This document is a Stormwater Quality Management Plan (SWQMP) Standard Copy template adopted by the County of San Diego for managing stormwater and urban runoff from land development activities in compliance with the County's Watershed Protection Ordinance and regional MS4 Permit requirements. The specific project involves a Shade Structure with Miscellaneous Electrical installation at 12122 Canyonside Park Driveway, San Diego, CA 92129 (APN 509-333-10-00), prepared by Jarrett Linn of Nasland Engineering on May 14, 2026. The project is managed by the County of San Diego Parks and Recreation Department. The SWQMP framework requires project applicants to identify and implement Best Management Practices (BMPs) across three main categories: baseline BMPs for existing and proposed site features, source control BMPs for pollutant-generating sources, and temporary construction phase BMPs for erosion and sediment control.
For this specific project, the selected BMPs include erosion control measures for disturbed slopes using hydroseeding and bonded fiber matrix during appropriate seasons, erosion control for flat areas, silt fence and fiber rolls for sediment control, energy dissipation outlet protection, stabilized construction entrance to prevent sediment tracking, material delivery and storage management, and spill prevention and control measures. The SWQMP also requires storm drain inlet protection and comprehensive waste management protocols including concrete waste, solid waste, and sanitary waste management. The preparer, a Professional Engineer (PE Number C84231), certifies that the plan complies with the BMP Design Manual standards and accurately reflects the proposed project's stormwater management approach. All selected BMPs must be incorporated into the construction plan set, and the County retains discretion to request additional justifications for any BMPs not fully implemented or for infeasibility determinations.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
County of San Diego Stormwater Quality Management Plan (SWQMP) For Standard Projects Use for all Standard Projects (see Storm Water Intake Form, Part 5)
Preparation Date: Template Date: January 28, 2019 LUEG: SW Standard SWQMP P a g e | i
COUNTY ACCEPTED
SWQMP Approved By: Approval Date:
* Note* Approval does not constitute compliance with regulatory requirements.
Project Information Project Name
Project Address Assessor’s Parcel # (APN)
Permit # / Record ID
Project Applicant / Project Proponent Name
Address Phone Email:
SWQMP Preparer Name
Company (if applicable) Address
Phone Email:
PE Number (if applicable)
Preparer's Certification I understand that the County of San Diego has adopted minimum requirements for managing urban runoff, including storm water, from land development activities, as described in the County of San Diego BMP Design Manual. The BMP Design Manual is a design manual for compliance with local County of San Diego Watershed Protection Ordinance (Sections 67.801 et seq.) and regional MS4 Permit (California Regional Water Quality Control Board San Diego Region Order No. R9-2013-0001, as amended by Order No. R9-2015-0001 and Order No. R9-2015-0100) requirements for storm water management.
This SWQMP is intended to comply with applicable requirements of the BMP Design Manual. I certify that it has been completed to the best of my ability and accurately reflects the project being proposed and the applicable BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the plan check review of this SWQMP by County staff is confined to a review and does not relieve me as the person in charge of overseeing the selection and design of storm water BMPs for this project, of my responsibilities for project design.
Signature Date
Template Date: January 28, 2019 Preparation Date:
LUEG: SW Standard SWQMP P a g e | ii
General Directions Note: These directions may be omitted from the final SWQMP submittal.
See Standard SWQMP Form Instructions for additional, more detailed guidance and explanation of terms.
Attachment 1: Stormwater Intake Form (Required) Include a copy of your completed Storm Water Intake Form as Attachment 1 to this submittal.
Table 1: BMPs for Existing Natural Features and Proposed Site Features Complete Table 1 to document existing and proposed site features and the BMPs to be implemented for them. Except where otherwise noted, all BMPs must be implemented where applicable and feasible.
• Full implementation means a BMP will be fully implemented everywhere that the feature exists on the site. For example, all existing water bodies will be fully conserved.
• Partial implementation means that some BMP implementation will occur, but the BMP will NOT be fully implemented everywhere that the feature exists. For example, only one of two existing water bodies will be conserved, or not all rooftop runoff will be dispersed to vegetated areas.
• Infeasible means a BMP cannot be either partially or fully implemented. Infeasibility can be based both on technical factors (soil type, site layout, etc.) and economic considerations (material or labor costs, etc.). However, technical factors should generally be given greater weight.
Provide justifications for not fully implementing BMPs in Table 4, Part 1.
Table 2: Source Control BMPs for Pollutant-generating Sources All projects must complete Table 2, Part A. Part B is required unless the project is a Small Residential Project OR none of the features listed in the table are proposed for the project. Small Residential Projects are those requiring either: a Building Permit, Minor Residential Grading Permit, or Site Plan Permit for a single family home; or a Tentative Parcel Map Permit for up to 4 single family homes and a remainder parcel.
Each BMP must be implemented where applicable and feasible. Leaving a BMP unselected means it will not be implemented (either partially or fully). Provide infeasibility and partial feasibility justifications in Table 4, Part 1. Also describe in Table 4, Part 1 any proposed sources and/or BMPs not listed in Table 3.
If requested, complete and submit a Source Control BMP Worksheet (Attachment 3).
Table 3: Temporary Construction Phase BMPs Complete Table 3 to document which BMPs will be implemented for each construction activity on the site.
For each applicable activity, all BMPs listed must be fully implemented where applicable and feasible.
Provide justifications for not fully implementing BMPs in Table 4, Part 2.
Table 4: Required Explanations Use Table 4 to provide justifications for Table 1, 2, and 3 BMPs as shown below.
Feature or Activity Mandatory Justification Justify if Requested
• Table 1 and 2 Site Features & Sources Any feature or activity for which NO
BMPs are selected (you must explain why all BMPs are infeasible)
Individual BMPs that will either not be implemented, or will only be partially implemented
• Table 3 Construction Activities
Table 5: Construction Plan Set Requirements Complete Table 5 to verify that the construction plans incorporate all applicable site features, activities, and BMPs identified in this SWQMP (Tables 1, 2, and 3).
Preparation Date: Template Date: January 28, 2019 LUEG: SW Standard SWQMP P a g e | 1
Table 1 – Baseline BMPs for Existing and Proposed Site Features Site Features Select each feature that applies.
BMP Implementation Describe BMP implementation for each selected site feature.
Group 1: Existing Natural Site Features [See BMPDM Sections 4.3.1 and 4.3.2]
Maintain & conserve natural features (SD-G)
Establish buffers for waterbodies
(SD-H)
Full Partial Full Partial
☐ Natural waterbodies ☐ ☐ ☐ ☐ ☐ Natural storage reservoirs
& drainage corridors ☐ ☐
☐ Natural areas, soils, & vegetation (incl. trees) ☐ ☐
Group 2: Common Impervious Outdoor Site Features [See BMPDM Sections 4.3.3 and 4.3.5]
Disperse impervious areas
(SD-B)
Use permeable materials
(SD-D)
Minimize impervious areas
(SD-I)
Full Partial Full Partial ☐ Check here to confirm that impervious surfaces have been minimized where applicable and feasible for all outdoor impervious areas. If not, explain in Table 4.
☐ Streets and roads ☐ ☐ ☐ ☐ ☐ Sidewalks & walkways ☐ ☐ ☐ ☐ ☐ Parking areas & lots ☐ ☐ ☐ ☐ ☐ Driveways ☐ ☐ ☐ ☐
☐ Patios, decks, & courtyards ☐ Hardcourt recreation areas
Group 3: Other Outdoor Site Features [See BMPDM Sections 4.2.6, 4.3.4, 4.3.5, 4.3.7, and 4.3.8]
☐ Rooftop areas Disperse rooftop runoff
(SD-B)
Install green roofs (optional; SD-C)
Use rain barrels to capture runoff
(optional; SD-E) Full Partial Full Partial Full Partial
☐ Landscaped areas Use water-efficient landscaping
(SD-J)
Install efficient irrigation systems
(SD-K)
Minimize erosion of slopes and surfaces
(SD-L)
Full Partial Full Partial Full Partial
☐ Water features (pools, spas, etc.)
Provide a designated washing area (SC-A)
Drain feature to the sanitary sewer (if allowed) (SC-B)
Drain feature to a stormwater BMP
(SC-C)
Full Partial Full Partial Full Partial
Note: Table 4 justifications are required for any feature not selecting at least one BMP (either full or partial implementation). For Group 2 features this means not selecting either SD-B or SD-D. Additional justifications may be required on request by County staff. Also use Table 4 to describe sources or BMPs other than those listed.
LUEG: SW Standard SWQMP P a g e | 2
Table 2 –Baseline BMPs for Pollutant-generating Sources (Group 4) A. Requirements for Documentation Select either or both as applicable.
Completion of Part B is not required because:
☐ This is a Small Residential Project, OR
☐ None of these sources or features are proposed.
☐ Source Control BMP Requirements Worksheet E.1-1 (SC in Appendix E of the BMP Design Manual) is included as Attachment 3 (optional unless requested by County staff).
B. Sources and BMPs Select all proposed sources and features below. Then select the BMPs on the right to be implemented for each.
SC-B SC-C SC-D SC-E SC-F SC-G SC-H
Plumb to sanitary sewer
Drain feature to a pervious area
Provide containment for spills and discharges
Prevent contact with rainfall
Isolate flows from adjacent areas Prevent wind dispersal
Label with stencils or signs
Common Source Areas ☐ Trash & Refuse Storage ☐ --- ☐ ☐ ☐ ☐ --- ☐ Materials & Equipment Storage ☐ --- ☐ ☐ ☐ ☐ --- ☐ Loading & Unloading ☐ --- ☐ ☐ ☐ --- --- ☐ Fueling ☐ --- ☐ ☐ ☐ --- --- ☐ Maintenance & Repair ☐ --- ☐ ☐ ☐ --- --- ☐ Vehicle & Equipment Cleaning ☐ --- ☐ ☐ ☐ --- --- ☐ Food Preparation or Service ☐ --- ☐ ☐ ☐ --- ---
Distributed Features ☐ Storm drain inlets & catch basins --- --- --- --- --- --- ☐
☐ Interior floor drains and sumps ☐ --- --- --- --- --- --- ☐ Drain lines (air conditioning, etc.) ☐ ☐ ☐ --- --- --- --- ☐ Fire test sprinkler discharges ☐ ☐ ☐ --- --- --- ---
Provide the following in Table 4, Part 1: (1) justification of any source area or feature with NO BMPs selected, (2) justification of individual unselected BMPs if requested by County staff, and (3) identification of any proposed pollutant-generating sources and BMPs not listed here.
Note: Pollutant-generating sources and features may not discharge directly to the MS4.
LUEG: SW Standard SWQMP P a g e | 3
Table 3 –Minimum Construction Stormwater BMPs
Minimum Required BMPs by Activity Type Select all applicable activities and at least one BMP for each
References
Caltrans1 County of San
Diego
☐ Erosion Control for Disturbed Slopes (choose at least 1 per season) ☐ Vegetation Stabilization Planting2 (Summer) SS-2, SS-4 ☐ Hydraulic Stabilization Hydroseeding6 (Summer) SS-4 ☐ Bonded Fiber Matrix or Stabilized Fiber Matrix3 (Winter) SS-3 ☐ Physical Stabilization Erosion Control Blanket7 (Winter) SS-7
☐ Erosion control for disturbed flat areas (slope < 5%) ☐ County Standard Lot Perimeter Protection Detail SC-2 PDS 6594 ☐ Use of Item A erosion control measures on flat areas SS-3, SS-4, SS-7 ☐ County Standard Desilting Basin (must treat all site runoff) SC-2 PDS 6605 ☐ Mulch, straw, wood chips, soil application SS-6, SS-8
☐ Energy dissipation (required to control velocity for concentrated runoff or dewatering discharge) ☐ Energy Dissipater Outlet Protection SS-10 RSD D-406
☐ Sediment control for all disturbed areas ☐ Silt Fence SC-1 ☐ Fiber Rolls (Straw Wattles) SC-5 ☐ Gravel & Sand Bags SC-6, SC-8 ☐ Dewatering Filtration NS-2 ☐ Storm Drain Inlet Protection SC-10 ☐ Engineered Desilting Basin (sized for 10-year flow) SC-2
☐ Preventing offsite tracking of sediment ☐ Stabilized Construction Entrance TC-1 ☐ Construction Road Stabilization TC-2 ☐ Entrance/Exit Tire Wash TC-3 ☐ Entrance/Exit Inspection & Cleaning Facility TC-1 ☐ Street Sweeping and Vacuuming SC-7
☐ Materials Management ☐ Material Delivery & Storage WM-1 ☐ Spill Prevention and Control WM-4
☐ Waste Management7
☐ Waste Management Concrete Waste Management WM-8 ☐ Solid Waste Management WM-5 ☐ Sanitary Waste Management WM-9 ☐ Hazardous Waste Management WM-6
1 See Caltrans 2017 Storm Water Quality Handbooks, Construction Site BMP Manual, available at:
(http://www.dot.ca.gov/hq/construc/stormwater/manuals.htm) 2 Planting or Hydroseeding may be installed between May 1st and August 15th. Slope irrigation must be in place and operable for slopes >3 feet. Vegetation must be watered and established prior to October 1st. A contingency physical BMP must be implemented by August 15th if vegetation is not established by that date.
If landscaping is proposed, erosion control measures must also be used while landscaping is being established. Established vegetation must have a subsurface mat of intertwined mature roots with a uniform vegetative coverage of 70 percent of the natural vegetative coverage or more on all disturbed areas.
3 All slopes over three feet must have established vegetative cover prior to final permit approval.
4 County PDS 659. Standard Lot Perimeter Protection Design System (Bldg. Division) 5 County PDS 660. County Standard Desilting Basin for Disturbed Areas of 1 Acre or Less Bldg. Division 6 Regional Standard Drawing D-40 – Rip Rap Energy Dissipater (also acceptable for velocity reduction) 7 Applicants are responsible to apply appropriate BMPs for specific wastes (e.g., BMP WM-8 for concrete).
http://www.dot.ca.gov/hq/construc/stormwater/manuals.htm
Template Date: January 28, 2019 Preparation Date:
LUEG: SW Standard SWQMP P a g e | 4
Table 4 – Required Explanations
Part 1: Permanent Post-construction BMPs (from Tables 1 and 2)
• Required Justifications: If NO BMPs are selected for a source or feature, justify why all BMPs are either not applicable or are infeasible. For Group 2 features NO BMPs means not selecting either SD-B or SD-D.
• If Requested: Justify why individual BMPs will not be implemented or will only be partially implemented.
• Additional Explanation: Describe any proposed features and/or BMPs not listed in Tables 1 or 2.
BMP-Feature Combination Explanation
Feature
BMP
Feature
BMP
Feature
BMP
Part 2: Justifications for Temporary Construction Phase BMPs (from Table 3)
• Required Justifications: Justify all construction activity types for which NO BMPs were selected.
• If Requested: Justify why specific individual BMPs were not selected.
• Additional Explanation: Describe any proposed features and/or BMPs not listed in Table 3.
BMP-Activity Combination Explanation
Activity Type
BMP
Activity Type
BMP
Table 5 – Construction Plan Set Requirements8
Use this checklist to confirm that the required information is included on the construction plans.
☐ Include all source control and site design measures described in the SWQMP.
☐ Include all construction BMPs described in the SWQMP.
8 For Building Permit Applications, refer to Form PDS 272, https://www.sandiegocounty.gov/content/dam/sdc/pds/docs/pds272.pdf
| Project Name: Shade Structure with Miscellaneous Electrical |
| Project Address: 12122 Canyonside Park Driveway |
| Assessors Parcel APN: 509-333-10-00 |
| Permit Record ID: San Diego, CA 92129 |
| Name: County of San Diego, Parks and Recreation |
| Address: 5500 Overland Avenue #410, San Diego, CA 92123 |
| Phone: (877) 565-3600 |
| Email: |
| Name_2: Jarrett Linn |
| Company if applicable: Nasland Engineering |
| Address_2: 4740 Ruffner Street, San Diego CA 92111 |
| Phone_2: (858)292-7770 |
| Email_2: jarrettl@nasland.com |
| PE Number if applicable: C84231 |
| Date: 5/14/2026 |
| Check here to confirm: On |
| Source Control BMP Requirements Worksheet: Off |
| This is a Small Residential Project OR: Off |
| None of these sources or features are: Off |
| Materials Equipment Storage: Off |
| Loading Unloading: Off |
| Fueling: Off |
| Maintenance Repair: Off |
| Vehicle Equipment Cleaning: Off |
| Food Preparation or Service: Off |
| Storm drain inlets catch basins: On |
| Interior floor drains and sumps: Off |
| Drain lines air conditioning etc: Off |
| Fire test sprinkler discharges: Off |
| Erosion Control for Disturbed Slopes choose at least 1 per season: On |
| Vegetation Stabilization Planting2 Summer: Off |
| Hydraulic Stabilization Hydroseeding6 Summer: On |
| Bonded Fiber Matrix or Stabilized Fiber Matrix3 Winter: On |
| Physical Stabilization Erosion Control Blanket7 Winter: Off |
| Erosion control for disturbed flat areas slope 5: On |
| County Standard Lot Perimeter Protection Detail: Off |
| Use of Item A erosion control measures on flat areas: On |
| County Standard Desilting Basin must treat all site runoff: Off |
| Mulch straw wood chips soil application: Off |
| Energy dissipation required to control velocity for concentrated runoff or dewatering discharge: On |
| Energy Dissipater Outlet Protection: On |
| Sediment control for all disturbed areas: On |
| Silt Fence: On |
| Fiber Rolls Straw Wattles: On |
| Gravel Sand Bags: Off |
| Dewatering Filtration: Off |
| Storm Drain Inlet Protection: Off |
| Engineered Desilting Basin sized for 10year flow: Off |
| Preventing offsite tracking of sediment: On |
| Stabilized Construction Entrance: On |
| Construction Road Stabilization: Off |
| EntranceExit Tire Wash: Off |
| EntranceExit Inspection Cleaning Facility: Off |
| Street Sweeping and Vacuuming: Off |
| Materials Management: On |
| Material Delivery Storage: On |
| Spill Prevention and Control: On |
| Waste Management7: On |
| Waste Management Concrete Waste Management: On |
| Solid Waste Management: On |
| Sanitary Waste Management: On |
| Hazardous Waste Management: Off |
| Date1_af_date: 05/14/2026 |
| Trash Refuse Storage: Off |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Yes |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |
| Check Box5: Off |
| Check Box10: Off |
| Check Box46: Off |
| Check Box47: Off |
| Check Box48: Yes |
| Check Box49: Off |
| Check Box50: Off |
| Check Box51: Off |
| Text47: |
| Text48: |
| Text49: |
| Check Box54: Off |
| Check Box55: Off |
| Check Box56: Off |
| Check Box57: Off |
| Check Box58: Off |
| Check Box59: Yes |
| Check Box60: Off |
| Check Box61: Off |
| Check Box62: Off |
| Check Box63: Off |
| Check Box64: Off |
| Check Box65: Off |
| Check Box68: Off |
| Check Box69: Off |
| Check Box70: Off |
| Check Box71: Off |
| Check Box72: Off |
| Check Box73: Off |
| Check Box74: Off |
| Check Box75: Off |
| Check Box76: Off |
| Check Box77: Off |
| Check Box78: Off |
| Check Box79: Off |
| Check Box80: Off |
| Check Box81: Off |
| Check Box82: Off |
| Check Box83: Off |
| Check Box84: Off |
| Check Box85: Off |
| Check Box86: Off |
| Check Box87: Off |
| Check Box88: Off |
| Check Box89: Off |
| Check Box66: Off |
| Check Box67: Off |
| Check Box90: Off |
| Check Box91: Yes |
| Check Box92: Off |
| Check Box52: Off |
| Check Box53: Off |
| Check Box93: Off |
| Check Box94: Off |
| Check Box95: Off |
| Check Box96: Off |
| Check Box97: Off |
| Check Box98: Off |
| Check Box99: Yes |
| Check Box100: Off |
| Check Box101: Yes |
| Check Box102: Off |
| Check Box103: Yes |
| Check Box104: Off |
| Check Box105: Off |
| Check Box106: Off |
| Check Box107: Off |
| Check Box108: Off |
| Check Box109: Off |
| Check Box110: Off |
| Check Box200: Off |
| Check Box201: Yes |
| Check Box202: Yes |
| Check Box203: Off |
| Check Box204: Off |
| Check Box205: Yes |
| Check Box206: Off |
| Check Box207: Off |
| Check Box208: Off |
| Check Box209: Off |
| Check Box210: Off |
| Check Box211: Yes |
| Feature: |
| BMP: |
| Part 1 Permanent Postconstruction BMPs from Tables 1 and 2 Required Justifications If NO BMPs are selected for a source or feature justify why all BMPs are either not applicable or are infeasible For Group 2 features NO BMPs means not selecting either SDB or SDD If Requested Justify why individual BMPs will not be implemented or will only be partially implemented Additional Explanation Describe any proposed features andor BMPs not listed in Tables 1 or 2 BMPFeature Combination ExplanationRow1: |
| Feature_2: |
| BMP_2: |
| Part 1 Permanent Postconstruction BMPs from Tables 1 and 2 Required Justifications If NO BMPs are selected for a source or feature justify why all BMPs are either not applicable or are infeasible For Group 2 features NO BMPs means not selecting either SDB or SDD If Requested Justify why individual BMPs will not be implemented or will only be partially implemented Additional Explanation Describe any proposed features andor BMPs not listed in Tables 1 or 2 BMPFeature Combination ExplanationRow2: |
| Feature_3: |
| BMP_3: |
| Part 1 Permanent Postconstruction BMPs from Tables 1 and 2 Required Justifications If NO BMPs are selected for a source or feature justify why all BMPs are either not applicable or are infeasible For Group 2 features NO BMPs means not selecting either SDB or SDD If Requested Justify why individual BMPs will not be implemented or will only be partially implemented Additional Explanation Describe any proposed features andor BMPs not listed in Tables 1 or 2 BMPFeature Combination ExplanationRow3: |
| Activity Type: |
| BMP_4: |
| Part 2 Justifications for Temporary Construction Phase BMPs from Table 3 Required Justifications Justify all construction activity types for which NO BMPs were selected If Requested Justify why specific individual BMPs were not selected Additional Explanation Describe any proposed features andor BMPs not listed in Table 3 BMPActivity Combination ExplanationRow1: |
| Activity Type_2: |
| BMP_5: |
| Part 2 Justifications for Temporary Construction Phase BMPs from Table 3 Required Justifications Justify all construction activity types for which NO BMPs were selected If Requested Justify why specific individual BMPs were not selected Additional Explanation Describe any proposed features andor BMPs not listed in Table 3 BMPActivity Combination ExplanationRow2: |
| Include all source control and site design measures described in the SWQMP: On |
| undefined_49: On |