Attachment J-1 CDRLs.pdf
PDF 1 MB Posted
- Attached to
- Hot Oil Flush of External Hydraulics System
- Solicitation number
- N4523A24R0801
About this file
This document package includes two Contract Data Requirements List (CDRL) forms and associated Data Item Descriptions (DIDs). The CDRLs require the contractor to submit a Condition Found Report and a Contractor Hazardous Material Inventory.
The Condition Found Report CDRL (A001) requires the contractor to report any unsatisfactory conditions discovered during contract performance, along with proposed repairs, replacement parts, cost estimates, and schedule impact assessments. It references DI-MGMT-81648 for format and content requirements. The Contractor Hazardous Material Inventory CDRL (A002) requires the contractor to submit an inventory of all hazardous materials to be transported to the worksite. It references DI-ENVR-82091, which specifies the format and content of PSNS&IMF Form 5090/132. Both CDRLs are associated with Solicitation N4523A24R0801 for a hot oil flush of external hydraulics on an unspecified ship, to be awarded by the Department of the Navy Naval Supply Systems Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Answers to RFP Questions 9-25.docx | DOCX document | |
| N4523A24R0801 Hot Oil Flush Combined Synopsis Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CLIN XXXX A X
EMERGENCY DIESEL ENGINE N4523A-23-X-XXXX TBD
A002 CONDITION FOUND REPORT UNSATISFACTORY CONDITIONS, PROPOSED
REPAIRS AND REPLACEMENT PARTS
DI-MGMT-81648 SOW PARAGRAPH 3.12.4 PSNS&IMF CODE 101.13
N/A
N/A D
ASREQ
YYMMMDD
ANGEN
See Block16 See Block 16
0 0 0
Block 13 - Date of subsequent submission:
Block 14 - Distribution: Contractor shall deliver an electronic copy of the report to the Contracting Officers Representative (COR).
WILLIAMS.MATTHEW.SCOTT.1
156405864
Digitally signed by
WILLIAMS.MATTHEW.SCOTT.1156405864
Date: 2023.04.04 06:53:09 -07'00'
WILLIAMS.MATTHEW.SCOTT.1156405864
Digitally signed by
WILLIAMS.MATTHEW.SCOTT.1156405864
Date: 2023.04.04 06:53:48 -07'00'
Adobe Professional 8.0
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
CLIN XXXX A X
EMERGENCY DIESEL ENGINE N4523A-23-X-XXXX TBD
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
DATA ITEM DESCRIPTION
Title: CONDITION FOUND REPORT
Number: DI-MGMT-81648 Approval Date: 20040809 AMSC Number: N7531 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: N PEO SHIPS-FL32 Applicable Forms: N/A
Use/Relationship: The Condition Found Report identifies needed repairs and recommends corrective action for work discovered during the contract performance period which are not covered by the work specifications.
This DID contains the format, content, and intended use information for the data product resulting from the work task described in the contract.
Requirements:
1. Reference documents. N/A.
2. Format. The report shall be in contractor’s format.
3. Content. The report shall be serialized by CFR Number, and shall include the following:
a. Contract number, ship and hull number
b. Work Item Number to which the CFR relates
c. Date work requirement was discovered
d. Clear description of the work requirement
e. Specific location of the work requirement
f. Recommendation for corrective action
3.1 Recommendation for appropriate/best time to accomplish (i.e. during current availability with or without schedule change, future CNO or Continuous Maintenance Availability), and supporting rationale for the recommendation (such as cost efficiencies, availability of work force, availability of material, premium expenditures, etc.).
3.2 Cost and time estimates and the time frame for which it is valid, including:
a. Class “C” cost estimates. For work requirements which could be estimated within five working days, a class “F” estimate (+/-40%) identifying any potential impact which may affect the current schedule shall be included. The Class “F” estimate shall also contain the date on which a class “C” estimate will be provided.
b. Estimated Premium/Acceleration Costs, including premium costs for; material, subcontractors, man-hours, rework and any additional costs to on going work resulting from inclusion of the CFR work requirement.
c. Identification of related changes, if any, to the internal milestones and production and contract completion dates shall be included. When no changes were required a statement to that fact shall also be included
4. Media. The electronic media requirements shall be as specified in the contract on the DD 1423 CDRL.
5. End of DI-MGMT-81648
Source: https://assist.dla.mil -- Downloaded: 2016-08-11T20:59Z
Check the source to verify that this is the current version before use.
DD FORM 1423-1, FEB 2001
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CLIN 000X A X
EXTERNAL HYDRAULICS N4523A-23-X-XXX TBD
A001 CONTRACTOR'S HAZARDOUS MATERIAL INVENTORY CONTRACTOR HAZARDOUS MATERIAL
INVENTORY REPORT
DI-ENVR-82091 SOW paragraph 3.12.1.1 PSNS and IMF
DD
N/A D
OTIME
See BLK 16
ASREQ
See BLK 16
C/400 COR 1
0 1 0
Block 9: DISTRIBUTION D: Distribution authorized to Department of Defense and US DoD contractors only (administrative or operational use) (As of 7-8-2016) Other requests for this document shall be referred to PSNS and IMF, 1400 Farragut Ave.
Bremerton, WA 98314.
Block 10: Submit HAZMAT Inventory to C/400 with proposal.
Block 11, 12, and 13: Submit inventory changes within 15 days of identifying the requirement to add HAZMAT to the initial report.
WORLEY.DAVID.KELSEY.11200
52736
Digitally signed by
WORLEY.DAVID.KELSEY.1120052736
Date: 2018.11.05 05:32:36 -08'00'
WORLEY.DAVID.KELSEY.
1120052736
Digitally signed by
WORLEY.DAVID.KELSEY.1120052736
Date: 2018.11.05 05:32:53 -08'00'
Adobe Professional 8.0
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
CLIN 000X A X
EXTERNAL HYDRAULICS N4523A-23-X-XXX TBD
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
DATA ITEM DESCRIPTION
Title: CONTRACTOR HAZARDOUS MATERIAL INVENTORY REPORT
Number: DI-ENVR-82091 Approval Date: 20161208
AMSC Number: N9751 Limitation: N /A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: SH Project Number: ENVR-2017-001
Applicable Forms: PSNS&IMF form 5090/132
Use/Relationship: Contractor Hazardous Material Inventory Report will be used to identify hazardous materials needing for approval by the government for use on the Naval Installation.
This DID contains the format and content preparation instructions for the data product generated by the discrete task requirement as delineated in the contract.
Requirements:
1. Format. The Hazardous Material Inventory Report shall be presented on PSNS&IMF form
5090/132 in this DID.
2. Content. The report shall contain all of the information specified in PSNS&IMF 5090/132.
End of DI-ENVR-82091
Source: https://assist.dla.mil -- Downloaded: 2018-02-22T19:11Z
DI-ENVR-82091
CONTRACTOR HAZARDOUS MATERIAL INVENTORY (CHMI)
Ref: NAVSEA Standard Items 009-97 and 009-02 NWRMC Local Standard Item 099-04NW
Document No.
CONTRACTOR – INITIAL REQUEST1 (Before moving any hazmat onto this Federal facility) **Refer to instructions on last page**
PRIME CONTRACTOR (KTR) (POC) SUB-CONTRACTOR (If Applicable) PRIME KTR CERTIFICATION SIGNATURE (sign or submit electronically) Print & sign
PHONE
Mr KTR NA Signature on File 555-232-2222
CONTRACT NUMBER PROJECT NAME2 WORKSITE LOCATION3 PROJECT EXECUTION START
DATE
PROJECTED
END5
N4523A-12-D-0003 USS Michigan Dry Dock 2 12/14/2015 04/03/2016
ENVIRONMENTAL, SAFETY, AND HEALTH (ESH) GOVERNMENT REPRESENTATIVE
CONTRACT OFFICE AGENCY (i.e., C/400, AIT)
ESH GOVERNMENT REPRESENTATIVE NAME PHONE FAX SUBMITTAL
DATE C/400/106.2 ESH SBS 360-535-2222
CODE 106.31 HAZARDOUS MATERIAL PROCESS MANAGEMENT BRANCH
106.31 NAME & INITIALS RECEIPT DATE REVIEW DATE
Trade Name6
Name on product & MSDS must match
For kits, list kit name, then list kit components individually
Manufacturer7
Name on product & MSDS must match
Process Code Number8
Use provided flow chart
Container Size & Type9
Enter size
SHIPYARD MSDS
Number10 (As assigned by Code 106.31)
SHIPYARD Assigned Stock Number (Assigned by Code 106.31)
Speclt SSPR 6PK Marking Fluorescent Green Spray Paint, #1989830
Rust-Oleum Corp. ID0507 11 oz AER See Attached SDS
CONTRACTOR HAZARDOUS MATERIAL INVENTORY (CHMI) CODE 106.31 Document No. Page 2 of 2
CONTRACTOR – INITIAL REQUEST (Before moving any hazmat onto this Federal facility)
Trade Name6
Name on product & MSDS must match
For kits, list kit name, then list kit components individually
Manufacturer7
Name on product & MSDS must match
Process Code Number8
Use provided flow chart
Container Size & Type9
Enter size
SHIPYARD MSDS Number10 (As assigned by Code 106.31)
SHIPYARD Assigned Stock Number ( assigned by Code 106.31)
PSNS & IMF 5090/132 (Rev. 04-13)
INSTRUCTIONS
Contractor: Fill out each section under the heading “CONTRACTOR” per the following instructions and footnotes. List all hazardous material (HM) that you, as the contractor, anticipate transporting from offsite onto the Federal property located at the Bremerton Naval Complex (BNC). Do not list HM obtained inside the BNC that has been labeled with the facility’s salmon colored supplemental barcode label. Use as many additional sheets as necessary to include all HM that you anticipate transporting onsite. Provide the most current MSDS for each product listed in the CHMI. If you are using a “Non-Road” engine do not forget to submit an O&M plan to Code 106.31 Air Department. For all marine coatings, provide a Volatile Organic Compound (VOC) certification sheet for each batch. If you have a Marine Coating that is
General Use and the VOC’s are above 340g/l you must submit separate paperwork to Code 106.31 Air department. All HM must be approved by the Code 106.31 before bringing material onsite. Low Use
Exempt materials may also be processed on this form. Upon completion of all Contractors required items submit the completed CHMI form to your Government Environmental, Safety, and Health representative.
* Prime Contractor Certification Statement: I hereby certify that the submitted information contained in the attached document(s) is true, complete and accurate, and all material listed has been approved by
Code 106.31.
Designated Government Environmental, Safety, and Health Representative: Complete Designated Government ESH section. Submit completed CHMI to Code 106.31 for review and approval.
FOOTNOTES
This is for the initial request. Use the Receipt & Monthly Usage Form to report monthly HM usage by the 5 th calendar day of the following month. Negative usage reports are required. If no usage, enter 0 in applicable field or leave blank and submit report.
Identify Project (e.g. – ship hull number or name, etc).
Identify Worksite Location (e.g. – Hull number, bldg. 431 5th floor, Dry
Dock 2, Pier D, etc).
The date that the contractor is to start work on the project.
The planned (best estimation) completion date for work on the project.
Provide a separate line for each product and/or container size that will be used. When reporting kits, list each component on separate lines. If part numbers are included in the Trade Name block, it will be helpful in processing the CHMI faster.
Reference example below.
Trade Name Manuf acturer
Container
Size & Type
MSDS
Stock
Number
Buff Base Part
A PPG 0.8 gal CN
Converter Part
B PPG 0.2 gal CN
Welding electrodes 7018 ESAB 10lb
Table 1 – Container Type
Descripti on
Aeros ol Can
Ba g
Bottle Bo x
Cartri dge
Can Contain er
Cylind er
Drum
Code AER BG BT B
X
CA CN CO CY DR
Descripti on
Each Jar Package Ki t
Rod Spool Tank Tube
Code EA JR PG K
T
RD SP TK TU
Manufacturer, product name on container and company name must all match.
To determine the proper Process Code Number use the attached Hazardous Material Process Code Selection Flow Chart.
Report container size(s) in quantifiable units (e.g., weight or volume) such as a 3 lb. jar or a 16 fl oz bottle. For compressed gas cylinders, report the quantity of gas in cubic feet or units such as pounds (e.g., 150 cu-ft or 100 lb cylinder). For bulk material (e.g., diesel fuel) or material without a specific container size (e.g., welding rod or wire), use the units in which the material is commonly sold to consumers (e.g., use gallon for diesel fuel or pound for welding rod or wire). For kits, list both the kit size and each individual component size. Reference Footnote 6 for reporting kits. See Table 1 for the applicable container type. Enter container type code.
Provide the Shipyard approved Material Safety Data Sheet (MSDS) number (if known) or include a MSDS for each product (Code
400 projects only). Sending a Technical Data Sheet with the MSDS will be helpful in processing the CHMI faster. When sending an MSDS ensure that it is no older than 5 years old, the MSDS must be a representative of the material being used.
For Usage remember you are reporting for the size requested and it is listed on the form. When reporting round up to the nearest tenth, use percentages (i.e. do not use: 3 gal of a 10 gal container, use: .3
When Reporting Partial Usage, Use Decimals to Represent the Fraction of Container Used.
EXAMPLE:
Use 0.8 to indicate 3/4 usage of a container
Do Not Enter as Lbs, Gallons, Ounces etc.
Round Up to Nearest Tenth.
Use 0.3 to indicate 1/4 usage of a container Use 0.8 to indicate 3/4 usage of a container
PSNS 5090/132 (Rev. 04-13)
| CDRL CFR.pdf |
| A04.03 DI-MGMT-81648 Condition Found Report.pdf |
| DATA ITEM DESCRIPTION |
| CDRL - CHMI.pdf |
| A04.03 DI-ENVR-82091 CHMI.pdf |
File details come from the government source that posted it. Updated .