMITED TO:

• WORK EXCEEDING 6 MONTHS IN DURATION.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.

• LARGE-SCALE DEMOLITION OF BUILDING COMPONENTS AND INFRASTRUCTUREINCLUDING REMOVAL OF

MULTIPLE DOORS, WALLS, FRAMING, CEILINGS, FLOORING, PIPING, ELECTRICAL AND HVAC.

• THE INSTALLATION BUILDING COMPONENTS SUCH AS NEW WALLS, CEILINGSAND DOORS INCLUDING

FRAMING, DRYWALL AND ASSOCIATED PLASTER WORK.

• PLUMBING WORK SUCH AS THE INSTALLATION OF: NEW MEDICAL GAS SYSTEMS, STEAM/HEATING HOT

WATER, CONDENSATE SYSTEMS, MULTIPLE SINKS, SHOWERS AND TOILETS INCLUDING ASSOCIATED

PLUMBING.

• SHUTDOWN OF POTABLE WATER, STEAM/HEATING HOT WATER, CONDENSATE, AND MEDICAL GAS

SYSTEMS.

• ELECTRICAL WORK SUCH AS INSTALLATION OF ELECTRICAL FEEDERS, DISTRIBUTION PANELS, CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES FOR AN AREA, THE INSTALLATION OF CONDUIT

AND WIRE FOR NEW DEVICES SUCH AS TERMINAL UNITS, FANS ETC.

• INSTALLATION OF FIRE ALARM AND SUPPRESSION SYSTEMS.

• ELECTRICAL SHUTDOWN OF MULTIPLE PANELS.

• MECHANICAL WORK SUCH AS THE INSTALLATION OF AIR HANDLING EQUIPMENT, ASSOCIATED DUCTWORK,

• DIFFUSERS, HEAT EXCHANGERS, TERMINAL UNITS AND CONTROLS.

INSPECTIONS AND NON-INVASIVE ACTIVITIESCATEGORY A

INCLUDES BUT NOT LIMITED TO:

• WORK CAN BE COMPLETED IN A SINGLE SHIFT, NOT TO EXCEED 10 HOURS.

• PATIENTS AND/OR EMPLOYEES MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.

• WORK THAT DOES NOT CREATE DUST OR DEBRIS.

• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR VISUAL

INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET WITH LIMITED EXPOSURE TIME (NOT TO EXCEED

AN HOUR FOR EACH TILE) WITHIN THE SHIFT.

• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING WITHOUT SANDING) THAT DO NOT CREATE DUST OR

DEBRIS.

• LIMITED BUILDING SYSTEM MAINTENANCE SUCH AS PLUMBING ON POTABLE SYSTEMS LIMITED TO

FAUCET REPLACEMENT ETC. AND ELECTRICAL WORK SUCH AS REPLACEMENT OF BULBS,

RECEPTACLES, OR SWITCHES.

INFECTION CONTROL RISK ASSESSMENT (ICRA)

LOW RISK

PATEINT RISK GROUPS

MEDIUM RISK HIGH RISK HIGHEST RISK

• PUBLIC HALLWAYS AND

GATHERING AREAS NOT IN

CLINICAL AREAS

• OFFICE AREAS NOT IN

CLINICAL AREAS

• BREAKROOMS NOT IN

CLINICAL AREAS

• BATHROOMS OR LOCKER

ROOMS NOT IN CLINICAL

AREAS

• MECHANCIAL/ELECTRICAL

ROOMS NOT IN CLINICAL

AREAS

• EMS CLOSETS NOT ON

CLINICAL UNITS

• WAITING AREAS

• CLINICAL ENGINEERING

(BIOMEDICAL/STORAGE

CLOSETS FOR ITEMS USED

ON A CLINICAL UNIT.)

• MATERIALS MANAGEMENT/

LOGISTICS/ TSS

• STERILE PROCESSING

DEPARTMENT- DIRTY SIDE

• KITCHEN, CAFETERIA, GIFT

SHOP, COFFEE SHOP, AND

FOOD KIOSKS.

• PATIENT CARE ROOMS AND

AREAS

• ALL ACUTE CARE UNITS,

INCLUDING MENTAL HEALTH

• ALL OUTPATIENT UNITS AND

CLINICS

• EMERGENCY DEPARTMENT

• DOMICILIARIES AND

TRANSITIONAL RESIDENCES

• EMPLOYEE HEALTH

• PHARMACY- GENERAL WORK

ZONE

• MEDICATION ROOMS AND

CLEAN UTILITY ROOMS

• IMAGING SUITES-

DIAGNOSTIC IMAGING

• LABORATORY

• ALL TRANSPLANT UNITS

• ALL INTENSIVE CARE UNITS

• ALL ONCOLOGY UNITS AND

CHEMOTHERAPY/INFUSION

CENTERS

• OR THEATERS AND

RESTRICTED AREAS

• HEMODIALYSIS UNITS

• PROCEDURAL ROOMS

• PHARMACY COMPOUNDING

AREA

• STERILE PROCESSING

DEPARTMENT- CLEAN SIDE

• TRANSFUSION SERVICES

• IMAGING SUITES-

INTERVENTIONAL IMAGING

• DEDICATED ISOLATION

WARDS/UNITS FOR

INFECTIOUS DISEASES

RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

I

I

I

II

II

II

II

III/IV

II

III

III/IV

III/IV

III/IV

IV

IV

IV

IC MATRIX - CLASS OF PRECAUTIONS:

CONSTRUCTION PROJECT BY PATIENT RISK

CONSTRUCTION PROJECT TYPE

NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL INDICATE

THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.

NON-PATIENT CARE AREAS

SUCH AS:

PATIENT CARE SUPPORT

AREAS SUCH AS:

PATIENT CARE AREAS SUCH AS: PROCEDURAL, INVASIVE,

STERILE SUPPORT AND HIGHLY

COMPROMISED PATIENT CARE

AREAS SUCH AS:

O U T S

ID

E O F B U

IL

D

IN

G

WEEKLY CHANGED HEPA FILTER

HEPA NEGATIVE AIR UNIT

WEEKLY CHANGED (OR MORE AS

NEEDED) PRE FILTER

F

IR

E R A T E D P

LY

W O O D

FLEX DUCT

SUPPLY DUCTS EITHER KEEP

RUNNING OR COVER WHEN

RUNNING TO KEEP DUST OUT.

TAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION

A O V

FIRE EXTINGUISHER ON PORTABLE

FLOOR BRACKET (ILSM MAY REQUIRE

MORE THAN ONE)

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

6 MIL PLASTIC

TEMPORARY DIGITAL MANOMETER FOR NEGATIVE

PRESSURE MONITORING OUTSIDE OF ICRA BARRIER

FOR VA'S INSPECTION. INDICATOR SHALL BE AT -0.01

OR GREATER (VERIFY DAILY). IF NOT, VERIFY ALL

OPENINGS, SUCH AS DOOR CLOSED, AND/OR CHANGE

OUT NEGATIVE AIR PRE-FILTER.

PROVIDE STICKY MAT, DRY MAT, WET MAT

(CHANGED END OF SHIFT OR MORE IF

NECESSARYTO MAINTAIN CLEANLINESS)

PROVIDE WIPES AND SPRAY FOR WET MAT

POST ICRA ILSM FIRE

INSPECTION SHEETS

CONTAINER VISIBLE TO

PUBLIC

COVER ALL RETURNS AT THE

GRATE/DIFFUSERS

OPTIONAL EXHAUST DUCTS

(COVER THE GRATES AND

THE DIFFUSERS) E

DOOR OPENING

VENT TO OUTSIDE

ROUTE TO BE

APPROVED BY COR.

FIRE PULL STATION WITH AUDIO/

VISUAL

ILSM SIGNAGE

ICRA BARRIER, SEE PLANS FOR TYPE AND LOCATION

GI002

GI002

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO LOCKING

BRAKES

MOBILE CART

A D

JU

S T A B

LE

H E

IG

H T

HEPA NEGATIVE AIR

UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

HEATED DETECTOR CUT-OFF

BASIS OF DESIGN: HEPA NEGATIVE AIR UNIT

INTEGRAL WITH EDGEGUARD BARRIER SYSTEM.

FIRE RATED PLYWOOD (TEMP.

REMOVE GLASS PANEL)

EXISTING WINDOW FRAME

TYPE A OR C ICRA BARRIER,

SEE PLANS FOR TYPE AND

LOCATION

TYPE B OR D ICRA BARRIER,

SEE PLANS FOR TYPE AND

LOCATION

EXISTING CEILING

EXISTING CONCRETE SLAB FLOOR OR

ROOF ASSEMBLY

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING

REPLACED MUST BE PROTECTED.

COVER WITH ROSIN PAPER/ FIRE

RATED PLYWOOD.

WHEN WORKING ABOVE CEILING WITH

BARRIERS THAT TERMINATE AT CEILING,

PROVIDE PLASTIC ENCLOSURE IN

PLENUM SPACE.

XXXXXX

XXXXXX

XXXXXX

A .F .F

4' -0

THIS IS A RESTRICTED AREA

AREA UNDER CONSTRUCTION

PERSONNEL ENTERING MUST HAVE: HARD HAT,

SAFETY GLASSES AND PROPER I.D.

COMING SOON!!

--DESCRIPTION ON NEWLY PROPOSED OCCUPANCY--

ICRA, ISLM, WATCH,

MISC. FORMS

PAPER CADDY

INDICATOR

(REFER TO

PLAN AND

ELEVATION)

FRAMED PICTURE

OF C.O.R. WITH

CONTACT

INFORMATION

CONSTRUCTION

SUPERVISOR

NAME AND CELL NUMBER

XXXXX

BOILER/CHILLER PLANT AFTER

HOURS CONTACT PHONE 317-988-2329

FIRE EMERGENCY DIAL 911

3 5/8" INSULATED WALL WITH 16

GAUGE METAL STUDS @ 16" O.C.

WALL TO EXTEND TO UNDERSIDE

OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH EXISTING

AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

4 7/8"

C

3 5/8" INSULATED WALL WITH 16

GAUGE METAL STUDS @ 16" O.C.

(2) LAYERS 5/8" GYPSUM BOARD

EACH SIDE. WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH EXISTING

AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

6 1/8"

D

FIRE RESISTANT SEALANT, BOTH

SIDES

FIRE RESISTANT SEALANT, BOTH

SIDES

1-HR RATED AND SMOKE RATED

U.L. DESIGN NO. U404

2-HR RATED AND SMOKE

RATED

U.L. DESIGN NO. U404

th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t

00 00

11 11 o n e in c h o n e fo o t o n e in c h o n e fo o t o n e in c h o n e fo o t o n e in c h o n e fo o t

00 00

22 22 th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t

00 00 22 22 o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t o n e h a lf in c h o n e fo o t

00 00 44 44 th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t th re e e ig h th s in c h o n e fo o t

00 00 44 44 o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

00 00 44 44

88 88 o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t o n e e ig h th in c h o n e fo o t

00 00 44 44

88 88

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

DRAWING TITLE PROJECT TITLE

LOCATION

DATE CHECKED DRAWN

PROJECT NUMBERCONSULTANTS:

DRAWING #

VA HEALTH CARE SYSTEM APPROVAL:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH REG. NO. AR12100034 EXP. 12/31/2025

MECH ENGR REG. NO. PE12100220 EXP. 07/31/2024

ELEC ENGR REG. NO. PE12300478 EXP. 07/31/2024

STRUCTURAL ENGINEER

STAND

8234 ROBINSON ST

OVERLAND PARK, KS 66204

(913) 214-2169

MECHANICAL / ELECTRICAL /

VERTICAL TRANSPORTATION

SPUR DESIGN

2519 MADISON AVE, SUITE 100

KANSAS CITY, MO 64108

(913) 369-7200

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FIRE PROTECTION ENGINEER

POOLE FIRE PROTECTION, INC.

19910 WEST 161ST STREET

OLATHE, KANSAS 66062

(913) 829-8690

FULLY SPRINKLERED

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

11140 SOUTH TOWNE SQUARE, SUITE 100

ST. LOUIS, MO 63123

(314) 917-0148

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

DRAWING NUMBER

BUILDING NUMBER

/2

/2

:1 :2

P

M

ICRA CONSTRUCTION DETAILS

EFB 03 OF 91AJS

FINAL BID SET

UPGRADE A WING AND D

WING ELEVATORS

08/22/2024

583-22-101

RICHARD L. ROUDEBUSH VAMC

1481 WEST 10TH STREET

INDIANAPOLIS, IN 46202

GI002

SPUR #: 2303

1/2" = 1'-0"

GENERAL ICRA CONSTRUCTION PLAN LAYOUT3 3/8" = 1'-0"

ICRA MOBILE CONTAINMENT CART13/8" = 1'-0"

SECTION AT ICRA CONSTRUCTION PLAN2

3/8" = 1'-0"

ICRA ELEVATION4

3/4" = 1'-0"

ICRA BARRIER WALL TYPES5

No. REVISION DESCRIPTION DATE

A.10 A.9 A.8 A.7 A.6

A.F

A.F5

A.F8

A.F3

CORRIDOR

C1-7

1' -0 /4

'-4

3' -1 0"

'-6

8' -1 3/ 4"

'-8

27'-0" 2'-2" 19'-0" 22'-4" 6'-10"

77'-4"

STAIR

9-1

ELEV.

S-11

ELEV.

S-12

ELEV.

S-13

ELEV.

P-14

ELEV.

P-13

ELEV.

P-16

ELEV.

P-15

TELE. RM.

A-1485

PASSENGER

ELEVATOR

LOBBY

C1-1

CORRIDOR

C1-3

ELECT. ROOM

A-1486

SERVICE

ELEVATOR

LOBBY

A-1479

TOILET

A-1473

TOILET

A-1474

BLOOD DRAW

A-1472

WAITING

A-1471

CHASE

1B

TYPICAL ICRA BARRIER CONFIGURATION

36" MIN.

10.45

10.45

10.46

10.41

10.41

D.3D.4D.5

D.C

D.B

D.A

D.X

D.Y

D.Z

CHASE "A"

C H A S

EELEV.

P-10

ELEV.

P-9

ELEV.

P-8

ELEC. ROOM

D-1031

HAC

D-1024

DENTAL

STORAGE

D-1032

LOBBY

C1-1002

CORRIDOR

C1-106

ELEV.

S-7

STORAGE

D-1001

LOBBY

C1-1003

STAIR

7-1

CORRIDOR

C1-105

CHIEF DENTAL

SERVICE

D-1042

SECRETARY

D-1041

DENTAL

RECEPTION

D-1040

DENTAL

WAITING

D-1039

ONCOLOGY

SOCIAL

WORKER

D-1039A

CLINICAL

NURSE

SPECIALIST

D-1038

CONFERENCE

D-1030

TREATMENT

ROOM

D-1029

TREATMENT

ROOM

D-1028

STAFF

LOUNGE

D-1023

OFFICE

D-1002

7'-9 5/8 " 2 '- 6 7 /8"

15'-10 1 / 4" 2 '- 6 7 /8 "

21 '-0" 21 '-10 "

10 '-6"

82'-1 5/ 8"

11'-0"21'-0"

32'-0"

11 1/8" 21'-0" 11'-0"

32'-11 1/8"

GENERAL PHASING NOTES

1. ALL CONSTRUCTION PHASING TO BE COORDINATED WITH INDIANAPOLIS VA COR FOR WORK

RELATED TIMES OF DAY, NIGHT, AND WEEKEND WORK.

2. CONTRACTOR TO COORDINATE WITH THE AHJ FOR CODE AND LIFE SAFETY MEASURES

ASSOCIATED WITH PHASING OF DEMOLITION AND CONSTRUCTION WORK TO MAINTAIN LIFE

SAFETY MEASURES.

3. CONTRACTOR TO COORDINATE PHASING WITH PROCUREMENT SCHEDULES OF ELEVATOR

EQUIPMENT AND NOTIFY OWNER, INDIANOPOLIS VA COR AND ARCHITECT FOR PHASING

MODIFICIATIONS NECESSARY TO COMPLETE WORK.

4. HOISTWAY CONSTRUCTION SHALL COMPLY WITH OSHA STANDARD 1910.146 PERMIT-REQUIRED

CONFINED SPACES. PROVIDE REQUIRED SIGNAGE WHERE NECESSARY TO MEET OSHA

STANDARDS.

5. CONSTRUCTION IN MACHINE ROOMS SHALL COMPLY WITH OSHA STANDARD 1926.416. PROVIDE

REQUIRED SIGNAGE WHERE NECESSARY TO MEET OSHA STANDARDS.

6. CONTRACTOR TO COORDINATE AND CONFIRM WITH INDIANAPOLIS VA COR ON OPTIMAL ROUTE

FOR ICRA NEGATIVE AIR DUCTING.

7. ANY SHUTDOWNS TO TAKE PLACE TO BE COORDINATED WITH INDIANAPOLIS VA COR.

8. DIGITAL MONITORING IS REQUIRED AT ALL ICRA ENCLOSURES. CONTRACTOR TO COORDINATE

DIGITAL MONITORING WITH INDIANAPOLIS COR.

PHASING PLAN LEGEND

PHASE 2

PHASE 1

PHASE 3AREA OF WORK

NOT IN SCOPE

ICRA LEGEND

A. WALL TYPE 'W', TEMPORARY 1-HR RATED AND SMOKE BARRIER AT THIS

LOCATION, CONTRACTOR TO COORDINATE WITH VA COR AND VA SAFETY

OFFICER FOR EXTENTS OF BARRIER. REFER TO ICRA CONSTRUCTION

DETAILS (GI002).

B. WALL TYPE 'B', TEMPORARY SMOKE BARRIER AT THIS LOCATION,

CONTRACTOR TO COORDINATE WITH VA COR AND VA SAFETY OFFICER

FOR EXTENTS OF BARRIER. REFER TO ICRA CONSTRUCTION DETAILS

(GI002).

C. WALL TYPE 'C', TEMPORARY 2-HR RATED AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .