Attachment I PWS.pdf
PDF 588 KB Posted
- Attached to
- NAS Fallon, NV - Fuel Services Federal contract opportunity
- Solicitation number
- SPE603-20-R-0524
- Issued by
- Defense Logistics Agency Energy
About this file
This performance work statement outlines requirements for firm-fixed-price fuel services at Naval Air Station Fallon, Nevada. The contractor shall be responsible for operating and maintaining government-owned, contractor-operated facilities and equipment to receive, store, issue, provide quality control and accountability for defense working capital fund-owned petroleum products. This includes aviation and ground fuel facilities as well as providing and maintaining contractor-furnished fuel servicing equipment. The contractor must submit detailed plans for contract compliance, product quality surveillance, maintenance, operations and staffing, environmental protection, equipment provisioning, contingency planning, security, inventory control, safety, and fuel safety. The contractor shall be responsible for fuel operations including dispatch, servicing, direct refueling, mobile fuel servicing, portable refueling, off-station operations, and data collection. Requirements also cover bulk storage operations, service stations, ground fuels, recyclable and recoverable fuels, inventory accountability, quality surveillance, maintenance, training, safety, environmental compliance, security, incidental equipment, and use of Navy facilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amd 7.pdf | ||
| Fallon RFP (May21).pdf | ||
| Amd 6.pdf | ||
| Fallon QA.pdf | ||
| Amd 5.pdf | ||
| BSM-E FY18-20.pdf | ||
| FMD CY17-20.pdf | ||
| SCCP Red Plan May 18.pdf | ||
| PWS Fallon Feb 9 21.pdf | ||
| Amd 4.pdf | ||
| Amd 3.pdf | ||
| Amd 2.pdf | ||
| Attachment VIII QASP.pdf | ||
| Attachment I PWS.pdf | ||
| Amd 1.pdf | ||
| Fallon RFP.pdf | ||
| Attachment VII QAPs.pdf | ||
| Attachment III PP Consent Form.pdf | ||
| Attachment V CBA WD.pdf | ||
| Attachment IV PP References.pdf | ||
| Attachment II PPQ.pdf | ||
| Attachment VI Form 19.3.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment I PWS
SPE603-20-R-0524
NAS Fallon, NV
PERFORMANCE WORK STATEMENT (PWS)
for
AIRCRAFT/GROUND FUEL SERVICES
and
FUEL STORAGE AND DISTRIBUTION
under
SOLICITATION SPE603-20-R-0524
at
NAVAL AIR STATION FALLON, NV
Dated: December 28, 2020
TABLE OF CONTENTS
C-1.0 REQUIREMENTS AND DELIVERABLES
C-1.1 RESPONSIBILITIES:
C-1.2 FACILITIES:
C-1.3 CONTRACTOR DETAILED PLANS:
C-1.3.1 Contract Compliance Plan:
C-1.3.2 Product Quality Surveillance Plan (PQSP):
C-1.3.3 Maintenance Plan:
C-1.3.4 Operations and Staffing Plan:
C-1.3.5 Environmental Protection Plan:
C-1.3.6 Equipment Provisioning Plan:
C-1.3.7 Contract Contingency Plan:
C-1.3.8 Security Plan:
C-1.3.9 Inventory Control and Accountability Plan:
C-1.3.10 Safety Plan:
C-1.3.11 Training Plan:
C-1.3.12 Fuel Safety Plan
C-1.4 CONTRACT TURNOVER:
C-1.5 QUALITY MONITORING AND EVALUATION:
C-1.6 STAFFING:
C-1.6.1 Workload:
C-1.6.2 Knowledge and Skills:
C-1.6.3 Employment Standards:
C-1.7 KEY PERSONNEL:
C-1.7.1 Corporate Executive Officer:
C-1.7.2 Terminal Manager (TM):
C-1.7.2.2 Collateral Duties:
C-1.7.3 Assistant Terminal Manager (ATM) C-1.7.3.1 Collateral Duties:
C-1.8 SERVICE PERSONNEL:
C-1.8.1 Dispatcher/Computer Operator (DCO):
C-1.8.2 Fuel Accountant (FA):
C-1.8.2.1 Collateral Duties:
C-1.8.3 Truck Driver/System Operator (DSO):
C-1.8.3.1 Collateral Duties:
C-1.8.4 Fuel Distribution System Operator (FDSO):
C-1.8.4.1 Collateral Duties:
C-1.8.5 Fuel Laboratory Technician (FLT):
C-1.8.5.1 Collateral Duties:
C-1.8.6 License, Special License, Skills, Training, and other Certifications:
C-1.9 CORRESPONDENCE AND VISITS:
C-1.10 RECORDS MANAGEMENT:
C-1.11 LABOR REPORTING:
C-1.12 REPORTING INPUTS:
C-2.0 PERFORMANCE REQUIREMENTS
C-2.1 FUEL OPERATIONS:
C-2.1.1 Dispatch Center:
C-2.1.2 Fuel Servicing:
C-2.1.2.1 Performance of Services:
C-2.1.3 Direct Refueling Operations (Hot Pits):
C-2.1.4 Direct Fuel Servicing Equipment:
C-2.1.5 Mobile Fuel Servicing Equipment:
C-2.1.6 Portable Pantograph (Hot) Refueling:
C-2.1.7 After Hours Notification:
C-2.1.8 Off Station Operation:
C-2.1.9 Jet Fuel Services Data:
C-2.2 BULK STORAGE OPERATIONS:
C-2.2.1 Bulk Output:
C-2.2.1.1 NAS Fallon:
C-2.2.2 Transfers to Refuelers:
C-2.2.3 Receipts of Fuels:
C-2.2.3.1 NAS Fallon:
C-2.3 SERVICE STATION:
C-2.3.1 Automated Dispensing System Key Management:
C-2.3.2 Service Station Outage:
C-2.4 GROUND FUELS:
C-2.4.1 Equipment:
C-2.4.2 Delivery:
C-2.5 RECYCLABLE AND RECOVERABLE FUELS:
C-2.6 PRODUCT INVENTORY ACCOUNTABILITY:
C-2.7 PRODUCT QUALITY SURVEILLANCE:
C-2.7.1 Quality Determination:
C-2.7.2 Laboratory Operation:
C-2.7.3 Sampling:
C-2.7.4 Housekeeping:
C-2.8 MAINTENANCE:
C-2.8.1 Operator Maintenance (OM):
C-2.8.1.1 Operator Maintenance Requirements:
C-2.8.2 System Maintenance (SM):
C-2.8.2.1 System Maintenance Requirements:
C-2.8.3 Repairs:
C-2.8.4 Maintenance Records:
C-2.8.5 Buildings and Structures:
C-2.8.6 Pest and Rodent Control:
C-2.8.7 Designated Areas:
C-2.8.8 Trash Removal:
C-2.8.9 Grounds:
C-2.8.10 Other Facilities, Equipment, and Utilities:
C-2.8.11 Storage Tanks:
C-2.8.12 Tank Maintenance:
C-2.8.13 Berms/Containment Systems:
C-2.8.14 Pipelines:
C-2.8.15 Pits:
C-2.8.16 Oil/Water Separator System:
C-2.8.17 Cathodic Protection System:
C-2.8.18 Corrosion Control and Painting:
C-2.8.19 Large Surfaces:
C-2.8.20 Materials Used:
C.2.8.21 Fire Extinguisher Inspection:
C-2.9 TRAINING:
C-2.9.1 CONTRACTOR PROVIDED TRAINING
C-2.10 SAFETY:
C-2.10.1 ACCIDENT/INCIDENT REPORTING:
C-2.11 ENVIRONMENTAL:
C-2.11.1 Assignments:
C-2.11.2 Spill Response:
C-2.11.3 Spill Reporting:
C-2.11.4 Spill Response Supplies:
C-2.12 SECURITY:
C-2.12.1 ADP and Information Assurance:
C-2.12.2 Key Control:
C-2.12.3 Heightened Security:
C-2.13 INCIDENTAL EQUIPMENT:
C-2.13.1 Joint Incidental Equipment Inventory:
C-2.13.2 Annual Inventory:
C-2.13.3 Disposition of Incidental Equipment:
C-2.14 USE OF NAVY FACILITIES:
C-2.14.1 Parking:
C-3.0 CONTRACTOR - FURNISHED EQUIPMENT
C-3.1 VEHICLES AND EQUIPMENT:
C-3.1.1 Condition of Vehicles and Equipment:
C-3.1.2 Modification/Overhaul/Replacement of Vehicles and Equipment:
C-3.1.3 Vehicle Lighting:
C-3.1.4 Company Logo:
C-3.1.5 Spill Remediation Kits:
C-3.1.6 Radios:
C-3.1.7 Overfill Protection Equipment (OPE):
C-3.1.8 Low Point Drain:
C-3.1.9 Recirculation and Defueling:
C-3.1.10 Meters:
C-3.1.11 Hoses:
C-3.1.12 Hose fittings:
C-3.1.13 Hose Storage:
C-3.1.14 Tires:
C-3.1.15 Spotlight:
C-3.1.16 Warning Light:
C-3.1.17 Relaxation Chamber:
C-3.1.18 Pressure Regulation and Flow Control:
C-3.1.19 Exterior Paint Color:
C-3.1.20 Vehicle Marking and Identification Numbers:
C-3.2 RECORDS:
C-3.3 DISPOSITION OF PROPERTY:
C-3.4 PROPERTY STORAGE:
C-3.5 EQUIPMENT INSPECTION:
C-3.6 OTHER CONTRACTOR PROVIDED EQUIPMENT AND SUPPLIES:
C-3.6.1 Communication Services:
C-3.6.2 Administrative Supplies and Equipment:
C-3.6.3 Tools:
C-3.6.4 Spares for Contractor-Furnished Equipment:
C-3.6.5 Specification/Standards:
C-3.6.6 Consumables and Expendables:
C-3.6.7 Replacement Filters:
C-3.6.8 Grounds Maintenance Equipment and Supplies:
C-3.6.9 Snow Removal Equipment and Supplies:
C-3.6.10 Computer Hardware and Software:
C-3.6.11 Uniforms:
C-3.6.12 Safety Equipment:
APPENDIX A FACILITY SPECIFIC INFORMATION
APPENDIX B DEFINITIONS, ACRONYMS, AND ABBREVIATIONS
APPENDIX C REFERENCE DOCUMENTS
APPENDIX D COMMON ACCESS CARD (CAC) PROCEDURES:
NAS Fallon, NV
C-1.0 REQUIREMENTS AND DELIVERABLES
C-1.1 Responsibilities:
This Performance Work Statement (PWS) describes the firm-fixed-price requirement to obtain Government-owned, Contractor-operated (GOCO) fuel services at NAS Fallon, Nevada. The Contractor shall be responsible for the operation and maintenance of all GOCO facilities and equipment to receive, store, issue, provide quality control and accountability of all Defense Wide Working Capital Fund (DWWCF)-owned petroleum products under their control. The Contractor is also responsible to provide, maintain, and operate Contractor-provided fuel servicing equipment in support of aircraft and vehicles assigned or transient to NAS Fallon.
C-1.2 Facilities:
The Naval Air Station (NAS) Fallon fuel facility is a system consisting of bulk storage, direct refueling system and automated service station pumps supplied by above ground fuel tanks. Aviation and ground fuel facilities managed by NAS Fallon consists of bulk storage facility and components necessary to receive, store, and dispense aviation fuel product, and ground fuel products. Jet fuel is supplied primarily by the Kinder Morgan Pipeline. Aviation fuel bulk tankage consists of one (1) 635,000-gallon and two (2)1,200,000-gallon jet fuel tanks. Bulk ground fuel tankage consists of one (1) 15,000-gallon diesel tank and one (1) 4,000-gallon gasoline MOGAS tank. The service station consists of one (1) 10,000-gallon diesel tank and one (1) 10,000-gallon gasoline tank.
C-1.3 Contractor Detailed Plans:
The Contractor must submit all detailed plans listed the below section C-1.3.1 through C-1.3.12 to the Contracting Officer for review and acceptance no later than 60 days prior to the start of the contract performance period and ensure that all required plans are accepted and approved by DLA Energy 30 days prior to start of the contract performance period unless noted otherwise noted below. DLA Energy reserves the right to request changes or modifications to any detailed plans at any time throughout the contract performance period. The plans are considered dynamic documents and must be updated as required throughout the contract period. Updates will be provided to the COR and Contracting Officer for review and acceptance as changes are made. These plans may be used by the COR for monitoring and assessing contract performance.
C-1.3.1 Contract Compliance Plan:
The Contractor is responsible for ensuring compliance with all contract performance requirements. The inspection system must be used by the Contractor to measure performance on a continuous basis throughout the contract performance period and any contract option periods. The Contract Compliance Plan (CCP) must include performance requirements for all of the services and specific tasks listed in this PWS and the Contractor’s own performance-based plans. General performance criteria must include the Contractor’s ability to provide continuous support capabilities as specified in this PWS, record keeping and reporting procedures pertaining to administrative requirements, facility operations, and upkeep of facilities and grounds. The CCP must include time specific checklists for evaluation of all operational requirements. The CCP must address procedures for corrective actions including the resolution of any Contract Discrepancy Report (CDR) generated by the Contracting Officer/COR. The CCP must be made available for Contracting Officer/COR review upon request at any time during the contract performance period.
C-1.3.2 Product Quality Surveillance Plan (PQSP):
A comprehensive plan to ensure that products placed in the care of the Contractor are properly handled, remain on-specification, and are ready for issue. The plan must include policy and procedure regarding product sampling, visual examination of samples, and the submission of samples needing further analysis to the regional fuel laboratory. In addition, the plan must outline the documentation of samples and test
NAS Fallon, NV results, reports and records keeping applicable, and actions to be taken in case of unacceptable test results.
The plan must fully outline Contractor responsibilities for quality surveillance under this contract.
C-1.3.3 Maintenance Plan:
The Contractor must provide a detailed maintenance plan for all facilities, equipment, and system components. The Maintenance Plan must clearly outline the process of planning, programming, accomplishing, documenting, and reporting all maintenance actions and must include the installation and use of a Contractor-furnished computerized maintenance management system (CMMS) to track maintenance for components and facilities at all sites. The plan will be continuously reviewed over the course of the contract and any need for change must be communicated to the Contractor through the Contracting Officer. The complete Maintenance Plan will include a copy of all maintenance action forms, listings and reports to be generated by the CMMS.
C-1.3.4 Operations and Staffing Plan:
The Operations and Staffing Plan is a comprehensive and detailed matrix that outlines all manning aspects, to include sub-contracting, and requirements regarding the management and labor force to undertake the required tasks. The plan must include a detailed organization chart showing the number of employees identified by wage determination, job classification, and full/part time employee status, a brief description of the tasks to be performed, and the duty description of the employee that will perform the task described. A manning matrix defining staffing in terms of full-time equivalents (FTEs) for a typical seven-day workweek must be included. Operating hours are detailed in Appendix A.
C-1.3.5 Environmental Protection Plan:
The Contractor must submit a comprehensive and detailed plan outlining policy, procedures, and safeguards necessary to protect the environment. The Contractor’s plan must be site specific, cover all areas, facilities, equipment, duties, and tasks for which the Contractor is responsible, establish mishap-reporting procedures as required below, and elaborate on issues that may be unique to the activity. The plan must comply with all applicable Federal, DoD, Navy, state, local references, and laws.
C-1.3.6 Equipment Provisioning Plan:
The Contractor must identify and include the types and quantities of vehicles, major equipment items, i.e., powered grounds maintenance equipment (unless subcontracted), computer systems, and office machines, necessary to support the locations under this contract. Upgrading or modifying equipment to meet specific off station and public over-the-road requirements, licensing or obtaining permits for equipment and personnel, and the adherence to all insurance requirements must be the responsibility of the Contractor. Vehicles, pantographs, and/or hose carts must be in an up-to-date maintenance and operational condition to withstand the entire contract period. Information relevant to vehicles and equipment capabilities such as and not limited to manufacture date, mileage/hours, make, and model along with the maintenance plan for all vehicles and equipment, must identify each piece and will be utilized in determining operational abilities. Contractor equipment must be on site and available at the start of the performance period. Should the Contractor be required to lease equipment due to long lead times or unexpected delays with procuring equipment it will do so at its own expense to ensure there is no disruption of service. All leased vehicles and equipment must meet the performance requirements and specifications as stated in this PWS.
C-1.3.7 Contract Contingency Plan:
The Contract Contingency Plan must outline Contractor actions to ensure there are no significant interruptions. The plan must provide specific details regarding labor issues as may result from potential strike actions, military contingency, war time, and emergent staffing requirements, (subcontracting where required), and the replacement of equipment. The Contractor must be responsible for repairing or replacing inoperable equipment or obtaining additional equipment and labor required to carry out day-to-
NAS Fallon, NV day and contingency operations. The plan must include contingencies for major/minor breakdowns or unavailability of Contractor-furnished equipment such as vehicles, pantographs, and/or hose carts to meet the contract requirements. The contingency plan must detail fluctuating quantities of equipment (e.g., such as one refueler out of service, two refuelers out of service, three to four or more) and a resolution for each situation without any interruption of customer service. All necessary equipment, material, and parts associated with incidental equipment such as pantographs, hose carts, etc. shall remain the responsibility of the U.S. Navy to support the locations identified under this contract.
C-1.3.8 Security Plan:
The Contractor must provide a detailed Security Plan and identify their responsibilities for maintaining the security of Navy facilities, including contingency procedures for power outages, inoperative automated equipment, data processing, and computer systems, as well as any Contractor-furnished equipment, tools, and materials. The plan must outline policy, guidance, and procedures regarding facility access controls, visitor logs, lock and key controls, random patrols of fuel management facilities and pipelines, Automated Data Processing (ADP) security, and other force protection measures.
C-1.3.9 Inventory Control and Accountability Plan:
A detailed plan must be written to ensure Contractor compliance with the inventory, accounting, and reporting requirements of DOD 4140.25M, DOD Management of Bulk Petroleum Products, Natural Gas and Coal, and DLA Energy and Navy instructions, policies, and regulations.
C-1.3.10 Safety Plan:
The Contractor must provide a detailed plan outlining procedures necessary to maintain safety in accordance with applicable federal, state and local laws and regulations. At a minimum, this plan must include industrial hygiene, confined space entry, disaster preparedness, fire prevention and protection, hazardous waste operations, emergency response, safety and health standards, Safety Data Sheets, accident /incident reporting, and safety procedures during general fuel handling operations. The plan must also include name of responsible individual that will monitor the safety program and maintain records.
C-1.3.11 Training Plan:
The Contractor must provide a comprehensive plan outlining training and objectives. The plan must list course and subject titles of materials to be used, a brief description of the subject, identify training sources, establish the frequency of training, and detail the method of monitoring plan compliance and record keeping. Training required by Federal, DoD, Navy, state, local references and laws, must be included.
C-1.3.12 Fuel Safety Plan The Contractor must provide a detailed plan outlining the fuel systems applicable to the contracted locations, product handling characteristic, and the policy, procedures, and actions necessary to maintain a safe working environment. The plan, a compendium of references, local laws, and regulations applicable to the products stored and handled, Safety Data Sheets, and guidelines regarding the safe handling of such products must be maintained and updated over the course of the contract.
C-1.4 Contract Turnover:
During the ten working days prior to the start of contract performance, the outgoing Contractor shall permit the incoming Contractor access to the applicable fuel facilities in order to observe their operation.
During this ten-day period, the incoming Contractor shall be provided assistance from the outgoing Contractor, DLA Energy representatives and the Contracting Officer’s Representative (COR) to accomplish a joint facilities turnover inspection, to include product testing, and product and property inventory. The outgoing Contractor shall also provide the incoming Contractor with all relevant information concerning the facility and its operation, including maintenance records and engineering
NAS Fallon, NV documentation. The incoming Contractor shall protect and not disclose any proprietary information of the outgoing Contractor discovered during the turnover period.
C-1.5 Quality Monitoring and Evaluation:
DLA Energy will utilize a Quality Assurance Surveillance Plan (QASP) to monitor and evaluate the Contractor’s performance throughout the contract performance period. DLA Energy may also perform customer satisfaction surveys, which may be used as part of the assessment of Contractor’s performance.
The Contracting Officer has the option to increase the frequency of surveys to address contract compliance issues as needed.
C-1.6 Staffing:
The Contractor must provide sufficient staffing to accomplish all functions and tasks to include simultaneous operations. There is no provision for augmentation or overtime. The Contractor’s staffing must be flexible and fully meet all demands of hot and cold aircraft fuel services (to include reserve training), ground fuel services, bulk storage, and pipeline operations, quality surveillance, general management, and administrative functions.
C-1.6.1 Workload:
The Contractor shall plan to provide simultaneous fuel and defuel operations, ground fuel delivery, recyclable jet fuel collection, and other related operations as defined within the periods established in Appendix A. Based on historic information coupled with current flight schedules, aircraft/squadron deployments, exercise and training schedules provided IAW NAVAIR 00-80T-124 by Air Operation (Air Plan). The Contractor must be fully responsible for adjusting levels of service and providing personnel and equipment to meet workload demands for day-to-day operations. Unforeseen workloads such as the testing of fuels after normal laboratory duty hours or contingency support of any type are not quantified but are required to be supported.
C-1.6.1.1 Scheduled and Recurring Event:
The installation will, to the extent possible and practical, provide the Contractor documented information outlining anticipated dates, number and type aircraft, number of anticipated sorties, and historical information regarding aviation and ground fuel requirements in order to support known, scheduled, and recurring event, i.e., annual large force exercises, tactical training and competition events, or air shows.
To the extent practical, the Contractor will be given access to event planning meetings. In concert, the Contractor must fully document all services provided for all specified events. The entire staffing workload will be covered under the Monthly Usage Charge CLIN.
C-1.6.2 Knowledge and Skills:
The Contractor must ensure that personnel assigned to all tasks have the requisite knowledge and skills to meet the performance standards for those tasks and comply with all Federal, State, DoD, DLA Energy, Navy, and station/base regulations, instructions, guidelines, policy, and codes. All employees must be able to read and understand English (be literate) to the extent they can understand and follow oral instructions/directions, read and understand instructions, directives, regulations, operating procedures, detailed written orders, and training materials, and write in English to compose required detailed reports.
All employees must perform basic numeric operations (addition, subtraction, multiplication, and division) and the use of numbers as they relate to ledgers, logs, forms, meters, gauges, and measuring devices such as tapes, thermometers, hydrometers, and other instruments as may be used during the receipt, handling, inventory and issue of petroleum products.
C-1.6.3 Employment Standards:
All employees or persons who may be hired to represent, perform on behalf of, or work under the management of the Contractor must comply with all Federal, State, DOD, DLA Energy, Navy, and
NAS Fallon, NV station/base regulations, instructions, guidelines, and policy regarding employment at and entry to base facilities. The Contractor must ensure that it meets the requirements of employment and conform to the rules regarding, but not necessarily limited to, security, clearance, identification policy, vehicle registration and operation of a POV on station, medical assistance, the use of the exchange and military facilities, and other local rules, guidance, or prohibitions that may apply to their entrance to and activity or employment on station. In accordance with FAR 7.108 telecommuting is prohibited.
C-1.7 Key Personnel:
The Corporate Executive Officer, Terminal Manager and the Assistant Terminal Manager, and Fuel Distribution Mechanic are key personnel and must have the education, training, background/experience, and skills required and necessary to make fiscal and management decisions, direct personnel, and work with individuals at all levels of corporate management and the military for this contract. Resumes must be submitted for these personnel 30 days prior to start of Performance Period. The resumes must be reviewed and accepted by DLA Energy. A replacement candidate’s resume must be submitted for review and accepted by DLA Energy prior to assuming duties. In the event it becomes necessary to replace any service personnel, the Contractor must notify the Contracting Officer/COR as to the final work-day or termination date of the outgoing person and a plan outlining specific dates/time frames for the hiring of the replacement person that supports the experience as noted below.
C-1.7.1 Corporate Executive Officer:
To assure continuity between the contracted location/activity and corporate office, the Contractor must employ an executive, who, for the duration of the contract, can make fiscal, management, and administrative decisions concerning this contract. He/she must demonstrate a complete understanding of the terms and conditions of this contract and must demonstrate knowledge of fuel management and operations to the extent outline herein.
C-1.7.2 Terminal Manager (TM):
The TM must demonstrate experience that is current and relevant to the magnitude of the PWS, facilities, and any Contractor provided equipment to be utilized. The TM must have a minimum of five years of experience in petroleum storage and distribution operations, airfield fuel services, and fuel systems maintenance. The TM must have performed as a supervisor for at least two years within the five-year period prior to the individuals hiring date with the Contractor.
C-1.7.2.1 Required DLA Energy TM Training:
DLA Energy Policy P-32 provides training requirements and procedures for Terminal Managers. The Terminal Manager must comply with DLA Energy Policy P-32 and complete all training requirements established therein. This training is funded by DLA Energy. In addition, the TM will complete required underground storage tank Operator Training and Spill Response Training.
C-1.7.2.2 Collateral Duties:
This The TM position cannot be a collateral duty, but this does not prevent the TM from infrequent performance of routine PWS tasks to maintain proficiency, build teamwork, and augment during peak or elevated workload so long as TM duties, segregation of duties, and overall performance management is not affected.
C-1.7.3 Assistant Terminal Manager (ATM) The ATM must demonstrate a minimum of two years of experience in petroleum services operations and documented supervisory experience gained prior to the performance start date or the individual’s hiring date. Supervisory experience in bulk storage or mobile fuel servicing operations with emphasis on equipment/systems maintenance and quality surveillance is required.
NAS Fallon, NV
C-1.7.3.1 Collateral Duties:
The Assistant Terminal Manager may have collateral duties such as Fuel Distribution System Operator (FDSO), Driver/System Operator (DSO), and Fuel Laboratory Technician (FLT). However, the ATM may not act as the Dispatcher/Computer Operator, (DCO) to supplement the day-to-day workforce.
Assistant terminal managers elevated to the terminal manager position, short or long term, must have no collateral duties.
C-1.8 Service Personnel:
The personnel/position descriptions cited within this section are those classes of service employees applicable to this contract. In the event there is no wage determination listing for a class of service employee required, the Contractor must submit a request to conform to a specific wage determination category to the DLA Energy Contracting Officer with the initial offer. All such conformance issues must be resolved prior to the submission of the final revised offer. When requested by DLA Energy or the Navy, the Contractor must submit a staffing roster that identifies personnel by name, position, full or part time status, and their date of hire.
C-1.8.1 Dispatcher/Computer Operator (DCO):
The Fuels Dispatcher must demonstrate sufficient skills to effectively operate the dispatch system and Business Systems Modernization-Enterprise (BSM-E)/Enterprise Business System (EBS) and Fuel Manager Defense (FMD). He/she must also be familiar with the most current use of Microsoft standard office products such as Word and Excel to ensure that daily fuel operations are conducted in an effective and efficient manner. In addition, dispatchers must be knowledgeable of radio communications, instructions/regulations pertaining to fueling and defueling of DoD and civilian aircraft, and forms used to document aircraft fuel servicing. He/she must demonstrate familiarity with the layout of the base and outlying fields as well as the airfield and aircraft parking areas and restrictions applicable to servicing aircraft within those areas. Individuals acting as dispatchers must communicate in English, both orally and in writing. Except for those administrative and accounting duties outlined within this PWS, dispatchers must not have collateral duties.
C-1.8.2 Fuel Accountant (FA):
The Fuel Accountant must be fully knowledgeable of manual and automated fuel management and accounting systems such as the Fuel Manager Defense (FMD), Enterprise External Business Portal (EEBP), and Wide Area Work Flow (WAWF), and the Supply computer systems applicable to the processing of fuel management accounting data. He/she must demonstrate sufficient computer skills to use client/server applications in a Microsoft Windows environment. Those skills must include the ability to logon; shutdown; initiate modems; manipulate files and resolve technical issues and problems required to maintain a fully functional file, records, and reporting system; send and receive email; and to use web browsers to send and receive information. The use of Microsoft standard office products such as Word, Excel, and PowerPoint; other commercial off the shelf applications, utilities; and custom software in such a manner that daily fuel operations are effectively and efficiently conducted may also be required. Those skills must include the use of the real time information systems, the manipulation data within the Fuel Manager system and the related fuel management modules and status systems. He/she must also be fully knowledgeable of all DLA Business System Modernization Interim Policy and Procedural Guidance for the receipt, handling, issue, inventory, and accounting of petroleum products. Additionally, the TM must ensure that a fully trained alternate/back-up accountant will process transactions when the primary accountant is not available for duty to ensure compliance with DLA Energy P-10, Segregation of Duties.
C-1.8.2.1 Collateral Duties:
This cannot be a collateral duty job, but this does not prevent the Accountant from infrequent performance of routine PWS tasks (such as a FDSO or Dispatcher) to maintain proficiency, build
NAS Fallon, NV teamwork, and augment during peak or elevated workload so long as specific accounting duties and segregation of duties are not affected.
C-1.8.3 Truck Driver/System Operator (DSO):
DSOs must be qualified to perform fuel servicing operations (refuel/defuel) by mobile fuel servicing equipment/trucks, portable pantograph, hose sets, and fixed direct fuel servicing systems (hydrants). A DSO may be required to perform the duties of hot refueling pit operator (deadman control), nozzle operator, or fire watch within a pit operation. Drivers must be trained in the appropriate use of radio procedures. DSOs must pass a Contractor administered base and flight line familiarization test, practical equipment/facility competency tests, and must be certified, by the Contractor, as qualified and the individuals training records updated prior to the unsupervised operation of any fuel servicing equipment.
The Contractor must re-certify personnel annually or as requested by the COR. DSOs must be familiar with safety regulations applicable to aviation and ground fuel servicing operations on and around the airfield and supported activities. Unless specifically directed by the contracting officer, the Contractor is not responsible for the staffing of the fire watch, nozzle operator, or refueling director/coordinator positions. The unit receiving services will be responsible for providing all staffing other than that of the fuel system or pit operator.
C-1.8.3.1 Collateral Duties:
The DSO position cannot be a collateral duty job, but this does not prevent the truck driver/system operator from infrequent performance of routine PWS tasks (such as a FDSO or FLT) to maintain proficiency, build teamwork, and augment during peak or elevated workload so long as specific truck driver/system operator duties are not affected.
C-1.8.4 Fuel Distribution System Operator (FDSO):
The FDSOs must have practical experience in operation of bulk fuel distribution systems. The FDSOs must be able to perform receipt, issue, storage, spill cleanup, preventative maintenance scheduling, hazardous waste, and petroleum quality surveillance operations.
C-1.8.4.1 Collateral Duties:
The FDSO position cannot be a collateral duty job, but this does not prevent the fuel distribution system operator from infrequent performance of routine PWS tasks (such as a DSO or FLT) to maintain proficiency, build teamwork, and augment during peak or elevated workload so long as specific fuel distribution system operator duties are not affected.
C-1.8.5 Fuel Laboratory Technician (FLT):
The fuel laboratory technician must be experienced in the use of common fuel sampling equipment, aviation and ground fuel sampling procedures, and conducting laboratory tests of petroleum products commensurate with the level of analysis required to be performed. All personnel performing these duties must be properly trained in accordance with applicable regulations and must demonstrate, with proficiency, the various methods and means of sampling petroleum handling equipment and systems, from receipt to product issue, the operation, maintenance, and calibration of laboratory equipment, record keeping, and laboratory safety procedures. Personnel assigned are required to perform the full spectrum of quality surveillance sampling and testing as may be required to include weekend and holiday fuel support.
C-1.8.5.1 Collateral Duties:
This cannot be a collateral duty job, but this does not prevent the laboratory technician from infrequent performance of routine PWS tasks (such as a FDSO or DSO) to maintain proficiency, build teamwork, and augment during peak or elevated workload so long as specific laboratory duties are not affected.
NAS Fallon, NV
C-1.8.6 License, Special License, Skills, Training, and other Certifications:
All drivers must be licensed, in accordance with the vehicle operating laws, regulations, and code for the state in which they will operate equipment and must be/remain in compliance with all such requirements for the duration of their employment under this contract. The Contractor must ensure that drivers required to operate vehicles and equipment on public roads are licensed for the class of vehicle to be operated on such public roads. All service personnel who will operate fuel-servicing vehicles on or off station must hold a current and valid Commercial Driver’s License (CDL) with the appropriate tank truck and HAZMAT endorsements. Specific tasks may require other special licenses, skills, training or certifications. All special licenses and certifications must be included in employee training records and available for inspection by the COR upon request.
C-1.9 Correspondence and Visits:
The Contractor must notify the COR of any and all visits or notice of intent to visit contract management, its employees, or the contracted facilities by any federal, state, local government, base (military) office/agency, union representative, or contract corporate officers. Except for that considered to be company or proprietary documents, the Contractor must provide the COR copies of all correspondence resulting from such visits. The Contractor must establish and maintain a visitor’s log showing name of all visitors, date of visit, time of visit, organization, and reason of visit.
C-1.10 Records Management:
Documents held or generated by the Contractor must be open and readily available for inspection, review, and audit for the duration of the contract and any subsequent and contiguous contract periods. The Contractor must submit reports to the appropriate agency for compliance with Federal, state, and local requirements. In addition, special reports may be requested for audits, inspections, reviews, and research.
Should proprietary company, or non-DOD maintenance and accounting systems be installed by the Contractor, the Contractor must provide continuous secure web access or access to a secure workstation.
Upon termination of the contract, all records except personnel files, training records, Contractor-furnished equipment records, and proprietary company management records must be turned over to DLA Energy.
C-1.11 Labor Reporting:
The Contractor must report all Contractor labor hours (including sub-contractor labor hours) required for performance of services provided under this contract for the Defense Logistics Agency via a secure data collection site. The Contractor is required to completely fill in all required data fields per the paragraph below.
C-1.12 Reporting Inputs:
The reporting will be for the labor executed during the period of performance during each fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data must be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at http://www.sam.gov.
C-2.0 PERFORMANCE REQUIREMENTS
C-2.1 Fuel Operations:
The Contractor must receive, maintain, store, sample and test, internally transfer, and issue petroleum products. The Contractor must be responsible for all fuel-servicing operations and safeguarding facilities, equipment, and fuel products under its control during normal and adverse conditions.
C-2.1.1 Dispatch Center:
Requests for all fuel services must be taken and processed by the fuel dispatch center. Based on the specific request, equipment and personnel must be dispatched and controlled as needed to satisfy the http://www.sam.gov/
NAS Fallon, NV request received. All requests for fuel services must be recorded, monitored, and historical records kept utilizing appropriate software and business systems. The dispatch center must be manned by Contractor personnel during hours of operation as required in Appendix A.
C-2.1.2 Fuel Servicing:
The Contractor must simultaneously issue, defuel, and provide off-station fuel services to aircraft and support equipment by mobile fuel servicing vehicles and portable pantograph/hose systems. Aircraft fuel services must comply with Naval Air (NAVAIR) 00-80T-109, Aircraft Refueling Naval Air Training and Operating Procedures Standardization (NATOPS) Manual, and all other applicable military, federal, and commercial policies regarding the performance of aircraft fuel servicing operations. It is the responsibility of the Contractor to identify situations where the Contractor believes applicable guidance conflicts. However, in the absence of guidance by the Contracting Officer or COR to the contrary, the NATOPS will take precedence over conflicting guidance and or procedures.
C-2.1.2.1 Performance of Services:
The Contractor must provide refueling and defueling services as per Appendix A. The request for service must result in the dispatch and arrival of a truck/operator to the location identified by the requesting activity within the established priority in the Air Operations Instruction or Manual. If an individual request for service encompasses multiple aircraft, the truck/operator must respond to subsequent aircraft in the priority provided by the requesting activities. Truck/operator must not service aircraft to which they are not directed without approval by the dispatch center. The Contractor’s performance is measured from time of request received at the dispatch center to time of arrival to requesting activity location and the same for individual request encompassing multiple aircraft. If an activity submits a complaint, circumstances must be annotated by the dispatch center, in the remarks section of the Fuels Manager Defense (FMD) control log. The COR must evaluate each complaint and identify all contributing facts which may or may not have contributed to mission failure, on a case-by-case basis. If any Government action or lack of action caused unacceptable performance, the delay is not valid and the contractor is responsible to notify the COR. If the complaint is deemed valid and resulted in a mission failure, the COR must notify the Contracting Officer.
C-2.1.3 Direct Refueling Operations (Hot Pits):
The manning crew for refueling services will consist of military personnel to operate and control (deadman operator) at one fuel point with supplemental staffing provided by the squadron(s) being serviced (i.e., plane captain/nozzle operator and fire watch). Operating hours are during daylight hours and must be requested 24 hours in advance. Saturday and Sunday services must be requested with 72 hours advanced notice. In all cases, the contractor must provide an FDSO to operate the pumps.
C-2.1.4 Direct Fuel Servicing Equipment:
The direct refueling system must be inspected and maintained by the contractor. Equipment/system inspections and product sampling/testing must be completed and documented prior to the initial use of the equipment for the duty day.
C-2.1.5 Mobile Fuel Servicing Equipment:
The Contractor must provide the fuel servicing equipment in sufficient numbers to undertake the workload, which includes simultaneous operations. The Contractor must fully maintain all furnished trucks, tractors, equipment fuel tanks, refueling/defueling systems, and components ready for dispatch condition. Equipment inspections and product sampling/testing, i.e., periodic Type "C" product analysis, must be completed and documented prior to the initial dispatch of the equipment for the duty day.
NAS Fallon, NV
C-2.1.6 Portable Pantograph (Hot) Refueling:
The Contractor shall provide mobile hot refueling within the prescribed times in Appendix A under hours of operations and all after-hour refueling requests. Mobile hot refueling is defined as the use of mobile refueling vehicles in conjunction with the use of a mobile pantograph systems, or additional ancillary components (hoses, nozzles, etc.) to refuel aircraft while engines are running.
C-2.1.7 After Hours Notification:
The Contractor must establish an after-hours notification mechanism: a means of being contacted in the event emergent services or workforce augmentation is required without prior coordination/notification.
All services required outside of the normal hours of operation without prior coordination/notification must be met within two (2) hours as measured from the time the Contractor is notified until the operator is in position to perform the service required. If the Contractor is notified in advance of requirements for after-hours service, the Contractor will be in place to perform the required services as required in paragraph C-2.1.2.1. All after hours support will be the Contractor’s responsibility under the Monthly Usage Charge CLIN at no additional cost to DLA Energy.
C-2.1.8 Off Station Operation:
If required, aviation and ground fuel deliveries over public roads to off station locations must be accomplished using equipment that is configured and licensed/permitted for use on public roads. All Federal, state, and local inspections, licensing or permits, and insurance requirements for the equipment used, is the responsibility of the Contractor. Furthermore, the Contractor must ensure that cargo quantities and vehicle weights are adjusted to meet the all Federal, state, and local highway laws, regulations, and codes for traveling over public roads.
C-2.1.9 Jet Fuel Services Data:
The Squadrons and Aircraft Assigned Table, found in Appendix A lists squadrons/aircraft currently assigned to the installation and provides a local picture of the services required on a day-to-day basis.
The Contractor must keep this table, as well as the home station aircraft database, in FMD, current.
Transient aircraft ranging from trainer, fighter series, to the larger military transport requiring multiple truck services are common.
C-2.2 Bulk Storage Operations:
Bulk Storage operations are defined as the receipt, storage, handling, inter-terminal product movement, and issue of capitalized bulk fuel products at the Navy-owned facilities via all modes of conveyance (tank truck and pipeline). The Contractor is responsible for performing bulk fuel operations, system inspections, operator/system maintenance, quality surveillance, inventory accountability and safeguarding fuel supplies under its control during normal and adverse conditions 24 hours a day, seven days a week, year round (24/7). Bulk operations requires a dedicated fuel scheduler to receiving fueling request from customers; scheduling shipments, deliveries, and receipts; making scheduling changes; and creating daily schedules of fuel operations. All assignments and control of qualified personnel will be handled to ensure compliance with approved standards and operating procedures.
C-2.2.1 Bulk Output:
Fuel is issued from bulk storage to refuelers and commercial tank trucks. Except for scheduled maintenance and other occurrences of which the fuel dispatch center has been notified, the Contractor must maintain tank and fill-stand systems in the ready-to-issue mode and work to transfer/issue products on demand.
NAS Fallon, NV
C-2.2.1.1 NAS Fallon:
Bulk fuel consists of consists of one (1) 635,000-gallon and two (2)1,200,000-gallon jet fuel tanks. Bulk ground fuel tankage consists of one (1) 15,000-gallon diesel tank and one (1) 4,000-gallon gasoline MOGAS tank. There are two (2) jet fuel fill-stands at facility 202.
C-2.2.2 Transfers to Refuelers:
The truck fill-stand is a driver-operated, supply on demand or self-service system used to fill refuelers.
Documentation relevant to refueler top-offs and the disposition of those documents must be compiled and controlled in a manner as to ensure compliance with DoD Policy.
C-2.2.3 Receipts of Fuels:
The Contractor must be responsible for all work required and necessary to conduct all receipt related actions in a safe manner.
C-2.2.3.1 NAS Fallon:
Jet fuel is received by commercial pipeline by Kinder Morgan. Ground products, GUR and DS2, are received by commercial tank truck in 3,000-gallon increments for GUR and 7,800-gallon increments for DS2, as product is required. The Contractor shall be responsible for all work, i.e., gauging, truck inspections, sampling, system alignment, documentation, and system monitoring required and necessary to conduct all receipt related actions in a safe manner.
C-2.3 Service Station:
Service station operations, the dispensing of ground products from a fixed facility/system to authorized customers, are conducted at Bldg. 1064. The service stations, automated product storage and dispensing systems, shall be inspected, operator/system maintenance performed, products inventoried, system data collected, documented, and forwarded to fuels accounting, and the station readied for continued customer service for the days and hours reflected in Appendix A. The Contractor shall be responsible for providing the qualified personnel to perform the aforementioned tasks and duties as further defined within this section.
C-2.3.1 Automated Dispensing System Key Management:
The Contractor must be responsible for issuing and revoking keys as required in writing by the COR and in accordance with DLA Energy Policy P-5, Vehicle Identification Link (VIL) Key Encoding, Accountability, and Control and downloading the lock-out list for WEX Cards each week. The Contractor will provide keying services for the keys.
C-2.3.2 Service Station Outage:
In the event of a service station outage, such as a system failure in which the station can be operated manually, the Contractor must establish servicing hours and staff the service station to assist customers and manually document issues/sales/transactions, which will be entered into FMD for billing. Disruption of automated service station function may require the dispensing of products from a ground fuel servicing truck. The Contractor must provide the personnel and equipment to maintain the availability of ground fuel products to its customers and account for the product IAW DLA Energy policy.
C-2.4 Ground Fuels:
Issues or defuels by truck to authorized customers (jet fuel may be used in lieu of diesel). The Contractor must be responsible for performing all ground fuel delivery operations and safeguarding fuel supplies under its control during normal and adverse conditions.
NAS Fallon, NV
C-2.4.1 Equipment:
The Contractor must furnish and maintain ground fuel servicing equipment necessary to undertake the projected workload and include specifications for the proposed equipment in their proposal. The Contractor must fully maintain all equipment and components thereof in a safe, serviceable, and ready for dispatch condition. Equipment inspections must be completed and documented on the vehicle inspection form of each equipment prior to the initial use of the equipment for the duty day. Should they be required at off station locations, this must be accomplished using trucks that are configured and licensed for use on public roads. All Federal, state, and local inspections, permits, licensing and insurance requirements for the truck(s) used on public roads, are the responsibility of the Contractor and must be included under the Monthly Usage Charge CLIN, at no additional cost to DLA Energy.
C-2.4.2 Delivery:
Fuel products must be delivered as required to the authorized activities. Unscheduled requests must be accomplished within the time limits mutually agreed upon by the requesting activity and dispatcher.
C-2.5 Recyclable and Recoverable Fuels:
The Contractor must be responsible for recycling and recovery of aviation and ground fuels within the identified fuel facilities in Appendix A. This includes, but not limited to, quality surveillance samples, facility maintenance, and tank bottoms. The Contractor must be responsible for coordinating with the COR for disposition of all recoverable and recyclable fuel stocks in accordance DLA Policies and Instructions. All products classified as non-reclaimable are collected and disposed of by the Installation.
C-2.6 Product Inventory Accountability:
The Contractor must be responsible for the inventory management of petroleum products held within the facilities, equipment, tanks, and vehicles under Contractor control. The Contractor must provide accurate inventories of all DLA Energy Capitalized Stocks under Contractor control, in accordance with DoDM 4140.25, all applicable DLA Energy and Navy Policies and Instructions, and all clauses/provisions of this contract. The Contractor must be responsible for updating the COR to provide information to DLA Energy on current inventory levels IAW INT- I119.04 Inventory Control Records and Systems of Record.
Any anticipated fuel shortages, based on customer requests, must be reported to the COR immediately.
All product receipts, issues, shipments or transfers, must be properly documented and are auditable by DLA Energy.
C-2.7 Product Quality Surveillance:
The Contractor must be responsible for maintaining the quality of the Capitalized Stocks in accordance with MIL-STD-3004, Department of Defense Standard Practice, and Quality Assurance/Surveillance for Fuels, Lubricants and Related Products; NAVAIR 00-80T-109, Aircraft Refueling NATOPS Manual; and the Contractor developed PQSP.
C-2.7.1 Quality Determination:
No…