Attachment I - AFTER REPAIRS API Internal Inspection Template.docx
DOCX document 208 KB Posted
- Attached to
- POL Tank Inspection LGY
- Solicitation number
- W9128F24Q0013
About this file
This document is an API 653 out-of-service inspection report template for an internal tank inspection. The template includes sections for general tank information, inspection comments on the tank construction, foundation, bottom, shell and appurtenances including piping, coatings and cathodic protection systems. It also includes sections for any repairs completed on the tank along with engineering calculations for shell and bottom thicknesses and recommended future inspection dates. Photographs from the inspection are to be included in an appendix. The related federal contract opportunity is for POL tank inspections at an Army Corps of Engineers facility and has a solicitation number of W9128F24Q0013.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| API-653 Out-Of-Service Inspection | [INSTALLATION] | |
| [DATE] | [DRAFT/FINAL] | [FACILITY NUMBER] |
| API 653 Out-of-Service Final Inspection Report | Installation, State |
US Army Corps of Engineers Omaha District API 653 Out-of-Service Inspection Report - Final
[Location] [Facility Number] [Tank Number]
US Army Corps of Engineers Center of Expertise for Petroleum, Oils and Lubricants
(USACE POL-MCX)
[DATE]
Table of Contents
| ACRONYMS AND ABBREVIATIONS | 4 | |
| GENERAL SUMMARY | 6 | |
| INSPECTION DATE | 7 | |
| STATE REGULATIONS | 7 | |
| PREVIOUS INSPECTION DATES | 7 | |
| RECOMMENDED FUTURE INSPECTION DATES (CALCULATIONS SHALL BE PROVIDED) | 7 | |
| GENERAL TANK INFORMATION | 8 | |
| A. | GENERAL PROJECT INFORMATION | 9 |
| 1. | API 653 Inspection | 9 |
| 2. | Site Information | 9 |
| B. | TANK INSPECTION COMMENTS | 9 |
| 1. | Tank Construction | 9 |
| 2. | Tank Foundation | 9 |
| 3. | Tank Bottom | 9 |
| 4. | Tank Shell | 9 |
| 5. | Tank Appurtenances | 9 |
| 6. | Tank Coating | 9 |
| 7. | Tank Piping System | 9 |
| 8. | Fire Protection System | 9 |
| 9. | Floating Roof | 9 |
| 10. | Secondary Containment | 10 |
| 11. | Cathodic Protection | 10 |
| C. | TANK REPAIRS | 10 |
| 1. | TITLE OF TANK REPAIR | 10 |
| 2. | TITLE OF TANK REPAIR | 10 |
| 3. | TITLE OF TANK REPAIR | 11 |
| 4. | TITLE OF TANK REPAIR | 11 |
| APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS | 12 | |
| SHELL THICKNESS CALCULATION | 12 | |
| NEXT INSPECTION | 13 | |
| SHELL THICKNESS | 14 | |
| CRITICAL ZONE SHELL THICKNESS | 15 | |
| BOTTOM THICKNESS | 16 | |
| BOTTOM CRITICAL ZONE THICKNESS | 17 | |
| APPENDIX B: PHOTOGRAPHS | 18 |
ACRONYMS AND ABBREVIATIONS
| API | American Petroleum Institute |
| ASME | American Society of Mechanical Engineers |
| ASNT | American Society of Non-Destructive Testing |
| ATG | Automatic Tank Gauge |
| BBL | Barrel |
| CFR | Code of Federal Regulations |
| CP | Cathodic Protection |
| DFT | Dry Film Thickness |
| HLA | High Level Alarm |
| HLCS | High Level Control Shutoff |
| HHLA | High-High Level Alarm |
| LLA | Low Level Alarm |
| LLLA | Low-Low Level Alarm |
| MFL | Magnetic Flux Leakage |
| MT | Magnetic Particle Testing |
| NACE | National Association of Corrosion Engineers |
| NDT | Non-Destructive Testing |
| NFPA | National Fire Protection Association |
| PSI | Pounds per Square Inch |
| PT | Penetrant Testing |
| P/V | Pressure/Vacuum |
| RP | Recommended Practice |
| PST | Product Saver Tank |
| RT | Radiography Testing |
| TML | Thickness Measurement Location |
| TRV | Thermal Relief Valve |
| UFC | Unified Facilities Criteria |
| UFGS | Unified Facilities Guide Specifications |
| ULS | Ultra Low Sulfur |
| UT | Ultrasonic Testing |
| VT | Visual Testing |
STORAGE TANK NO. [ XXXXX]
SUITABILITY FOR SERVICE MEMORANDUM
Out-of-Service API 653 Tank Inspection and Repair Contract No. [XXXXX] [Location]
Tank [XXX] was inspected [XXX]. An API 653 Out-of-Service Inspection was performed by [XXX]. This tank report is an Appendix to the original API 653 tank report.
The tank is in suitable condition for return to service. All mandatory repairs have been completed.
Mandatory Repairs
[Description of all mandatory repairs that were completed along with a suitable for continued service time frame in years]
Other Repairs and Maintenance
[Description of all other repairs and maintenance items that were completed]
Inspection Intervals
The next In-Service Inspection should occur in [XX years], and the next In-Service Inspection with UT thickness measurements should occur in [XX years] in accordance with API 653.
The next Out-of-Service inspection should occur in [XX years].
This storage tank suitability for service evaluation has been completed in accordance with the requirements of API STD 653, [XX] Edition, [Date].
Prepared by:
[Name] [Title] [Company] API 653 Certified Inspector No. [XXXX]
GENERAL SUMMARY
Summary of Inspection
INSPECTION DATE
API Out-of-Service (Internal) Inspection Date: 1 January 20XX Equipment Used:
| Manufacturer: |
| Model Number: |
| Calibration Method: |
Inspector(s):
STATE REGULATIONS
| State Regulation for API In-Service Tank Inspections | XX Years | |
| State Regulation for API Out-of-Service Tank Inspections | XX Years |
NOTE: If there are no state regulations for tank inspections then N/A shall reside in-place of the number of years between inspections. If state regulations reside, the recommended future inspections dates shall be based on whichever is more stringent between the API inspector’s calculations and the State regulations.
PREVIOUS INSPECTION DATES
| API Out-of-Service (Internal) Inspection Date: | 1 January 20XX |
| API In-Service (External) Inspection Date: | 1 January 20XX |
RECOMMENDED FUTURE INSPECTION DATES (CALCULATIONS SHALL BE PROVIDED)
| API Out-of-Service (Internal) Inspection Date: | 1 January 20XX |
| API In-Service (External) Inspection Date: | 1 January 20XX |
[Name] [Title] [Company] API 653 Certified Inspector No. [XXXX]
GENERAL TANK INFORMATION
| ITEM |
| DESCRIPTION |
Owner
Location
Facility Number
Tank Number
State / Country
City
Inspection Date
Tank Manufacturer
Design Standard
Date of Construction
Tank Contents
Tank Serial Number
Tank Diameter
Shell Height
Product Height
Tank Capacity
Foundation
| Construction |
| Bottom |
Shell
Floating Roof
Fixed Roof
| Material |
| Bottom |
Shell
Floating Roof
Fixed Roof
Cathodic Protection
Interior Coating System
Exterior Coating System
Level Gauging
Overfill Protection
| Piping |
| Receipt |
Issue
Low Suction
Water Draw-Off
Level Alarms
Type of Internal Floating Roof
A. GENERAL PROJECT INFORMATION
1. API 653 Inspection
XXXX
2. Site Information
XXXX
B. TANK INSPECTION COMMENTS
1. Tank Construction
XXXX
2. Tank Foundation
XXXX
3. Tank Bottom
XXXX
4. Tank Shell
XXXX
5. Tank Appurtenances
a. Internal Floating Roof
XXXX
b. Geodesic Dome Roof
XXXX
c. Gauging
XXXX
d. Level Alarms
XXXX
e. Stairs and Platforms
XXXX
f. Grounding and Bonding
XXXX
6. Tank Coating
XXXX
7. Tank Piping System
XXXX
8. Fire Protection System
XXXX
9. Secondary Containment
XXXX
10. Cathodic Protection
XXXX
C. TANK REPAIRS
1. TITLE OF TANK REPAIR
Observation: Description of tank repair that was completed
2. TITLE OF TANK REPAIR
Observation: Description of tank repair that was completed
3. TITLE OF TANK REPAIR
4. TITLE OF TANK REPAIR
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
*NOTE: APPENDIX A CALCULATIONS AND DRAWINGS SHALL ONLY BE COMPLETED IF TANK REPAIRS EFFECTED THE EXISTING API 653 REPORT FINDINGS.
SHELL THICKNESS CALCULATION
NEXT INSPECTION
SHELL THICKNESS
CRITICAL ZONE SHELL THICKNESS
BOTTOM THICKNESS
BOTTOM CRITICAL ZONE THICKNESS
APPENDIX B: PHOTOGRAPHS
E.1: Tank XX North View E.2: Tank XX South View
E.3: Tank XX East View E.4: Tank XX West View
E.5: Picture Description E.6: Picture Description
E.7: Picture Description E.8: Picture Description
E.9: Picture Description E.10: Picture Description
E.11: Picture Description E.12: Picture Description
E.13: Picture Description E.14: Picture Description
E.15: Picture Description E.16: Picture Description image3.jpeg image4.jpeg image5.jpeg image1.png image2.jpeg image6.gif
File details come from the government source that posted it. Updated .