This is a bid schedule document for a VA elevator upgrade project requiring contractors to submit four distinct proposal options. The project involves upgrades to elevators in both A Wing and D Wing, with a base bid covering all work including general construction, alterations, and existing item removal, to be completed within 690 calendar days after Notice to Proceed.
The document outlines three bid alternates: Alternate No. 1 excludes D Wing hydraulic Elevator S7; Alternate No. 2 includes limited scope work for D Wing Elevators P8-P10 (replacing hoist machines, ropes, grippers, counterweight components, and HVAC modifications); and Alternate No. 3 excludes all D Wing elevators to focus solely on A Wing work. The project is being conducted for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10, under solicitation number 36C25025B0003.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25025B0003 0004.docx | DOCX document | |
| 36C25025B0003 0003.docx | DOCX document | |
| Sign in Sheet.pdf | ||
| 36C25025B0003 0002.docx | DOCX document | |
| 36C25025B0003 0001.docx | DOCX document | |
| 36C25025B0003.docx | DOCX document | |
| Attachment X - Sole Sources-Motion Control.pdf | ||
| Attachment IX - Sole Sources-Imperial Electric.pdf | ||
| Attachment VIII - PCRA - Elevator Modification.pdf | ||
| Attachment VI - Specifications.pdf | ||
| Attachment IV - VHA Directive 1192-01.pdf | ||
| Attachment VII - NEPA Documentation.pdf | ||
| Attachment III - EMR.docx | DOCX document | |
| Attachment II - RFI Template.doc | DOC document | |
| Attachment V - Drawings.pdf | ||
| Attachment I - Wage Determination.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID DEDUCTS
The Contractor will submit FOUR proposal options for this project. The design and specifications only include three bidding items; however, the VA wants a fourth bidding item. The contractor's bid will include Base Bid, Bid Alternate NO.1, Base Bid Alternate NO.2, and Bid Alternate NO.3 as follow:
BASE BID: All work in the project. Work includes general construction, alterations, necessary removal of existing items and construction and certain other items necessary to prepare the existing space for the installation and operation of the new elevators. All phases of work shall be complete within 690 calendar days after Notice to Proceed.
BASE BID: ______________________________
BID ALTERNATE NO.1: BASE BID except deletes D Wing hydraulic Elevator S7 from scope of work. The project duration is reduced by 0 calendar days after the Notice to Proceed.
ALT 1 BID: ______________________________
BID ALTERNATE NO.2: BASE BID and BID ALTERNATE NO. 1, Contractor to perform limited scope for D Wing Elevators P8-P10. The scope is limited to replacing geared hoist machines with new hoist ropes, rope grippers, counterweight frames, and weights with new counterweight roller guides. As indicated in drawings and specifications, HVAC modifications to the machine room will also be included in the scope.
ALT 2 BID: ______________________________
BID ALTERNATE NO.3: Base bid except all D Wing Elevators. This alternate shall only include work required for the A Wing.
ALT 3 BID: ______________________________
GUARANTEE PERIOD SERVICES: ________________________________