SUMMARY
OFFEROR/COMPANY NAME:
| TAB | SUMMARY | SUMMARY | CLIN | Total Labor (MH) | Labor Cost | Material Cost | ODC Cost | Proposed Price |
| SOLICITATION NO: | | N6264925RA040 | CLIN 0001(57 TGIs) | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| SHIP NAME: | | PSNS Barge YR95 | | | | | | |
| AVAILABILITY: | | FY25 SUMMER AVAILABILITY | Total for All CLIN | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Total TGIs (Specify Total) | 57 | Total Evaluated Price | ¥0 |
| Growth CLIN % | | | |
| Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary. | | | | | | | | | |
| No. | TGI No. | DESCRIPTION | Proposed Labor | | | | Material/ODCs | | Proposed Price (JPY) |
| | | In-House Labor (MH) | Sub-Contractor Labor (MH) | Total Labor (MH) | Overall Total Labor Cost (JPY) | Material Cost (JPY) | ODC (JPY) | |
| 1 | 38HWA11004A01 | F/O – PRESERVE EXTERIOR SURFACE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 2 | 38HWA16704A01 | F/O – REPAIR PART OF SLIDING DOOR 1-16-1 AND 1-16-2 | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 3 | 38HWA17902A01 | F/O – PRESERVE MATERIAL HANDLING VEHOCLE RAMP SYSTEM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 4 | 38HWA51406T01 | CHILL WATER SYS (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 5 | 38HWA51406A01 | *F/O – REPLACE CHILLWATER VENTURI ASSEMBLY FOR A/C PLANT IN 04 LVL WEA DECK | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 6 | 38HWA51407T01 | CHILL WATER SYS (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 7 | 38HWA51407A01 | *F/O – REPLACE CHILLED WATER VALVE 04 LEVEL WEATHER | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 8 | 38HWA51408T01 | HEATING SYS (OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 9 | 38HWA51408A01 | F/O – REPLACE DUCT HEATERS 03-18-2 AND 03-20-2 IN 03-17-2-Q | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 10 | 38HWA59304A01 | F/O – PRESERVE DETERIORATED COATING OF CHT SEWAGE TANK IN 2-20 1/2-1-Q | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 11 | 38HWA61201A01 | F/O – MODIFY HANDRAIL ON 01 LEVEL HVAC EQPT MAINTENANCE PLATFORM PORT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 12 | 38HWA33101A01 | *F/O - S/A YR-1174D, ACCOMPLISH MOD OF THE LTG SYS IN 1-8 1/2-0-Q AND 1-17-0-Q | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 13 | 38HWA63101A01 | *F/O - REPLACE PIPE HGR FOR DECK DR PP IN MAIN DK WEA, FR 29 - 30, PORT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 14 | 38HWA64401T01 | POTABLE WATER SYS (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 15 | 38HWA64401T02 | SEWAGE SYS (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 16 | 38HWA64401A01 | F/O – REPLACE URINALS AND CHT PIPING ASSEMBLY IN 02-20-1-L AND 03-19-1-L | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 17 | 38HWA66501A01 | F/O - ACCOMPLISH S/A YR-1109D, REPLACEMENT OF LATHE, 1-17-0-Q | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 18 | 38HWA11002A01 | F/O - INSPECT INCLINED LADDER AND VERTICAL LADDER | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 19 | 38HWA11003A01 | F/O - INSPECT LIFERAIL AND GUARDLINE SYSTEM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 20 | 38HWA51205A01 | F/O – S/A 1142D, ACCOMPLISH HVAC MODIFICATION | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 21 | 38HWA16701A01 | F/O - ACCOMPLISH NDT INSPECTION OF WATERTIGHT SCUTTLE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 22 | 38HWA16702A01 | F/O - ACCOMPLISH NDT INSPECTION OF WATERTIGHT SLIDING DOOR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 23 | 38HWA32101A02 | *(F/O) - ACCOMPLISH PLANNED MAINTENANCE OF SHORE POWER SYSTEM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 24 | 38HWA32102A01 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF 1S, 2S AND SHORE POWER SWITCHBOARDS | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 25 | 38HWA32103A01 | * F/O – ACCOMPLISH PLANNED MAINTENANCE OF EACH RECEPTACLE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 26 | 38HWA32402A01 | * F/O – ACCOMPLISH PLANNED MAINTENANCE OF ELECTRIC HEATERS | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 27 | 38HWA43601A01 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF 1J SHORELINE CONNECTION BOX | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 28 | 38HWA43602A01 | *F/O – ACCOMPLISH PLANNED MAINTENANCE OF FLOODING ALARM SWITCHES | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 29 | 38HWA43603A01 | * F/O – ACCOMPLISH PLANNED MAINTENANCE OF AIRFLOW MONITORING SYSTEM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 30 | 38HWA51201A01 | F/O - CLEAN AND INSPECT COOLING COIL AND DRAIN | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 31 | 38HWA51202A01 | F/O - CLEAN AND INSPECT WEATHER OPENING OF HVAC SYSTEM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 32 | 38HWA51203A01 | F/O - CLEAN AND INSPECT VENTILATION FAN HOUSING AND IMPELLER | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 33 | 38HWA51204A01 | F/O - CLEAN AND INSPECT FAN COIL UNIT AND DRAIN | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 34 | 38HWA51401A01 | *F/O - ACCOMPLISH PM OF RESILIENT MOUNT FOR CHW PUMP AND A/C PLANT | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 35 | 38HWA51402A01 | *F/O – ACCOMPLISH PLANNED MAINTENANCE OF MANUALLY OPERATED CHILLED WATER VALVE | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 36 | 38HWA51404T01 | A/C CW PUMP #1A (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 37 | 38HWA51404T02 | A/C CW PUMP #2A (T & OP) - KTR | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 38 | 38HWA51404A01 | *F/O – ACCOMPLISH PLANNED MAINTENANCE OF OVERHAUL FOR CHW PUMP 1A AND 2A YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 39 | 38HWA51405T01 | CHILL WATER SYS (T & OP) - KTR YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 40 | 38HWA51405A01 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF CHILLED WATER EXPANSION JOINT YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 41 | 38HWA52802A01 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF DECK DRAINS YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 42 | 38HWA52803A01 | F/O – ASSESS DRAIN SUMP IN 2-20 1/2-1-Q YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 43 | 38HWA55301A01 | *F/O – ACCOMPLISH PLANNED MAINTENANCE OF MANUALLY OPERATED FRESH WATER VALVE YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 44 | 38HWA55302A01 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF BACKFLOW PREVENTER YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 45 | 38HWA55502A01 | *F/O - ACCOMPLISH PLANNED MAINT OF TEST FOR FRESH WTR FIREMAIN SYS, PP AND CMPNT YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 46 | 38HWA55801T01 | PIPING SYSTEMS, STEAM SYS Y-STRAINER (T & OP) - KTR YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 47 | 38HWA55801A01 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF STEAM Y-STRAINER YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 48 | 38HWA55803T01 | PIPING SYSTEMS, STEAM SYS (T & OP) - KTR YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 49 | 38HWA55803A01 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF DRAIN STRAINER/ORIFICE ASSEMBLY YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 50 | 38HWA55805A01 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF MANUALLY OPERATED STEAM VALVE YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 51 | 38HWA60002A01 | F/O – S/A 1160D, ACCOMPLISH ZONE MANAGER OFFUCES MODIFICATION YR95 CM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 52 | 38HWA58201A01 | F/O – ACCOMPLISH NDT INSPECTION OF MOORING SYSTEM YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 53 | 38HWA59302T01 | CHT PUMP #1A (T & OP) - KTR YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 54 | 38HWA59302T02 | CHT PUMP #1B (T & OP) - KTR YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 55 | 38HWA59302A01 | *F/O – ACCOMPLISH PLANNED MAINTENANCE OF OVERHAUL FOR CHT PUMP YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 56 | 38HWA59303T01 | SEWAGE SYS (T & OP) - KTR YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 57 | 38HWA59303A01 | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF CHT PIPING YR95 PM | 0 | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| 58 | | | | | | | | | |
| 59 | | | | | | | | | |
| 60 | | | | | | | | | |
| 61 | | | | | | | | | |
| 62 | | | | | | | | | |
| 63 | | | | | | | | | |
| 64 | | | | | | | | | |
| 65 | | | | | | | | | |
| 66 | | | | | | | | | |
| 67 | | | | | | | | | |
| 68 | | | | | | | | | |
| 69 | | | | | | | | | |
| 70 | | | | | | | | | |
| 71 | | | | | | | | | |
| 72 | | | | | | | | | |
| 73 | | | | | | | | | |
| 74 | | | | | | | | | |
| 75 | | | | | | | | | |
| 76 | | | | | | | | | |
| 77 | | | | | | | | | |
| 78 | | | | | | | | | |
| 79 | | | | | | | | | |
| 80 | | | | | | | | | |
| 81 | | | | | | | | | |
| 82 | | | | | | | | | |
| 83 | | | | | | | | | |
| 84 | | | | | | | | | |
| 85 | | | | | | | | | |
| 86 | | | | | | | | | |
| 87 | | | | | | | | | |
| 88 | | | | | | | | | |
| 89 | | | | | | | | | |
| 90 | | | | | | | | | |
| 91 | | | | | | | | | |
| 92 | | | | | | | | | |
| 93 | | | | | | | | | |
| 94 | | | | | | | | | |
| 95 | | | | | | | | | |
| 96 | | | | | | | | | |
| 97 | | | | | | | | | |
| 98 | | | | | | | | | |
| 99 | | | | | | | | | |
| 100 | | | | | | | | | |
1_38HWA11004A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 1_38HWA11004A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O – PRESERVE EXTERIOR SURFACE | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
HOURS
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
2_38HWA16704A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 2_38HWA16704A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O – REPAIR PART OF SLIDING DOOR 1-16-1 AND 1-16-2 | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
3_38HWA17902A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 3_38HWA17902A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O – PRESERVE MATERIAL HANDLING VEHOCLE RAMP SYSTEM | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
4_38HWA51406T01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 4_38HWA51406T01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CHILL WATER SYS (T & OP) - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
5_38HWA51406A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 5_38HWA51406A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O – REPLACE CHILLWATER VENTURI ASSEMBLY FOR A/C PLANT IN 04 LVL WEA DECK | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
6_38HWA51407T01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 6_38HWA51407T01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | CHILL WATER SYS (T & OP) - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
7_38HWA51407A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 7_38HWA51407A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O – REPLACE CHILLED WATER VALVE 04 LEVEL WEATHER | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
8_38HWA51408T01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 8_38HWA51408T01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | HEATING SYS (OP) - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
9_38HWA51408A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 9_38HWA51408A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O – REPLACE DUCT HEATERS 03-18-2 AND 03-20-2 IN 03-17-2-Q | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
10_38HWA59304A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 10_38HWA59304A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O – PRESERVE DETERIORATED COATING OF CHT SEWAGE TANK IN 2-20 1/2-1-Q | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
11_38HWA61201A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 11_38HWA61201A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O – MODIFY HANDRAIL ON 01 LEVEL HVAC EQPT MAINTENANCE PLATFORM PORT | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
12_38HWA33101A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 12_38HWA33101A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O - S/A YR-1174D, ACCOMPLISH MOD OF THE LTG SYS IN 1-8 1/2-0-Q AND 1-17-0-Q | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
13_38HWA63101A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 13_38HWA63101A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O - REPLACE PIPE HGR FOR DECK DR PP IN MAIN DK WEA, FR 29 - 30, PORT | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
14_38HWA64401T01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 14_38HWA64401T01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | POTABLE WATER SYS (T & OP) - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
15_38HWA64401T02
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 15_38HWA64401T02 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | SEWAGE SYS (T & OP) - KTR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
16_38HWA64401A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 16_38HWA64401A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O – REPLACE URINALS AND CHT PIPING ASSEMBLY IN 02-20-1-L AND 03-19-1-L | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
17_38HWA66501A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 17_38HWA66501A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - ACCOMPLISH S/A YR-1109D, REPLACEMENT OF LATHE, 1-17-0-Q | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
18_38HWA11002A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 18_38HWA11002A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - INSPECT INCLINED LADDER AND VERTICAL LADDER | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
19_38HWA11003A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 19_38HWA11003A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - INSPECT LIFERAIL AND GUARDLINE SYSTEM | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
20_38HWA51205A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 20_38HWA51205A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O – S/A 1142D, ACCOMPLISH HVAC MODIFICATION | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
21_38HWA16701A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 21_38HWA16701A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - ACCOMPLISH NDT INSPECTION OF WATERTIGHT SCUTTLE | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
22_38HWA16702A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 22_38HWA16702A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | F/O - ACCOMPLISH NDT INSPECTION OF WATERTIGHT SLIDING DOOR | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
23_38HWA32101A02
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 23_38HWA32101A02 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *(F/O) - ACCOMPLISH PLANNED MAINTENANCE OF SHORE POWER SYSTEM | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
24_38HWA32102A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 24_38HWA32102A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF 1S, 2S AND SHORE POWER SWITCHBOARDS | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
25_38HWA32103A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 25_38HWA32103A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | * F/O – ACCOMPLISH PLANNED MAINTENANCE OF EACH RECEPTACLE | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
26_38HWA32402A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 26_38HWA32402A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | * F/O – ACCOMPLISH PLANNED MAINTENANCE OF ELECTRIC HEATERS | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
27_38HWA43601A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 27_38HWA43601A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O - ACCOMPLISH PLANNED MAINTENANCE OF 1J SHORELINE CONNECTION BOX | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL (¥) ¥0
28_38HWA43602A01
| SHIP NAME/AVAILABILITY: | PSNS Barge YR95 - FY25 SUMMER AVAILABILITY | | | | | TGI SUMMARY | | | | | |
| SOLICITATION #: | N6264925RA00xx | | | | | | | | | | |
| SRF-JRMC TGI #: | 28_38HWA43602A01 | | | | | In-House MH | Sub-KTR MH | Labor Cost (JPY) | Material (JPY) | ODC (JPY) | TOTAL (JPY) |
| DESCRIPTION: | *F/O – ACCOMPLISH PLANNED MAINTENANCE OF FLOODING ALARM SWITCHES | | | | | 0 | 0 | ¥0 | ¥0 | ¥0 | ¥0 |
| Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed. | | | | | | | | | | | |
| IN-HOUSE LABOR HOUR BREAKDOWN | | | | | | | | | | | |
| KEY WORK ITEM | SFTR | INSL | WELD | SMTL | RGRS | PNTR | ELEC | PFTR | QA | OTHERS | TOTAL |
TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
| KEY WORK ITEM | IN-HOUSE LABOR BREAKDOWN | | | | | SUB-CONTRACTOR LABOR BREAKDOWN | TOTAL |
| | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | |
| HOURS | TOTAL MAN HOURS (MH) | # PERSONNEL | HOURS PER DAY | # DAYS | ADDITIONAL | | | |
| TOTAL M/Hs | 0 | | | | TOTAL M/Hs | 0 | |
| COST PER M/H (¥) | | <--- Please input in-house labor rate | | | COST PER M/H (¥) | | <--- Please input sub-contractor labor rate |
| LABOR COST (¥) | ¥0 | | | | LABOR COST (¥) | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed. | | | | | | | |
| MATERIAL COST BREAKDOWN | | | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS | | |
| TOTAL (¥) | | | | ¥0 | |
| Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed. | | | | | |
| OTHER DIRECT COST (ODC) (IF ANY) | | | | | |
| DESCRIPTION | QUANTITY | UNIT OF ISSUE | UNIT PRICE (¥) | EXTENDED PRICE (¥) | REMARKS |
TOTAL…